BuildNYC
Office, 20+ stories, with or without commercial
Korea Society
350 MADISON AVENUE · BIN 1035377
💬 Discuss this project
1922Year Built
25Stories
O4Building Class
C5-3Zoning
380,776 sfGross Floor Area
2Units
LL97 Covered0 Active ViolationsFISP: SAFE
Office, 20+ stories, with or without commercial · Owner of record: 350 Madison Acquisition · 18,800 sf lot · 20.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPaul Stuart3p · 1 filing · 20 docs
Floor 20Alkeon Capital5p · 1 filing · 3 docs
Floor 19Alkeon Capital5p · 1 filing · 3 docs
Floor 18Alkeon Capital7p · 2 filings · 10 docs
Floor 17Rfr Realty LLC9p · 1 filing · 5 docs
Floor 16
Floor 15AlphaSights55p · 5 filings · 20 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8Certares Management, LLC.2p · 1 filing · 16 docs
Floor 7Rfr Realty LLC14p · 3 filings · 20 docs
Floor 6Marsh & McLennan Companies (MMC)34p · 5 filings · 20 docs
Floor 5
Floor 4
Floor 3Paul Stuart2p · 1 filing · 9 docs
Floor 2Paul Stuart124p · 9 filings · 20 docs
Floor 1Paul Stuart121p · 6 filings · 20 docs
MezzaninePaul Stuart87p · 5 filings · 20 docs
CellarPaul Stuart120p · 5 filings · 20 docs
Site & exterior350 Madison Acquisition LLC5p · 1 filing · 15 docs
Filed — no permit issuedIRA Condition Assessment1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
350 Madison37703/21/2026
350 Madison Acquisition27503/22/2026
RFR Realty12910/07/2026
350 Investors4103/21/2026
RFR2107/08/2026
Max Capital1703/21/2026
350 Madison Partners Lessee1303/21/2026
350 Madison LLC Max Capital Man1203/21/2026
237 Park Holdings603/21/2026
Hines303/21/2026
Advance Magazine Publishers303/21/2026
JRD Electrifc103/22/2026
350 Madison Partner Lesse103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Juan Kee Feng103/21/2026
Metropolis Group8003/21/2026
LMS-Ace Services203/21/2026
Codegreen403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tri-Star ConstructionGeneral Contractor1407/08/2026
Allran Electric of N.YElectrical503/21/2026
James E FitzgeraldGeneral Contractor507/08/2026
JT Magen & CompanyGeneral Contractor403/21/2026
Abco-Peerless SprinklerFire Protection307/08/2026
Benjamin Group EnterprisesGeneral Contractor307/08/2026
PSI PartnersFire Protection307/08/2026
MKZ Construction GroupGeneral Contractor303/21/2026
Structure ToneGeneral Contractor310/04/2026
Advanced PlumbingPlumbing207/08/2026
Par Plumbing CoPlumbing207/08/2026
City/Suburban PlumbingPlumbing207/08/2026
Standard Fire ProtectionFire Protection107/08/2026
JRD ElectricElectrical103/22/2026
Par Plumbing Co., Inc.oFire Protection103/21/2026
Geoffrey A. Lagas & AssociatesPlumbing107/08/2026
Par Fire ProtectionFire Protection107/08/2026
Concord Electrical Contracting CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EDG2578208/11/2022
Atlantic Engineeringlabor13811003/30/2022
PSI Agency2541803/15/2022
DNA Controlled Inspection554603/03/2022
Etna Consulting1869312/08/2021
AR-Tech Engineering6659106/03/2021
Socotec Engineering4983302/09/2021
Building Lifecycle
All (233)Filed (48)Permit Issued (37)Signed Off (25)Facade (FISP) (15)Violation (60)Inspection (16)Objection (2)Special Inspection (30)
09/16/2026
Filed — Alteration
IRA to assist with Condition Assessment
M01460951-I1
03/05/2024
Signed off — Alteration
M00416236-I1
08/16/2023
Signed off — Alteration
Installation of new plumbing piping and fixtures. No change to use, egress or occupancy.
M00516466-I1
12/13/2022
Cycle 9 facade report submitted
12/13/2022
Cycle 9 facade report signed — SAFE
11/16/2022
Cycle 9 facade inspection completed
09/07/2022
Signed off — Alteration
PROPOSED FACADE REPAIRS AS PER PLANS FILED HERWEITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00473202-I1
08/29/2022
Special inspection requirement — Final
Anthony Stasio
08/29/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
08/29/2022
Special inspection requirement — Masonry
Anthony Stasio
08/22/2022
Objection resolved — Addressed
08/21/2022
Objection raised — Admin
08/16/2022
Signed off — Alteration
INSTALL NEW SPRINKLER HEADS IN 6TH FLOOR OFFICE SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00578019-I1
08/11/2022
Filed — Alteration
PROPOSED FACADE REPAIRS AS PER PLANS FILED HERWEITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00473202-P1
08/04/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/19/2022
Signed off — Alteration
INSTALL NEW PANTRY FIXTURES IN 6TH FLOOR OFFICE SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00578013-I1
06/27/2022
Special inspection requirement — Masonry
Anthony Stasio
06/27/2022
Special inspection requirement — Final
Anthony Stasio
06/27/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Stasio
06/22/2022
Signed off — Alteration
INFILL OF EXISTING SECOND FLOOR STAIR OPENING AND DUMBWAITER OPENING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00592574-I1
05/11/2022
Signed off — Alteration
INSTALL PLUMBING FIXTURES AND RELATED PIPING IN 15TH FLOOR OFFICE SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00582461-I1
05/06/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/28/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/20/2022
Special inspection requirement — Final
FAWZY SALIB
04/18/2022
Signed off — Alteration
M00577979-I1
04/18/2022
Signed off — Alteration
New steel framing for new stair landing
M00516582-I1
04/18/2022
Filed — Alteration
M00516399-P2
04/18/2022
Signed off — Alteration
INSTALL NEW DIFFUSERS, DUCTWORK AND COMPONENTS IN 6TH FLOOR OFFICE SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00578002-I1
04/18/2022
Signed off — Alteration
M00593285-I1
04/14/2022
Signed off — Alteration
INTERIOR RENOVATION TO 15TH FLOOR OFFICE SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00582423-I1
04/01/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/31/2022
Special inspection requirement — Post-installed Anchors
Christopher O'Malley
03/31/2022
Special inspection requirement — Interior lighting power
Christopher O'Malley
03/31/2022
Special inspection requirement — Final
Christopher O'Malley
03/31/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher O'Malley
03/31/2022
Special inspection requirement — HVAC-R and service water heating equipment
Christopher O'Malley
03/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher O'Malley
03/31/2022
Special inspection requirement — Mechanical Systems
Christopher O'Malley
03/31/2022
Special inspection requirement — Shutoff dampers
Christopher O'Malley
03/31/2022
Special inspection requirement — Maintenance information
Christopher O'Malley
03/31/2022
Special inspection requirement — Electrical motors and elevators
Christopher O'Malley
03/31/2022
Special inspection requirement — Lighting controls
Christopher O'Malley
03/31/2022
Special inspection requirement — HVAC-R and service water heating system controls
Christopher O'Malley
03/30/2022
Filed — Alteration
Removal and installation of mechanical ductwork, new diffusers, related piping and HVAC units. No change to use, egress or occupancy.
M00516411-P4
03/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher O'Malley
03/25/2022
Special inspection requirement — Post-installed Anchors
Christopher O'Malley
03/24/2022
Filed — Alteration
Modification of existing sprinkler system to install, remove and relocate sprinklers heads. No change to use, egress or occupancy.
M00516573-P2
03/24/2022
Filed — Alteration
Installation of new plumbing piping and fixtures. No change to use, egress or occupancy.
M00516466-P2
03/23/2022
Special inspection requirement — Interior lighting power
03/23/2022
Special inspection requirement — Electrical motors and elevators
03/23/2022
Special inspection requirement — Lighting controls
03/22/2022
Signed off — Alteration
INSTALL NEW CRAC UNIT AND RELATED PIPING IN 8TH FLOOR OFFICE SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00575164-I1
03/16/2022
Special inspection requirement — Final
MAURICIO ANDRADE
03/16/2022
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
03/16/2022
Special inspection requirement — HVAC-R and service water heating equipment
MAURICIO ANDRADE
03/16/2022
Special inspection requirement — Maintenance information
MAURICIO ANDRADE
03/16/2022
Special inspection requirement — Mechanical Systems
MAURICIO ANDRADE
03/16/2022
Special inspection requirement — HVAC-R and service water heating system controls
MAURICIO ANDRADE
03/15/2022
Signed off — Alteration
M00582445-I1
03/15/2022
Signed off — Alteration
REMOVE DOORS, FINISHES AND MILLWORK FROM PORTION OF 15TH FLOOR OFFICE SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00568954-I1
Latest 60 of 233 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offTri-Star Construction11/15/2021
DOB NOWPlumbingSigned-offPar Plumbing Co10/29/2021
DOB NOWSprinklersSigned-offAbco-Peerless Sprinkler10/27/2021
DOB NOWSprinklersSigned-offAbco-Peerless Sprinkler10/20/2021
DOB NOWGeneral ConstructionSigned-offStructure Tone10/19/2021
DOB NOWPlumbingSigned-offGeoffrey A. Lagas & Associates10/19/2021
DOB NOWMechanical SystemsPermit IssuedTri-Star Construction10/15/2021
DOB NOWMechanical SystemsSigned-offJames E Fitzgerald10/15/2021
DOB NOWGeneral ConstructionPermit IssuedTri-Star Construction10/15/2021
DOB NOWStructuralSigned-offTri-Star Construction10/15/2021
DOB NOWGeneral ConstructionSigned-offJames E Fitzgerald10/14/2021
DOB NOWGeneral ConstructionSigned-offJames E Fitzgerald10/13/2021
DOB NOWSprinklersSigned-offStandard Fire Supp10/12/2021
DOB NOWMechanical SystemsSigned-offJodom Mechanical09/24/2021
DOB NOWSprinklersPermit IssuedMora Fire Protection09/17/2021
DOB NOWMechanical SystemsSigned-offTri-Star Construction09/01/2021
DOB NOWSprinklersPermit IssuedMora Fire Protection08/25/2021
DOB NOWGeneral ConstructionSigned-offJames E Fitzgerald08/24/2021
DOB NOWPlumbingSigned-offCity/Suburban Plumbing08/13/2021
DOB NOWPlumbingSigned-offCity/Suburban Plumbing07/09/2021
DOB NOWSprinklersSigned-offMora Fire Protection07/07/2021
DOB NOWMechanical SystemsPermit IssuedTri-Star Construction06/29/2021
DOB NOWGeneral ConstructionPermit IssuedTri-Star Construction06/28/2021
DOB NOWStructuralSigned-offTri-Star Construction06/25/2021
DOB NOWGeneral ConstructionSigned-offBenjamin Group Enterprises06/25/2021
DOB NOWGeneral ConstructionSigned-offTri-Star Construction06/17/2021
DOB NOWMechanical SystemsSigned-offTri-Star Construction06/16/2021
DOB NOWGeneral ConstructionPermit IssuedMKZ Construction Group06/10/2021
DOB NOWGeneral ConstructionSigned-offBenjamin Group Enterprises05/12/2021
DOB NOWGeneral ConstructionSigned-offJT Magen & Company03/08/2021
DOB NOWMechanical SystemsSigned-offJT Magen & Company11/10/2020
DOB NOWSprinklersSigned-offAbco-Peerless Sprinkler10/28/2020
DOB NOWSprinklersSigned-offLawrence J. Levine03/25/2020
DOB NOWMechanical SystemsSigned-offStructure Tone03/24/2020
DOB NOWPlumbingSigned-offPar Plumbing Co03/24/2020
DOB NOWPlumbingSigned-offAdvanced Plumbing02/26/2020
DOB NOWPlumbingSigned-offAdvanced Plumbing10/18/2019
BISPLISSUEDGeoffrey A. Lagas & Associates01/11/2021
BISOTISSUEDStructure Tone03/20/2020
BISSPISSUEDPar Fire Protection03/02/2020
+ 47 more permits on file
1 project · most recent 03/30/2022
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/30/2022Permit IssuedTri-Star ConstructionAir Conditioning Systems
Cooling
Climatemaster TCH030AHD20CS3S 1,030 CFM · Wshp ×2
TCH060AHD202S2S 1,950 CFM · Wshp ×2
TCH060AHD202T2S 2,060 CFM · Wshp ×2
TCH120AHD2A2WSS 4,000 CFM · Wshp ×2
TC-060 59,700 BTU · Wshp ×2
TC-030 29,400 BTU · Wshp ×1
TC-120 120,000 BTU · Wshp ×1
Lg ARNU183SKA4 19,100 BTU · Vrf Indoor ×4
ARNU243M2A4 24,200 BTU · Vrf Indoor ×2
ARUN060GSS4 5 tons · Vrf Outdoor ×3
1 project · most recent 03/24/2022
FiledStatusContractorScope
03/24/2022Permit IssuedPSI Partners—
15 projects · most recent 11/17/2025
General Wiring Lighting
FiledStatusContractorScope
11/17/2025CancelledCloonagh Electrical—
07/25/2022CompleteP.E. StoneGeneral Wiring
11/01/2021CompleteNead ElectricGeneral Wiring
10/29/2021CompleteApollo Electric InsdusGeneral Wiring
10/29/2021Permit IssuedP.E. Stone—
11/03/2020CompleteH. & L. ElectricGeneral Wiring
06/19/2020Permit IssuedNee ElectricalGeneral Wiring
03/24/2020CompleteNead ElectricGeneral Wiring
06/26/2019Permit IssuedApollo ElectricGeneral Wiring
05/07/2019Permit IssuedAvalon ElectricGeneral Wiring
03/14/2019CompleteCommercial Electric ContGeneral Wiring
02/06/2019CompleteNee ElectricalGeneral Wiring
12/07/2018CompleteJRD Electric—
11/20/2018CompleteAvalon ElectricGeneral Wiring
06/22/2018CompleteCommercial Electric ContGeneral Wiring, Lighting
1 project · most recent 09/16/2026
FiledStatusContractorScope
09/16/2026———
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
08/04/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/06/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/15/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/09/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/23/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/20/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/30/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/05/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/28/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/15/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/30/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/27/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/27/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 141
DateRequirementInspectorRole
08/29/2022MasonryAnthony Stasiospecial
08/29/2022FinalAnthony Stasioprogress
08/29/2022Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
06/27/2022MasonryAnthony Stasiospecial
06/27/2022FinalAnthony Stasioprogress
06/27/2022Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
04/20/2022FinalFAWZY SALIBprogress
03/31/2022FinalChristopher O'Malleyprogress
03/31/2022Mechanical SystemsChristopher O'Malleyspecial
03/31/2022Fire-Resistant Penetrations and JointsChristopher O'Malleyspecial
03/31/2022Post-installed AnchorsChristopher O'Malleyspecial
03/31/2022Interior lighting powerChristopher O'Malleyenergy_progress
03/31/2022HVAC-R and service water heating equipmentChristopher O'Malleyenergy_progress
03/31/2022HVAC-R and service water heating system controlsChristopher O'Malleyenergy_progress
03/31/2022Electrical motors and elevatorsChristopher O'Malleyenergy_progress
03/31/2022HVAC-R and service water piping design and insulationChristopher O'Malleyenergy_progress
03/31/2022Shutoff dampersChristopher O'Malleyenergy_progress
03/31/2022Lighting controlsChristopher O'Malleyenergy_progress
03/31/2022Maintenance informationChristopher O'Malleyenergy_progress
03/25/2022Fire-Resistant Penetrations and JointsChristopher O'Malleyspecial
03/25/2022Post-installed AnchorsChristopher O'Malleyspecial
03/23/2022Interior lighting power—energy_progress
03/23/2022Lighting controls—energy_progress
03/23/2022Electrical motors and elevators—energy_progress
03/16/2022Mechanical SystemsMAURICIO ANDRADEspecial
Latest 25 of 141.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
AlphaSightsOfficeFloor 15
Project M00582445 Alteration · LOC Issued · 10/01/2021
Project M00582461 Alteration · LOC Issued · 10/01/2021
Project M00593285 Alteration · LOC Issued · 10/01/2021
Project M00582423 Alteration · LOC Issued · 09/29/2021
Project M00568954 Alteration · LOC Issued · 08/19/2021
Marsh & McLennan Companies (MMC)OfficeFloor 6
Project M00578002 Alteration · LOC Issued · 09/22/2021
Project M00578013 Alteration · LOC Issued · 09/22/2021
Project M00578019 Alteration · LOC Issued · 09/22/2021
Paul StuartRetailCellar, Floors 1–3, Mezzanine
Project M00516399 Alteration · Permit Entire · 06/15/2021
Project M00516411 Alteration · Permit Entire · 06/14/2021
Project M00516582 Alteration · LOC Issued · 06/09/2021
Project M00516466 Alteration · LOC Issued · 06/08/2021
Project M00516573 Alteration · Permit Entire · 06/08/2021
Project M00493858 Alteration · LOC Issued · 06/04/2021
Project M00513676 Alteration · LOC Issued · 06/03/2021
Project M00513728 Alteration · LOC Issued · 06/03/2021
Project M00513757 Alteration · LOC Issued · 06/03/2021
Project M00232168 Alteration · LOC Issued · 10/17/2019
Alkeon CapitalOfficeFloors 18–20
Project M00463825 Alteration · LOC Issued · 03/03/2021
Project M00416236 Alteration · LOC Issued · 11/06/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 3,872 on file (BIS + DOB NOW)
▸Plans & Drawings49
▸DOB NOWPlans/Sketch37
10/07/2026M01460951-I1Request digital key ↗
09/04/2026M00463825-I1Request digital key ↗
09/03/2026M00513757-I1Request digital key ↗
Showing 3 of 37 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/04/2026M00410474-I1Request digital key ↗
09/04/2026M00314743-I1Request digital key ↗
Showing 2 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00232168-I1Request digital key ↗
09/05/2026M00232168-P1Request digital key ↗
09/05/2026M00314723-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction3
09/04/2026M00463825-I1Request digital key ↗
09/03/2026M00473202-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00314713-I1Request digital key ↗
09/04/2026M00416236-I1Request digital key ↗
▸Applications & Permits731
▸BISPLAN / WORK APPROVAL APPLICATION470
01/22/2026122438200Open ↗
08/07/2025122438200Open ↗
06/18/2024122438200Open ↗
Showing 3 of 470 on file for this type
▸BISWORK PERMIT APPLICATION258
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 258 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications993
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION526
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 526 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST134
11/13/2020123407786Open ↗
Showing 1 of 134 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT127
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 127 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature60
10/19/2026M00578002-I1Open ↗
09/02/2026M00516466-I1Open ↗
09/02/2026M00516466-I1Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature47
09/05/2026M00232168-P1Open ↗
09/05/2026M00232168-I1Open ↗
09/05/2026M00314723-I1Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWProgress Inspector Seal & Signature46
10/19/2026M00578002-I1Open ↗
10/19/2026M00578002-I1Open ↗
09/01/2026M00516411-P4Open ↗
Showing 3 of 46 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 41 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment360
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE128
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 128 on file for this type
▸BISSCHEDULE B - PLUMBING54
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 54 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA53
10/19/2021123672604Open ↗
Showing 1 of 53 on file for this type
▸BISSELF-CERT PLUMBING NOTICE52
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 52 on file for this type
▸BISEQUIPMENT USE PERMITS39
01/04/2021123025010Open ↗
01/04/2021123025010Open ↗
01/04/2021123025010Open ↗
Showing 3 of 39 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT20
01/04/2021123025010Open ↗
01/04/2021123407786Open ↗
12/23/2020123025010Open ↗
Showing 3 of 20 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8510
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSPRINKLER SYSTEMS2
01/21/2021123897104Open ↗
10/01/2020123706999Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos325
▸BISASBESTOS: CERTIFICATION (DEP ACP5)152
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 152 on file for this type
▸DOB NOWOER: Notice to Proceed44
09/05/2026M00232168-I1Open ↗
09/05/2026M00232168-P1Open ↗
09/05/2026M00314723-I1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report44
09/05/2026M00232168-I1Open ↗
09/05/2026M00232168-P1Open ↗
09/05/2026M00314723-I1Open ↗
Showing 3 of 44 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸DOB NOWOER: Notice of Satisfaction22
09/05/2026M00232168-I1Open ↗
09/05/2026M00314723-I1Open ↗
09/04/2026M00463825-I1Open ↗
Showing 3 of 22 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION9
12/07/2021123672604Open ↗
03/17/2021123378406Open ↗
12/22/2020123407786Open ↗
Showing 3 of 9 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/03/2026M00592574-I1Open ↗
▸Energy Compliance197
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS129
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 129 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS38
10/26/2020123689972Open ↗
09/30/2020123739909Open ↗
08/05/2020123174368Open ↗
Showing 3 of 38 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
05/26/2021123897097Open ↗
05/26/2021123897097Open ↗
03/17/2021123378406Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.6
09/03/2026M00575164-I1Open ↗
Showing 1 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
05/17/2021123897097Open ↗
03/17/2021123378406Open ↗
12/23/2020123025010Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports46
▸BISTECHNICAL REPORT: RESPONSIBILITY35
05/26/2021123897097Open ↗
05/26/2021123897097Open ↗
05/26/2021123897097Open ↗
Showing 3 of 35 on file for this type
▸BISTECHNICAL REPORT: CONCRETE-TEST CYLINDER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Approvals, Objections & Sign-offs322
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST211
12/08/2021123672604Open ↗
08/05/2021121547282Open ↗
05/26/2021123897097Open ↗
Showing 3 of 211 on file for this type
▸BISADMINISTRATIVE OBJECTIONS51
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 51 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE36
01/22/2026122438200Open ↗
08/07/2025122438200Open ↗
06/18/2024122438200Open ↗
Showing 3 of 36 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION16
10/28/2020123689972Open ↗
Showing 1 of 16 on file for this type
▸BISSUPERSEDING LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFA LETTER OF DEFECT : FD-FALD1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership310
▸BISCOST AFFIDAVIT302
04/23/2021123096167Open ↗
03/18/2021123378406Open ↗
01/26/2021123430377Open ↗
Showing 3 of 302 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW38
12/07/2021123672604Open ↗
05/17/2021123897097Open ↗
05/06/2021121547282Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms494
▸BISEFILING COVER SHEET241
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 241 on file for this type
▸BISADDITIONAL INFORMATION153
06/22/2023122438200Open ↗
04/07/2023122438200Open ↗
05/24/2022122438200Open ↗
Showing 3 of 153 on file for this type
▸BISBOROUGH INTAKE FORM90
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 90 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸Other Documents31
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION25
01/26/2021123430377Open ↗
Showing 1 of 25 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
10/07/2026M01460951-I1Open ↗