← Back
Two family brick
351 CLINTON STREET
BROOKLYN · BIN 3003934
💬 Discuss this project
1877Year Built
3Stories
B1Building Class
R6Zoning
2,704 sfGross Floor Area
2Units
0 Open Violations
Two family brick · 1,528 sf lot · 1.77 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof11p · 1 filing · 20 docs
Floor 310p · 1 filing · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 111p · 1 filing · 20 docs
Cellar14p · 1 filing · 20 docs
Basement12p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANNE MARIE LUBRANO308/29/2025
CES ENGINEERING LLC412/18/2024
BARRY STRUCTURAL ENGINEERING, PLLC208/05/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R. SUTTON & CO LLCGeneral Contractor807/08/2026
ARCON PLBG SOLUTIONSPlumbing207/08/2026
DONATO PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BARRY STRUCTURAL ENGINEER749808/29/2025
DNA CONTROLLED INSPECTION554105/06/2022
Building Lifecycle
All (65)Filed (9)Permit Issued (9)Signed Off (4)Violation (2)Inspection (4)Objection (22)Special Inspection (15)
02/09/2026
Signed off — Alteration CO
Conversion of Two Family Residence into a Single Family Residence. Partial Modification and replacement of rear facade, windows and doors. New rear yard deck and modified patio. General construction through out. Replacement of existing Roof sheathing.
B00721693-I1
08/29/2025
Filed — Alteration CO
Conversion of Two Family Residence into a Single Family Residence. Partial Modification and replacement of rear facade, windows and doors. New rear yard deck and modified patio. General construction through out. Replacement of existing Roof sheathing.
B00721693-P5
05/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/21/2025
Filed — Alteration CO
Conversion of Two Family Residence into a Single Family Residence. Partial Modification and replacement of rear facade, windows and doors. New rear yard deck and modified patio. General construction through out. Replacement of existing Roof sheathing.
B00721693-P4
03/25/2025
Signed off — Alteration CO
Conversion of Two Family Residence into a Single Family Residence. Partial Modification and replacement of rear facade, windows and doors. New rear yard deck and modified patio. General construction through out. Replacement of existing Roof sheathing.
B00721693-S3
03/25/2025
Signed off — Alteration CO
Conversion of Two Family Residence into a Single Family Residence. Partial Modification and replacement of rear facade, windows and doors. New rear yard deck and modified patio. General construction through out. Replacement of existing Roof sheathing.
B00721693-S2
02/26/2025
Signed off — Alteration CO
Conversion of Two Family Residence into a Single Family Residence. Partial Modification and replacement of rear facade, windows and doors. New rear yard deck and modified patio. General construction through out. Replacement of existing Roof sheathing.
B00721693-S1
12/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL BARRY
12/30/2024
Objection resolved — Addressed
12/26/2024
Objection raised — Scope
12/18/2024
Filed — Alteration CO
Conversion of Two Family Residence into a Single Family Residence. Partial Modification and replacement of rear facade, windows and doors. New rear yard deck and modified patio. General construction through out. Replacement of existing Roof sheathing.
B00721693-P3
03/22/2024
Permit issued — Plumbing
B00721693-S3-PL
08/01/2023
Permit issued — Plumbing
B00721693-S3-PL
05/31/2023
Filed — Alteration CO
Conversion of Two Family Residence into a Single Family Residence. Partial Modification and replacement of rear facade, windows and doors. New rear yard deck and modified patio. General construction through out. Replacement of existing Roof sheathing.
B00721693-P2
05/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL BARRY
03/24/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/24/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/07/2022
Permit issued — Mechanical Systems
B00721693-S2-MS
10/07/2022
Permit issued — Mechanical Systems
B00721693-S2-MS
10/07/2022
Permit issued — General Construction
B00721693-I1-GC
09/27/2022
Permit issued — Structural
B00721693-S1-ST
09/08/2022
Special inspection requirement — Structural Steel - Details
MICHAEL BARRY
09/08/2022
Special inspection requirement — Structural Steel - Welding
MICHAEL BARRY
09/08/2022
Special inspection requirement — Concrete - Cast-In-Place
MICHAEL BARRY
09/08/2022
Special inspection requirement — Structural Steel - High Strength Bolting
MICHAEL BARRY
09/08/2022
Special inspection requirement — Final
MICHAEL BARRY
08/31/2022
Objection resolved — Addressed
08/17/2022
Permit issued — Plumbing
B00721693-S3-PL
08/17/2022
Objection resolved — Addressed
08/12/2022
Objection raised — Scope
08/12/2022
Objection raised — Scope
08/09/2022
Permit issued — Mechanical Systems
B00721693-S2-MS
08/05/2022
Filed — Alteration CO
Conversion of Two Family Residence into a Single Family Residence. Partial Modification and replacement of rear facade, windows and doors. New rear yard deck and modified patio. General construction through out. Replacement of existing Roof sheathing.
B00721693-P1
08/05/2022
Permit issued — General Construction
B00721693-I1-GC
08/05/2022
Special inspection requirement — Concrete - Cast-In-Place
MICHAEL BARRY
08/05/2022
Special inspection requirement — Structural Steel - Welding
MICHAEL BARRY
08/05/2022
Special inspection requirement — Final
MICHAEL BARRY
08/05/2022
Special inspection requirement — Structural Steel - Details
MICHAEL BARRY
08/05/2022
Special inspection requirement — Structural Steel - High Strength Bolting
MICHAEL BARRY
05/24/2022
Objection raised — Fire_Protection
05/24/2022
Objection resolved — Addressed
05/24/2022
Objection raised — Admin
05/24/2022
Objection resolved — Addressed
05/24/2022
Objection raised — Inspections
05/24/2022
Objection resolved — Addressed
05/06/2022
Filed — Alteration CO
Conversion of Two Family Residence into a Single Family Residence. Partial Modification and replacement of rear facade, windows and doors. New rear yard deck and modified patio. General construction through out. Replacement of existing Roof sheathing.
B00721693-S3
05/06/2022
Filed — Alteration CO
Conversion of Two Family Residence into a Single Family Residence. Partial Modification and replacement of rear facade, windows and doors. New rear yard deck and modified patio. General construction through out. Replacement of existing Roof sheathing.
B00721693-S2
05/05/2022
Objection raised — Scope
05/05/2022
Objection resolved — Addressed
05/05/2022
Objection raised — Scope
05/05/2022
Objection resolved — Addressed
05/05/2022
Objection raised — Admin
05/05/2022
Objection resolved — Addressed
05/05/2022
Objection raised — Fire_Protection
05/05/2022
Objection resolved — Addressed
05/05/2022
Objection raised — Scope
05/05/2022
Objection resolved — Addressed
05/03/2022
Filed — Alteration CO
Conversion of Two Family Residence into a Single Family Residence. Partial Modification and replacement of rear facade, windows and doors. New rear yard deck and modified patio. General construction through out. Replacement of existing Roof sheathing.
B00721693-S1
04/28/2022
Filed — Alteration CO
Conversion of Two Family Residence into a Single Family Residence. Partial Modification and replacement of rear facade, windows and doors. New rear yard deck and modified patio. General construction through out. Replacement of existing Roof sheathing.
B00721693-I1
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/22/2024
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS08/01/2023
DOB NOWMechanical SystemsSigned-offR. SUTTON & CO LLC10/07/2022
DOB NOWMechanical SystemsSigned-offR. SUTTON & CO LLC10/07/2022
DOB NOWGeneral ConstructionPermit IssuedR. SUTTON & CO LLC10/07/2022
DOB NOWStructuralSigned-offR. SUTTON & CO LLC09/27/2022
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS08/17/2022
DOB NOWMechanical SystemsSigned-offR. SUTTON & CO LLC08/09/2022
DOB NOWGeneral ConstructionPermit IssuedR. SUTTON & CO LLC08/05/2022
BISPLISSUEDSCARPONI&SON PLBG&HTG COR06/06/2007
BISPLISSUEDVITAL PLUMBING, INC03/07/2006
BISOTISSUEDRF SERVICES GROUP, INC.03/02/2006
1 project · most recent 08/29/2025
Gas Water/Sanitary
FiledStatusContractorScope
08/29/2025Signed-offDONATO PLUMBING, INCGas, Water/Sanitary
1 project · most recent 08/29/2022
General Wiring
FiledStatusContractorScope
08/29/2022CompleteSUPER CHARGED ELEC. INC.General Wiring
1 project · most recent 08/29/2025
Steel Concrete
FiledStatusContractorScope
08/29/2025Signed-offDONATO PLUMBING, INCSteel, Concrete
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/24/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
12/31/2024Fire-Resistant Penetrations and JointsMICHAEL BARRYspecial
05/25/2023Fire-Resistant Penetrations and JointsMICHAEL BARRYspecial
09/08/2022Structural Steel - DetailsMICHAEL BARRYspecial
09/08/2022Structural Steel - WeldingMICHAEL BARRYspecial
09/08/2022Concrete - Cast-In-PlaceMICHAEL BARRYspecial
09/08/2022Structural Steel - High Strength BoltingMICHAEL BARRYspecial
09/08/2022FinalMICHAEL BARRYprogress
08/05/2022Concrete - Cast-In-PlaceMICHAEL BARRYspecial
08/05/2022Structural Steel - WeldingMICHAEL BARRYspecial
08/05/2022FinalMICHAEL BARRYprogress
08/05/2022Structural Steel - DetailsMICHAEL BARRYspecial
08/05/2022Structural Steel - High Strength BoltingMICHAEL BARRYspecial
04/28/2022Mechanical SystemsWILLIAM FITZJOHNspecial
04/28/2022Fire-Resistant Penetrations and JointsWILLIAM FITZJOHNspecial
04/28/2022FinalWILLIAM FITZJOHNprogress
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/27/2026B00721693-P4Request digital key ↗
08/27/2026B00721693-P2Request digital key ↗
08/27/2026B00721693-P5Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits10
▸DOB NOWLPC Approval/Permit9
08/13/2026B00721693-I1Open ↗
08/13/2026B00721693-P3Open ↗
08/13/2026B00721693-P2Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
02/07/2025302074751Open ↗
▸Seals & Professional Certifications24
▸DOB NOWSpecial Inspector Seal & Signature12
08/28/2026B00721693-P2Open ↗
08/28/2026B00721693-S1Open ↗
08/28/2026B00721693-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026B00721693-P5Open ↗
08/27/2026B00721693-P4Open ↗
08/27/2026B00721693-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026B00721693-S1Open ↗
08/25/2026B00721693-P1Open ↗
08/23/2026B00721693-S2Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026B00721693-P5Open ↗
08/13/2026B00721693-P4Open ↗
08/13/2026B00721693-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00721693-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/27/2026B00721693-S3Open ↗
08/27/2026B00721693-S2Open ↗
08/27/2026B00721693-S1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents8
▸DOB NOWProperty Ownership Certification4
08/27/2026B00721693-P5Open ↗
08/27/2026B00721693-P4Open ↗
08/27/2026B00721693-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProof of Historic Building3
08/13/2026B00721693-P4Open ↗
08/13/2026B00721693-I1Open ↗
08/13/2026B00721693-P5Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00721693-I1Open ↗