| Owner | Filings | Most Recent |
|---|---|---|
| KINSEY | 46 | 03/21/2026 |
| CHELSEA VILLAGE ASSOCIATES | 40 | 03/21/2026 |
| MEPA REALTY | 33 | 03/21/2026 |
| Tavros | 23 | 09/15/2026 |
| REPUBLIC EXTERIOR SERVICES | 21 | 07/08/2026 |
| COOPER SQUARE REALTY | 12 | 03/21/2026 |
| BCG | 7 | 07/08/2026 |
| OWNERS REP | 6 | 07/08/2026 |
| BARONE STEEL INC | 5 | 03/22/2026 |
| TAVROS CAPITAL | 2 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| EP ENGINEERING LLC | 3 | 09/11/2026 |
| DEREK ZIEMER ARCHITECTURE, PLLC | 3 | 05/12/2026 |
| BKSK ARCHITECTS, LLP | 2 | 03/28/2026 |
| DAGHER ENGINEERING PLLC | 19 | 09/02/2025 |
| FOGARTY FINGER ARCHITECTURE PLLC | 1 | 08/26/2025 |
| GILSANZ MURRAY STEFICEK LLP | 14 | 07/14/2025 |
| DOWNTOWN ENGINEERS | 2 | 05/07/2025 |
| ADG ARCHITECTURE AND DESIGN PC | 1 | 11/04/2024 |
| SYNC ARCHITECTURE P.C | 2 | 09/05/2024 |
| THE ROCK BROOK CONSULTING GROUP, PA | 5 | 08/27/2024 |
| HLW INTERNATIONAL | 2 | 07/23/2024 |
| GASBARRO STRUCTURAL ENGINEERING | 1 | 02/06/2024 |
| URBAN INTEGRATIONS | 6 | 02/27/2023 |
| PAUL PERDEK, PROF. ENG. PLLC | 4 | 02/22/2023 |
| PATUXENT ENGINEERING LLC | 3 | 10/12/2022 |
| FL&M ENGINEERING DESIGN &INSPECTION | 1 | 05/26/2022 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 05/18/2022 |
| SOUTH BAY ENGINEERING PLLC | 2 | 02/11/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| WILLIAM VITACCO ASSOCIATES | 82 | 03/21/2026 |
| Rigid Structural Design, LLC | 6 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 4 | 03/21/2026 |
| DVA Advisors | 8 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 03/21/2026 |
| PATUXENT ENGINEERING | 6 | 03/21/2026 |
| AE DESIGN SOLUTION | 4 | 03/21/2026 |
| LOMBARDO BUILDING CONSULTANTS | 2 | 03/21/2026 |
| GREEN STUDIO | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| BROADWAY CONSTRUCTION GRO | General Contractor | 28 | 07/08/2026 |
| SAFETY FIRE SPRINKLER CORP | Fire Protection | 8 | 07/08/2026 |
| R.J.C. MECHANICAL CORP | Plumbing | 6 | 07/08/2026 |
| CORE SCAFFOLD SYSTEMS INC. | General Contractor | 5 | 07/08/2026 |
| REPUBLIC EXTERIOR SERVICE | General Contractor | 5 | 07/08/2026 |
| ICON INTERIORS INC | General Contractor | 5 | 07/08/2026 |
| AMERICAN STANDARD P&H CORORP. | Plumbing | 5 | 07/08/2026 |
| TRI BOROUGH SCAFFOLDING | General Contractor | 4 | 07/08/2026 |
| WCD SERVICES CORP | General Contractor | 3 | 03/21/2026 |
| MANHATTAN D ENTERPRISES | General Contractor | 3 | 07/08/2026 |
| MC SUPERSTRUCTURE INC | General Contractor | 2 | 03/21/2026 |
| VOLK INDUSTRIAL SERVICES | General Contractor | 2 | 04/09/2026 |
| BARONE STEEL INC | General Contractor | 2 | 03/21/2026 |
| NICON BUILD LLC | General Contractor | 2 | 04/09/2026 |
| WILLIAM C. GERAKARIS P&H | Plumbing | 1 | 07/08/2026 |
| METROPOLIS ELECTRIC CORP | Electrical | 1 | 03/22/2026 |
| NASH ELECTRIC SERVICES IN | Electrical | 1 | 03/22/2026 |
| A PLUS PLUMBING CORP | Fire Protection | 1 | 06/27/2026 |
| PSI PARTNERS, LLC | Fire Protection | 1 | 07/08/2026 |
| ENER-CON TECHNICAL SERVIC | General Contractor | 1 | 07/08/2026 |
| GWT ENTERPRISES INC | General Contractor | 1 | 07/08/2026 |
| WINICK PRODUCTIONS, LLC | General Contractor | 1 | 07/08/2026 |
| BRADFORD MECH. CONTR INC | Plumbing | 1 | 07/08/2026 |
| LEADER ELECTRIC CO., INC | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| OUTSOURCE SPECIAL INSPECT | 2827 | 5 | 05/12/2026 |
| FENAGH, INC | 6942 | 3 | 09/02/2025 |
| GILSANZ MURRAY STEFICEK | 240 | 13 | 07/14/2025 |
| DOMANI INSPECTION SERVICE | 843 | 1 | 07/10/2025 |
| CROSSCHECK INSPECTION SER | 544 | 7 | 08/27/2024 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 11 | 07/31/2024 |
| ATLAS ATC ENGINEERING INC | 8011 | 9 | 07/31/2024 |
| RA ENGINEERING LLP | 6986 | 3 | 01/24/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | R.J.C. MECHANICAL CORP | 04/03/2026 |
| DOB NOW | Sprinklers | Permit Issued | A PLUS PLUMBING CORP | 03/04/2026 |
| DOB NOW | Sprinklers | Permit Issued | SAFETY FIRE SPRINKLER CORP | 01/09/2026 |
| DOB NOW | General Construction | Signed-off | BROADWAY CONSTRUCTION GRO | 12/23/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | BROADWAY CONSTRUCTION GRO | 12/04/2025 |
| DOB NOW | Structural | Permit Issued | VOLK INDUSTRIAL SERVICES | 09/25/2025 |
| DOB NOW | Support of Excavation | Permit Issued | VOLK INDUSTRIAL SERVICES | 09/11/2025 |
| DOB NOW | Plumbing | Permit Issued | R.J.C. MECHANICAL CORP | 07/24/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | NICON BUILD LLC | 07/21/2025 |
| DOB NOW | General Construction | Permit Issued | NICON BUILD LLC | 06/30/2025 |
| DOB NOW | Plumbing | Permit Issued | AMERICAN STANDARD P&H CORORP. | 09/24/2024 |
| DOB NOW | General Construction | Signed-off | WINICK PRODUCTIONS, LLC | 09/09/2024 |
| DOB NOW | Plumbing | Permit Issued | AMERICAN STANDARD P&H CORORP. | 04/16/2024 |
| DOB NOW | Structural | Signed-off | ICON INTERIORS INC | 04/01/2024 |
| DOB NOW | Plumbing | Signed-off | WILLIAM C. GERAKARIS P&H | 03/26/2024 |
| DOB NOW | Sprinklers | Signed-off | MORA FIRE PROTECTION LLC | 03/25/2024 |
| DOB NOW | Mechanical Systems | Signed-off | ICON INTERIORS INC | 03/13/2024 |
| DOB NOW | General Construction | Signed-off | ICON INTERIORS INC | 02/14/2024 |
| DOB NOW | Boiler Equipment | Signed-off | JACK PICCINI, INC | 12/15/2023 |
| DOB NOW | Boiler Equipment | Signed-off | JACK PICCINI, INC | 12/14/2023 |
| DOB NOW | Mechanical Systems | Signed-off | ENER-CON TECHNICAL SERVIC | 10/10/2023 |
| DOB NOW | Supported Scaffold | Signed-off | CORE SCAFFOLD SYSTEMS INC | 09/15/2023 |
| DOB NOW | Plumbing | Permit Issued | AMERICAN STANDARD P&H CORORP. | 09/01/2023 |
| DOB NOW | General Construction | Permit Issued | MC SUPERSTRUCTURE INC | 08/17/2023 |
| DOB NOW | Standpipe | Signed-off | SAFETY FIRE SPRINKLER CORP | 08/10/2023 |
| DOB NOW | Sprinklers | Permit Issued | SAFETY FIRE SPRINKLER CORP | 06/09/2023 |
| DOB NOW | Standpipe | Signed-off | SAFETY FIRE SPRINKLER CORP | 06/08/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | GWT ENTERPRISES INC | 05/25/2023 |
| DOB NOW | General Construction | Permit Issued | TRI BOROUGH SCAFFOLDING | 02/24/2023 |
| DOB NOW | Sprinklers | Signed-off | SAFETY FIRE SPRINKLER CORP | 02/13/2023 |
| DOB NOW | Supported Scaffold | Permit Issued | TRI BOROUGH SCAFFOLDING | 02/08/2023 |
| DOB NOW | Structural | Signed-off | BROADWAY CONSTRUCTION GRO | 01/17/2023 |
| DOB NOW | Structural | Signed-off | BROADWAY CONSTRUCTION GRO | 01/17/2023 |
| DOB NOW | Structural | Signed-off | BROADWAY CONSTRUCTION GRO | 01/17/2023 |
| DOB NOW | Structural | Signed-off | BROADWAY CONSTRUCTION GRO | 01/17/2023 |
| DOB NOW | Structural | Signed-off | BROADWAY CONSTRUCTION GRO | 01/17/2023 |
| DOB NOW | Structural | Signed-off | BROADWAY CONSTRUCTION GRO | 01/11/2023 |
| DOB NOW | Structural | Signed-off | BROADWAY CONSTRUCTION GRO | 01/10/2023 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | REPUBLIC EXTERIOR SERVICE | 12/09/2022 |
| DOB NOW | Supported Scaffold | Permit Issued | REPUBLIC EXTERIOR SERVICE | 12/07/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/11/2026 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | |
| 05/12/2026 | Permit Issued | VOLK INDUSTRIAL SERVICES | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Lg ARNU483B8A4 48,100 BTU · Vrf Indoor ×6 ARNU363B8A4 36,200 BTU · Vrf Indoor ×4 ARNU283M3A4 28,000 BTU · Vrf Indoor ×2 ARUM072BTE5 72,000 BTU · Vrf Outdoor ×1 Ventilation |
| 09/02/2025 | Signed-off | BROADWAY CONSTRUCTION GRO | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Lg ARNU123M1A4 12,300 BTU · Vrf Indoor ×4 ARNU283M2A4 28,000 BTU · Vrf Indoor ×3 ARNU543M3A4 54,000 BTU · Vrf Indoor ×3 ARNU183M1A4 19,100 BTU · Vrf Indoor ×2 ARNU363M2A4 36,200 BTU · Vrf Indoor ×2 ARNU153M1A4 15,400 BTU · Vrf Indoor ×1 ARNU243M1A4 24,200 BTU · Vrf Indoor ×1 ARNU283M1A4 28,000 BTU · Vrf Indoor ×1 |
| 07/31/2024 | Signed-off | ENER-CON TECHNICAL SERVIC | Air Conditioning Systems, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/11/2026 | — | — | Sprinkler System |
| 05/12/2026 | Permit Issued | A PLUS PLUMBING CORP | 97 heads |
| 09/02/2025 | Permit Issued | SAFETY FIRE SPRINKLER COR | Sprinkler System |
| 07/31/2024 | Permit Issued | SAFETY FIRE SPRINKLER COR | 1,197 heads, 44 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/11/2026 | — | — | Water/Sanitary |
| 05/12/2026 | Permit Issued | GREAT OAKS MECHANICAL INC | Gas, Storm, Water/Sanitary |
| 09/02/2025 | — | — | — |
| 07/31/2024 | Permit Issued | AMERICAN STANDARD P&H COR | Gas, Storm, Water/Sanitary |
| 04/11/2024 | Permit Issued | AMERICAN STANDARD P&H COR | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/02/2026 | Permit Issued | NOVA ELECTRIC LLC | General Wiring |
| 11/25/2025 | Permit Issued | TUXEDO ELEC'L CONTR'G INC | — |
| 08/07/2025 | Permit Issued | NOVA ELECTRIC LLC | General Wiring |
| 04/05/2024 | Permit Issued | SOLAS ELECTRICAL CONTRACT | General Wiring |
| 02/15/2024 | Complete | METROPOLIS ELECTRIC CORP | General Wiring |
| 11/22/2023 | Permit Issued | LEADER ELECTRIC CO., INC | General Wiring |
| 12/07/2022 | Complete | NASH ELECTRIC SERVICES IN | — |
| 10/12/2022 | Complete | NASH ELECTRIC SERVICES IN | — |
| 06/23/2022 | Permit Issued | STAR ELEC'L CONTRACTORS C | — |
| 05/12/2021 | Complete | V. VASS ELECTRIC CORP | — |
| 03/20/2019 | Complete | LCJ ELEC'L CONTR'S INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/12/2026 | Permit Issued | GREAT OAKS MECHANICAL INC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/27/2023 | Permit Issued | REPUBLIC EXTERIOR SERVICE | Scaffold |
| Date | Type | Result | Report |
|---|---|---|---|
| 05/28/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 04/29/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/29/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/10/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/01/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/26/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/08/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/08/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 11/07/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/15/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 10/15/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/15/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 10/07/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 10/07/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/07/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 12/26/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 11/15/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/08/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/05/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/05/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/01/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/01/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/20/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 07/20/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 07/20/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 07/20/2026 | Maintenance information | — | energy_progress |
| 07/20/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 07/20/2026 | Shutoff dampers | — | energy_progress |
| 07/06/2026 | Post-installed Anchors | — | special |
| 07/06/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 05/12/2026 | Post-installed Anchors | JONAR MADRIAGA | special |
| 05/12/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 05/12/2026 | Post-installed Anchors | JONAR MADRIAGA | special |
| 05/12/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 03/27/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 03/27/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 03/27/2026 | Energy Code Compliance Inspections | — | progress |
| 03/27/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 03/27/2026 | Energy Code Compliance Inspections | — | progress |
| 03/27/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 03/27/2026 | Maintenance information | — | energy_progress |
| 03/27/2026 | Post-installed Anchors | — | special |
| 03/27/2026 | Final | — | progress |
| 03/27/2026 | Sprinkler Systems | — | special |
| 03/27/2026 | Post-installed Anchors | — | special |
| 03/27/2026 | Mechanical Systems | — | special |
| 03/27/2026 | Exhaust and Vent Systems in Plenums and Ducts | — | special |