1931Year Built
2Stories
F4Building Class
M1-1Zoning
2,625 sfGross Floor Area
1Units
0 Open Violations
Factory, industrial, semi-fireproof · Owner of record: NILMAR REALTY CORP · 1,579 sf lot · 1.66 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 12p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NILMAR REALTY CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TWIG NJ ENGINEERS110/22/2025
D&B ENGINEERS AND ARCHITECTS111/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
D&B ENGINEERS AND ARCHITECTS203/21/2026
PSE CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDWISE PLUMBING HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METROSPEC SIA6420110/22/2025
Building Lifecycle
All (8)Filed (2)Permit Issued (1)Signed Off (1)Violation (1)Inspection (2)Special Inspection (1)
02/06/2026
Signed off — Alteration
New gas piping from existing meter to exist gas fired hot water heater on first floor, existing gas fired heater and to existing gas fired furnace on 2nd floor.
Q01305266-I1
12/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/12/2025
Permit issued — Plumbing
Q01305266-I1-PL
10/22/2025
Filed — Alteration
New gas piping from existing meter to exist gas fired hot water heater on first floor, existing gas fired heater and to existing gas fired furnace on 2nd floor.
Q01305266-I1
11/20/2023
Filed — Alteration
Structural/Interior Renovation - construct a new concrete pad on existing slab to sufficiently hold the weight of the new CO2 tank and its contents that is being installed.
Q00924668-I1
08/24/2023
Special inspection requirement — Final
12/22/2020
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBUILDWISE PLUMBING HEATIN11/12/2025
1 project · most recent 11/20/2023
Concrete
FiledStatusContractorScope
11/20/2023——Concrete
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
08/24/2023Final—progress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026Q00924668-I1Request digital key ↗
08/18/2026Q01305266-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026Q00924668-I1Open ↗
08/18/2026Q01305266-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026Q01305266-I1Open ↗