| Owner | Filings | Most Recent |
|---|---|---|
| 59 MAIDEN LANE ASSOCIATES, LLC | 177 | 09/29/2026 |
| AMCAP 360 LLC | 2 | 03/22/2026 |
| NOUVEAU ELEVATOR IND LLC | 1 | 03/22/2026 |
| CPT 360 LEXINGTON | 181 | 03/22/2026 |
| 360 LEXINGTON AVENUE PROP INVEST | 6 | 03/22/2026 |
| BENJAMIN GROUP ENTPR | 2 | 03/22/2026 |
| SKYLINE SCAFFOLDING GROUP | 2 | 03/22/2026 |
| CPT 360 LEXINGTON,LLC MAR | 1 | 03/22/2026 |
| OWNER OF 354 LEXINGTON AV | 6 | 03/22/2026 |
| CBRE | 3 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 11/14/2024 | $65.5M | — | 360 LEXINGTON AVENUE PROPERTY INVESTORS IV, LLC → AMCAP 360 LLC | $275/sf building |
| 08/19/2019 | $180.0M | — | — → — | $755/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| CONCESSI ENGINEERING, P.C. | 3 | 08/17/2026 |
| MDEAS ARCHITECTS | 14 | 08/04/2026 |
| MG ENGINEERING D.P.C. | 60 | 07/02/2026 |
| RIMKUS | 3 | 06/10/2026 |
| RAAD | 1 | 06/08/2026 |
| GKV ARCHITECTS | 1 | 03/02/2026 |
| ROBERT DERECTOR ASSOCIATES | 5 | 01/21/2026 |
| B+W ARCHITECTURE DPC | 1 | 10/23/2025 |
| GILSANZ MURRAY STEFICEK LLP | 1 | 07/02/2025 |
| GEORGE J. XERAKIAS, PE | 1 | 05/23/2025 |
| APPLIED DESIGN INITIATIVE, LLC | 1 | 03/19/2025 |
| CFS ENGINEERING, DPC | 6 | 11/03/2023 |
| ENV ARCHITECTS, DPC | 2 | 01/25/2023 |
| TPG ARCHITECTURE, LLP | 8 | 11/29/2022 |
| HC ARCHITECT, PC | 1 | 05/19/2022 |
| SPECTOR GROUP II LLP | 2 | 10/19/2021 |
| GACE DPC | 1 | 03/04/2021 |
| ASHRAF CORP | 2 | 05/28/2020 |
| DOOLING & COMPANY ARCHITECTS | 1 | 04/10/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| JM ZONING, LLC. | 63 | 03/21/2026 |
| METROPOLIS GROUP INC | 86 | 03/21/2026 |
| GREEN LIGHT EXPEDITING LLC | 12 | 03/21/2026 |
| EMPIRE CITY CONSULTANTS, INC. | 4 | 03/21/2026 |
| KMA DESIGNS LLC | 4 | 03/21/2026 |
| RIZZO GROUP | 6 | 03/21/2026 |
| WHIDDEN SILVER | 6 | 03/21/2026 |
| HS DESIGN STUDIO | 2 | 03/21/2026 |
| JP EXPEDITE | 2 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SAVCON LLC | General Contractor | 17 | 07/08/2026 |
| PLAZA CONSTRUCTION LLC | General Contractor | 15 | 07/08/2026 |
| FIVE BORO ASSOCIATES INC | Fire Protection | 10 | 07/08/2026 |
| SOLUTION MECH CONTNG LLC | Plumbing | 8 | 07/08/2026 |
| AFFECT BUILD LLC | General Contractor | 8 | 07/08/2026 |
| VANQUISH GROUP INC | General Contractor | 7 | 07/08/2026 |
| WHALEN CONSTRUCTION, INC | General Contractor | 6 | 08/12/2026 |
| W5 GROUP LLC | General Contractor | 5 | 05/15/2026 |
| LAWRENCE EXTERIOR RESTORATION | General Contractor | 4 | 07/08/2026 |
| ALLERTONFOX CONSTRUCTION | General Contractor | 4 | 07/08/2026 |
| ARMON MECHANICAL INC | Fire Protection | 4 | 07/08/2026 |
| KINGS GROUP NY CORP | General Contractor | 3 | 07/08/2026 |
| NEW ROC CONTRACTING CORP | General Contractor | 3 | 04/09/2026 |
| ARMON MECHANICAL INC | Plumbing | 3 | 07/08/2026 |
| EVEREST SCAFFOLDING INC | General Contractor | 3 | 07/08/2026 |
| AMERICAN STANDARD P&H CORORP. | Plumbing | 2 | 07/08/2026 |
| ADVANCED PLBG, MECH & SPR | Fire Protection | 2 | 07/08/2026 |
| SIGNATURE CONSTRUCTION GROUP | General Contractor | 2 | 04/09/2026 |
| HYDRONIC CONCEPTS NY PLBG | Fire Protection | 2 | 07/08/2026 |
| ENOBRAC PLUMBING, INC | Fire Protection | 1 | 07/08/2026 |
| METRO FIRE PROTECTION INC | Fire Protection | 1 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 1 | 09/24/2026 |
| ADVANCED PLUMBING MECH | Plumbing | 1 | 07/08/2026 |
| ENOBRAC PLUMBING, INC | Plumbing | 1 | 07/08/2026 |
| HYDRONIC CONCEPTS NY P&H | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CONCESSI ENGINEERING, P.C | 540 | 4 | 08/17/2026 |
| MG ENGINEERING D.P.C. | 8546 | 29 | 07/02/2026 |
| RAAD | 7727 | 1 | 06/08/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 9 | 01/21/2026 |
| GILSANZ MURRAY STEFICEK | 240 | 4 | 12/09/2025 |
| GEORGE J. XERAKIAS, PE | 1658 | 1 | 05/23/2025 |
| MEP INSPECTIONS, INC | 1102 | 8 | 11/03/2023 |
| ALAN MARGOLIN & ASSOC | 423 | 24 | 01/25/2023 |
| PSI AGENCY INC. | 254 | 6 | 10/29/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | BEDROCK MECHANICAL INC | 09/28/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 09/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | WHALEN CONSTRUCTION, INC | 08/11/2026 |
| DOB NOW | Plumbing | Permit Issued | MCL NY INDUSTRIES CORP | 06/24/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | WHALEN CONSTRUCTION, INC | 06/12/2026 |
| DOB NOW | Sprinklers | Permit Issued | ARMON MECHANICAL INC | 05/29/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | KINGS GROUP NY CORP | 05/22/2026 |
| DOB NOW | General Construction | Permit Issued | W5 GROUP LLC | 05/13/2026 |
| DOB NOW | Sprinklers | Signed-off | AMERICAN STANDARD P&H CORORP. | 04/22/2026 |
| DOB NOW | Plumbing | Signed-off | AMERICAN STANDARD P&H CORORP. | 03/27/2026 |
| DOB NOW | Sprinklers | Signed-off | AMERICAN STANDARD PLUMBIN | 03/27/2026 |
| DOB NOW | General Construction | Signed-off | SIGNATURE CONSTRUCTION GR | 03/10/2026 |
| DOB NOW | Mechanical Systems | Signed-off | SIGNATURE CONSTRUCTION GR | 03/10/2026 |
| DOB NOW | Sprinklers | Permit Issued | ARMON MECHANICAL INC | 01/27/2026 |
| DOB NOW | Plumbing | Permit Issued | ARMON MECHANICAL INC | 01/27/2026 |
| DOB NOW | Plumbing | Permit Issued | ARMON MECHANICAL INC | 01/25/2026 |
| DOB NOW | Plumbing | Permit Issued | ARMON MECHANICAL INC | 01/16/2026 |
| DOB NOW | Sprinklers | Permit Issued | ARMON MECHANICAL INC | 01/16/2026 |
| DOB NOW | Sprinklers | Permit Issued | ARMON MECHANICAL INC | 01/16/2026 |
| DOB NOW | General Construction | Signed-off | AFFECT BUILD LLC | 01/14/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | W5 GROUP LLC | 01/14/2026 |
| DOB NOW | General Construction | Signed-off | W5 GROUP LLC | 01/14/2026 |
| DOB NOW | General Construction | Signed-off | AFFECT BUILD LLC | 01/14/2026 |
| DOB NOW | General Construction | Permit Issued | AFFECT BUILD LLC | 01/14/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | AFFECT BUILD LLC | 01/13/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | AFFECT BUILD LLC | 01/12/2026 |
| DOB NOW | Sprinklers | Permit Issued | FIVE BORO ASSOCIATES INC | 01/09/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | AFFECT BUILD LLC | 01/09/2026 |
| DOB NOW | Plumbing | Signed-off | SOLUTION MECH CONTNG LLC | 01/09/2026 |
| DOB NOW | Structural | Permit Issued | NEW ROC CONTRACTING CORP | 01/08/2026 |
| DOB NOW | Plumbing | Signed-off | BENT MECHANICAL CORP | 01/06/2026 |
| DOB NOW | General Construction | Permit Issued | NEW ROC CONTRACTING CORP | 12/26/2025 |
| DOB NOW | Sprinklers | Signed-off | BENT MECHANICAL CORP | 12/19/2025 |
| DOB NOW | Sprinklers | Signed-off | HYDRONIC CONCEPTS NY P&H | 12/19/2025 |
| DOB NOW | General Construction | Signed-off | WHALEN CONSTRUCTION, INC | 10/31/2025 |
| DOB NOW | Mechanical Systems | Signed-off | WHALEN CONSTRUCTION, INC | 10/27/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | PLAZA CONSTRUCTION LLC | 10/16/2025 |
| DOB NOW | Sprinklers | Signed-off | FIVE BORO ASSOCIATES INC | 10/10/2025 |
| DOB NOW | General Construction | Signed-off | NEW ROC CONTRACTING CORP | 10/01/2025 |
| DOB NOW | Mechanical Systems | Signed-off | PLAZA CONSTRUCTION LLC | 08/29/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/08/2026 | Permit Issued | WHALEN CONSTRUCTION, INC | Air Conditioning Systems | Cooling Mitsubishi Electric PUY-AK18NL 18,000 BTU · Condensing Unit ×1 |
| 03/02/2026 | Signed-off | SIGNATURE CONSTRUCTION GR | Air Conditioning Systems, Heating Systems | |
| 01/21/2026 | Signed-off | ALLERTONFOX CONSTRUCTION | Heating and Air Conditioning Systems | Heat / Cool |
| 01/07/2026 | Signed-off | AFFECT BUILD LLC | Air Conditioning Systems, Heating Systems | |
| 01/02/2026 | Signed-off | AFFECT BUILD LLC | Air Conditioning Systems | |
| 08/08/2025 | Signed-off | PLAZA CONSTRUCTION LLC | Air Conditioning Systems | Cooling Lg KUSAB121A 11,180 BTU · Vrf Outdoor ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/17/2026 | Signed-off | BENT MECHANICAL CORP | — |
| 08/04/2026 | Permit Issued | BEDROCK MECHANICAL INC | Sprinkler System |
| 02/26/2026 | Signed-off | AMERICAN STANDARD PLUMBIN | 94 heads, 1 outlets |
| 01/21/2026 | Signed-off | FIVE BORO ASSOCIATES INC | Sprinkler System |
| 01/07/2026 | Permit Issued | ARMON MECHANICAL INC | Sprinkler System |
| 01/02/2026 | Permit Issued | ARMON MECHANICAL INC | Sprinkler System |
| 08/21/2025 | Signed-off | FIVE BORO ASSOCIATES INC | 11 heads |
| 08/08/2025 | Signed-off | METRO FIRE PROTECTION INC | 24 heads |
| 01/25/2023 | — | — | 181 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/17/2026 | Signed-off | HYDRONIC CONCEPTS NY P&H | Water/Sanitary |
| 08/04/2026 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 03/02/2026 | Signed-off | AMERICAN STANDARD P&H COR | Water/Sanitary |
| 01/21/2026 | Signed-off | SOLUTION MECH CONTNG LLC | Water/Sanitary |
| 01/07/2026 | Permit Issued | ARMON MECHANICAL INC | Water/Sanitary |
| 01/02/2026 | Permit Issued | ARMON MECHANICAL INC | Water/Sanitary |
| 08/21/2025 | — | — | — |
| 01/25/2023 | — | — | Water/Sanitary |
| 03/01/2021 | Signed-off | PACE PLUMBING CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/06/2026 | Permit Issued | JTE ELECTRICAL SERVICES | General Wiring |
| 03/31/2026 | Permit Issued | SUNBIRD ELECTRICAL CONTR | General Wiring |
| 01/23/2026 | Permit Issued | ENNELL GRP ELECTRIC CORP | General Wiring |
| 01/23/2026 | Permit Issued | ENNELL GRP ELECTRIC CORP | General Wiring |
| 11/28/2025 | Complete | MODERN VOLTAGE NYC INC | General Wiring |
| 10/27/2025 | Permit Issued | CONTROL ELEC'L CONT'G COR | General Wiring |
| 06/05/2025 | Permit Issued | HIGH QUALITY ELEC.OF NYC | — |
| 05/05/2025 | Complete | EXECUTIVE ELECTL SER INC | General Wiring |
| 04/07/2025 | Complete | MIKOMA ELECTRIC LLC | General Wiring |
| 06/14/2022 | Complete | METROPOLIS ELECTRIC CORP | General Wiring |
| 02/16/2022 | Complete | METROPOLIS ELECTRIC CORP | General Wiring |
| 10/21/2021 | Complete | FREEDOM ELECTL & DATA INC | General Wiring |
| 05/07/2021 | Complete | C.M. RICHEY ELEC'L CONTR | General Wiring |
| 12/22/2020 | Complete | 5 J'S ELECTL CONTS CORP | — |
| 08/25/2020 | Complete | C.M. RICHEY ELEC'L CONTR | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/09/2025 | Permit Issued | MCL NY INDUSTRIES CORP | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2026 | Signed-off | KINGS GROUP NY CORP | Scaffold, Sidewalk Shed |
| 04/10/2020 | Permit Issued | LAWRENCE EXTERIOR RESTORA | Scaffold |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/10/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/09/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/04/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 06/02/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/02/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 05/08/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 05/08/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/04/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/30/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 04/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/21/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/02/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/01/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/27/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/11/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 03/11/2026 | Certified Gas-Gas-Piping-Underground | Certified | View ↗ |
| 03/05/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/10/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/04/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 02/04/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 02/02/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/20/2026 | Sprinkler Systems | Robert Concessi | special |
| 08/20/2026 | Post-installed Anchors | Robert Concessi | special |
| 08/20/2026 | Fire-Resistant Penetrations and Joints | Robert Concessi | special |
| 08/03/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 08/03/2026 | Fire-Resistance Rated Construction | — | progress |
| 06/04/2026 | HVAC-R and service water piping design and insulation | NICHOLAS AZADIAN | energy_progress |
| 06/04/2026 | Energy Code Compliance Inspections | NICHOLAS AZADIAN | progress |
| 06/04/2026 | Fire-Resistant Penetrations and Joints | NICHOLAS AZADIAN | special |
| 06/04/2026 | HVAC-R and service water heating equipment | NICHOLAS AZADIAN | energy_progress |
| 06/04/2026 | HVAC-R and service water heating system controls | NICHOLAS AZADIAN | energy_progress |
| 06/03/2026 | Final | NICHOLAS AZADIAN | progress |
| 06/03/2026 | Mechanical Systems | NICHOLAS AZADIAN | special |
| 05/13/2026 | HVAC-R and service water piping design and insulation | Peter Gerazounis | energy_progress |
| 05/13/2026 | HVAC-R and service water heating equipment | Peter Gerazounis | energy_progress |
| 05/13/2026 | HVAC-R and service water heating system controls | Peter Gerazounis | energy_progress |
| 05/12/2026 | Energy Code Compliance Inspections | Peter Gerazounis | progress |
| 05/12/2026 | Fire-Resistant Penetrations and Joints | Peter Gerazounis | special |
| 05/12/2026 | Post-installed Anchors | Peter Gerazounis | special |
| 05/12/2026 | Post-installed Anchors | Peter Gerazounis | special |
| 05/12/2026 | Fire-Resistant Penetrations and Joints | Peter Gerazounis | special |
| 05/06/2026 | Energy Code Compliance Inspections | Peter Gerazounis | progress |
| 05/06/2026 | Fire-Resistant Penetrations and Joints | Peter Gerazounis | special |
| 05/06/2026 | Lighting controls | Peter Gerazounis | energy_progress |
| 05/06/2026 | Post-installed Anchors | Peter Gerazounis | special |
| 05/06/2026 | Interior lighting power | Peter Gerazounis | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Webster Bank | Office | Floors 5, 6 | Project M01295741 |