Elevator apt, fireproof without stores
Van Dyke I (NYCHA)
373 MOTHER GASTON BLVD · BIN 3328024
💬 Discuss this project
1953Year Built
14Stories
D3Building Class
R6Zoning
497,397 sfGross Floor Area
628Units
LL97 Covered20 Open Violations 19 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 337,075 sf lot · 1.48 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Roof1p · 1 filing · 14 docs
Bulkhead1p · 1 filing · 3 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA3009/01/2026
NEW YORK CITY HOUSING AUTHORITY1304/09/2026
NYC HOUSING AUTHORITY303/22/2026
ZORIA HOUSING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS603/21/2026
NERIS403/21/2026
SYNERGY STRATEGIC DESIGN ARCHITECTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KORDUN CONSTRUCTION CORPGeneral Contractor1307/08/2026
J & N CONSTRUCTION GROUPGeneral Contractor704/09/2026
KORDUN CONSTRUCTION CORPPlumbing307/08/2026
ANDREW DRAZICElectrical103/21/2026
D.D.S. MECH PBG&HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUREAU VERITAS NA6902705/28/2026
MP ENGINEERS & ARCHITECTS1438202/23/2023
Building Lifecycle
All (113)Filed (18)Permit Issued (19)Signed Off (9)Violation (5)Inspection (6)Objection (26)Special Inspection (30)
08/31/2026
Signed off — Alteration
MECHANICAL WORK FOR CENTRAL BOILER PLANT AND DOMESTIC HOT WATER SYSTEM REPLACEMENT (VAN DYKE BLDG #9) AS PER THE PLANS FILED HEREWITH.
B00462722-I1
08/13/2026
Signed off — Alteration
"NYCHA BOILER" GENERAL CONSTRUCTION IN THE CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00455362-I1
08/11/2026
Signed off — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
B08025777-I1
06/15/2026
Signed off — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00463342-I1
06/09/2026
Special inspection requirement — Final
IBRAHIM MOURAD
06/09/2026
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
06/09/2026
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
06/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
06/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
06/09/2026
Special inspection requirement — Permanent certificate
IBRAHIM MOURAD
06/09/2026
Special inspection requirement — Electrical motors and elevators
IBRAHIM MOURAD
06/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
06/09/2026
Special inspection requirement — Mechanical Systems
IBRAHIM MOURAD
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
06/09/2026
Special inspection requirement — Chimneys and vents
IBRAHIM MOURAD
05/28/2026
Filed — Alteration
MECHANICAL WORK FOR CENTRAL BOILER PLANT AND DOMESTIC HOT WATER SYSTEM REPLACEMENT (VAN DYKE BLDG #9) AS PER THE PLANS FILED HEREWITH.
B00462722-P1
04/01/2026
Signed off — Alteration
Roofing Replacement and Roof Structure Renovation
B00783964-I1
03/31/2026
Permit issued — General Construction
B00455362-I1-GC
03/31/2026
Permit issued — Mechanical Systems
B00462722-I1-MS
03/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/05/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/03/2026
Permit issued — Plumbing
B00463342-I1-PL
12/19/2025
Permit issued — General Construction
B00783964-I1-GC
12/05/2025
Signed off — Alteration
B01096390-I1
12/03/2025
Permit issued — Plumbing
B08025777-I1-PL
10/17/2025
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 371 BLAKE AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01047755-I1
10/17/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 371 BLAKE AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01042822-I1
10/17/2025
Signed off — Alteration
INSTALLATION OF SUPPORTED PIPE SCAFFOLD AT 371 BLAKE AVENUE BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01041601-I1
08/04/2025
Permit issued — General Construction
B00783964-I1-GC
07/29/2025
Special inspection requirement — Post-installed Anchors
IBRAHIM MOURAD
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
07/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
07/24/2025
Filed — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
B08025777-P3
07/18/2025
Special inspection requirement — Post-installed Anchors
IBRAHIM MOURAD
07/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
06/05/2025
Filed — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
B08025777-P2
05/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/30/2025
Special inspection requirement — Post-installed Anchors
04/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/28/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/10/2025
Permit issued — Mechanical Systems
B00462722-I1-MS
03/31/2025
Permit issued — General Construction
B00455362-I1-GC
03/27/2025
Filed — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
B08025777-P1
03/06/2025
Special inspection requirement — Final
IBRAHIM MOURAD
03/06/2025
Special inspection requirement — Structural Cold-Formed Steel
IBRAHIM MOURAD
03/06/2025
Special inspection requirement — Concrete - Cast-In-Place
IBRAHIM MOURAD
03/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/05/2025
Special inspection requirement — Post-installed Anchors
03/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/27/2025
Filed — Alteration
STRUCTURAL RELATED WORK IN THE CELLAR FOR CENTRAL BOILER PLANT AND DOMESTIC HOTWATER SYSTEM REPLACEMENT
B00458387-P1
01/29/2025
Permit issued — Plumbing
B00463342-I1-PL
08/15/2024
Permit issued — Protection and Mechanical Methods
B01096390-I1-PMM
08/14/2024
Filed — Alteration
B01096390-I1
08/07/2024
Permit issued — General Construction
B00783964-I1-GC
08/02/2024
Special inspection requirement — Air barrier - visual inspection
JAMES WILSON
08/02/2024
Special inspection requirement — Masonry
JAMES WILSON
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP03/31/2026
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP03/31/2026
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP02/03/2026
DOB NOWGeneral ConstructionSigned-offJ & N CONSTRUCTION GROUP12/19/2025
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP12/03/2025
DOB NOWGeneral ConstructionSigned-offJ & N CONSTRUCTION GROUP08/04/2025
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/10/2025
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP03/31/2025
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP01/29/2025
DOB NOWProtection and Mechanical MethodsSigned-offJ & N CONSTRUCTION GROUP08/15/2024
DOB NOWGeneral ConstructionSigned-offJ & N CONSTRUCTION GROUP08/07/2024
DOB NOWSidewalk ShedSigned-offJ & N CONSTRUCTION GROUP05/09/2024
DOB NOWConstruction FenceSigned-offJ & N CONSTRUCTION GROUP04/30/2024
DOB NOWSupported ScaffoldSigned-offJ & N CONSTRUCTION GROUP04/26/2024
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/05/2024
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP04/04/2024
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP12/14/2023
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP12/13/2023
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP12/06/2023
BISPLISSUEDJCC CONSTRUCTION CORP10/28/2017
BISEQISSUEDZORIA HOUSING, LLC08/07/2015
BISEQISSUEDZORIA HOUSING, LLC07/08/2015
BISOTISSUEDZORIA HOUSING, LLC07/07/2015
BISEQISSUEDVIKRANT CONTRACTING & BUILDER06/23/2015
BISEQISSUEDAMC UNITED INC04/03/2002
BISPLISSUEDOLIMPIA MECH05/20/1999
1 project · most recent 05/28/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/28/2026Signed-offKORDUN CONSTRUCTION CORPVentilation Systems
Ventilation
Greenheck AER-S20C 1,000 CFM · Exhaust Fan ×4
2 projects · most recent 07/24/2025
Gas Storm
FiledStatusContractorScope
07/24/2025Signed-offD.D.S. MECH PBG&HTG CORPGas
07/25/2024——Storm
9 projects · most recent 04/26/2024
General Wiring
FiledStatusContractorScope
04/26/2024CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
04/16/2024CompleteAUJLA ELECTRIC CORP—
06/26/2023Permit IssuedMECO ELECTRIC CO. INC.General Wiring
11/29/2020CancelledCITY GRID ELECTRIC CORPGeneral Wiring
11/29/2020CancelledCITY GRID ELECTRIC CORPGeneral Wiring
10/30/2020CompleteCITY GRID ELECTRIC CORPGeneral Wiring
10/30/2020CompleteCITY GRID ELECTRIC CORPGeneral Wiring
08/15/2018CompleteJEMCO ELECT. CONTRS INCGeneral Wiring
07/23/2018CompleteZENA ELECTRIC INC—
1 project · most recent 02/27/2025
Concrete
FiledStatusContractorScope
02/27/2025——Concrete
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/05/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
06/09/2026FinalIBRAHIM MOURADprogress
06/09/2026Energy Code Compliance InspectionsIBRAHIM MOURADprogress
06/09/2026Maintenance informationIBRAHIM MOURADenergy_progress
06/09/2026HVAC-R and service water heating system controlsIBRAHIM MOURADenergy_progress
06/09/2026HVAC-R and service water heating equipmentIBRAHIM MOURADenergy_progress
06/09/2026Permanent certificateIBRAHIM MOURADenergy_progress
06/09/2026Electrical motors and elevatorsIBRAHIM MOURADenergy_progress
06/09/2026HVAC-R and service water piping design and insulationIBRAHIM MOURADenergy_progress
06/09/2026Mechanical SystemsIBRAHIM MOURADspecial
06/09/2026Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
06/09/2026Chimneys and ventsIBRAHIM MOURADspecial
07/29/2025Post-installed AnchorsIBRAHIM MOURADspecial
07/29/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
07/29/2025Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
07/18/2025Post-installed AnchorsIBRAHIM MOURADspecial
07/18/2025Tenant Protection Plan Compliance—special
07/18/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
04/30/2025Tenant Protection Plan Compliance—special
04/30/2025Post-installed Anchors—special
04/30/2025Fire-Resistant Penetrations and Joints—special
03/06/2025FinalIBRAHIM MOURADprogress
03/06/2025Structural Cold-Formed SteelIBRAHIM MOURADspecial
03/06/2025Concrete - Cast-In-PlaceIBRAHIM MOURADspecial
03/05/2025Tenant Protection Plan Compliance—special
03/05/2025Post-installed Anchors—special
Latest 25 of 43.
▾Documents — 166 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch11
08/25/2026B01041601-I1Request digital key ↗
08/25/2026B01042822-I1Request digital key ↗
08/25/2026B01047755-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/16/2026B00462722-I1Request digital key ↗
08/16/2026B00462722-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00463342-I1Request digital key ↗
08/14/2026B00463342-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/01/2026B00458387-I1Request digital key ↗
09/01/2026B00458387-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/14/2026B00455362-I1Request digital key ↗
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION7
10/26/2017340557374Open ↗
10/16/2015340272305Open ↗
08/07/2015340280699Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
12/21/2017340557374Open ↗
10/26/2017340557374Open ↗
07/14/2015340280699Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications58
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/01/2026B00463342-P1Open ↗
09/01/2026B00463342-I1Open ↗
09/01/2026B00455362-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026B08025777-I1Open ↗
09/02/2026B08025777-I1Open ↗
09/02/2026B00458387-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
08/09/2019340557374Open ↗
07/29/2019340557374Open ↗
07/29/2019340557374Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026B00458387-I1Open ↗
08/25/2026B00455362-I1Open ↗
08/25/2026B00455362-I1Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
10/26/2017340557374Open ↗
07/14/2015340280699Open ↗
07/07/2015340277603Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
10/26/2017340557374Open ↗
07/14/2015340280699Open ↗
07/07/2015340277603Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
10/26/2017340557374Open ↗
07/14/2015340280699Open ↗
07/07/2015340277603Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
10/26/2017340557374Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
10/26/2017340557374Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/01/2026B00463342-I1Open ↗
09/01/2026B00458387-I1Open ↗
08/24/2026B00783964-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
07/14/2015340272305Open ↗
07/14/2015340280699Open ↗
07/06/2015340272305Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026B08025777-P3Open ↗
08/22/2026B08025777-I1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00462722-I1Open ↗
08/14/2026B00455362-I1Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/22/2015340273812Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
10/26/2017340557374Open ↗
07/14/2015340272305Open ↗
07/14/2015340280699Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs45
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
09/01/2026B00463342-I1Open ↗
09/01/2026B00458387-P1Open ↗
09/01/2026B00458387-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)11
09/01/2026B00458387-I1Open ↗
09/01/2026B00458387-P1Open ↗
08/16/2026B00462722-P1Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
11/20/2015340280699Open ↗
11/05/2015340273812Open ↗
11/05/2015340277603Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
08/09/2019340557374Open ↗
11/20/2015340280699Open ↗
11/05/2015340273812Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)5
09/01/2026B00458387-I1Open ↗
08/22/2026B08025777-I1Open ↗
08/16/2026B00462722-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B00783964-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
08/09/2019340557374Open ↗
10/26/2017340557374Open ↗
11/05/2015340272305Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms7
▸BISEFILING JOB APPLICATION COVER SHEET5
10/26/2017340557374Open ↗
07/14/2015340280699Open ↗
07/07/2015340277603Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM1
08/09/2019340557374Open ↗
▸DOB NOWAI1 Form (from plan PDF)1