← Back
Elevator apt, fireproof without stores
Van Dyke I (NYCHA)
373 MOTHER GASTON BLVD · Brownsville · BIN 3328027
💬 Discuss this project
1953Year Built
14Stories
D3Building Class
R6Zoning
497,397 sfGross Floor Area
628Units
LL97 Covered20 Open Violations 19 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 337,075 sf lot · 1.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof1 filing · 18 docs
Bulkhead1p · 1 filing · 3 docs
Floor 152 filings · 19 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
CellarUnder Construction3p · 4 filings · 20 docs
Site & exterior3 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA3209/24/2026
NEW YORK CITY HOUSING AUTHORITY1004/09/2026
ZORIA HOUSING203/21/2026
NYC Housing Authority203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS803/21/2026
NERIS403/21/2026
SYNERGY STRATEGIC DESIGN ARCHITECTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KORDUN CONSTRUCTION CORPGeneral Contractor1209/24/2026
J & N CONSTRUCTION GROUPGeneral Contractor704/09/2026
KORDUN CONSTRUCTION CORPPlumbing307/08/2026
D.D.S. MECH PBG&HTG CORPPlumbing107/04/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUREAU VERITAS NA6902808/10/2026
MP ENGINEERS & ARCHITECTS1438110/14/2022
Building Lifecycle
All (88)Filed (19)Permit Issued (18)Signed Off (8)Violation (2)Inspection (6)Objection (14)Special Inspection (21)
09/23/2026
Permit issued — Structural
B00458348-I1-ST
08/25/2026
Signed off — Alteration
B00462689-I1
08/13/2026
Signed off — Alteration
GENERAL CONSTRUCTION IN CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00455254-I1
08/10/2026
Filed — Alteration
NYCHA BOILER-STRUCTURAL RELATED WORK IN THE CELLAR FOR CENTRAL BOILER PLANT AND DOMESTIC HOTWATER SYSTEM REPLACEMENT
B00458348-P2
08/05/2026
Signed off — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
B08025772-I1
08/05/2026
Signed off — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00463305-I1
07/22/2026
Special inspection requirement — Concrete - Cast-In-Place
IBRAHIM MOURAD
07/22/2026
Special inspection requirement — Final
IBRAHIM MOURAD
05/26/2026
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00463305-P3
04/01/2026
Signed off — Alteration
Roofing Replacement and Roof Structure Renovation
B00783933-I1
03/05/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/25/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/19/2025
Permit issued — General Construction
B00783933-I1-GC
10/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/17/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 421 BLAKE AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01042800-I1
10/17/2025
Signed off — Alteration
INSTALLATION OF SUPPORTED PIPE SCAFFOLD AT 421 BLAKE AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01041474-I1
10/17/2025
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 421 BLAKE AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01040799-I1
07/29/2025
Permit issued — Plumbing
B08025772-I1-PL
07/24/2025
Special inspection requirement — Post-installed Anchors
IBRAHIM MOURAD
07/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
07/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
07/22/2025
Permit issued — General Construction
B00455254-I1-GC
07/18/2025
Filed — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
B08025772-P2
07/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/11/2025
Permit issued — Plumbing
B00463305-I1-PL
07/11/2025
Permit issued — Mechanical Systems
B00462689-I1-MS
06/05/2025
Filed — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
B08025772-P1
04/25/2025
Objection resolved — Addressed
04/24/2025
Objection raised — Other
04/14/2025
Filed — Alteration
GENERAL CONSTRUCTION IN CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00455254-P1
04/14/2025
Special inspection requirement — Interior lighting power
Ronnette Riley
04/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Ronnette Riley
04/14/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Ronnette Riley
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
Ronnette Riley
04/07/2025
Special inspection requirement — Final
IBRAHIM MOURAD
03/07/2025
Filed — Alteration
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00463305-P2
01/22/2025
Filed — Alteration
NYCHA BOILER-STRUCTURAL RELATED WORK IN THE CELLAR FOR CENTRAL BOILER PLANT AND DOMESTIC HOTWATER SYSTEM REPLACEMENT
B00458348-P1
10/04/2024
Special inspection requirement — Structural Steel - High Strength Bolting
08/05/2024
Permit issued — General Construction
B00783933-I1-GC
07/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES WILSON
07/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES WILSON
07/31/2024
Special inspection requirement — Post-installed Anchors
JAMES WILSON
07/31/2024
Special inspection requirement — Masonry
JAMES WILSON
07/31/2024
Special inspection requirement — Insulation placement and R values
JAMES WILSON
07/31/2024
Special inspection requirement — Air barrier - visual inspection
JAMES WILSON
07/30/2024
Special inspection requirement — Final
IBRAHIM MOURAD
07/30/2024
Special inspection requirement — Concrete - Cast-In-Place
IBRAHIM MOURAD
07/25/2024
Filed — Alteration
Roofing Replacement and Roof Structure Renovation
B00783933-P1
07/10/2024
Permit issued — Mechanical Systems
B00462689-I1-MS
07/09/2024
Permit issued — General Construction
B00455254-I1-GC
07/09/2024
Permit issued — Plumbing
B00463305-I1-PL
05/20/2024
Permit issued — Sidewalk Shed
B01040799-I1-SH
04/30/2024
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 421 BLAKE AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01042800-I1
04/30/2024
Permit issued — Construction Fence
B01042800-I1-FN
04/26/2024
Permit issued — Supported Scaffold
B01041474-I1-SF
04/25/2024
Filed — Alteration
INSTALLATION OF SUPPORTED PIPE SCAFFOLD AT 421 BLAKE AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01041474-I1
04/24/2024
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 421 BLAKE AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01040799-I1
04/04/2024
Permit issued — General Construction
B00455254-I1-GC
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedKORDUN CONSTRUCTION CORP09/23/2026
DOB NOWGeneral ConstructionSigned-offJ & N CONSTRUCTION GROUP12/19/2025
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP07/29/2025
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP07/22/2025
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP07/11/2025
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP07/11/2025
DOB NOWGeneral ConstructionSigned-offJ & N CONSTRUCTION GROUP08/05/2024
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP07/10/2024
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP07/09/2024
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP07/09/2024
DOB NOWSidewalk ShedSigned-offJ & N CONSTRUCTION GROUP05/20/2024
DOB NOWConstruction FenceSigned-offJ & N CONSTRUCTION GROUP04/30/2024
DOB NOWSupported ScaffoldSigned-offJ & N CONSTRUCTION GROUP04/26/2024
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP04/04/2024
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/04/2024
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP12/12/2023
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP12/11/2023
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP12/11/2023
BISEQISSUEDZORIA HOUSING, LLC07/15/2015
BISEQISSUEDZORIA HOUSING, LLC07/08/2015
BISOTISSUEDZORIA HOUSING, LLC07/07/2015
BISEQISSUEDVIKRANT CONTRACTING & BUILDER06/23/2015
BISEQISSUEDAMC UNITED INC02/04/2002
BISPLISSUEDOLIMPIA MECH05/20/1999
3 projects · most recent 05/26/2026
Gas Water/Sanitary Storm
FiledStatusContractorScope
05/26/2026Signed-offKORDUN CONSTRUCTION CORPGas, Water/Sanitary
07/18/2025Signed-offD.D.S. MECH PBG&HTG CORPGas
07/25/2024——Storm
7 projects · most recent 04/26/2024
General Wiring
FiledStatusContractorScope
04/26/2024CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
04/16/2024Permit IssuedAUJLA ELECTRIC CORP—
06/26/2023Permit IssuedMECO ELECTRIC CO. INC.General Wiring
10/18/2020CompleteCITY GRID ELECTRIC CORPGeneral Wiring
10/18/2020CompleteCITY GRID ELECTRIC CORPGeneral Wiring
08/15/2018CompleteJEMCO ELECT. CONTRS INCGeneral Wiring
07/14/2018CompleteZENA ELECTRIC INC—
1 project · most recent 08/10/2026
Concrete
FiledStatusContractorScope
08/10/2026Permit IssuedKORDUN CONSTRUCTION CORPConcrete
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/05/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/25/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/19/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
07/22/2026Concrete - Cast-In-PlaceIBRAHIM MOURADspecial
07/22/2026FinalIBRAHIM MOURADprogress
07/24/2025Post-installed AnchorsIBRAHIM MOURADspecial
07/24/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
07/24/2025Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
04/14/2025Interior lighting powerRonnette Rileyenergy_progress
04/14/2025Energy Code Compliance InspectionsRonnette Rileyprogress
04/14/2025Fenestration and door U-factor and product ratingsRonnette Rileyenergy_progress
04/07/2025Fire-Resistant Penetrations and Joints—special
04/07/2025Fire-Resistance Rated ConstructionRonnette Rileyprogress
04/07/2025FinalIBRAHIM MOURADprogress
10/04/2024Structural Steel - High Strength Bolting—special
07/31/2024Fire-Resistant Penetrations and JointsJAMES WILSONspecial
07/31/2024Structural Stability – Alterations of existing buildingsJAMES WILSONspecial
07/31/2024Post-installed AnchorsJAMES WILSONspecial
07/31/2024MasonryJAMES WILSONspecial
07/31/2024Insulation placement and R valuesJAMES WILSONenergy_progress
07/31/2024Air barrier - visual inspectionJAMES WILSONenergy_progress
07/30/2024FinalIBRAHIM MOURADprogress
07/30/2024Concrete - Cast-In-PlaceIBRAHIM MOURADspecial
01/03/2023Tenant Protection Plan Compliance—special
▾Documents — 150 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch9
08/25/2026B01040799-I1Request digital key ↗
08/25/2026B01041474-I1Request digital key ↗
08/25/2026B01042800-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/16/2026B00463305-P3Request digital key ↗
08/16/2026B00463305-P2Request digital key ↗
08/16/2026B00463305-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural3
09/01/2026B00458348-I1Request digital key ↗
09/01/2026B00458348-P2Request digital key ↗
08/15/2026B00458348-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
08/21/2026B00455254-I1Request digital key ↗
08/14/2026B00455254-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/01/2026B00462689-I1Request digital key ↗
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION5
10/16/2015340277541Open ↗
07/14/2015340280653Open ↗
07/06/2015340277541Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
07/14/2015340280653Open ↗
07/06/2015340277541Open ↗
07/06/2015340272163Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/01/2026B00462689-I1Open ↗
09/01/2026B00458348-P2Open ↗
09/01/2026B00458348-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/25/2026B00783933-I1Open ↗
08/25/2026B00783933-I1Open ↗
08/25/2026B00455254-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/26/2026B08025772-I1Open ↗
08/26/2026B08025772-I1Open ↗
08/25/2026B00783933-I1Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
07/14/2015340280653Open ↗
07/06/2015340277541Open ↗
07/06/2015340272163Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
11/05/2015340273803Open ↗
11/05/2015340280653Open ↗
11/05/2015340277541Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
07/14/2015340280653Open ↗
07/06/2015340277541Open ↗
07/06/2015340272163Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
07/14/2015340280653Open ↗
07/06/2015340277541Open ↗
07/06/2015340272163Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/01/2026B00462689-I1Open ↗
09/01/2026B00458348-I1Open ↗
08/21/2026B00455254-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/14/2015340280653Open ↗
07/06/2015340272163Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026B08025772-P2Open ↗
08/14/2026B08025772-I1Open ↗
▸Energy Compliance2
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/22/2015340273803Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/21/2026B00455254-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
07/15/2015340277541Open ↗
07/14/2015340280653Open ↗
07/06/2015340277541Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs44
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
09/01/2026B00462689-I1Open ↗
09/01/2026B00458348-P2Open ↗
09/01/2026B00458348-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)13
09/01/2026B00458348-P2Open ↗
08/16/2026B00463305-P3Open ↗
08/13/2026B00455254-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)6
09/01/2026B00462689-I1Open ↗
09/01/2026B00458348-I1Open ↗
08/21/2026B00455254-I1Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
11/05/2015340273803Open ↗
11/05/2015340280653Open ↗
11/05/2015340277541Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/15/2015340277541Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B00783933-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/05/2015340272163Open ↗
07/06/2015340272163Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET4
07/14/2015340280653Open ↗
07/06/2015340277541Open ↗
07/06/2015340272163Open ↗
Showing 3 of 4 on file for this type
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
11/05/2015340273803Open ↗
11/05/2015340280653Open ↗
11/05/2015340277541Open ↗
Showing 3 of 4 on file for this type