← Back
Elevator apt, fireproof without stores
Van Dyke I (NYCHA)
373 MOTHER GASTON BLVD · Brownsville · BIN 3328026
💬 Discuss this project
1953Year Built
14Stories
D3Building Class
R6Zoning
497,397 sfGross Floor Area
628Units
LL97 Covered22 Open Violations 21 unresolved · 1 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 337,075 sf lot · 1.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction12p · 4 filings · 20 docs
BulkheadUnder Construction3p · 2 filings · 19 docs
Cellar4 filings
Site & exteriorUnder Construction7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA7009/13/2026
NEW YORK CITY HOUSING AUTHORITY1308/04/2026
NYC Housing Authority503/21/2026
ZORIA HOUSING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS403/21/2026
AK CONSULTING SERVICES403/21/2026
NERIS403/21/2026
SYNERGY STRATEGIC DESIGN ARCHITECTS103/21/2026
AE DESIGN SOLUTION203/21/2026
JOEL PHAGOO P.E. PLLC103/21/2026
JOEL PHAGOO P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & N CONSTRUCTION GROUPGeneral Contractor3308/04/2026
ROMA SCAFFOLDING INCGeneral Contractor2307/08/2026
KORDUN CONSTRUCTION CORPGeneral Contractor1507/08/2026
KORDUN CONSTRUCTION CORPPlumbing307/08/2026
PHILLIPS, WENDELLElectrical103/21/2026
IRVING BAPTISTEElectrical103/21/2026
D.D.S. MECH PBG&HTG CORPPlumbing107/08/2026
IOVINE, MICHAELElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983205/12/2026
RI CONSULTING SERVICES IN8904410/06/2025
JOEL PHAGOO ,PE, PLLC2416308/06/2025
BUREAU VERITAS NA6902607/18/2025
MP ENGINEERS & ARCHITECTS1438307/25/2024
LEO Y LEE ASSOCIATES2481103/04/2024
Building Lifecycle
All (192)Filed (26)Permit Issued (49)Signed Off (7)Facade (FISP) (19)Violation (22)Inspection (10)Objection (30)Special Inspection (29)
08/25/2026
Signed off — Alteration
B00462701-I1
08/13/2026
Signed off — Alteration
B00455354-I1
08/03/2026
Permit issued — Sidewalk Shed
B01040800-I1-SH
08/03/2026
Permit issued — General Construction
B00782672-I1-GC
07/30/2026
Signed off — Alteration
B00463315-I1
06/09/2026
Permit issued — Supported Scaffold
B01041583-I1-SF
06/09/2026
Permit issued — Supported Scaffold
B01236278-I1-SF
05/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
05/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
05/22/2026
Special inspection requirement — Masonry
ALEXIS SCHLESSINGERMAN
05/22/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
05/14/2026
Signed off — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
B08025773-I1
05/12/2026
Filed — Alteration
Facade restoration at Van Dyke #7 to comply with LL 11/98, cycle 9 report. No change in use, egress or occupancy.
B01130456-P1
05/12/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
05/12/2026
Special inspection requirement — Masonry
ALEXIS SCHLESSINGERMAN
05/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
05/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
04/23/2026
Permit issued — General Construction
B01130456-I1-GC
04/23/2026
Permit issued — Sidewalk Shed
B01040800-I1-SH
04/22/2026
Permit issued — Construction Fence
B01042816-I1-FN
04/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/17/2026
Permit issued — Suspended Scaffold
B01079118-I1-SC
03/09/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
02/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/18/2026
Cycle 10 facade report submitted
02/18/2026
Cycle 10 facade report signed — UNSAFE
02/06/2026
Cycle 10 facade inspection completed
11/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/22/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/17/2025
Objection resolved — Addressed
10/17/2025
Special inspection requirement — Post-installed Anchors
MD ISLAM
10/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/09/2025
Objection raised — Structural
10/06/2025
Filed — Alteration
Suspended scaffold outrigger system and materials hoist system at 419 BLAKE AVE, BROOKLYN, NY for roof replacement and repair works.
B01079118-P3
09/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/06/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01236278-P1
08/06/2025
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
08/06/2025
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
08/04/2025
Permit issued — General Construction
B00782672-I1-GC
07/30/2025
Permit issued — Plumbing
B08025773-I1-PL
07/28/2025
Special inspection requirement — Post-installed Anchors
IBRAHIM MOURAD
07/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
07/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
07/25/2025
Permit issued — Suspended Scaffold
B01079118-I1-SC
07/22/2025
Permit issued — Structural
B00458358-I1-ST
07/18/2025
Filed — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
B08025773-P3
07/15/2025
Violation issued (FDNY_NOV, closed)
07/11/2025
Permit issued — General Construction
B00455354-I1-GC
07/11/2025
Permit issued — Plumbing
B00463315-I1-PL
07/11/2025
Permit issued — Mechanical Systems
B00462701-I1-MS
07/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
07/10/2025
Special inspection requirement — Post-installed Anchors
IBRAHIM MOURAD
06/26/2025
Permit issued — General Construction
B01130456-I1-GC
06/05/2025
Filed — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
B08025773-P2
06/05/2025
Permit issued — Supported Scaffold
B01236278-I1-SF
06/04/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01236278-I1
05/07/2025
Permit issued — Supported Scaffold
B01041583-I1-SF
Latest 60 of 192 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP08/03/2026
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP08/03/2026
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP06/09/2026
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP06/09/2026
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP04/23/2026
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP04/23/2026
DOB NOWConstruction FencePermit IssuedJ & N CONSTRUCTION GROUP04/22/2026
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP03/17/2026
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP08/04/2025
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP07/30/2025
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP07/25/2025
DOB NOWStructuralPermit IssuedKORDUN CONSTRUCTION CORP07/22/2025
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP07/11/2025
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP07/11/2025
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP07/11/2025
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP06/26/2025
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP06/05/2025
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP05/07/2025
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP05/06/2025
DOB NOWConstruction FencePermit IssuedJ & N CONSTRUCTION GROUP05/06/2025
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP03/27/2025
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP08/23/2024
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP08/16/2024
DOB NOWStructuralPermit IssuedKORDUN CONSTRUCTION CORP07/31/2024
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP07/29/2024
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP07/18/2024
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP07/10/2024
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP07/09/2024
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP07/09/2024
DOB NOWConstruction FencePermit IssuedJ & N CONSTRUCTION GROUP04/30/2024
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP04/26/2024
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP04/24/2024
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC04/05/2024
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP04/04/2024
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP04/03/2024
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC01/19/2024
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP01/08/2024
DOB NOWPlumbingSigned-offKORDUN CONSTRUCTION CORP01/05/2024
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP01/05/2024
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC12/04/2023
+ 23 more permits on file
2 projects · most recent 07/18/2025
Gas Storm
FiledStatusContractorScope
07/18/2025Signed-offD.D.S. MECH PBG&HTG CORPGas
07/25/2024——Storm
8 projects · most recent 04/26/2024
General Wiring
FiledStatusContractorScope
04/26/2024CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
04/16/2024Permit IssuedAUJLA ELECTRIC CORP—
06/26/2023Permit IssuedMECO ELECTRIC CO. INC.General Wiring
10/30/2020CompleteCITY GRID ELECTRIC CORPGeneral Wiring
12/04/2019Permit IssuedRAIDEN ELECTRIC LLC—
08/15/2018CompleteJEMCO ELECT. CONTRS INCGeneral Wiring
07/17/2018CompleteZENA ELECTRIC INC—
07/14/2018CompleteZENA ELECTRIC INC—
1 project · most recent 07/06/2021
Concrete
FiledStatusContractorScope
07/06/2021Permit IssuedKORDUN CONSTRUCTION CORPConcrete
4 projects · most recent 08/06/2025
Scaffold Fence Sidewalk Shed
FiledStatusContractorScope
08/06/2025Permit IssuedJ & N CONSTRUCTION GROUPScaffold
04/30/2024Permit IssuedJ & N CONSTRUCTION GROUPFence
04/25/2024Permit IssuedJ & N CONSTRUCTION GROUPScaffold
04/24/2024Permit IssuedJ & N CONSTRUCTION GROUPSidewalk Shed
2 projects · most recent 10/06/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
10/06/2025Permit IssuedJ&N CONSTRUCTION GRP CORPSuspended Scaffold (SC)
03/25/2025Permit IssuedJ&N CONSTRUCTION GRP CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/09/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
02/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/22/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/20/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
05/22/2026Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
05/22/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
05/22/2026MasonryALEXIS SCHLESSINGERMANspecial
05/22/2026FinalALEXIS SCHLESSINGERMANprogress
05/12/2026FinalALEXIS SCHLESSINGERMANprogress
05/12/2026MasonryALEXIS SCHLESSINGERMANspecial
05/12/2026Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
05/12/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
10/17/2025Post-installed AnchorsMD ISLAMspecial
08/06/2025Post-installed AnchorsJOEL PHAGOOspecial
08/06/2025Post-installed AnchorsJOEL PHAGOOspecial
07/28/2025Post-installed AnchorsIBRAHIM MOURADspecial
07/28/2025Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
07/28/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
07/10/2025Tenant Protection Plan Compliance—special
07/10/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
07/10/2025Post-installed AnchorsIBRAHIM MOURADspecial
03/20/2025Post-installed AnchorsJOEL PHAGOOspecial
03/05/2025Fire-Resistant Penetrations and Joints—special
03/05/2025Tenant Protection Plan Compliance—special
03/05/2025Post-installed Anchors—special
02/12/2024Post-installed AnchorsLeo Leespecial
02/12/2024Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
11/30/2022Tenant Protection Plan ComplianceJAMES WILSONspecial
01/22/2021Post-installed AnchorsIBRAHIM MOURADspecial
Latest 25 of 29.
▾Documents — 215 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch20
08/27/2026B00782672-P1Request digital key ↗
08/25/2026B01004108-I1Request digital key ↗
08/25/2026B01040800-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/01/2026B00458358-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/01/2026B00463315-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/01/2026B00462701-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00278487-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00278461-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00455354-I1Request digital key ↗
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION10
07/14/2015340280662Open ↗
07/06/2015340277550Open ↗
07/06/2015340272207Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
07/14/2015340280662Open ↗
07/06/2015340277550Open ↗
07/06/2015340272207Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications63
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/01/2026B00462701-I1Open ↗
09/01/2026B00463315-I1Open ↗
09/01/2026B00455354-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/29/2026B01130456-P1Open ↗
09/15/2026B01004108-I1Open ↗
09/15/2026B01004108-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
11/05/2015340272207Open ↗
11/05/2015340277550Open ↗
11/05/2015340280662Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
07/14/2015340280662Open ↗
07/06/2015340277550Open ↗
07/06/2015340272207Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
07/14/2015340280662Open ↗
07/06/2015340277550Open ↗
07/06/2015340272207Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
07/14/2015340280662Open ↗
07/06/2015340277550Open ↗
07/06/2015340272207Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
06/20/2012320493514Open ↗
04/16/2012320459945Open ↗
08/13/2010320197960Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/20/2012320493514Open ↗
04/16/2012320459945Open ↗
08/13/2010320197960Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/29/2026B01130456-P1Open ↗
08/29/2026B00458358-I1Open ↗
08/24/2026B01130456-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/13/2026B00278461-I1Open ↗
08/13/2026B00278487-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/01/2026B00462701-I1Open ↗
09/01/2026B00463315-I1Open ↗
09/01/2026B00458358-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/14/2015340280662Open ↗
07/06/2015340272207Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/14/2026B08025773-I1Open ↗
08/13/2026B08025773-P3Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/16/2012320459945Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/13/2010320197960Open ↗
▸DOB NOWACP5/20/21 or V51
09/01/2026B00455354-I1Open ↗
▸Energy Compliance6
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00463315-I1Open ↗
09/01/2026B00455354-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/13/2013320459945Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/13/2013320459945Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/22/2015340273796Open ↗
▸BISTECHNICAL REPORT: ENERGY1
04/16/2012320459945Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
07/14/2015340280662Open ↗
07/06/2015340277550Open ↗
07/06/2015340272207Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs61
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter26
09/01/2026B00462701-I1Open ↗
09/01/2026B00463315-I1Open ↗
09/01/2026B00455354-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
08/21/2026B08025773-P1Open ↗
08/21/2026B08025773-P2Open ↗
08/17/2026B01130456-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)7
09/01/2026B00462701-I1Open ↗
09/01/2026B00463315-I1Open ↗
09/01/2026B00455354-I1Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
11/05/2015340272207Open ↗
11/05/2015340277550Open ↗
11/05/2015340280662Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
11/05/2015340272207Open ↗
11/05/2015340277550Open ↗
11/05/2015340280662Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
06/19/2012320493514Open ↗
04/11/2012320459945Open ↗
08/13/2010320197960Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/13/2026B00782672-I1Open ↗
08/13/2026B01130456-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
11/05/2015340272207Open ↗
07/06/2015340272207Open ↗
06/13/2013320459945Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms8
▸BISEFILING JOB APPLICATION COVER SHEET4
07/14/2015340280662Open ↗
07/06/2015340277550Open ↗
07/06/2015340272207Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
06/20/2012320493514Open ↗
04/16/2012320459945Open ↗
08/13/2010320197960Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B01236278-P1Open ↗
▸Other Documents14
▸DOB NOWCalculations6
08/13/2026B01079118-P2Open ↗
08/13/2026B01079118-P1Open ↗
08/13/2026B01079118-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWManufacturer's Specifications6
08/13/2026B01079118-P3Open ↗
08/13/2026B01004108-I1Open ↗
08/13/2026B01079118-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWWaiver Document2
08/17/2026B01130456-P1Open ↗
08/13/2026B01130456-I1Open ↗