| Owner | Filings | Most Recent |
|---|---|---|
| DCO QOZB 38-15 QB | 155 | 07/08/2026 |
| RFP CONSTRUCTION | 15 | 03/22/2026 |
| SSC CONNECTION INC | 1 | 03/22/2026 |
| CONSTRUCTION INC RFP | 1 | 03/22/2026 |
| 38-15 OWNER LLC | 2 | 03/22/2026 |
| T SITIRDIS SAVAS 38-15 QU | 1 | 03/22/2026 |
| 38-15 QNS LLC | 1 | 03/22/2026 |
| 38-15 QUEENS LLC | 8 | 03/22/2026 |
| FIRST FLEET CAR WASH LLC | 1 | 03/22/2026 |
| SUNOCO | 3 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 10/28/2016 | $3.6M | — | 38-15 QUEENS LLC → G-MED 1 LLC | — not available |
| 10/28/2016 | $3.6M | — | 38-15 QUEENS LLC → G-MED 1 LLC | — not available |
| 10/28/2016 | $3.6M | — | 38-15 QUEENS LLC → G-MED 1 LLC | — not available |
| Firm | Filings | Most Recent |
|---|---|---|
| H2M ARCHITECTS AND ENGINEERS | 1 | 08/17/2026 |
| SYNERGIC DESIGN ARCHITECTS | 1 | 12/24/2025 |
| TROLYDIA ENGINEERING PLLC | 15 | 12/15/2025 |
| PERRY M PETRILLO ARCHITECTS, PC | 4 | 11/05/2025 |
| WELLWORTH CONSULTING LLC | 9 | 11/04/2025 |
| GREEN DESIGN CONSTRUCT, LLC | 4 | 10/24/2025 |
| JZN ENGINEERING, PC. | 1 | 09/25/2025 |
| STUDIO HUJI | 4 | 08/18/2025 |
| FNA ENGINEERING SERVICES PC | 3 | 09/04/2024 |
| YAKER ENGINEERING, P.C. | 5 | 03/04/2024 |
| MASER CONSULTING P.A. | 6 | 09/20/2023 |
| H G LEE ARCHITECT PC | 1 | 05/24/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| GERALD J. CALIENDO R.A., P.C. | 28 | 03/21/2026 |
| UNITED SAFETY CONSULTANTS | 9 | 03/21/2026 |
| LOUIS STRIAR | 8 | 03/21/2026 |
| MONICA SANTOS EXP | 2 | 03/21/2026 |
| R MANETTA | 4 | 03/21/2026 |
| URBAN EXPEDITING | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| RFP CONSTRUCTION INC | General Contractor | 35 | 07/08/2026 |
| RED ROCK INDUSTRIES INC | General Contractor | 12 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 10 | 04/09/2026 |
| SIGNSTAR NYC | Scaffold | 4 | 07/08/2026 |
| BALATON CONSULTING LLC | Scaffold | 4 | 07/08/2026 |
| STAT FIRE SPRINKLER NYC C | Fire Protection | 3 | 07/08/2026 |
| WILLDAN ELECTRICAL OF NY | Electrical | 1 | 03/22/2026 |
| PRACTICAL PLBG & HTG INC | Plumbing | 1 | 07/08/2026 |
| GENMAR ELECT. CONT'G CORP | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SYNERGIC DESIGN LLC | 8561 | 1 | 12/24/2025 |
| TROLYDIA TESTING & INSPEC | 4422 | 21 | 12/15/2025 |
| YAKER ENGINEERING, P.C. | 4892 | 3 | 03/04/2024 |
| FNA ENGINEERING SERVICES | 7846 | 3 | 07/17/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | RFP CONSTRUCTION INC | 01/06/2026 |
| DOB NOW | Support of Excavation | Signed-off | GI ENDURANT LLC | 12/10/2025 |
| DOB NOW | Construction Fence | Signed-off | SPRING SCAFFOLDING LLC | 11/10/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 10/28/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 10/28/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 10/28/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 10/28/2025 |
| DOB NOW | General Construction | Permit Issued | RFP CONSTRUCTION INC | 10/16/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | SPRING SCAFFOLDING LLC | 10/10/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SPRING SCAFFOLDING LLC | 09/12/2025 |
| DOB NOW | Sprinklers | Permit Issued | STAT FIRE SPRINKLER NYC C | 08/29/2025 |
| DOB NOW | Sign | Signed-off | SIGNSTAR NYC | 08/22/2025 |
| DOB NOW | Sign | Signed-off | SIGNSTAR NYC | 08/21/2025 |
| DOB NOW | Sign | Signed-off | SIGNSTAR NYC | 08/21/2025 |
| DOB NOW | Sign | Signed-off | SIGNSTAR NYC | 08/21/2025 |
| DOB NOW | Standpipe | Permit Issued | STAT FIRE SPRINKLER NYC C | 05/23/2025 |
| DOB NOW | Mechanical Systems | Signed-off | RFP CONSTRUCTION INC | 04/29/2025 |
| DOB NOW | Foundation | Signed-off | RFP CONSTRUCTION INC | 03/20/2025 |
| DOB NOW | Support of Excavation | Signed-off | RFP CONSTRUCTION INC | 03/20/2025 |
| DOB NOW | Foundation | Signed-off | RFP CONSTRUCTION INC | 03/19/2025 |
| DOB NOW | General Construction | Permit Issued | RFP CONSTRUCTION INC | 03/18/2025 |
| DOB NOW | Structural | Signed-off | RFP CONSTRUCTION INC | 03/18/2025 |
| DOB NOW | Plumbing | Signed-off | PRACTICAL PLBG & HTG INC | 01/14/2025 |
| DOB NOW | Construction Fence | Signed-off | SPRING SCAFFOLDING LLC | 11/12/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | SPRING SCAFFOLDING LLC | 10/21/2024 |
| DOB NOW | Curb Cut | Signed-off | RFP CONSTRUCTION INC | 08/28/2024 |
| DOB NOW | Curb Cut | Signed-off | RFP CONSTRUCTION INC | 08/28/2024 |
| DOB NOW | Curb Cut | Signed-off | RFP CONSTRUCTION INC | 08/12/2024 |
| DOB NOW | Curb Cut | Signed-off | RFP CONSTRUCTION INC | 08/07/2024 |
| DOB NOW | Curb Cut | Signed-off | RFP CONSTRUCTION INC | 08/07/2024 |
| DOB NOW | Curb Cut | Signed-off | RFP CONSTRUCTION INC | 08/07/2024 |
| DOB NOW | Structural | Signed-off | RFP CONSTRUCTION INC | 07/18/2024 |
| DOB NOW | Earth Work | Signed-off | RFP CONSTRUCTION INC | 07/17/2024 |
| DOB NOW | Sprinklers | Permit Issued | STAT FIRE SPRINKLER NYC C | 07/16/2024 |
| DOB NOW | Foundation | Signed-off | RFP CONSTRUCTION INC | 07/05/2024 |
| DOB NOW | General Construction | Permit Issued | RFP CONSTRUCTION INC | 06/25/2024 |
| DOB NOW | Support of Excavation | Signed-off | RFP CONSTRUCTION INC | 06/11/2024 |
| DOB NOW | Support of Excavation | Signed-off | RFP CONSTRUCTION INC | 05/13/2024 |
| DOB NOW | Full Demolition | Signed-off | RED ROCK INDUSTRIES INC | 05/06/2024 |
| DOB NOW | Full Demolition | Signed-off | RED ROCK INDUSTRIES INC | 05/03/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 12/15/2025 | Permit Issued | RFP CONSTRUCTION INC | Heating and Air Conditioning Systems | Heat / Cool Carrier 50FCQM28D6M6-3X2NO 10,000 CFM · Heat Pump Outdoor ×24 50FCQM24D6M6-3X2NO 8,000 CFM · Heat Pump Outdoor ×6 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/15/2025 | Permit Issued | STAT FIRE SPRINKLER NYC C | Sprinkler System |
| 12/15/2025 | Permit Issued | STAT FIRE SPRINKLER NYC C | 4 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/15/2025 | Signed-off | PRACTICAL PLBG & HTG INC | Storm, Water/Sanitary |
| 12/15/2025 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/24/2025 | Permit Issued | ACCORD POWER ELECTRIC LLC | — |
| 11/13/2025 | Permit Issued | GENMAR ELECT. CONT'G CORP | 2 meters, 2 new_meters |
| 08/31/2025 | Complete | PROFF ELECTRICAL LLC | — |
| 08/31/2025 | Complete | PROFF ELECTRICAL LLC | — |
| 08/31/2025 | Complete | PROFF ELECTRICAL LLC | — |
| 08/31/2025 | Complete | PROFF ELECTRICAL LLC | — |
| 10/10/2024 | Complete | TOP SHELF ELECTRIC CORP | — |
| 09/10/2024 | Permit Issued | GENMAR ELECT. CONT'G CORP | General Wiring |
| 12/09/2020 | Permit Issued | EOS ELECTRICAL CORP | General Wiring |
| 01/30/2020 | Complete | WILLDAN ELECTRICAL OF NY | General Wiring |
| 11/01/2019 | Complete | WILLDAN ELECTRICAL OF NY | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/25/2025 | Signed-off | RFP CONSTRUCTION INC | 1 scope_items |
| 07/17/2023 | Signed-off | RFP CONSTRUCTION INC | 1 scope_items |
| 06/27/2023 | Signed-off | RFP CONSTRUCTION INC | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/27/2023 | Signed-off | RFP CONSTRUCTION INC | Earthwork |
| Date | Type | Result | Report |
|---|---|---|---|
| 04/09/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/09/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/09/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Water Test | Certified | View ↗ |
| 01/21/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/31/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/31/2025 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 12/19/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 12/01/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/13/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 05/13/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/22/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 01/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 12/05/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/10/2022 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/17/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 08/10/2026 | Fuel-Oil Storage and Fuel-Oil Piping Systems | — | special |
| 12/23/2025 | Energy Code Compliance Inspections | Malathi Ananthakrishnan | progress |
| 12/23/2025 | Fire-Resistant Penetrations and Joints | Malathi Ananthakrishnan | special |
| 12/23/2025 | Post-installed Anchors | JAIME MOYA | special |
| 12/23/2025 | Sprinkler Systems | JAIME MOYA | special |
| 12/23/2025 | Final | Malathi Ananthakrishnan | progress |
| 12/23/2025 | Structural Stability – Alterations of existing buildings | Malathi Ananthakrishnan | special |
| 12/23/2025 | Air barrier - visual inspection | Malathi Ananthakrishnan | energy_progress |
| 12/18/2025 | Standpipe Systems | JAIME MOYA | special |
| 12/12/2025 | Sprinkler Systems | JAIME MOYA | special |
| 12/12/2025 | Post-installed Anchors | JAIME MOYA | special |
| 11/28/2025 | Concrete - Cast-In-Place | EDWARD TOROSSIAN | special |
| 11/28/2025 | Structural Steel - High Strength Bolting | EDWARD TOROSSIAN | special |
| 11/28/2025 | Subgrade Inspections | EDWARD TOROSSIAN | special |
| 11/28/2025 | Structural Steel - Details | EDWARD TOROSSIAN | special |
| 11/28/2025 | Construction Operations Influencing Adjacent Structures | EDWARD TOROSSIAN | special |
| 11/28/2025 | Final | EDWARD TOROSSIAN | progress |
| 11/28/2025 | Structural Steel - Welding | EDWARD TOROSSIAN | special |
| 11/28/2025 | Masonry | EDWARD TOROSSIAN | special |
| 11/28/2025 | Subsurface Conditions – Fill Placement & In-Place Density | EDWARD TOROSSIAN | special |
| 11/25/2025 | Electric vehicle service equipment requirements | EDWARD TOROSSIAN | energy_progress |
| 11/25/2025 | Fenestration air leakage | EDWARD TOROSSIAN | energy_progress |
| 11/25/2025 | Fenestration and door U-factor and product ratings | EDWARD TOROSSIAN | energy_progress |
| 11/25/2025 | Vestibules | EDWARD TOROSSIAN | energy_progress |