| Owner | Filings | Most Recent |
|---|---|---|
| WATERMAN PROPERTIES | 74 | 09/29/2026 |
| BOP WEST 31ST STREET | 243 | 07/08/2026 |
| RFR REALTY | 112 | 07/08/2026 |
| 390 TOWER ASSOCIATES, LLC | 1 | 03/22/2026 |
| 390 PARK AVENUE ASSOCIATES | 165 | 03/22/2026 |
| QUICK PARK 390 GARAGE LLC | 1 | 03/22/2026 |
| PAVARINI MCGOVERN | 2 | 03/22/2026 |
| 400 PARK AVENUE SOUTH | 1 | 03/22/2026 |
| 890 PARK | 1 | 03/22/2026 |
| 390 PARK AVENUE SOUTH | 5 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| GILSANZ MURRAY STEFICEK LLP | 7 | 06/04/2026 |
| AMA CONSULTING ENGINEERS, PC | 2 | 06/03/2026 |
| PERKINS & WILL ARCHITECTS, P.C. | 1 | 06/03/2026 |
| HIGHLAND ASSOCIATES | 4 | 03/26/2026 |
| COSENTINI ASSOCIATES | 64 | 01/20/2026 |
| FORGE GROUP NYC LLC | 2 | 12/02/2025 |
| NELSON ARCHITECTURE &INTERIORS, INC | 1 | 09/24/2025 |
| TED MOUDIS ASSOCIATES | 1 | 07/23/2025 |
| MARMOL RADZINER | 10 | 04/10/2025 |
| SKIDMORE OWINGS & MERRILL LLP | 13 | 09/17/2024 |
| ROBERT DERECTOR ASSOCIATES | 4 | 03/12/2024 |
| LEHMAN SMITH MCLEISH | 3 | 11/21/2023 |
| ANDREW FORMICHELLA | 1 | 10/16/2023 |
| SSM DESIGN LLP D/B/A SPECTOR GROUP | 1 | 08/25/2023 |
| LEON SKVIRSKY PE | 1 | 07/20/2023 |
| KZ ENGINEERING, P.C | 1 | 04/24/2023 |
| FL&M ENGINEERING DESIGN &INSPECTION | 6 | 04/13/2023 |
| DAVID BUCOVY ARCHITECT | 1 | 12/21/2022 |
| PAUL PERDEK, PROF. ENG. PLLC | 2 | 11/15/2021 |
| JACK GREEN ASSOCIATES | 2 | 08/15/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| WILLIAM VITACCO ASSOCIATES | 132 | 03/21/2026 |
| Rigid Structural Design, LLC | 6 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 1 | 03/21/2026 |
| DVA Advisors | 24 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 7 | 03/21/2026 |
| AE DESIGN SOLUTION | 4 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 03/21/2026 |
| METROPOLIS GROUP INC | 4 | 03/21/2026 |
| BUILDING BROTHERS | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| PAVARINI MCGOVERN LLC | General Contractor | 37 | 07/08/2026 |
| BENCHMARK BUILDERS LLC | General Contractor | 20 | 07/08/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 17 | 10/01/2026 |
| TRI BOROUGH SCAFFOLDING | General Contractor | 15 | 07/08/2026 |
| TURNER CONSTRUCTION COMPANY | General Contractor | 11 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 6 | 07/08/2026 |
| PHASE 3 INTERIORS LLC | General Contractor | 4 | 03/21/2026 |
| PARKVIEW P&H INC | Plumbing | 4 | 07/08/2026 |
| DK CONSTRUCTION ONE, CORP | General Contractor | 4 | 07/08/2026 |
| PEAK FIRE PROTECTION LLC | Fire Protection | 4 | 07/08/2026 |
| CAPITOL FIRE SPRINKLER CO | Fire Protection | 3 | 07/08/2026 |
| ARSENAL SCAFFOLD INC | General Contractor | 2 | 03/21/2026 |
| ASHLAND PLUMBING CORP | Plumbing | 2 | 07/15/2026 |
| ABSOLUTE SPECIAL INSPTN | Fire Protection | 2 | 07/08/2026 |
| CMA PLUMBING & HEATING IN | Fire Protection | 2 | 07/08/2026 |
| TOWER FIRE PROTECTION INC | Fire Protection | 2 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 2 | 07/08/2026 |
| ASE HVAC INC | General Contractor | 2 | 07/08/2026 |
| TRI-STAR CONSTRUCTION CORP | General Contractor | 1 | 04/09/2026 |
| CONNELLY & SONS PLUMBING | Plumbing | 1 | 06/02/2026 |
| M&T PLBG AND HTG CO., INC | Plumbing | 1 | 06/27/2026 |
| PAR PLUMBING CO., INC | Plumbing | 1 | 07/08/2026 |
| PREFERRED MECHANICAL INC | Plumbing | 1 | 07/08/2026 |
| P.S.I. MECHANICAL | Plumbing | 1 | 07/08/2026 |
| AGIR ELEC'L LTD. D/B/A | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| MILROSE CONSULTANTS LLC | 2003 | 4 | 06/04/2026 |
| SAG ENGINEERING & CONSULT | 608 | 4 | 03/26/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 11 | 01/20/2026 |
| AK ENGINEERING PC | 678 | 4 | 12/03/2025 |
| SOCOTEC ENGINEERING | 4983 | 9 | 07/28/2025 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 30 | 08/27/2024 |
| ATLAS ATC ENGINEERING INC | 8011 | 26 | 08/05/2024 |
| DNA CONTROLLED INSPECTION | 554 | 4 | 07/29/2024 |
| ENGINEERING BUILDING SERV | 7303 | 3 | 09/14/2023 |
| JACK GREEN ASSOCIATES | 422 | 2 | 08/15/2019 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Structural | Permit Issued | JT MAGEN & COMPANY INC | 09/30/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT MAGEN & COMPANY INC | 09/28/2026 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 09/25/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT MAGEN & COMPANY INC | 09/25/2026 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 09/25/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT MAGEN & COMPANY INC | 09/25/2026 |
| DOB NOW | Sprinklers | Permit Issued | ASHLAND PLUMBING CORP | 07/14/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR FIRE PROTECTION LLC | 07/09/2026 |
| DOB NOW | Structural | Permit Issued | JT MAGEN & COMPANY INC | 06/16/2026 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 06/09/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT MAGEN & COMPANY INC | 06/08/2026 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 05/05/2026 |
| DOB NOW | Plumbing | Permit Issued | CONNELLY & SONS PLUMBING | 05/05/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT MAGEN & COMPANY INC | 04/23/2026 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 04/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TURNER CONSTRUCTION COMPANY | 02/10/2026 |
| DOB NOW | Sprinklers | Permit Issued | MANENGEERING BUREAU, INC | 12/16/2025 |
| DOB NOW | Plumbing | Permit Issued | M&T PLBG AND HTG CO., INC | 12/15/2025 |
| DOB NOW | General Construction | Signed-off | TURNER CONSTRUCTION COMPANY | 12/11/2025 |
| DOB NOW | Sprinklers | Permit Issued | STANDARD FIRE SUPP CORP | 10/23/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | JT MAGEN & COMPANY INC | 10/06/2025 |
| DOB NOW | Plumbing | Signed-off | ASHLAND PLUMBING CORP | 09/29/2025 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 09/26/2025 |
| DOB NOW | Structural | Permit Issued | TURNER CONSTRUCTION COMPANY | 08/06/2025 |
| DOB NOW | General Construction | Signed-off | TRI-STAR CONSTRUCTION COR | 07/30/2025 |
| DOB NOW | Sprinklers | Signed-off | CMA PLUMBING & HEATING IN | 06/16/2025 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 06/16/2025 |
| DOB NOW | General Construction | Permit Issued | TURNER CONSTRUCTION COMPANY | 05/09/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | TURNER CONSTRUCTION COMPANY | 05/09/2025 |
| DOB NOW | Structural | Signed-off | AMERICON CONSTRUCTION INC. | 03/01/2025 |
| DOB NOW | Sprinklers | Signed-off | CMA PLUMBING & HEATING IN | 02/14/2025 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 02/11/2025 |
| DOB NOW | Sprinklers | Signed-off | LEGUCI PIPING&HEATING LLC | 02/10/2025 |
| DOB NOW | General Construction | Signed-off | TURNER CONSTRUCTION COMPANY | 02/05/2025 |
| DOB NOW | Mechanical Systems | Signed-off | TURNER CONSTRUCTION COMPANY | 02/04/2025 |
| DOB NOW | Sprinklers | Signed-off | MORA FIRE PROTECTION LLC | 03/26/2024 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 03/22/2024 |
| DOB NOW | General Construction | Signed-off | TURNER CONSTRUCTION COMPANY | 03/20/2024 |
| DOB NOW | Mechanical Systems | Signed-off | TURNER CONSTRUCTION COMPANY | 03/20/2024 |
| DOB NOW | Plumbing | Signed-off | DEPENDABLE MECHANICAL COR | 03/07/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/03/2026 | Permit Issued | JT MAGEN & COMPANY INC | Heating and Air Conditioning Systems | Heat / Cool |
| 03/26/2026 | Permit Issued | JT MAGEN & COMPANY INC | Heating and Air Conditioning Systems | Heat / Cool Enertech ENERTECH - Model #ZS012J00LM0NSS 914 CFM · Wshp ×1 |
| 01/20/2026 | Permit Issued | JT MAGEN & COMPANY INC | Air Conditioning Systems | Cooling Compu-Aire MKW-4 55,800 BTU · Crac Unit ×6 |
| 12/03/2025 | Permit Issued | TURNER CONSTRUCTION COMPA | Ventilation Systems | — |
| 07/28/2025 | Permit Issued | TURNER CONSTRUCTION COMPA | Air Conditioning Systems, Heating Systems | — |
| 07/29/2024 | Signed-off | DK CONSTRUCTION ONE, CORP | Air Conditioning Systems | Cooling Williams HPY0800567363 18,719 BTU · Ptac ×14 HPY1600567364 45,425 BTU ×10 HPY1800567361 50,654 BTU · Ptac ×8 HPY1000567365 22,035 BTU ×4 HPY1200567362 31,077 BTU ×4 HPY080056763 18,279 BTU ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/03/2026 | Permit Issued | PAR FIRE PROTECTION LLC | — |
| 03/24/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 84 heads |
| 01/20/2026 | Permit Issued | STANDARD FIRE PROTECT LLC | Sprinkler System |
| 12/03/2025 | Permit Issued | MANENGEERING BUREAU, INC | 125 heads |
| 07/28/2025 | Signed-off | CMA PLUMBING & HEATING IN | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/03/2026 | Permit Issued | ASHLAND PLUMBING CORP | Water/Sanitary |
| 03/24/2026 | — | — | — |
| 03/24/2026 | Permit Issued | CONNELLY & SONS PLUMBING | Water/Sanitary |
| 01/20/2026 | Signed-off | ASHLAND PLUMBING CORP | Water/Sanitary |
| 12/03/2025 | Permit Issued | M&T PLBG AND HTG CO., INC | Water/Sanitary |
| 07/28/2025 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/19/2026 | Permit Issued | RONAN ELECTRICAL LLC | General Wiring |
| 07/17/2026 | Complete | ROZ-A-LITE ELECTRICAL CONTR INC | General Wiring |
| 05/13/2026 | Permit Issued | RONAN ELECTRICAL LLC | General Wiring |
| 12/15/2025 | Complete | CORZO ELECTL SYS CORP | General Wiring |
| 10/27/2025 | Complete | CENTRIFUGAL ELECTRIC LLC | — |
| 10/25/2025 | Permit Issued | PATRIOT ELECTRIC CORP | General Wiring |
| 10/13/2025 | Permit Issued | PATRIOT ELECTRIC CORP | — |
| 09/19/2025 | Permit Issued | FIVE BOROUGH ELECTRIC INC | 2 meters |
| 04/21/2025 | Complete | USIS ELECTRIC INC | — |
| 03/07/2025 | Permit Issued | FOREST ELECTRIC CORP. | General Wiring |
| 02/17/2025 | Complete | ROZ-A-LITE ELEC'L CONTG I | General Wiring |
| 10/07/2024 | Complete | PRIME LIGHT ELEC'L CONSTR | General Wiring |
| 08/19/2024 | Complete | TRANSFORM ELECTL CONTRS I | General Wiring |
| 03/22/2024 | Complete | CORZO ELECTL SYS CORP | General Wiring |
| 11/14/2023 | Complete | D&D ELECTL CONST CO INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/04/2026 | Permit Issued | JT MAGEN & COMPANY INC | Steel, Concrete |
| 01/20/2026 | Permit Issued | JT MAGEN & COMPANY INC | Steel, Concrete |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/24/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/16/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/21/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/21/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 04/24/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/09/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/06/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 02/18/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 02/12/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/10/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 02/09/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/09/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/02/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/29/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/21/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 01/21/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/16/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/12/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 12/12/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/12/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/29/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/22/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/17/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/17/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/14/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 05/14/2026 | HVAC-R and service water heating equipment | Christopher Drutjons | energy_progress |
| 05/14/2026 | Duct leakage testing, insulation and design | Christopher Drutjons | energy_progress |
| 05/14/2026 | HVAC-R and service water piping design and insulation | Christopher Drutjons | energy_progress |
| 05/14/2026 | Maintenance information | Christopher Drutjons | energy_progress |
| 05/14/2026 | HVAC-R and service water heating system controls | Christopher Drutjons | energy_progress |
| 05/14/2026 | Final | Christopher Drutjons | progress |
| 05/14/2026 | Mechanical Systems | Christopher Drutjons | special |
| 05/14/2026 | Post-installed Anchors | Christopher Drutjons | special |
| 03/23/2026 | Exhaust and Vent Systems in Plenums and Ducts | Chester Kowalski | special |
| 03/11/2026 | Final | Chester Kowalski | progress |
| 03/11/2026 | Mechanical Systems | Chester Kowalski | special |
| 03/11/2026 | Fire-Resistance Rated Construction | Chester Kowalski | progress |
| 03/11/2026 | Fire-Resistant Penetrations and Joints | Chester Kowalski | special |
| 03/10/2026 | Final | Chester Kowalski | progress |
| 01/26/2026 | Post-installed Anchors | Young Suh | special |
| 01/26/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 01/07/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 01/07/2026 | Post-installed Anchors | Young Suh | special |
| 11/26/2025 | Post-installed Anchors | Ari Kamo | special |
| 11/26/2025 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 11/26/2025 | Sprayed fire-resistant materials | Ari Kamo | special |
| 11/26/2025 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 11/26/2025 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 10/30/2025 | Mechanical Systems | Ari Kamo | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Thoma Bravo | Office | Floors 19–21 | Project M01394898 Project M01399610 Project M01402217 Project M01402285 |
| Industrious | Office | Floors 4–9, 17 | Project M01370357 Project M01370144 Project M01370381 Project M01370453 Project M01179071 |
| Atairos | Office | Floors 15, 16 | Project M01184397 |
| Northern Trust | Office | Floor 2 | Project M00880339 Project M00880343 Project M00880348 Project M00880356 |
| Casa Lever | Restaurant / Food Service | Floor 1 | Project M08035176 Project M08035191 |