← Back
Elevator apt, fireproof without stores
Van Dyke I (NYCHA)
373 MOTHER GASTON BLVD · BIN 3328030
💬 Discuss this project
1953Year Built
14Stories
D3Building Class
R6Zoning
497,397 sfGross Floor Area
628Units
LL97 Covered20 Open Violations 19 unresolved · 1 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 337,075 sf lot · 1.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction56p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 6 docs
Floor 1Under Construction32p · 2 filings · 20 docs
CellarUnder Construction9p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY3309/13/2026
NYCHA6109/13/2026
NYC HOUSING AUTHORITY503/22/2026
NYCHA 99303/22/2026
ZORIA HOUSING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS403/21/2026
IMA EXPEDITNG203/21/2026
GREENMAN-PEDERSEN403/21/2026
AE DESIGN SOLUTION203/21/2026
LMS-ACE SERVICES103/21/2026
DVA Advisors303/21/2026
DESIGN APPROVE BUILD803/21/2026
WILLIAM VITACCO ASSOCIATES603/21/2026
NERIS403/21/2026
GAMILL ENGINEERING P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & N CONSTRUCTION GROUPGeneral Contractor3208/26/2026
KORDUN CONSTRUCTION CORPGeneral Contractor1107/30/2026
GRYPHON CONSTRUCTION INCGeneral Contractor504/09/2026
JCC CONSTRUCTION CORPGeneral Contractor403/21/2026
STANTON, TElectrical103/21/2026
ASHLAR MECHANICAL CORPFire Protection105/15/2026
TRIUMPH CONSTRUCTION CORPGeneral Contractor107/08/2026
D.D.S. MECH PBG&HTG CORPPlumbing107/08/2026
I.M.P. PLBG. & HTG. CORPPlumbing107/08/2026
JCC CONSTRUCTION CORPPlumbing107/08/2026
KORDUN CONSTRUCTION CORPPlumbing106/28/2026
CHRYSSIADIS, NICOLASElectrical103/21/2026
OLYMPIC PLBG & HTG SVC INPlumbing107/08/2026
ORTEGA-CEDENO, DAVIDElectrical103/21/2026
RIVERA, EDWARDElectrical103/21/2026
ROBERT SPALLINOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MP ENGINEERS & ARCHITECTS1438204/29/2026
BUREAU VERITAS NA6902704/29/2026
JPC LOGISTICS DBA JPCL EN351803/04/2026
RI CONSULTING SERVICES IN8904207/22/2025
LEO Y LEE ASSOCIATES2481112/21/2023
ALAN MARGOLIN & ASSOC423206/27/2023
UNIVERSAL TESTING AND INS400204/06/2021
Building Lifecycle
All (234)Filed (41)Permit Issued (42)Signed Off (11)Facade (FISP) (12)Violation (16)Inspection (24)Objection (58)Special Inspection (30)
09/08/2026
Signed off — Alteration
GENERAL CONSTRUCTION WORK INTHE CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00455043-I1
08/11/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 382 SUTTER AVENUE , BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01042785-P1
08/03/2026
Permit issued — Supported Scaffold
B01041465-I1-SF
08/03/2026
Permit issued — Sidewalk Shed
B01040784-I1-SH
07/29/2026
Permit issued — Structural
B01390689-I1-ST
07/27/2026
Permit issued — Supported Scaffold
B01258616-I1-SF
07/24/2026
Signed off — Alteration CO
Modification of standpipe system as shown on plans
B08022913-S1
07/09/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01241163-P1
06/30/2026
Objection resolved — Resolved
06/30/2026
Objection resolved — Resolved
06/30/2026
Objection resolved — Resolved
06/20/2026
Objection raised — Other
06/20/2026
Objection raised — Other
06/09/2026
Permit issued — Construction Fence
B01042785-I1-FN
06/09/2026
Permit issued — Sidewalk Shed
B01241163-I1-SH
06/04/2026
Objection raised — Other
06/04/2026
Objection resolved — Addressed
05/28/2026
Objection raised — Other
05/26/2026
Filed — Alteration
Bldg 3: Remove and Replace existing floor drain, hot water tank with temp domestic water heater, replace damage insulation of somestic water piping and new gas service to new domestic water heater as per the plans filed herewith.
B01081586-P1
05/26/2026
Permit issued — General Construction
B00783848-I1-GC
05/26/2026
Objection resolved — Addressed
05/20/2026
Signed off — Alteration CO
Modification of standpipe system as shown on plans
B08022913-S3
05/10/2026
Objection raised — Other
05/04/2026
Permit issued — Sidewalk Shed
B01040784-I1-SH
04/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/29/2026
Filed — Alteration
B01390689-I1
04/29/2026
Filed — Alteration
Replace five (5) roof drains and install six (6) new scuppers roof.
B00783848-P2
04/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/28/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/28/2026
Special inspection requirement — Masonry
JAMES WILSON
04/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES WILSON
04/28/2026
Special inspection requirement — Insulation placement and R values
JAMES WILSON
04/28/2026
Special inspection requirement — Post-installed Anchors
JAMES WILSON
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES WILSON
04/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/21/2026
Special inspection requirement — Final
IBRAHIM MOURAD
04/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
IBRAHIM MOURAD
04/21/2026
Special inspection requirement — Concrete - Cast-In-Place
IBRAHIM MOURAD
04/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
IBRAHIM MOURAD
04/21/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
IBRAHIM MOURAD
04/21/2026
Special inspection requirement — Post-installed Anchors
IBRAHIM MOURAD
03/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/23/2026
Special inspection requirement — Standpipe Systems
Asma Hashmi
03/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
Asma Hashmi
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
03/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/05/2026
Permit issued — General Construction
B08022913-I1-GC
03/04/2026
Filed — Alteration CO
Modification of standpipe system as shown on plans
B08022913-P2
02/13/2026
Signed off — Alteration CO
Modification of standpipe system as shown on plans
B08022913-S5
02/11/2026
Permit issued — Suspended Scaffold
B01118281-I1-SC
01/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/07/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
12/26/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/12/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/12/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
12/12/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/12/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/12/2025
Special inspection requirement — Duct leakage testing, insulation and design
Asma Hashmi
12/12/2025
Special inspection requirement — Maintenance information
Asma Hashmi
12/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
Latest 60 of 234 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP08/03/2026
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP08/03/2026
DOB NOWStructuralPermit IssuedKORDUN CONSTRUCTION CORP07/29/2026
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP07/27/2026
DOB NOWConstruction FencePermit IssuedJ & N CONSTRUCTION GROUP06/09/2026
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP06/09/2026
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP05/26/2026
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP05/04/2026
DOB NOWGeneral ConstructionPermit IssuedGRYPHON CONSTRUCTION INC03/05/2026
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP02/11/2026
DOB NOWMechanical SystemsSigned-offKORDUN CONSTRUCTION CORP12/05/2025
DOB NOWGeneral ConstructionPermit IssuedJ & N CONSTRUCTION GROUP10/16/2025
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP10/14/2025
DOB NOWPlumbingSigned-offD.D.S. MECH PBG&HTG CORP07/29/2025
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP07/25/2025
DOB NOWPlumbingPermit IssuedKORDUN CONSTRUCTION CORP07/22/2025
DOB NOWStandpipeSigned-offASHLAR MECHANICAL CORP06/30/2025
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP06/24/2025
DOB NOWGeneral ConstructionPermit IssuedGRYPHON CONSTRUCTION INC05/05/2025
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP05/02/2025
DOB NOWGeneral ConstructionSigned-offGRYPHON CONSTRUCTION INC04/24/2025
DOB NOWConstruction FencePermit IssuedJ & N CONSTRUCTION GROUP04/24/2025
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP04/24/2025
DOB NOWConstruction FencePermit IssuedKORDUN CONSTRUCTION CORP04/10/2025
DOB NOWPlumbingSigned-offI.M.P. PLBG. & HTG. CORP04/07/2025
DOB NOWGeneral ConstructionPermit IssuedGRYPHON CONSTRUCTION INC04/02/2025
DOB NOWMechanical SystemsSigned-offGRYPHON CONSTRUCTION INC02/04/2025
DOB NOWSuspended ScaffoldPermit IssuedJ&N CONSTRUCTION GRP CORP11/22/2024
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP07/10/2024
DOB NOWConstruction FencePermit IssuedJ & N CONSTRUCTION GROUP04/30/2024
DOB NOWSupported ScaffoldPermit IssuedJ & N CONSTRUCTION GROUP04/26/2024
DOB NOWSidewalk ShedPermit IssuedJ & N CONSTRUCTION GROUP04/24/2024
DOB NOWConstruction FencePermit IssuedKORDUN CONSTRUCTION CORP04/11/2024
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP04/02/2024
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC02/01/2024
DOB NOWGeneral ConstructionSigned-offKORDUN CONSTRUCTION CORP01/04/2024
DOB NOWSupport of ExcavationSigned-offJCC CONSTRUCTION CORP09/14/2023
DOB NOWStructuralSigned-offJCC CONSTRUCTION CORP06/14/2023
DOB NOWConstruction FencePermit IssuedKORDUN CONSTRUCTION CORP06/05/2023
DOB NOWPlumbingSigned-offJCC CONSTRUCTION CORP04/17/2023
+ 19 more permits on file
3 projects · most recent 05/26/2026
Water/Sanitary Storm Gas
FiledStatusContractorScope
05/26/2026Permit IssuedKORDUN CONSTRUCTION CORPGas, Water/Sanitary
04/29/2026——Storm
03/04/2026Signed-offI.M.P. PLBG. & HTG. CORPStorm, Water/Sanitary
14 projects · most recent 09/04/2026
General Wiring
FiledStatusContractorScope
09/04/2026Permit IssuedREDD ELECTRICAL SVCS INCGeneral Wiring
09/02/2026CompleteA.T.J. ELECTRICAL CO.INC.—
08/19/2026CompleteEMPIRE STATE ELEC MAINT &General Wiring
08/19/2026CompleteEMPIRE STATE ELEC MAINT &General Wiring
08/10/2026CompleteEMPIRE STATE ELEC MAINT &General Wiring
09/15/2025CompleteJKC ELECTRICAL INC—
06/02/2025Permit IssuedAUJLA ELECTRIC CORP—
04/26/2024CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
10/13/2023Permit IssuedMECO ELECTRIC CO. INC.—
06/20/2023CompleteJEMCO ELECT. CONTRS INC—
06/16/2023Permit IssuedMECO ELECTRIC CO. INC.General Wiring
10/30/2020CompleteCITY GRID ELECTRIC CORPGeneral Wiring
08/15/2018CompleteJEMCO ELECT. CONTRS INCGeneral Wiring
07/13/2018CompleteZENA ELECTRIC INC—
3 projects · most recent 04/29/2026
Concrete Steel
FiledStatusContractorScope
04/29/2026Permit IssuedKORDUN CONSTRUCTION CORPConcrete
03/04/2026Permit IssuedGRYPHON CONSTRUCTION INCSteel, Concrete
09/17/2024——Concrete
6 projects · most recent 08/11/2026
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
08/11/2026Permit IssuedJ & N CONSTRUCTION GROUPFence
07/09/2026Permit IssuedJ & N CONSTRUCTION GROUPSidewalk Shed
07/22/2025Permit IssuedJ & N CONSTRUCTION GROUPScaffold
04/25/2024Permit IssuedJ & N CONSTRUCTION GROUPScaffold
04/24/2024Permit IssuedJ & N CONSTRUCTION GROUPSidewalk Shed
06/05/2023Permit IssuedKORDUN CONSTRUCTION CORPFence
1 project · most recent 10/31/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
10/31/2024Permit IssuedJ&N CONSTRUCTION GRP CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
04/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/07/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
12/26/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/12/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/12/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/12/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
07/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/23/2024Pass-Final General Construction Non-Directive 14PassView ↗
10/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/10/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/18/2022Pass-Final Fence Non-Directive 14PassView ↗
10/13/2021Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/12/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 97
DateRequirementInspectorRole
04/28/2026Fire-Resistant Penetrations and JointsJAMES WILSONspecial
04/28/2026Insulation placement and R valuesJAMES WILSONenergy_progress
04/28/2026Structural Stability – Alterations of existing buildingsJAMES WILSONspecial
04/28/2026Post-installed AnchorsJAMES WILSONspecial
04/28/2026MasonryJAMES WILSONspecial
04/21/2026Concrete - Cast-In-PlaceIBRAHIM MOURADspecial
04/21/2026Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
04/21/2026FinalIBRAHIM MOURADprogress
04/21/2026Subsurface Conditions – Fill Placement & In-Place DensityIBRAHIM MOURADspecial
04/21/2026Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
04/21/2026Post-installed AnchorsIBRAHIM MOURADspecial
03/23/2026Fire-Resistant Penetrations and JointsAsma Hashmispecial
03/23/2026Tenant Protection Plan ComplianceAsma Hashmispecial
03/23/2026Standpipe SystemsAsma Hashmispecial
12/12/2025Duct leakage testing, insulation and designAsma Hashmienergy_progress
12/12/2025Energy Code Compliance InspectionsAsma Hashmiprogress
12/12/2025FinalAsma Hashmiprogress
12/12/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
12/12/2025Mechanical SystemsAsma Hashmispecial
12/12/2025Tenant Protection Plan ComplianceAsma Hashmispecial
12/12/2025HVAC-R and service water heating equipmentAsma Hashmienergy_progress
12/12/2025Electrical motors and elevatorsAsma Hashmienergy_progress
12/12/2025Maintenance informationAsma Hashmienergy_progress
12/12/2025HVAC-R and service water heating system controlsAsma Hashmienergy_progress
12/12/2025Shutoff dampersAsma Hashmienergy_progress
Latest 25 of 97.
▾Documents — 332 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch37
09/01/2026B00518940-I1Request digital key ↗
08/28/2026B00793408-I1Request digital key ↗
08/28/2026B00793408-P1Request digital key ↗
Showing 3 of 37 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00289743-I1Request digital key ↗
08/15/2026B00289743-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/26/2026B00865806-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/15/2026B00455043-I1Request digital key ↗
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION13
01/28/2026300449593Open ↗
01/23/2026300844371Open ↗
10/02/2025300459545Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION8
05/06/2021340720045Open ↗
08/27/2015340296726Open ↗
08/18/2015340291419Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/20/2021340720045Open ↗
▸Seals & Professional Certifications120
▸DOB NOWDPL-1: Design Professional Seal & Signature38
09/01/2026B00567792-I1Open ↗
08/28/2026B00793408-S2Open ↗
08/28/2026B00793408-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWProgress Inspector Seal & Signature29
08/31/2026B08022913-P1Open ↗
08/31/2026B08022913-P1Open ↗
08/31/2026B08022913-P1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/24/2026B01081659-I1Open ↗
08/31/2026B08022913-P1Open ↗
08/31/2026B08022913-P1Open ↗
Showing 3 of 27 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
12/12/2015340291419Open ↗
12/08/2015340290223Open ↗
12/08/2015340296726Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
08/27/2015340296726Open ↗
08/18/2015340291419Open ↗
08/10/2015340290134Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
08/27/2015340296726Open ↗
08/18/2015340291419Open ↗
08/10/2015340290134Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
08/27/2015340296726Open ↗
08/18/2015340291419Open ↗
08/10/2015340290134Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/24/2013320875335Open ↗
09/24/2013320875326Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/13/2020340720045Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
08/25/2008310188365Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B08022913-I1Open ↗
08/13/2026B08022913-S5Open ↗
▸Environmental & Asbestos22
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form10
08/27/2026B08022913-S5Open ↗
08/27/2026B08022913-S3Open ↗
08/27/2026B08022913-S2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/28/2026B00793408-S2Open ↗
08/28/2026B00793408-I1Open ↗
08/28/2026B00793408-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/27/2015340296726Open ↗
08/18/2015340291419Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/24/2013320875335Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/25/2008310188365Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
09/24/2013320875326Open ↗
▸Energy Compliance6
▸BISEN2 - As Built Energy Analysis2
07/29/2014320875335Open ↗
07/29/2014320875326Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/29/2014320875326Open ↗
09/24/2013320875326Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/10/2015340290134Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/27/2026B08022913-S1Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY13
12/22/2021340720045Open ↗
12/22/2021340720045Open ↗
12/22/2021340720045Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSOIL REPORT2
08/13/2026B00289743-P1Open ↗
Showing 1 of 2 on file for this type
▸BISSOIL PERC. TEST-STORM WATER SYSTEM (DRYWELL)1
12/22/2021340720045Open ↗
▸Approvals, Objections & Sign-offs78
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter41
08/27/2026B00783848-P2Open ↗
08/25/2026B01042785-P1Open ↗
08/21/2026B08025769-I1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)16
08/15/2026B01081586-P1Open ↗
08/14/2026B00567792-I1Open ↗
08/13/2026B08025769-P1Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
12/22/2021340720045Open ↗
12/12/2015340291419Open ↗
12/08/2015340290223Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)7
08/24/2026B01081636-I1Open ↗
08/15/2026B00455043-I1Open ↗
08/14/2026B00567792-I1Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/12/2015340291419Open ↗
07/29/2014320875326Open ↗
07/29/2014320875335Open ↗
▸DOB NOWDEP Variance (V5) letter3
08/19/2026B01283055-I1Open ↗
08/13/2026B00793408-S1Open ↗
08/13/2026B00783848-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/25/2008310188365Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
11/15/2021340720045Open ↗
02/16/2021340720045Open ↗
12/12/2015340291419Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms10
▸BISEFILING JOB APPLICATION COVER SHEET5
03/13/2020340720045Open ↗
08/27/2015340296726Open ↗
08/18/2015340291419Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION3
05/20/2021340720045Open ↗
05/20/2021340720045Open ↗
02/16/2021340720045Open ↗
▸BISEFILING COVER SHEET2
09/24/2013320875335Open ↗
09/24/2013320875326Open ↗
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
12/08/2015340290223Open ↗
12/08/2015340296726Open ↗
12/08/2015340290134Open ↗
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
08/13/2026B00976748-I1Open ↗
08/13/2026B01118281-I1Open ↗