← Back
Primarily 3 family with 1 store or office
394 BROADWAY
BROOKLYN · BIN 3059776
💬 Discuss this project
1910Year Built
4Stories
S3Building Class
R6Zoning
4,881 sfGross Floor Area
4Units
Rent Stabilized13 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: SHAKEL LLC · 765 sf lot · 6.38 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingLandscape
Roof4p · 1 filing · 20 docs
Floor 44p · 1 filing · 20 docs
Floor 34p · 1 filing · 20 docs
Floor 24p · 1 filing · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHAKEL LLC703/22/2026
RELIABLE ENTERPRISES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CNY ENGINEERING P.C406/16/2026
MOHAMMAD AHEAD, PE207/09/2025
MJE PROFESSIONAL SERVICES205/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CNY ENGINEERING PC203/21/2026
SCAFFTECH203/21/2026
MLS SERVICE GROUP403/21/2026
BAYSIDE ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THE DIMENSION GROUP LLCGeneral Contractor1107/08/2026
A & H INSTALLATION INCGeneral Contractor307/08/2026
P.H. WORKS INCPlumbing207/08/2026
RICHARD NEUElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CNY ENGINEERING P.C3304406/16/2026
MOHAMMAD AHEAD - PROFESSI9286207/09/2025
NORMAN C. LOK818105/05/2025
Building Lifecycle
All (83)Filed (8)Permit Issued (11)Signed Off (6)Violation (29)Inspection (2)Objection (10)Special Inspection (17)
07/21/2026
Signed off — Alteration
INSTALL HVAC SYSTEM FOR 2ND-4TH FLOOR FOR THE BUILDING IN SUBSEQUENT WITH JOB#B01146694, IN ORDER TO REMOVE ECB VIOLATION#39129793J. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01146694-S1
06/22/2026
Signed off — Alteration
INSTALL HVAC SYSTEM FOR 2ND-4TH FLOOR FOR THE BUILDING IN SUBSEQUENT WITH JOB#B01146694, IN ORDER TO REMOVE ECB VIOLATION#39129793J. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01146694-S2
06/17/2026
Special inspection requirement — Energy Code Compliance Inspections
YUE ZHOU
06/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
YUE ZHOU
06/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
YUE ZHOU
06/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
YUE ZHOU
06/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUE ZHOU
06/16/2026
Filed — Alteration
INSTALL HVAC SYSTEM FOR 2ND-4TH FLOOR FOR THE BUILDING IN SUBSEQUENT WITH JOB#B01146694, IN ORDER TO REMOVE ECB VIOLATION#39129793J. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01146694-P1
06/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
YUE ZHOU
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUE ZHOU
06/02/2026
Special inspection requirement — Energy Code Compliance Inspections
YUE ZHOU
06/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
YUE ZHOU
06/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
YUE ZHOU
05/19/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/07/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01187315-I1
05/07/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01187322-I1
05/04/2026
Signed off — Alteration
INSTALL HVAC SYSTEM FOR 2ND-4TH FLOOR FOR THE BUILDING IN SUBSEQUENT WITH JOB#B01146694, IN ORDER TO REMOVE ECB VIOLATION#39129793J. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01146694-S3
05/01/2026
Violation issued (HPD, open)
A
03/24/2026
Signed off — Alteration
Facade repairs including but not limited to new facebrick, repointing mortar, cornice repairs. No change in use, egress or occupancy. SHED FILED UNDER B01187315. SCAFFOLD FILED UNDER B01187322
B01251616-I1
03/24/2026
Permit issued — Mechanical Systems
B01146694-S2-MS
02/27/2026
Permit issued — Plumbing
B01146694-S1-PL
02/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/11/2025
Permit issued — General Construction
B01251616-I1-GC
07/25/2025
Objection resolved — Addressed
07/23/2025
Objection raised — Structural
07/09/2025
Filed — Alteration
Facade repairs including but not limited to new facebrick, repointing mortar, cornice repairs. No change in use, egress or occupancy. SHED FILED UNDER B01187315. SCAFFOLD FILED UNDER B01187322
B01251616-I1
07/09/2025
Special inspection requirement — Masonry
MOHAMMAD AHEAD
07/07/2025
Special inspection requirement — Final
ADITYA DESAI
07/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMMAD AHEAD
06/24/2025
Permit issued — Structural
B01146694-S3-ST
06/24/2025
Permit issued — General Construction
B01146694-I1-GC
06/04/2025
Permit issued — Structural
B01146694-S3-ST
05/19/2025
Objection resolved — Addressed
05/19/2025
Objection resolved — Addressed
05/19/2025
Objection resolved — Addressed
05/13/2025
Objection raised — Scope
05/13/2025
Objection raised — Cost
05/13/2025
Objection raised — Scope
05/08/2025
Permit issued — Supported Scaffold
B01187322-I1-SF
05/07/2025
Permit issued — Sidewalk Shed
B01187315-I1-SH
05/05/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01187322-I1
05/05/2025
Filed — Alteration
INSTALL HVAC SYSTEM FOR 2ND-4TH FLOOR FOR THE BUILDING IN SUBSEQUENT WITH JOB#B01146694, IN ORDER TO REMOVE ECB VIOLATION#39129793J. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01146694-S3
04/29/2025
Objection resolved — Addressed
04/28/2025
Objection raised — Other
04/21/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01187315-I1
03/25/2025
Violation issued (ECB, closed)
Construction
03/25/2025
Violation issued (ECB, closed)
Construction
03/04/2025
Permit issued — Mechanical Systems
B01146694-S2-MS
03/03/2025
Permit issued — Plumbing
B01146694-S1-PL
02/27/2025
Permit issued — General Construction
B01146694-I1-GC
12/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
YUE ZHOU
11/27/2024
Filed — Alteration
INSTALL HVAC SYSTEM FOR 2ND-4TH FLOOR FOR THE BUILDING IN SUBSEQUENT WITH JOB#B01146694, IN ORDER TO REMOVE ECB VIOLATION#39129793J. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01146694-S1
11/27/2024
Filed — Alteration
INSTALL HVAC SYSTEM FOR 2ND-4TH FLOOR FOR THE BUILDING IN SUBSEQUENT WITH JOB#B01146694, IN ORDER TO REMOVE ECB VIOLATION#39129793J. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01146694-S2
11/26/2024
Violation issued (HPD, closed)
I
11/25/2024
Filed — Alteration
INSTALL HVAC SYSTEM FOR 2ND-4TH FLOOR FOR THE BUILDING IN SUBSEQUENT WITH JOB#B01146694, IN ORDER TO REMOVE ECB VIOLATION#39129793J. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01146694-I1
11/22/2024
Special inspection requirement — Lighting in dwelling units
YUE ZHOU
11/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
YUE ZHOU
11/22/2024
Special inspection requirement — Energy Code Compliance Inspections
YUE ZHOU
11/07/2024
Violation issued (ECB, closed)
Unknown
11/06/2024
Violation issued (ECB, closed)
Construction
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTHE DIMENSION GROUP LLC03/24/2026
DOB NOWPlumbingSigned-offP.H. WORKS INC02/27/2026
DOB NOWGeneral ConstructionSigned-offTHE DIMENSION GROUP LLC08/11/2025
DOB NOWStructuralSigned-offTHE DIMENSION GROUP LLC06/24/2025
DOB NOWGeneral ConstructionPermit IssuedTHE DIMENSION GROUP LLC06/24/2025
DOB NOWStructuralSigned-offTHE DIMENSION GROUP LLC06/04/2025
DOB NOWSupported ScaffoldSigned-offA H INSTALLATION05/08/2025
DOB NOWSidewalk ShedSigned-offA H INSTALLATION05/07/2025
DOB NOWMechanical SystemsSigned-offTHE DIMENSION GROUP LLC03/04/2025
DOB NOWPlumbingSigned-offP.H. WORKS INC03/03/2025
DOB NOWGeneral ConstructionPermit IssuedTHE DIMENSION GROUP LLC02/27/2025
BISEQISSUEDHI TECH BRIDGING09/01/2005
BISPLISSUEDTMS PLMBG & HTG CORP05/30/2002
BISMHISSUEDTERRY CHANCE PAINTING CO01/16/2002
1 project · most recent 06/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/16/2026Signed-offP.H. WORKS INCGas, Water/Sanitary
2 projects · most recent 04/24/2025
General Wiring
FiledStatusContractorScope
04/24/2025CompleteRICHARD NEU—
02/04/2025Permit IssuedFIRST QUALITY ELECL LLCGeneral Wiring
1 project · most recent 06/16/2026
Steel Wood
FiledStatusContractorScope
06/16/2026Signed-offTHE DIMENSION GROUP LLCSteel, Wood
2 projects · most recent 05/05/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/05/2025Signed-offA & H INSTALLATION INCScaffold
04/21/2025Signed-offA & H INSTALLATION INCSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/19/2026Fail-Final General Construction Non-Directive 14FailView ↗
02/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
06/17/2026Energy Code Compliance InspectionsYUE ZHOUprogress
06/17/2026HVAC-R and service water heating system controlsYUE ZHOUenergy_progress
06/17/2026HVAC-R and service water heating equipmentYUE ZHOUenergy_progress
06/17/2026HVAC-R and service water piping design and insulationYUE ZHOUenergy_progress
06/17/2026Fire-Resistant Penetrations and JointsYUE ZHOUspecial
06/02/2026HVAC-R and service water heating system controlsYUE ZHOUenergy_progress
06/02/2026Fire-Resistant Penetrations and JointsYUE ZHOUspecial
06/02/2026Energy Code Compliance InspectionsYUE ZHOUprogress
06/02/2026HVAC-R and service water piping design and insulationYUE ZHOUenergy_progress
06/02/2026HVAC-R and service water heating equipmentYUE ZHOUenergy_progress
07/09/2025MasonryMOHAMMAD AHEADspecial
07/07/2025FinalADITYA DESAIprogress
07/07/2025Structural Stability – Alterations of existing buildingsMOHAMMAD AHEADspecial
12/18/2024Structural Stability – Alterations of existing buildingsYUE ZHOUspecial
11/22/2024Lighting in dwelling unitsYUE ZHOUenergy_progress
11/22/2024Fire-Resistant Penetrations and JointsYUE ZHOUspecial
11/22/2024Energy Code Compliance InspectionsYUE ZHOUprogress
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026B01187315-I1Request digital key ↗
08/21/2026B01146694-S2Request digital key ↗
08/21/2026B01146694-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
08/12/2010320201287Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature11
08/31/2026B01251616-I1Open ↗
08/26/2026B01146694-P1Open ↗
08/26/2026B01146694-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026B01146694-S2Open ↗
08/21/2026B01146694-S1Open ↗
08/21/2026B01146694-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026B01251616-I1Open ↗
08/31/2026B01251616-I1Open ↗
08/26/2026B01146694-P1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
08/12/2010320201287Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026B01146694-S2Open ↗
08/21/2026B01146694-S1Open ↗
08/21/2026B01146694-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/12/2010320201287Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
08/12/2010320201287Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/12/2010320201287Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/12/2010320201287Open ↗