← Back
BuildNYC
Elevator cooperative
40 EAST 80TH STREET
MANHATTAN · BIN 1091749
💬 Discuss this project
1967Year Built
26Stories
D4Building Class
C5-1Zoning
111,231 sfGross Floor Area
43Units
LL97 CoveredRent Stabilized61 Active Violations 58 unresolved · 3 paperwork only 1 old, status unconfirmed ▸
Elevator cooperative · Owner of record: 40 East 80 Apt · 9,720 sf lot · 11.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofHVAC system controlsUnder Construction3p · 2 filings · 7 docs
Floor 25Farman-Farmaian apartment plumbing renovation8p · 2 filings · 10 docs
Floor 24
Floor 23Unit 23A6p · 2 filings · 7 docs
Floor 223p · 1 filing · 15 docs
Floor 21Unit 21B11p · 1 filing · 15 docs
Floor 203p · 2 filings · 14 docs
Floor 19Unit 19B3p · 2 filings · 14 docs
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11Unit 11B6p · 2 filings · 20 docs
Floor 101 filing · 12 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Unit 2A12p · 2 filings · 15 docs
Floor 1
Site & exteriorDouglas Elliman Property ManagementUnder Construction9p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Depm904/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sal V. Tartaglione Architect101/28/2026
Studio St Architects302/07/2025
Lawless & Mangione103/05/2024
Ashraf102/15/2024
Robert Young Architects306/07/2023
Wilsonplunkett402/15/2023
Naphtali Deutsch Architecture310/04/2022
Aura Architecture205/18/2022
E_SPACE Design211/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Maryclare Nepogoda403/21/2026
Azar Associates303/21/2026
William Vitacco Associates403/21/2026
Boutiqkey403/21/2026
Naphtali Deutsch Architecture303/21/2026
Michelle Borde203/21/2026
Lewsan Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Oca BuildersGeneral Contractor903/21/2026
BK Construction ServicesScaffold807/08/2026
O&L Expert ContractingGeneral Contractor807/08/2026
212 Renovations GroupGeneral Contractor303/21/2026
City Design ServicesGeneral Contractor307/08/2026
ZFMPlumbing207/08/2026
Superb Plumbing & HeatingPlumbing207/08/2026
Gregg NY PlumbingPlumbing107/08/2026
Wawel Plumbing and HeatingPlumbing107/08/2026
Titan Construction ServicesGeneral Contractor104/09/2026
Craine Air Conditioningspecialty_contractor104/09/2026
Meg II DesignGeneral Contractor107/08/2026
Think ConstructionGeneral Contractor107/08/2026
High Quality Electric ofElectrical103/22/2026
American Standard P&H CororpPlumbing107/08/2026
Dynamic Blue Water MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC Special Inspections8355101/28/2026
Prudigm Engineering Llcu4304202/07/2025
Metric Consulting and Ins1803103/05/2024
Chang Park Arch663105/30/2023
GFC Consulting Engineer P4127105/18/2022
David McDonald Architect3239211/17/2021
Building Lifecycle
All (140)Filed (20)Permit Issued (26)Signed Off (12)Violation (2)Inspection (14)Objection (36)Special Inspection (30)
08/10/2026
Signed off — Alteration
INSTALLATION OF 165' NEW SIDEWALK SHED AT 40 E 80th St AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M01005465-I1
05/20/2026
Permit issued — Sidewalk Shed
M01005465-I1-SH
02/19/2026
Permit issued — Sidewalk Shed
M01005465-I1-SH
02/10/2026
Permit issued — Mechanical Systems
M01343333-I1-MS
01/28/2026
Filed — Alteration
M01343333-I1
01/16/2026
Signed off — Alteration
INTERIOR RENOVATION TO EXISTING DUPLEX APARTMENT: 19B REMODEL EXISTING BATHROOM (20TH FLOOR ONLY) AND REPLACE FIXTURES IN SAME LOCATION. NO PL WORK ON 19TH FLR. NO CHANGE TO USE EGRESS OR OCCUPANCY
M00629755-I1
10/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/01/2025
Permit issued — General Construction
M00993051-I1-GC
08/11/2025
Signed off — Alteration
INTERIOR RENOVATION TO DUPLEX APARTMENT #19B INCLUDES: NEW FINISHES, NEW INTERIOR LIGHTING AND UPGRADE OF EXISTING BATHROOM. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00629748-I1
08/11/2025
Permit issued — Plumbing
M00629755-I1-PL
08/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/20/2025
Permit issued — Plumbing
M01170507-S1-PL
06/11/2025
Permit issued — General Construction
M01170507-I1-GC
06/02/2025
Permit issued — Plumbing
M01170507-S1-PL
04/25/2025
Permit issued — General Construction
M01170507-I1-GC
02/18/2025
Permit issued — Sidewalk Shed
M01005465-I1-SH
02/07/2025
Filed — Alteration
REPLACED, AND CAPPED & REMOVED PLUMBING FIXTURES, ALL AS PER PLANS SUPPLIED. NOCHANGE TO USE, OCCUPANCY OR EGRESS
M01170507-I1
02/07/2025
Filed — Alteration
REPLACED, AND CAPPED & REMOVED PLUMBING FIXTURES, ALL AS PER PLANS SUPPLIED. NOCHANGE TO USE, OCCUPANCY OR EGRESS
M01170507-S1
01/22/2025
Special inspection requirement — Lighting controls
Esther Sperber
01/22/2025
Special inspection requirement — Lighting in dwelling units
Esther Sperber
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
01/22/2025
Special inspection requirement — Final
Esther Sperber
01/22/2025
Special inspection requirement — Interior lighting power
Esther Sperber
08/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/05/2024
Filed — Alteration
Filing for facade repairs as plans filed herewith. No change in use, occupancy or egress.
M00993051-I1
03/04/2024
Special inspection requirement — Insulation placement and R values
William Struth
03/04/2024
Special inspection requirement — Energy Code Compliance Inspections
William Struth
03/04/2024
Special inspection requirement — Air barrier - visual inspection
William Struth
03/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
03/04/2024
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
03/04/2024
Special inspection requirement — Masonry
SAMI HAJJAR P.E
02/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
02/16/2024
Permit issued — Sidewalk Shed
M01005465-I1-SH
02/15/2024
Filed — Alteration
INSTALLATION OF 165' NEW SIDEWALK SHED AT 40 E 80th St AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M01005465-I1
01/19/2024
Special inspection requirement — Final
William Struth
10/10/2023
Signed off — Alteration
APT RENOVATION , MINOR NON LOAD BEARING PARTITION REMOVAL, NEW INTERIOR GWB NONLOADBEARING PARTITIONS AND DOORS, NEW CABINETRY AND FINISHES, REPLACE EXISTINGACCESSORY STAIR,ALL AS PER PLANS SUPPLIED. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M00854977-I1
10/04/2023
Permit issued — Structural
M00854977-I1-ST
08/23/2023
Signed off — Alteration
M00787167-I1
08/21/2023
Signed off — Alteration
Plumbing work for apartment renovation
M00797454-I1
08/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/24/2023
Signed off — Alteration
M00732215-I1
07/24/2023
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE RENOVATION OF APARTMENT 23A ON THE 23RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00732222-I1
07/12/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/21/2023
Permit issued — Structural
M00854977-I1-GC
06/07/2023
Filed — Alteration
Plumbing work for apartment renovation
M00797454-P1
05/30/2023
Filed — Alteration
APT RENOVATION , MINOR NON LOAD BEARING PARTITION REMOVAL, NEW INTERIOR GWB NONLOADBEARING PARTITIONS AND DOORS, NEW CABINETRY AND FINISHES, REPLACE EXISTINGACCESSORY STAIR,ALL AS PER PLANS SUPPLIED. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M00854977-I1
05/11/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/12/2023
Signed off — Alteration
General construction in Apt. 21B. No change to use, egress or occupancy.
M00617796-I1
04/12/2023
Special inspection requirement — Lighting in dwelling units
Esther Sperber
04/12/2023
Special inspection requirement — Lighting controls
Esther Sperber
04/12/2023
Special inspection requirement — Interior lighting power
Esther Sperber
04/04/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chang Park
04/04/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Chang Park
04/04/2023
Special inspection requirement — Final
Esther Sperber
04/04/2023
Special inspection requirement — Structural Steel - Welding
Chang Park
04/04/2023
Special inspection requirement — Post-installed Anchors
Chang Park
04/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chang Park
02/24/2023
Signed off — Alteration
General construction in Apt. 21B. No change to use, egress or occupancy.
M00617796-S1
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offBK Construction Services05/20/2026
DOB NOWSidewalk ShedSigned-offBK Construction Services02/19/2026
DOB NOWMechanical SystemsPermit IssuedCraine Air Conditioning I02/10/2026
DOB NOWGeneral ConstructionPermit IssuedTitan Construction Services10/01/2025
DOB NOWPlumbingSigned-offSuperb Plumbing & Heating08/11/2025
DOB NOWPlumbingSigned-offZefi Mechanical06/20/2025
DOB NOWGeneral ConstructionPermit IssuedO&L Expert Contracting06/11/2025
DOB NOWPlumbingSigned-offZefi Mechanical06/02/2025
DOB NOWGeneral ConstructionPermit IssuedO&L Expert Contracting04/25/2025
DOB NOWSidewalk ShedSigned-offBK Construction Services02/18/2025
DOB NOWSidewalk ShedSigned-offBK Construction Services02/16/2024
DOB NOWStructuralSigned-offO&L Expert Contracting10/04/2023
DOB NOWStructuralSigned-offO&L Expert Contracting06/21/2023
DOB NOWPlumbingSigned-offSuper Plumbers02/09/2023
DOB NOWPlumbingSigned-offGregg NY Plumbing11/28/2022
DOB NOWGeneral ConstructionSigned-offMeg II Design10/27/2022
DOB NOWPlumbingSigned-offWawel Plumbing and Heating08/31/2022
DOB NOWGeneral ConstructionSigned-off212 Renovations Group08/05/2022
DOB NOWGeneral ConstructionSigned-offCity Design Services05/04/2022
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp04/28/2022
DOB NOWGeneral ConstructionSigned-offThink Construction04/13/2022
DOB NOWGeneral ConstructionSigned-offOca Builders01/28/2022
DOB NOWPlumbingSigned-offSuperb Plumbing & Heating12/16/2021
DOB NOWGeneral ConstructionSigned-offCity Design Services12/08/2021
DOB NOWGeneral ConstructionSigned-offOca Builders10/20/2021
DOB NOWGeneral ConstructionSigned-offOca Builders09/10/2021
1 project · most recent 02/07/2025
Water/Sanitary
FiledStatusContractorScope
02/07/2025Signed-offZFMWater/Sanitary
12 projects · most recent 04/08/2026
General Wiring
FiledStatusContractorScope
04/08/2026CompleteRight Voltage Electric Co—
10/21/2025CompleteNY City Electric—
08/06/2025CompleteNY City ElectricGeneral Wiring
08/04/2025CancelledJte Electrical ServicesGeneral Wiring
07/09/2025CompleteElectric A/CGeneral Wiring
02/19/2024Permit IssuedHigh Quality Electric of—
10/11/2023CompleteNY City ElectricGeneral Wiring
08/23/2022CompletePos Electrical ContractorsGeneral Wiring
05/27/2022CompleteMatros Automated Electrical—
04/29/2022CompleteInfinity ElectricGeneral Wiring
11/17/2021Permit IssuedFSM ElectricalGeneral Wiring
09/25/2019CompleteJam Electrical—
1 project · most recent 03/05/2024
FiledStatusContractorScope
03/05/2024Permit IssuedTitan Construction Services1 scope_items
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
10/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/22/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/24/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/04/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/01/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
01/22/2025Lighting controlsEsther Sperberenergy_progress
01/22/2025Lighting in dwelling unitsEsther Sperberenergy_progress
01/22/2025Fire-Resistant Penetrations and JointsNaeem Anwarspecial
01/22/2025FinalEsther Sperberprogress
01/22/2025Interior lighting powerEsther Sperberenergy_progress
03/04/2024Insulation placement and R valuesWilliam Struthenergy_progress
03/04/2024Energy Code Compliance InspectionsWilliam Struthprogress
03/04/2024Air barrier - visual inspectionWilliam Struthenergy_progress
03/04/2024Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
03/04/2024Post-installed AnchorsSAMI HAJJAR P.Especial
03/04/2024MasonrySAMI HAJJAR P.Especial
02/29/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
01/19/2024FinalWilliam Struthprogress
04/12/2023Lighting in dwelling unitsEsther Sperberenergy_progress
04/12/2023Lighting controlsEsther Sperberenergy_progress
04/12/2023Interior lighting powerEsther Sperberenergy_progress
04/04/2023Structural Stability – Alterations of existing buildingsChang Parkspecial
04/04/2023Structural Steel - High Strength BoltingChang Parkspecial
04/04/2023FinalEsther Sperberprogress
04/04/2023Structural Steel - WeldingChang Parkspecial
04/04/2023Post-installed AnchorsChang Parkspecial
04/04/2023Fire-Resistant Penetrations and JointsChang Parkspecial
12/02/2021Lighting in dwelling unitsPatrick Plunkettenergy_progress
11/17/2021Fire-Resistant Penetrations and JointsDavid McDonaldspecial
11/17/2021Energy Code Compliance InspectionsMagali Regisprogress
Latest 25 of 36.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
09/03/2026M00580387-I1Request digital key ↗
09/03/2026M00629755-I1Request digital key ↗
09/03/2026M00617796-P1Request digital key ↗
Showing 3 of 21 on file for this type
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature22
09/01/2026M00617796-I1Open ↗
09/01/2026M00617796-I1Open ↗
09/01/2026M00580387-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/03/2026M00629748-I1Open ↗
09/02/2026M00732215-I1Open ↗
09/02/2026M00732222-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/31/2026M00629755-I1Open ↗
08/31/2026M00854977-I1Open ↗
08/31/2026M00854977-I1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
09/02/2026M00732215-I1Open ↗
09/02/2026M00732222-I1Open ↗
09/01/2026M00787167-I1Open ↗
Showing 3 of 20 on file for this type
▸Energy Compliance5
▸DOB NOWEN2: As Built Energy Analysis5
08/15/2026M00629748-I1Open ↗
08/13/2026M00732215-I1Open ↗
08/13/2026M00787167-I1Open ↗
Showing 3 of 5 on file for this type