| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01331136 ↗ | 1165 FIFTH AVENUE MANHATTAN | Alteration | Permit Issued | 04/14/2026 | 08/31/2026 | Design E_SPACE DESIGN Contractor INSIGNIA RENOVATIONS,INC | Renovate Duplex Unit 2-3D on 2nd & 3rd floor. Work to include removing +installing new interior non-load partitions, dropped ceilings as pe… |
| Q01099570 ↗ | 25-07 HUMPHREY STREET QUEENS | Alteration CO | Filed — no permit on record | 07/01/2026 | — | Design DAVID MCDONALD ARCHITECT | — |
| B00536499 ↗ | 55 EASTERN PARKWAY BROOKLYN | Alteration | Signed-off | 06/17/2021 | 06/24/2026 | Design JAMES H. BAER -ARCHITECT Contractor PLUMBING PLBG & PLBG CORP | REMOVE EXISTING GAS STOVE, CAP GAS LINE IN BASEMENT AND DISCONNECT GAS. INSTALL NEW ELECTRIC STOVE AND DRYER. |
| B01373672 ↗ | 345 53RD STREET BROOKLYN | Alteration | Filed — no permit on record | 04/28/2026 | — | Design JAMES H. BAER -ARCHITECT | — |
| B00983465 ↗ | 6638 BERGEN PLACE BROOKLYN | Alteration | Permit Issued | 01/19/2024 | 04/14/2026 | Design JAMES H. BAER -ARCHITECT Contractor XPRESS PLBG AND HTG LLC | SCOPE OF WORK: REMOVAL OF GAS AND ASSOCIATED PLUMBING FIXTURES -AND THE INSTALLATION OF NEW GAS AND PLUMBING FIXTURES AS PER PLANS. |
| B00983464 ↗ | 6638 BERGEN PLACE BROOKLYN | Alteration | Signed-off | 01/19/2024 | 03/04/2026 | Design JAMES H. BAER -ARCHITECT Contractor GBI CONSTRUCTION CORP | Scope of Work includes select demolition of interior partitions, finishes and fixtures and new partitions, finishes and fixtures. Also reco… |
| Person | Filings | Most recent |
|---|---|---|
| Michelle Borde | 147 | 09/23/2026 |
| MICHELLE BORDE | 5 | 06/08/2026 |
| MICHELLE PENNY | 2 | 11/09/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| David McDonald Architect | 33 | 07/01/2026 |
| James H. Baer -Architect | 27 | 09/24/2026 |
| E_SPACE Design | 11 | 06/10/2026 |
| Allison Eden Karn | 6 | 12/28/2023 |
| NV/Design Architecture | 6 | 07/28/2026 |
| Oapd - Office for Architecture, PSC | 4 | 04/25/2024 |
| Tan Engineering | 3 | 06/13/2025 |
| As Engineering Services | 2 | 12/13/2021 |
| Hardie & Associates Consulting Engineering | 2 | 02/02/2024 |
| Jennifer Overton Architect | 2 | 07/06/2023 |
| Kiss + Cathcart Architects | 2 | 05/22/2023 |
| Marina Ferrante-Libonati | 2 | 04/07/2022 |
| P Georgopoulos Architect | 2 | 10/20/2023 |
| R & O Engineering | 2 | 10/06/2025 |
| Stanislav Slutsky, PE | 2 | 03/17/2022 |
| Bicaluro Associates | 1 | 10/06/2025 |
| Cany Architecture & Engineering | 1 | 07/21/2026 |
| Hany Rizkalla Architect | 1 | 10/06/2025 |
| Kam Chiu Consulting Engineering | 1 | 07/12/2022 |
| Lee Engineering | 1 | 07/21/2026 |
| Maxfield Blaufeux & Heywood Blaufeu | 1 | 07/30/2024 |
| Wavic Engineering | 1 | 01/15/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| BMT Plumbing & Heating | 5 | 10/06/2025 |
| Nyeusi Construction | 5 | 11/13/2025 |
| Chandrabali Ramanand | 3 | 09/21/2022 |
| Eco Design Construction | 3 | 08/10/2022 |
| Kelly Construction Co | 3 | 07/28/2026 |
| R.J. Wellbrock | 3 | 12/28/2023 |
| Aspiro Renovations | 2 | 05/24/2024 |
| Bayside Builders | 2 | 11/13/2025 |
| City Design Services | 2 | 08/01/2023 |
| Design 2 Build New York I | 2 | 06/16/2026 |
| DPH Plumbing & Heating | 2 | 02/04/2026 |
| Evay Development Associates | 2 | 11/21/2023 |
| Insignia Renovations | 2 | 06/10/2026 |
| John Evan Contracting | 2 | 10/06/2025 |
| Practical Plumbing & Heating | 2 | 11/30/2023 |
| R.J.C. Mechanical | 2 | 01/15/2024 |
| Samuel & Sons P & H | 2 | 07/27/2023 |
| TT Mechanical | 2 | 04/19/2024 |
| 2323 Development | 1 | 02/01/2022 |
| Amb Mechanical | 1 | 12/01/2022 |
| Aladdin Plumbing | 1 | 04/07/2022 |
| All Boro Cleaning Service | 1 | 03/17/2022 |
| All Pro Plumbing & Heating | 1 | 05/03/2021 |
| Alma Plumbing Sprinkler | 1 | 05/26/2022 |
| Alpine Refrigeration Co | 1 | 09/21/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| 254 Huron Projects | 3 | 09/06/2022 |
| Venture NY Property Management | 3 | 05/23/2024 |
| Anibic | 2 | 03/17/2022 |
| Douglas Elliman Property Management | 2 | 11/17/2021 |
| Eihab Human Services | 2 | 12/12/2024 |
| First Service Residential | 2 | 04/07/2022 |
| Yed | 2 | 10/06/2025 |
| 152 W 26 Street Restoration | 1 | 01/26/2021 |
| BW 450 St Marks | 1 | 12/29/2025 |
| First CS | 1 | 06/13/2025 |
| Overcoming-Love Ministries | 1 | 01/12/2022 |
| The Church of the Crucifixtion | 1 | 04/25/2024 |
| Topline Realty | 1 | 02/03/2021 |
| Valentine's Way Co | 1 | 02/02/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01331136 ↗ | 1165 FIFTH AVENUE MANHATTAN | Alteration | Permit Issued | 04/14/2026 | 08/31/2026 | Design E_SPACE DESIGN Contractor INSIGNIA RENOVATIONS,INC | Renovate Duplex Unit 2-3D on 2nd & 3rd floor. Work to include removing +installing new interior non-load partitions, dropped ceilings as pe… |
| Q01099570 ↗ | 25-07 HUMPHREY STREET QUEENS | Alteration CO | Filed — no permit on record | 07/01/2026 | — | Design DAVID MCDONALD ARCHITECT | — |
| B00536499 ↗ | 55 EASTERN PARKWAY BROOKLYN | Alteration | Signed-off | 06/17/2021 | 06/24/2026 | Design JAMES H. BAER -ARCHITECT Contractor PLUMBING PLBG & PLBG CORP | REMOVE EXISTING GAS STOVE, CAP GAS LINE IN BASEMENT AND DISCONNECT GAS. INSTALL NEW ELECTRIC STOVE AND DRYER. |
| B01373672 ↗ | 345 53RD STREET BROOKLYN | Alteration | Filed — no permit on record | 04/28/2026 | — | Design JAMES H. BAER -ARCHITECT | — |
| B00983465 ↗ | 6638 BERGEN PLACE BROOKLYN | Alteration | Permit Issued | 01/19/2024 | 04/14/2026 | Design JAMES H. BAER -ARCHITECT Contractor XPRESS PLBG AND HTG LLC | SCOPE OF WORK: REMOVAL OF GAS AND ASSOCIATED PLUMBING FIXTURES -AND THE INSTALLATION OF NEW GAS AND PLUMBING FIXTURES AS PER PLANS. |
| B00983464 ↗ | 6638 BERGEN PLACE BROOKLYN | Alteration | Signed-off | 01/19/2024 | 03/04/2026 | Design JAMES H. BAER -ARCHITECT Contractor GBI CONSTRUCTION CORP | Scope of Work includes select demolition of interior partitions, finishes and fixtures and new partitions, finishes and fixtures. Also reco… |
| B01346572 ↗ | 428 CLERMONT AVENUE BROOKLYN | Alteration | Permit Issued | 01/21/2026 | 03/02/2026 | Design JAMES H. BAER -ARCHITECT Contractor DESIGN 2 BUILD NEW YORK I | REMOVAL OF SELECT NON-BEARING PARTITIONS AS PER PLAN. ADDITIONAL WORK TO INCLUDED |
| M01354042 ↗ | 150 CENTRAL PARK SOUTH MANHATTAN | Alteration | Signed-off | 02/04/2026 | 02/19/2026 | Design E_SPACE DESIGN Contractor DPH PLUMBING & HTG CORP | PROPOSED WORK AT THE APARTMENT 2401 (24TH FLR) REMOVE NON-LOAD BEARING PARTITONS, INSTALL NEW PARTITIONS FOR NEW BATHROOM, NEW PLUMBING WORK… |
| B00976130 ↗ | 119A INDIA STREET BROOKLYN | Alteration CO | Permit Issued | 01/04/2024 | 02/13/2026 | Design JAMES H. BAER -ARCHITECT Contractor RADB SERVICES | DEMOLITION OF INTERIOR PARTITIONS, FINISHES & FIXTURES + THE INSTALLATION OF NEW PARTITIONS, FINISHES & FIXTURES. WORK INCLUDES OBTAINING A… |
| M01349203 ↗ | 150 CENTRAL PARK SOUTH MANHATTAN | Alteration | Signed-off | 02/04/2026 | 02/10/2026 | Design E_SPACE DESIGN Contractor INSIGNIA RENOVATIONS | INTERIOR RENOVATION TO APT 2401 ONLY - REMOVE NON-LOAD BEARING PARTITIONS AND INSTALL NEW PARTITIONS FOR NEW BATHROOM. NEW PLUMBING WORK, F… |
| X01314023 ↗ | 1112 UNDERHILL AVENUE BRONX | Alteration | Signed-off | 11/13/2025 | 12/22/2025 | Design DAVID MCDONALD ARCHITECT Contractor NYEUSI CONSTRUCTION.LLC | REMEDY ECB VIOLATION #34937125H FOR ILLEGAL WOODEN STRUCTURE IN REAR YARD. REMOVE ENTIRE STRUCTURE AND RESTORE TO LEGAL CONDITION. NO CHA… |
| Q00891879 ↗ | 224-17 LINDEN BOULEVARD QUEENS | Alteration | Signed-off | 07/26/2023 | 11/21/2025 | Design P GEORGOPOULOS ARCHITECT PC Owner EIHAB HUMAN SERVICES Contractor LG ELITE PLUMBING INC | APPLICATION FILED IN CONJUNCTION WITH ALTERATION APPLICATION #X00489843FOR SPRINKLER AND PLUMBING WORK. NO CHANGE IN USE, EGRESS AND/OR OCCU… |
| Q00863408 ↗ | 68-43 EXETER STREET QUEENS | Alteration | Signed-off | 05/31/2023 | 11/18/2025 | Design DAVID MCDONALD ARCHITECT Contractor DW PLUMBING INC | NEW PLUMBING FIXTURES AND PIPING AS PER PLANS |
| X01278694 ↗ | 6050 RIVERDALE AVENUE BRONX | Alteration | Signed-off | 09/02/2025 | 09/04/2025 | Design DAVID MCDONALD ARCHITECT Owner BW 450 ST. MARKS, LLC Contractor S. TIEGER PLBG. CO., INC | REPLACE EXISTING METER BAR; NEW GAS PIPING FOR NEW COMMERCIAL OVEN/RANGE. NEW ANSUL VALVE AND NEW (3) COMPARTMENT SINK; NEW GAS PIPING TO … |
| B01102103 ↗ | 2957 AVENUE T BROOKLYN | Alteration | Signed-off | 09/20/2024 | 08/22/2025 | Design JAMES H. BAER -ARCHITECT Contractor CONSTRUCTION XPERT INC | Shallow foundation for 7'4 extension to existing one car garage in rear yard. |
| M01227079 ↗ | 10 WEST 66TH STREET MANHATTAN | Alteration | Signed-off | 07/22/2025 | 08/22/2025 | Design E_SPACE DESIGN Contractor GB RENOVATIONS NYC | PROPOSED WORK AT APARTMENT # 28H. (28TH FLR). REMOVE EXISTING WHIRLPOOL TUB IN BEDROOM #1 AND INSTALL NEW BATHROOM. INSTALL NEW PARTITIONS… |
| M00629755 ↗ | 40 EAST 80TH STREET MANHATTAN | Alteration | Signed-off | 11/17/2021 | 08/11/2025 | Design E_SPACE DESIGN Owner Douglas Elliman Property Management Contractor SUPERB PLUMBING & HEATING | INTERIOR RENOVATION TO EXISTING DUPLEX APARTMENT: 19B REMODEL EXISTING BATHROOM (20TH FLOOR ONLY) AND REPLACE FIXTURES IN SAME LOCATION. NO… |
| B01237770 ↗ | 1731 BROADWAY BROOKLYN | Alteration | Permit Issued | 06/25/2025 | 07/22/2025 | Design R & O ENGINEERING Owner YED LLC Contractor JOHN EVAN CONTRACTING COR | FOUNDATION PLAN FILED IN CONJUNCTION WITH NB APPLICATION #B01170044. |
| B01170044 ↗ | 1731 BROADWAY BROOKLYN | New Building | Permit Issued | 03/13/2025 | 07/17/2025 | Design BICALURO ASSOCIATES PC Owner YED LLC Contractor JOHN EVAN CONTRACTING COR | NEW FENCE AS REQUIRED PRIOR TO WORK COMMENCING FOR NEW BUILDING AT 1731 BROADWAY |
| M01123118 ↗ | 20 MOTT STREET MANHATTAN | Alteration | Filed — no permit on record | 06/13/2025 | — | Design TAN ENGINEERING PC Owner FIRST CS CORP | — |
| B01216475 ↗ | 428 CLERMONT AVENUE BROOKLYN | Alteration CO | Filed — no permit on record | 05/23/2025 | — | Design LEE ENGINEERING, P.C. | — |
| Q00724403 ↗ | 84-27 DANA COURT QUEENS | Alteration | Permit Issued | 05/26/2022 | 04/30/2025 | Design DAVID MCDONALD ARCHITECT Contractor SMART PLUMBING & HTG CORP | PLUMBING WORK RELATED TO DOB VIOLATION #22-00466 FOR WORK WITHOUT A PERMIT 'INSTALL PLUMBING' IN SINGLE-FAMILY DWELLING AT 84-27 DANA COURT… |
| B01050624 ↗ | 119A INDIA STREET BROOKLYN | Alteration | Permit Issued | 05/16/2024 | 04/24/2025 | Design JAMES H. BAER -ARCHITECT Contractor EXPERT PLUMBING & HEATING | PLUMBING WORK CONSISTS OF THE REMOVAL OF EXISTING PLUMBING AND GAS FIXTURES AND ASSOCIATED PIPING; AND THE INSTALLATION OF NEW PLUMBING AND … |
| B01097969 ↗ | 414 3RD STREET BROOKLYN | Alteration | Permit Issued | 08/29/2024 | 03/26/2025 | Design DAVID MCDONALD ARCHITECT Contractor NYEUSI CONSTRUCTION.LLC | REMEDIY ECB VIOLATION 35344588Z FOR WORK WITHOUT A PERMIT. COMBINE APARTMENTS 3R + 4R. INSTALL A NON-EGRESS SPIRAL ACEESS STAIR AT 414 3RD … |
| Q01179126 ↗ | 25-07 HUMPHREY STREET QUEENS | Alteration | Signed-off | 02/13/2025 | 02/21/2025 | Design DAVID MCDONALD ARCHITECT Contractor BMT PLUMBING&HEATING LLC | LEGALIZE PLUMBING FIXTURES TO A TWO-STORY, TWO-FAMILY RESIDENCE AS PER DRAWINGS |
| Q00256174 ↗ | 69-04 69TH STREET QUEENS | Alteration | Signed-off | 11/22/2019 | 02/18/2025 | Design DAVID MCDONALD ARCHITECT Contractor TT MECHANICAL CORP | PLUMBING WORK IN ASSOCIATION WITH TWO-FAMILY DWELLING. PROPOSED TWO-STORY ENLARGEMENT, RENOVATION AND CONVERSION TO A TWO-FAMILY DWELLING O… |
| B01034701 ↗ | 9733 4TH AVENUE BROOKLYN | Alteration | Signed-off | 07/30/2024 | 02/13/2025 | Contractor CODE MECHANICAL INC | Boiler work type only for two boilers in cellar in conjunction with BIS #321973744. |
| B08038176 ↗ | 147 STERLING PLACE BROOKLYN | Alteration | Signed-off | 04/20/2023 | 02/04/2025 | Design JAMES H. BAER -ARCHITECT Contractor JOHN HLAD P & H CO., INC | PLUMBING WORK CONSISTS OF THE REMOVAL OF EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING AND THE INSTALLATION OF NEW PLUMBING FIXTURES AND … |
| B08037939 ↗ | 147 STERLING PLACE BROOKLYN | Alteration | Signed-off | 01/18/2023 | 01/13/2025 | Design JAMES H. BAER -ARCHITECT Contractor BAYSIDE BUILDERS INC | CONSTRUCT NEW 2 STORY REAR YARD ADDITION - WORK TO INCLUDE SELECT DEMOLITION OF INTERIOR PARTITION, FINISHES AND FIXTURES AND THE INSTALLATI… |
| B01104039 ↗ | 730 DECATUR STREET BROOKLYN | Alteration | Filed — no permit on record | 12/05/2024 | — | Design JAMES H. BAER -ARCHITECT | — |
| Q01039930 ↗ | 104-26 JAMAICA AVENUE QUEENS | Alteration CO | Filed — no permit on record | 11/26/2024 | — | Design DAVID MCDONALD ARCHITECT | — |
| B01104032 ↗ | 730 DECATUR STREET BROOKLYN | Alteration CO | Filed — no permit on record | 09/23/2024 | — | Design JAMES H. BAER -ARCHITECT | — |
| B01034404 ↗ | 181 HART STREET BROOKLYN | Alteration | Signed-off | 04/30/2024 | 08/27/2024 | Design DAVID MCDONALD ARCHITECT Contractor BMT PLUMBING&HEATING LLC | PLUMBING WORK ON INTERIOR OF TWO STORY CELLAR + BASEMENT MASONRY BUILDING / EXISTING (2) FAMILY DWELLING. |
| B01033301 ↗ | 181 HART STREET BROOKLYN | Alteration | Signed-off | 04/30/2024 | 08/22/2024 | Design DAVID MCDONALD ARCHITECT Contractor NYEUSI CONSTRUCTION.LLC | ENTIRE INTERIOR RENOVATION TO EXIST'G CELLAR/BASEM'T/1ST/2ND FLRS DUE TO FIRE DAMAGE; THIS INCLUDES SELECT DEMOLITION OF INTERIOR PARTITIONS… |
| B01043354 ↗ | 181 HART STREET BROOKLYN | Alteration | Signed-off | 04/30/2024 | 08/19/2024 | Design DAVID MCDONALD ARCHITECT Contractor NYEUSI CONSTRUCTION.LLC | THIS APPLICATION IS FILED TO REMEDY ECB VIOLATIONS FOR ILLEGAL OFF-STREET PARKING SPACE AT FRONT YARD, RESTORE TO LEGAL CONDITION. NO CHANG… |
| M01048565 ↗ | 30 EAST 37TH STREET MANHATTAN | Alteration | Signed-off | 05/24/2024 | 06/07/2024 | Design DAVID MCDONALD ARCHITECT Contractor ASPIRO RENOVATIONS LLC | CONSTRUCT AN INTERIOR NON-BEARING PARTITION FOR NEW BEDROOM IN 5TH FLOOR APARTMENT - 5J. NO CHANGE TO EGRESS, USE OR OCCUPANCY. |
| M01021458 | 450 CONVENT AVENUE MANHATTAN | Alteration | Filed — no permit on record | 04/25/2024 | — | — | |
| Q00973821 ↗ | 90-01 68TH AVENUE QUEENS | Alteration | Signed-off | 12/27/2023 | 02/14/2024 | Design ALLISON EDEN KARN Contractor M. BARGINE INC | INTERIOR ALTERATION CELLAR & 1ST FLRS: EXIST'G (1)-FAMILY-(2)-STORY SEMI-ATTACHED SINGLE FAMILY DWELLING, MINOR REMOVAL:NON-LOAD BEARING PAR… |
| M00984288 ↗ | 150 CENTRAL PARK SOUTH MANHATTAN | Alteration | Signed-off | 01/30/2024 | 02/09/2024 | Design E_SPACE DESIGN Contractor DPH PLUMBING & HTG CORP | RENOVATION TO KITCHEN AND TWO BATHROOMS AT APARTMENT 609 + 610 BEING COMBINED UNDER APPLICATION #M00985992 |
| X00967192 ↗ | 1626 CROSBY AVENUE BRONX | Alteration | Signed-off | 11/30/2023 | 02/05/2024 | Design DAVID MCDONALD ARCHITECT Contractor COLLINS PLUMBING CORP | REMEDY VIOLATION TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. REPAIR BUILDING DOWNSPOUTS TO THE EXISTING BUILDING STORM DRAIN. NO CHANGE… |
| Q00973829 ↗ | 90-01 68TH AVENUE QUEENS | Alteration | Signed-off | 12/28/2023 | 02/01/2024 | Design ALLISON EDEN KARN Contractor R.J. WELLBROCK INC | PLUMBING WORK ON 1ST AND CELLAR FLOORS ONLY. WORK IN CONJUNCTION WITH RELATED GC APPLICATION #Q00973821 |
| X08004456 ↗ | 524 UNDERHILL AVENUE BRONX | Alteration | Signed-off | 09/20/2022 | 01/03/2024 | Contractor EVAY DEVELOPMENT ASSOCIAT | THIS APPLICATION IS FILED TO LEGALIZE EXISTING SHED AND REMOVE VIOLATION: #039063360P |
| Q00976109 ↗ | 145-98 179TH STREET QUEENS | Alteration CO | Filed — no permit on record | 12/19/2023 | — | Design DAVID MCDONALD ARCHITECT | — |
| Q00964267 ↗ | 145-41 110TH AVENUE QUEENS | Alteration CO | Filed — no permit on record | 12/18/2023 | — | — | |
| Q00449394 ↗ | 23-66 28TH STREET QUEENS | Alteration | Signed-off | 02/10/2021 | 12/01/2023 | Design DAVID MCDONALD ARCHITECT Contractor CHANDRABALI RAMANAND | INSTALL 3-PIECE BATHROOM AND 3-PIECE LAUNDRY ROOM IN CELLAR OF TWO STORY TWO FAMILY DWELLING. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| B00746829 ↗ | 352 DEGRAW STREET BROOKLYN | Alteration | Permit Issued | 07/04/2022 | 11/28/2023 | Design JAMES H. BAER -ARCHITECT Contractor NOPHIER PLUMBING & HTG IN | PLUMBING WORK CONSISTS OF THE REMOVAL OF EXIST'G PLUMBING & GAS FIXTURES & ASSOCIATED PIPING & THE INSTALLATION OF NEW PLUMBING & GAS FIXTUR… |
| Q00899250 ↗ | 224-17 LINDEN BOULEVARD QUEENS | Alteration | Signed-off | 07/03/2023 | 11/16/2023 | Design JAMES H. BAER -ARCHITECT Owner EIHAB HUMAN SERVICES Contractor G-NET CONSTRUCTION CORP | INTERIOR RENOVATION OF EXIST'G GROUND FLR STORE INTO A DAY HABILITATION PROGRAM FOR DEVELOPMENTALLY DISABLED ADULTS. WORK TO INCLUDE SELECT … |
| Q00562091 ↗ | 33-08 84TH STREET QUEENS | Alteration | Signed-off | 07/27/2021 | 11/03/2023 | Design DAVID MCDONALD ARCHITECT Contractor BMT PLUMBING&HEATING LLC | Remove and replace some Commercial gas cooking equipment fixtures at commercial kitchen and install new Fire Suppression Shut Off Valve in c… |
| Q00843257 ↗ | 68-43 EXETER STREET QUEENS | Alteration | Permit Issued | 03/16/2023 | 11/02/2023 | Design DAVID MCDONALD ARCHITECT Contractor GOLDEN CONSTRUCTION NY CO | ALTERATION TO EXISTING TWO FAMILY MASONRY DWELLING: WORK INCLUDES SELECT DEMOLITION OF INTERIOR PARTITIONS, FINISHES & FIXTURES AND THE INS… |
| B08038280 ↗ | 38 SCHERMERHORN STREET BROOKLYN | Alteration | Signed-off | 02/08/2023 | 10/11/2023 | Design JAMES H. BAER -ARCHITECT Contractor ALPINE REFRIGERATION CO | PLUMBING WORK CONSISTS OF THE REMOVAL OF EXISTING PLUMBING AND GAS FIXTURES AND ASSOCIATED PIPING AND THE INSTALLATION OF NEW PLUMBING AND G… |
| M00900610 ↗ | 150 CENTRAL PARK SOUTH MANHATTAN | Alteration | Signed-off | 07/11/2023 | 08/17/2023 | Design E_SPACE DESIGN Contractor CITY DESIGN SERVICES | SCOPE OF WORK: INCORPORATE PORTION OF THE PUBLIC HALLWAY INTO APARTMENT, REVERSE DOOR SWINGS AT ENTRY AREA - INSTALL NEW PARTITIONS, MILL W… |
| B08038253 ↗ | 38 SCHERMERHORN STREET BROOKLYN | Alteration | Signed-off | 02/08/2023 | 07/28/2023 | Design JAMES H. BAER -ARCHITECT Contractor MKSSKR CONSULTING SERVICE | INTERIOR RENOVATION OF THE EXISTING BASEMENT APARTMENT. WORK TO INCLUDE SELECT DEMOLITION OF INTERIOR PARTITIONS, FINISHES AND FIXTURES AND… |
| M00480163 ↗ | 263 WEST 90TH STREET MANHATTAN | Alteration CO | Permit Issued | 03/17/2021 | 07/25/2023 | Design NV/DESIGN.ARCHITECTURE PLLC Contractor KELLY CONSTRUCTION CO INC | ALTERATION CO: CHANGE EXISTING (4) FAMILY DWELLING TO A (2) FAMILY DWELLING. PROPOSED NEW PARTITIONS -AS PER PLANS. |
| Q00876176 ↗ | 145-98 179TH STREET QUEENS | Alteration CO | Filed — no permit on record | 07/24/2023 | — | Design DAVID MCDONALD ARCHITECT | — |
| B00806341 ↗ | 71 16TH STREET BROOKLYN | Alteration | Signed-off | 03/01/2023 | 07/15/2023 | Design JAMES H. BAER -ARCHITECT Contractor WATSON'S PLBG, HTG, & BDG | PLUMBING WORK CONSISTS OF THE REMOVAL OF EXISTING PLUMBING AND GAS FIXTURES AND ASSOCIATED PIPING AND THE INSTALLATION OF NEW PLUMBING AND G… |
| M00800003 ↗ | 120 EAST 29TH STREET MANHATTAN | Alteration | Signed-off | 05/01/2023 | 07/12/2023 | Contractor M&D FIRE SPRINKLER INC | RELOCATE EXISTING SPRINKLER HEADS (4) AS PER PLANS |
| M08055649 ↗ | 120 EAST 29TH STREET MANHATTAN | Alteration | Signed-off | 05/01/2023 | 07/12/2023 | Contractor INS DYNAMICS INC | MECHANICAL WORK INCLUDES: RELOCATE LINEAR DIFFUSER AS PER PLANS; INSULATE RELOCATED DUCTS AND CONNECT KITCHEN RANGE HOOD TO EXISTING KITCHE… |
| M00595562 ↗ | 360 EAST 72ND STREET MANHATTAN | Alteration | Signed-off | 10/04/2021 | 06/23/2023 | Design JENNIFER OVERTON ARCHITECT Contractor GW MECHANICAL CORP | GENERAL RENOVATION TO APARTMENT 707A - SCOPE INCLUDES: REMOVE WALL BETWEEN LIV/DIN RM + KITCHEN; REPLACE PLUMBING FIXTURES AS PER PLAN |
| B00806340 ↗ | 71 16TH STREET BROOKLYN | Alteration CO | Permit Issued | 01/17/2023 | 05/24/2023 | Design JAMES H. BAER -ARCHITECT Contractor NYEUSI CONSTRUCTION.LLC | INTERIOR RENOVATION OF EXISTING BUILDING. WORK TO INCLUDE SELECT DEMOLITION OF INTERIOR PARTITIONS, FINISHES AND FIXTURES AND THE INSTALLAT… |
| Q00830899 ↗ | 18-11 STARR STREET QUEENS | Alteration | Filed — no permit on record | 05/22/2023 | — | Design KISS + CATHCART ARCHITECTS | — |
| Q00830148 ↗ | 73-20 AUSTIN STREET QUEENS | Alteration | Signed-off | 04/05/2023 | 05/18/2023 | Design DAVID MCDONALD ARCHITECT Contractor KEW FOREST PLBG & HTG INC | PLUMBING WORK FOR NEW BATHROOM AND INTERIOR REMODEL IN EXISTING APARTMENT #3A. |
| B00734532 ↗ | 374 MADISON STREET BROOKLYN | Alteration | Signed-off | 07/13/2022 | 05/12/2023 | Design JAMES H. BAER -ARCHITECT Contractor NEW YORK STANDARD MECH CORP | Plumbing work consists of the removal of existing plumbing and gas fixtures and associated piping and the installation of new plumbing and g… |
| B08037358 ↗ | 155 HERZL STREET BROOKLYN | Alteration | Signed-off | 12/31/2022 | 04/27/2023 | Design DAVID MCDONALD ARCHITECT Contractor SAMUEL & SONS P & H INC | REPLACE EXISTING GAS FIRED BOILER AT CELLAR AND EXISTING BOILER VENTING. NO CHANGE IN OCCUPANCY, USE OR EGRESS PROPOSED. |
| B08037556 ↗ | 172 AMBOY STREET BROOKLYN | Alteration | Signed-off | 12/31/2022 | 04/26/2023 | Design DAVID MCDONALD ARCHITECT Contractor SAMUEL & SONS P & H INC | REPLACE EXISTING GAS FIRED BOILER AT CELLAR AND EXISTING BOILER VENTING. NO CHANGE IN OCCUPANCY, USE OR EGRESS PROPOSED. |
| B08015311 ↗ | 248 LAFAYETTE AVENUE BROOKLYN | Alteration CO | Permit Issued | 01/31/2023 | 04/24/2023 | Design JAMES H. BAER -ARCHITECT Contractor BAYSIDE BUILDERS INC | OBTAIN A NEW CERTIFICATE OF OCCUPANCY FOR AN EXISTING SINGLE FAMILY DWELLING. MINOR INTERIOR WORK AS PER DRAWINGS. NO CHANGE TO EGRESS OR … |
| M08053674 ↗ | 120 EAST 29TH STREET MANHATTAN | Alteration | Filed — no permit on record | 04/21/2023 | — | Design E_SPACE DESIGN | — |
| Q00804185 ↗ | 73-20 AUSTIN STREET QUEENS | Alteration | Signed-off | 03/28/2023 | 04/06/2023 | Design DAVID MCDONALD ARCHITECT Contractor ASPIRO RENOVATIONS LLC | INTERIOR REMODEL OF 3RD FLR APARTMENT - UNIT #3A - INCLUDING: EXISTING BATHROOM AND KITCHEN. CONSTRUCT ONE NEW 3-PIECE BATHROOM AND UPDATE … |
| Q00830654 ↗ | 18-11 STARR STREET QUEENS | Alteration | Filed — no permit on record | 04/05/2023 | — | Design KISS + CATHCART ARCHITECTS | — |
| M00601871 ↗ | 360 EAST 72ND STREET MANHATTAN | Alteration | Signed-off | 10/04/2021 | 02/16/2023 | Design JENNIFER OVERTON ARCHITECT Contractor MANHATTAN CABINETS, INC | GENERAL RENOVATION TO APARTMENT 707A - SCOPE INCLUDES: REMOVE WALL BETWEEN LIV/DIN RM + KITCHEN; REPLACE PLUMBING FIXTURES AS PER PLAN. NO … |
| M00511733 ↗ | 263 WEST 90TH STREET MANHATTAN | Alteration | Signed-off | 04/28/2021 | 02/03/2023 | Design WAVIC ENGINEERING PLLC Contractor R.J.C. MECHANICAL CORP | INSTALL NEW SPRINKLER SYSTEM AS PER PLANS |
| B00340799 ↗ | 62 CLARK STREET BROOKLYN | Alteration | Signed-off | 10/20/2020 | 01/10/2023 | Design NV/DESIGN.ARCHITECTURE PLLC Owner VALENTINE'S WAY CO. Contractor R. BARONE PLUMBING | INSTALLATION OF PLUMBING FIXTURES IN EXISTING APARTMENT ON THE 2ND FLOOR TO SEPARATE ONE EXISTING DWELLING UNIT TO TWO DWELLING UNITS.ARCHIT… |
| B00776170 ↗ | 910 ST JOHNS PLACE BROOKLYN | Alteration | Signed-off | 09/29/2022 | 11/29/2022 | Design JAMES H. BAER -ARCHITECT Contractor PRIME PIPING & HEATING IN | PLUMBING WORK TO EXISTING BASEMENT APARTMENT AS PART OF INTERIOR RENOVATION. THIS JOB IS DONE IN CONJUNCTION WITH: B00776168-I1 |
| B00734387 ↗ | 374 MADISON STREET BROOKLYN | Alteration | Signed-off | 06/21/2022 | 11/07/2022 | Design JAMES H. BAER -ARCHITECT Contractor LANDMARK GEN'L CONSTRUCT | Interior Renovation of the existing basement apartment and the construction of a new first floor rear deck. Work to include select demolitio… |
| B00762836 ↗ | 252 HURON STREET BROOKLYN | Alteration | Filed — no permit on record | 09/06/2022 | — | Design TAN ENGINEERING PC Owner 254 HURON PROJECTS LLC | — |
| B00787048 ↗ | 252 HURON STREET BROOKLYN | Alteration | Filed — no permit on record | 09/06/2022 | — | Design TAN ENGINEERING PC Owner 254 HURON PROJECTS LLC | — |
| M00627271 ↗ | 139 WEST 122ND STREET MANHATTAN | Alteration | Signed-off | 11/12/2021 | 08/31/2022 | Design E_SPACE DESIGN Contractor TARA HOME/WORKS,INC | WORK ON ROOF AND SKYLIGHT AT BULKHEAD ONLY. REMOVE & REPLACE: STAIR SKYLIGHT, CURB, JOISTS + SHEATHING. ADD NEW STEEL STAIR FROM LOWER TO … |
| Q00704322 ↗ | 60 EXETER STREET QUEENS | Alteration | Signed-off | 06/29/2022 | 08/30/2022 | Design ALLISON EDEN KARN Contractor R.J. WELLBROCK INC | INTERIOR ALTERATION OF EXISTING ONE FAMILY - TWO STORY DWELLING. THIS APPLICATION INCLUDES REMOVAL OF SAUNA, STEAM ROOM & MINOR REMOVALS OF… |
| Q00766736 ↗ | 17 INGRAM STREET QUEENS | Alteration | Signed-off | 07/12/2022 | 08/09/2022 | Contractor ECO DESIGN CONSTRUCTION C | Cellar thru attic install 4-ton capacity HVAC split system. Provide new exhaust for bathrooms and kitchen hood. obtain certification as per … |
| Q00766732 ↗ | 17 INGRAM STREET QUEENS | Alteration | Signed-off | 07/04/2022 | 08/08/2022 | Design ALLISON EDEN KARN Contractor R.J. WELLBROCK INC | THIS APPLICATION FILED FOR PLUMBING WORK ONLY. REMOVE AND REPLACE FIXTURES AS PER PLANS. ALTERATION TO EXISTING TWO STORY ONE FAMILY DWEL… |
| M00478395 ↗ | 263 WEST 90TH STREET MANHATTAN | Alteration | Signed-off | 06/15/2021 | 07/20/2022 | Design NV/DESIGN.ARCHITECTURE PLLC Contractor KELLY CONSTRUCTION CO INC | MECHANICAL WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION. RELATED JOB # M00480163,M00452248,M00511733,M00451976 |
| Q00704321 ↗ | 60 EXETER STREET QUEENS | Alteration | Signed-off | 06/23/2022 | 07/20/2022 | Design ALLISON EDEN KARN Contractor ECO DESIGN CONSTRUCTION C | INTERIOR ALTERATION OF EXISTING TWO STORY ONE FAMILY DWELLING. SCOPE OF WORK INCLUDES: REMOVAL OF SAUNA, STEAM ROOM & REMOVAL OF MINOR NON-… |
| Q00766712 ↗ | 17 INGRAM STREET QUEENS | Alteration | Signed-off | 06/30/2022 | 07/20/2022 | Design ALLISON EDEN KARN Contractor ECO DESIGN CONSTRUCTION C | INTERIOR RENOVATION TO A ONE FAMILY-THREE STORY DWELLING - ONLY INTERIOR WORK - SOME NON-LOAD BEARING PARTITIONS TO BE REMOVED. NEW FINISHE… |
| B00727232 ↗ | 252 HURON STREET BROOKLYN | Alteration | Permit Issued | 06/24/2022 | 06/27/2022 | Design DAVID MCDONALD ARCHITECT Owner 254 HURON PROJECTS LLC Contractor PRACTICAL PLBG & HTG INC | Plumbing work related to enlargement & interior alterations. General renovation & build new mezzanine for existing high one story industria… |
| B00607432 ↗ | 111 GARFIELD PLACE BROOKLYN | Alteration | Permit Issued | 10/13/2021 | 06/16/2022 | Design AS ENGINEERING SERVICES PC Contractor LEE WERTZ INC | structural work in conjunction with basement, first floor and penthouse enlargement and general renovation of existing 3 story single-family… |
| M00629748 ↗ | 40 EAST 80TH STREET MANHATTAN | Alteration | Signed-off | 11/17/2021 | 05/04/2022 | Design E_SPACE DESIGN Owner Douglas Elliman Property Management Contractor CITY DESIGN SERVICES | INTERIOR RENOVATION TO DUPLEX APARTMENT #19B INCLUDES: NEW FINISHES, NEW INTERIOR LIGHTING AND UPGRADE OF EXISTING BATHROOM. NO CHANGE TO … |
| X00475677 ↗ | 670 WEST 261ST STREET BRONX | Alteration | Signed-off | 06/21/2021 | 04/13/2022 | Design DAVID MCDONALD ARCHITECT Contractor RENTOM GROUP CORP | REMOVE EXISTING KITCHENS & BATHROOMS; INSTALL NEW LAUNDRY, CELLAR TOILET, 2-BFP'S, FIRE SERVICE, 2-COMBI-BOILERS, HW STORAGE TANK, KITCHEN &… |
| B00616709 ↗ | 344 DEAN STREET BROOKLYN | Alteration | Signed-off | 11/19/2021 | 04/06/2022 | Design JAMES H. BAER -ARCHITECT Contractor CROSSFIELD PLBG.&HTG | PLUMBING WORK: REMOVAL OF EXISTING PLUMBING AND GAS FIXTURES AND ASSOCIATED PIPING AND THE INSTALLATION OF NEW PLUMBING AND GAS FIXTURES AN… |
| X00446755 ↗ | 1110 EAST 212TH STREET BRONX | Alteration | Signed-off | 01/08/2021 | 04/05/2022 | Contractor EVAY DEVELOPMENT ASSOCIAT | Scope of Work: is to address ECB violation #39032407L issued for balcony extended without a permit. No change, egress, use or occupancy. |
| B00571824 ↗ | 83 SHEPHERD AVENUE BROOKLYN | Alteration | Signed-off | 09/09/2021 | 04/02/2022 | Design JAMES H. BAER -ARCHITECT Contractor ORBIT PLBG & HTG INC | INTERIOR RENOVATION OF THE EXISTING PLUMBING FIXTURES AND INSTALLATION OF NEW FIXTURES. NO CHANGE TO OCCUPANCY, USE OR EGRESS |
| B00624717 ↗ | 344 DEAN STREET BROOKLYN | Alteration CO | Permit Issued | 11/12/2021 | 03/30/2022 | Design JAMES H. BAER -ARCHITECT Contractor DESIGN 2 BUILD NEW YORK I | INTERIOR RENOVATION TO EXISTING THREE FAMILY ROW HOUSE CONVERT TO OCCUPANCY J-3 TWO FAMILY. |
| B00353374 ↗ | 246 JAMAICA AVENUE BROOKLYN | Alteration | Signed-off | 06/02/2020 | 03/04/2022 | Design DAVID MCDONALD ARCHITECT Contractor PAUL COMMDORE & SONS LTD | LEGALIZE TWO-PIECE (TLT & LAV) BATHROOM, CLOTHES WASHING MACHINE, GAS CLOTHES DRYER AND DOMESTIC HOT WATER HEATER REPLACEMENT AND REMOVE; 2-… |
| Q00418166 ↗ | 68-51 GROTON STREET QUEENS | Alteration | Signed-off | 12/09/2020 | 02/28/2022 | Design DAVID MCDONALD ARCHITECT Contractor DUNDEE PLBG & HTG INC | REMOVE AND INSTALL KITCHEN + BATHROOM FIXTURES AT 1ST FLOOR OF TWO STORY - SINGLE FAMILY DWELLING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00478421 ↗ | 263 WEST 90TH STREET MANHATTAN | Alteration | Filed — no permit on record | 02/02/2022 | — | Design NV/DESIGN.ARCHITECTURE PLLC | — |
| B00351436 ↗ | 1221 ALBEMARLE ROAD BROOKLYN | Alteration | Signed-off | 08/21/2020 | 01/20/2022 | Design NV/DESIGN.ARCHITECTURE PLLC Contractor R.J.C. MECHANICAL CORP | Added word dryer to other gas use per inspector comments. |
| M00451976 ↗ | 263 WEST 90TH STREET MANHATTAN | Alteration | Signed-off | 02/24/2021 | 01/13/2022 | Design NV/DESIGN.ARCHITECTURE PLLC Contractor KELLY CONSTRUCTION CO INC | INTERIOR RENOVATION WITH REMOVAL OF SOME NON-BEARING PARTITIONS |
| B00524381 ↗ | 4616 CORTELYOU ROAD BROOKLYN | Alteration | Signed-off | 07/07/2021 | 12/03/2021 | Design DAVID MCDONALD ARCHITECT Contractor BMT PLUMBING&HEATING LLC | LEGALIZE THREE PIECE BATHROOM AND THREE PIECE LAUNDRY ROOM. PLUMBING FIXTURES IN CELLAR OF EXISTING TWO FAMILY DWELLING. NO CHANGE TO USE,… |
| B00603848 ↗ | 2630 EAST 24TH STREET BROOKLYN | Alteration | Filed — no permit on record | 10/25/2021 | — | Design JAMES H. BAER -ARCHITECT | — |
| B00550566 ↗ | 96 SCHERMERHORN STREET BROOKLYN | Alteration | Signed-off | 08/10/2021 | 10/18/2021 | Design MARINA FERRANTE-LIBONATI Owner FIRST SERVICE RESIDENTIAL Contractor ALADDIN PLUMBING CORP | Plumbing work in conjunction with B00548076-I1. No change in use, egress or occupancy. |
| B00548076 ↗ | 96 SCHERMERHORN STREET BROOKLYN | Alteration | Signed-off | 08/10/2021 | 10/12/2021 | Design MARINA FERRANTE-LIBONATI Owner FIRST SERVICE RESIDENTIAL Contractor 2323 DEVELOPMENT CORP | NON- STRUCTURAL INTERIOR RENOVATION. NO CHANGE TO EGRESS, USE OR OCCUPANCY |
| Q00323155 ↗ | 63-32 FITCHETT STREET QUEENS | Alteration | Signed-off | 04/30/2020 | 08/23/2021 | Design STANISLAV SLUTSKY, PE Owner ANIBIC Contractor ALL BORO CLEANING SERVICE | MECHANICAL WORK: TO PROVIDE CONDITIONED AIR IN DWELLING WITH THREE INDOOR SPLIT AC ELECTRIC UNITS @ BASEMENT, LIVING ROOM AND 2ND FLOOR + ON… |