1921Year Built
18Stories
RBBuilding Class
C6-9Zoning
406,421 sfGross Floor Area
28Units
LL97 Covered2 Open Violations ▸FISP: SWARMPFDNY Report ↗
Condo, office space · Owner of record: 40 RECTOR CONDOMINIUM · 30,080 sf lot · 13.51 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
Roof16p · 8 filings · 20 docs
BulkheadUnder Construction2p · 1 filing · 2 docs
Floor 191p · 2 filings · 18 docs
Floor 18Under Construction42p · 7 filings · 20 docs
Floor 1734p · 4 filings · 17 docs
Floor 16
Floor 151p · 1 filing · 14 docs
Floor 14
Floor 13
Floor 121p · 1 filing · 14 docs
Floor 111p · 1 filing · 14 docs
Floor 101p · 1 filing · 14 docs
Floor 94p · 3 filings · 20 docs
Floor 81p · 1 filing · 14 docs
Floor 73p · 2 filings · 18 docs
Floor 61p · 1 filing · 14 docs
Floor 5Under Construction13p · 6 filings · 20 docs
Floor 410p · 9 filings · 20 docs
Floor 312p · 8 filings · 20 docs
Floor 212p · 6 filings · 20 docs
Floor 112p · 10 filings · 20 docs
CellarUnder Construction12p · 5 filings · 20 docs
Sub-Cellar35p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PHILIPS INTERNATIONAL HOLDING4509/13/2026
NEW FORCE CONSTRUCTION3207/08/2026
CHINA INSTITUTE IN AMERICA6707/08/2026
PHILIPS INTERNATIONAL AS AGENT1307/08/2026
LEGAL DEFENSE FUND LDF604/09/2026
LEGAL DEFENSE FUND (LDF)403/22/2026
40 RECTOR CONDOMINIUM3503/22/2026
40 RECTOR OWNER LLC PHILI303/22/2026
40 RECTOR CONDOMINIUM PHI303/22/2026
AGL INDUSTRIES203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW FORCE CONSTRUCTION CORPGeneral Contractor2307/08/2026
CONSTRUCTORS TRADES & SKIGeneral Contractor2307/10/2026
PRIME MECHANICAL CONTRACTGeneral Contractor1407/08/2026
BENCHMARK BUILDERS LLCGeneral Contractor1307/08/2026
DAIN CONSTRUCTION CORPGeneral Contractor1207/08/2026
VANGUARD CONSTRUCTION ANDGeneral Contractor1207/08/2026
NORDEST SERVICES LLCGeneral Contractor603/21/2026
CS BRIDGE CORPGeneral Contractor507/08/2026
AURA PLUMBING INCPlumbing307/08/2026
WILLIAM C. GERAKARIS P&HPlumbing307/08/2026
MAC FELDER INCPlumbing307/08/2026
EMPRISE CONSTRUCTION INCGeneral Contractor303/21/2026
METRO FIRE PROTECTION INCFire Protection307/08/2026
FIVE BOROUGH NYC LLCFire Protection307/08/2026
JRM CONSTRUCTION MGMT LLCGeneral Contractor204/09/2026
GARY SCOTTOElectrical203/21/2026
ALANTE CONSTRUCTION CORPGeneral Contractor207/08/2026
GEORGE BRESLAW PLBNG LLCPlumbing207/08/2026
A1 SPECIALIZED, INCScaffold107/08/2026
CEDAR ELEC'L CONT'RS INC.Electrical103/22/2026
LMEC ELECTRIC INCElectrical103/22/2026
P&H ELECT D/B/A MAGE ELECElectrical103/22/2026
FULL CAPACITY FIRE CORPFire Protection107/08/2026
MEGA PLBG CORPFire Protection106/28/2026
MILL BROOK FIRE PROTECTIONFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC423301/28/2026
STRATFORD ENGINEERING997309/10/2025
MG ENGINEERING D.P.C.8546109/10/2025
JACK GREEN ASSOCIATES422608/25/2025
PRUDIGM ENGINEERING LLCU43041606/11/2024
RAYMOND HO ARCHITECT, PLL1654305/21/2024
KZ ENGINEERING, P.C.4665105/16/2024
PROJECT TACTICAL SOLUTION5859611/20/2023
PCS ENGINEERING3745208/16/2022
DOMANI INSPECTION SERVICE843205/16/2022
Building Lifecycle
All (300)Filed (62)Permit Issued (80)Signed Off (24)Facade (FISP) (3)Violation (8)Inspection (34)Objection (59)Special Inspection (30)
09/11/2026
Permit issued — Suspended Scaffold
M01449192-I1-SC
08/20/2026
Filed — Alteration
IRA to assist in Condition Assessment
M01449192-I1
07/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/17/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/15/2026
Violation issued (ECB, open)
Construction
07/14/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/14/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/08/2026
Permit issued — General Construction
M00788422-I1-GC
07/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/02/2026
Permit issued — Structural
M01274508-I1-ST
04/02/2026
Permit issued — Suspended Scaffold
M01052085-I1-SC
02/25/2026
Permit issued — General Construction
M01331293-I1-GC
02/24/2026
Permit issued — Sprinklers
M01331352-I1-EW-SP
02/23/2026
Permit issued — Mechanical Systems
M01331318-I1-MS
02/17/2026
Violation issued (FDNY_ORDER, closed)
02/17/2026
Violation issued (FDNY_ORDER, closed)
02/17/2026
Violation issued (FDNY_ORDER, closed)
02/17/2026
Violation issued (FDNY_ORDER, closed)
02/02/2026
Signed off — Alteration
Removal of Cooling Tower 11 (C.T 11) as per plans filed herewith. No change to use, egress or occupancy
M01264383-I1
01/28/2026
Filed — Alteration
MODIFICATION TO EXISTING SPRINKLER. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01331352-I1
01/28/2026
Filed — Alteration
Modification to existing mechanical system serving space. Reuse of existing VAV boxes and associated controls. Modification of ductwork as necessary to accommodate new layout.
M01331318-I1
01/22/2026
Filed — Alteration
Interior Renovation. No change in use, occupancy, or egress.
M01331293-I1
01/16/2026
Special inspection requirement — Post-installed Anchors
Young Suh
01/15/2026
Permit issued — Sidewalk Shed
M00224203-I1-SH
01/12/2026
Violation issued (FDNY_ORDER, closed)
12/12/2025
Signed off — Alteration
Repairs exiting sidewalk vaults
M01274508-S1
12/09/2025
Special inspection requirement — Final
LAWRANCE JACCARD
12/09/2025
Special inspection requirement — Sprayed fire-resistant materials
Young Suh
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
12/09/2025
Special inspection requirement — Sprinkler Systems
Young Suh
11/06/2025
Permit issued — Mechanical Systems
M01274508-S1-MS
10/27/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/21/2025
Objection resolved — Addressed
10/16/2025
Objection resolved — Addressed
10/16/2025
Objection resolved — Addressed
10/02/2025
Objection resolved — Addressed
10/01/2025
Filed — Alteration
INSTALLATION OF NEW (7) NON-RESIDENTIALS SINKS & (7) ELECTRIC WATER HEATERS AS PER PLANS.
M01292283-I1
09/24/2025
Special inspection requirement — Final
09/19/2025
Objection raised — Cost
09/18/2025
Objection raised — Scope
09/18/2025
Objection raised — Cost
09/18/2025
Objection raised — Scope
09/16/2025
Permit issued — Mechanical Systems
M01264383-I1-MS
09/10/2025
Filed — Alteration
Repairs exiting sidewalk vaults
M01274508-S1
09/10/2025
Filed — Alteration
Repairs exiting sidewalk vaults
M01274508-I1
09/10/2025
Special inspection requirement — Masonry
Xianzhang Chen
08/28/2025
Special inspection requirement — Structural Steel - Details
Xianzhang Chen
08/28/2025
Special inspection requirement — Sprayed fire-resistant materials
Xianzhang Chen
08/28/2025
Special inspection requirement — Structural Steel - Welding
Xianzhang Chen
08/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Xianzhang Chen
08/28/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Xianzhang Chen
08/28/2025
Special inspection requirement — Concrete - Cast-In-Place
Xianzhang Chen
08/25/2025
Filed — Alteration
Removal of Cooling Tower 11 (C.T 11) as per plans filed herewith. No change to use, egress or occupancy
M01264383-I1
08/20/2025
Special inspection requirement — Final
Xianzhang Chen
07/21/2025
Permit issued — General Construction
M00788422-I1-GC
05/14/2025
Signed off — Alteration
PARTIAL INTERIOR RENOVATION OF GROUND FLOOR AS PER PLANS FILED HEREWITH.NO CHANGE IN EGRESS, OCCUPANCY, OR USE.
M00472225-I1
04/23/2025
Permit issued — Suspended Scaffold
M01052085-I1-SC
03/10/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/14/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/11/2025
Permit issued — Sidewalk Shed
M00224203-I1-SH
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC09/11/2026
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTORS TRADES & SKI07/08/2026
DOB NOWStructuralPermit IssuedMAJOR GENERAL CON 1 CORP07/02/2026
DOB NOWSuspended ScaffoldPermit IssuedNEW FORCE CONSTR CORP04/02/2026
DOB NOWGeneral ConstructionPermit IssuedJRM CONSTRUCTION MGMT LLC02/25/2026
DOB NOWSprinklersPermit IssuedREAL PLUMBING CORP02/24/2026
DOB NOWMechanical SystemsPermit IssuedJRM CONSTRUCTION MGMT LLC02/23/2026
DOB NOWSidewalk ShedPermit IssuedCONSTRUCTORS TRADES & SKI01/15/2026
DOB NOWMechanical SystemsSigned-offPRIME MECHANICAL CONTRACT11/06/2025
DOB NOWMechanical SystemsSigned-offALANTE CONSTRUCTION09/16/2025
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTORS TRADES & SKI07/21/2025
DOB NOWSuspended ScaffoldPermit IssuedNEW FORCE CONSTR CORP04/23/2025
DOB NOWSidewalk ShedPermit IssuedCONSTRUCTORS TRADES & SKI02/11/2025
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTORS TRADES & SKI08/05/2024
DOB NOWSuspended ScaffoldPermit IssuedNEW FORCE CONSTR CORP05/30/2024
DOB NOWSignPermit IssuedMAD SIGNS INC05/29/2024
DOB NOWSprinklersPermit IssuedGEORGE BRESLAW PLBNG LLC04/08/2024
DOB NOWSuspended ScaffoldPermit IssuedNEW FORCE CONSTR CORP03/21/2024
DOB NOWSidewalk ShedPermit IssuedCONSTRUCTORS TRADES & SKI02/15/2024
DOB NOWGeneral ConstructionSigned-offPRIME MECHANICAL CONTRACT01/30/2024
DOB NOWPlumbingSigned-offLEGUCI PIPING&HEATING LLC01/09/2024
DOB NOWPlumbingSigned-offK.G. MECHANICAL INC12/13/2023
DOB NOWConstruction FencePermit IssuedCONSTRUCTORS TRADES & SKI11/13/2023
DOB NOWSupported ScaffoldPermit IssuedCONSTRUCTORS TRADES & SKI11/13/2023
DOB NOWPlumbingPermit IssuedM. SPINELLI PLB & HTG INC10/11/2023
DOB NOWGeneral ConstructionSigned-offEMPRISE CONSTRUCTION INC10/10/2023
DOB NOWGeneral ConstructionSigned-offVANGUARD CONSTRUCTION AND09/12/2023
DOB NOWMechanical SystemsSigned-offVANGUARD CONSTRUCTION AND09/12/2023
DOB NOWSprinklersSigned-offAURA PLUMBING INC08/09/2023
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTORS TRADES & SKI08/08/2023
DOB NOWBoiler EquipmentSigned-offEAST COAST PETROLEUM INC04/21/2023
DOB NOWMechanical SystemsSigned-offPRIME MECHANICAL CONTRACT04/18/2023
DOB NOWStructuralSigned-offPRIME MECHANICAL CONTRACT04/18/2023
DOB NOWStructuralPermit IssuedDAIN CONSTRUCTION04/17/2023
DOB NOWMechanical SystemsPermit IssuedDAIN CONSTRUCTION04/17/2023
DOB NOWPlumbingPermit IssuedGEORGE BRESLAW PLBNG LLC04/12/2023
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTORS TRADES & SKI03/03/2023
DOB NOWSidewalk ShedPermit IssuedCONSTRUCTORS TRADES & SKI02/14/2023
DOB NOWMechanical SystemsSigned-offVANGUARD CONSTRUCTION AND12/29/2022
DOB NOWConstruction FencePermit IssuedNEW FORCE CONSTRUCTION CO11/15/2022
+ 60 more permits on file
1 project · most recent 03/02/2022
Air Conditioning Systems
FiledStatusContractorScope
03/02/2022Permit IssuedDAIN CONSTRUCTION CORPAir Conditioning Systems
5 projects · most recent 01/28/2026
FiledStatusContractorScope
01/28/2026Permit IssuedREAL PLUMBING CORP—
06/11/2024Signed-offLEGUCI PIPING&HEATING LLC160 heads
03/02/2022———
08/19/2021Signed-offMETRO FIRE PROTECTION INC—
08/03/2021Permit IssuedFIVE BOROUGH NYC LLC12 heads
4 projects · most recent 10/01/2025
Water/Sanitary Gas
FiledStatusContractorScope
10/01/2025——Water/Sanitary
06/11/2024Permit IssuedGEORGE BRESLAW PLBNG LLCGas, Water/Sanitary
05/21/2024Permit IssuedVMC PLUMBING & HEATING INGas, Water/Sanitary
03/02/2022Permit IssuedMITIE PLUMBING & HTG CORPWater/Sanitary
25 projects · most recent 04/03/2026
General Wiring
FiledStatusContractorScope
04/03/2026Permit IssuedJSP ELECTL CNTNG CORPGeneral Wiring
02/11/2026CompleteMATROS AUTOMATED ELEC'L C—
11/14/2025Permit IssuedLION HEART ELECTRIC CORPGeneral Wiring
06/27/2025CompleteOMTA TECH INCGeneral Wiring
06/20/2025Permit IssuedBOROWIDE ELECT'L CONTR'S—
02/11/2025CompleteLIPPOLIS ELECTRIC, INC.General Wiring
08/26/2024CompleteM&L ELECL CONTNG CORPGeneral Wiring
05/20/2024CompleteCORZO ELECTL SYS CORPGeneral Wiring
02/15/2024CompleteMATROS AUTOMATED ELEC'L CGeneral Wiring
12/20/2023CompleteW 8 ELECTRIC CORPGeneral Wiring
11/30/2023CompleteGKF ELECL CONTRACTORS INCGeneral Wiring
11/18/2023CompleteLINA ELECTRIC, CORPGeneral Wiring
08/11/2023CompleteCEDAR ELEC'L CONT'RS INC.General Wiring
04/27/2023CompleteRIGHT AWAY ELECTRIC LLCGeneral Wiring
10/18/2022CompleteWEST SHORE ELECTRIC CORPGeneral Wiring
6 projects · most recent 09/10/2025
Steel Concrete Masonry
FiledStatusContractorScope
09/10/2025Permit IssuedMAJOR GENERAL CON 1 CORPSteel, Masonry
08/16/2022——1 scope_items
02/28/2022Permit IssuedDAIN CONSTRUCTION CORPSteel
02/18/2022——Steel, Concrete
02/26/2021——Steel, Concrete, Masonry
01/14/2020——Steel, Concrete
3 projects · most recent 10/25/2021
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
10/25/2021Permit IssuedCONSTRUCTORS TRADES & SKISidewalk Shed
10/24/2020Permit IssuedCONSTRUCTORS TRADES & SKIScaffold
09/25/2019Permit IssuedCONSTRUCTORS TRADES & SKIFence
3 projects · most recent 08/20/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/20/2026Permit IssuedSKYLINE ACCESS LLC—
05/16/2024Permit IssuedCONSTRUCTORS TRADES & SKISuspended Scaffold (SC)
03/18/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 34
DateTypeResultReport
07/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/17/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/14/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/14/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/10/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/14/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/13/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/16/2023Pass-Final Boiler Equipment InspectionPassView ↗
04/22/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/22/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
12/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/11/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/11/2022Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/04/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/04/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
Latest 25 of 34.
▾Special Inspection Requirements (DOB NOW) — 148
DateRequirementInspectorRole
01/16/2026Post-installed AnchorsYoung Suhspecial
12/09/2025Sprayed fire-resistant materialsYoung Suhspecial
12/09/2025FinalLAWRANCE JACCARDprogress
12/09/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
12/09/2025Sprinkler SystemsYoung Suhspecial
09/24/2025Final—progress
09/10/2025MasonryXianzhang Chenspecial
08/28/2025Structural Steel - WeldingXianzhang Chenspecial
08/28/2025Concrete - Cast-In-PlaceXianzhang Chenspecial
08/28/2025Sprayed fire-resistant materialsXianzhang Chenspecial
08/28/2025Structural Stability – Alterations of existing buildingsXianzhang Chenspecial
08/28/2025Structural Steel - High Strength BoltingXianzhang Chenspecial
08/28/2025Structural Steel - DetailsXianzhang Chenspecial
08/20/2025FinalXianzhang Chenprogress
07/16/2024Public Assembly Emergency LightingNaeem Anwarprogress
06/11/2024Fire-Resistant Penetrations and JointsNaeem Anwarspecial
06/11/2024Post-installed AnchorsNaeem Anwarspecial
06/11/2024Sprinkler SystemsNaeem Anwarspecial
05/21/2024Fire-Resistant Penetrations and JointsPING MAN HOspecial
05/16/2024Public Assembly Emergency LightingNaeem Anwarprogress
05/15/2024Post-installed AnchorsKarol Zdancewiczspecial
05/15/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
05/13/2024Lowest Floor ElevationNaeem Anwarprogress
05/13/2024Fire-Resistance Rated ConstructionNaeem Anwarprogress
05/13/2024Energy Code Compliance InspectionsNaeem Anwarprogress
Latest 25 of 148.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NAACP LDFOfficeFloor 5
Project M01331318 Alteration · Permit Entire · 01/28/2026
Project M01331352 Alteration · Permit Entire · 01/28/2026
Orthodox UnionOfficeFloors 3, 4
Project M00545579 Alteration · LOC Issued · 08/19/2021
Project M00545632 Alteration · LOC Issued · 08/19/2021
Project M00551760 Alteration · Permit Entire · 08/19/2021
China InstituteEducationFloor 1
Project M00562207 No Work · PA Certificate of Operation Issued · 07/30/2021
Project M00454546 Alteration · Permit Entire · 02/05/2021
Project M00275110 Alteration · LOC Issued · 01/07/2020
Project M00270633 Alteration · LOC Issued · 01/06/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 3,588 on file (BIS + DOB NOW)
▸Plans & Drawings83
▸DOB NOWPlans/Sketch47
09/04/2026M00478625-I1Request digital key ↗
09/04/2026M00480946-I1Request digital key ↗
09/04/2026M00478636-I1Request digital key ↗
Showing 3 of 47 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler9
09/05/2026M00270633-I1Request digital key ↗
09/04/2026M00211666-I1Request digital key ↗
09/04/2026M00202034-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00270753-I1Request digital key ↗
09/01/2026M00454546-P4Request digital key ↗
09/01/2026M00454546-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00275110-P1Request digital key ↗
09/04/2026M00454179-P1Request digital key ↗
09/04/2026M00454179-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
09/03/2026M00545529-I1Request digital key ↗
09/03/2026M00562207-I1Request digital key ↗
Showing 2 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/04/2026M00472225-P1Request digital key ↗
09/04/2026M00472225-P2Request digital key ↗
09/04/2026M00472225-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/04/2026M00229727-I1Request digital key ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/03/2026M00224203-I1Request digital key ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlans/Sketch - Structural2
09/05/2026M00269898-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits633
▸BISPLAN / WORK APPROVAL APPLICATION373
02/26/2025121576678Open ↗
04/17/2024123353691Open ↗
02/27/2024123353691Open ↗
Showing 3 of 373 on file for this type
▸BISWORK PERMIT APPLICATION232
03/26/2021123725727Open ↗
02/19/2021123725727Open ↗
07/07/2020123820268Open ↗
Showing 3 of 232 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION11
08/11/2021123353691Open ↗
Showing 1 of 11 on file for this type
▸BISPLACE OF ASSEMBLY10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION7
12/16/2022123353691Open ↗
12/02/2022123353691Open ↗
11/01/2022123353691Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications713
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION417
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 417 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature75
09/05/2026M00231301-I1Open ↗
09/05/2026M00270753-I1Open ↗
09/05/2026M00270633-I1Open ↗
Showing 3 of 75 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature66
09/23/2026M00270633-I1Open ↗
09/23/2026M00724119-I1Open ↗
09/23/2026M00270633-I1Open ↗
Showing 3 of 66 on file for this type
▸DOB NOWProgress Inspector Seal & Signature63
09/24/2026M00547194-P1Open ↗
09/24/2026M00547194-P1Open ↗
09/24/2026M00547194-P1Open ↗
Showing 3 of 63 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISAPPLICANT OWNER SIGNATURE20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Trade Schedules & Equipment271
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE65
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 65 on file for this type
▸BISSELF-CERT PLUMBING NOTICE54
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 54 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA45
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 45 on file for this type
▸BISSCHEDULE B - PLUMBING42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISEQUIPMENT USE PERMITS36
04/14/2022121189089Open ↗
08/21/2020123686920Open ↗
Showing 2 of 36 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT21
08/21/2020123686920Open ↗
Showing 1 of 21 on file for this type
▸BISSPRINKLER INSP REPORT : FP-856
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWFDNY: Letter of No Objection2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection19
▸BISSTREET TREE CHECKLIST14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISTenant Protection Plan and Notes3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWStreet Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos195
▸BISASBESTOS: CERTIFICATION (DEP ACP5)81
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 81 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report49
09/04/2026M00211666-I1Open ↗
09/04/2026M00211666-P1Open ↗
09/04/2026M00202034-I1Open ↗
Showing 3 of 49 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM9
02/19/2021123725727Open ↗
Showing 1 of 9 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)8
07/07/2020123820268Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
09/05/2026M00270753-I1Open ↗
09/05/2026M00270633-I1Open ↗
09/04/2026M00478625-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance249
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS132
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 132 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS56
12/14/2020123777662Open ↗
09/16/2020140870001Open ↗
06/29/2020121141353Open ↗
Showing 3 of 56 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY19
09/24/2020123699907Open ↗
09/16/2020140870001Open ↗
09/16/2020123725727Open ↗
Showing 3 of 19 on file for this type
▸BISTR8: Energy Code Progress Inspections17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)8
02/21/2025121576678Open ↗
02/06/2025122264744Open ↗
06/27/2023123353691Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.6
09/04/2026M00472225-I1Open ↗
09/03/2026M00547589-I1Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports56
▸BISTECHNICAL REPORT: RESPONSIBILITY41
06/04/2024123353691Open ↗
06/03/2024123353691Open ↗
11/08/2023123353691Open ↗
Showing 3 of 41 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION4
10/30/2020122516982Open ↗
Showing 1 of 4 on file for this type
▸Approvals, Objections & Sign-offs446
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST244
03/03/2025121576678Open ↗
09/27/2022123820268Open ↗
02/15/2022123725727Open ↗
Showing 3 of 244 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION59
04/29/2022123915139Open ↗
08/21/2020123686920Open ↗
07/10/2020121189089Open ↗
Showing 3 of 59 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE51
02/27/2024123353691Open ↗
02/26/2024123353691Open ↗
02/21/2024123353691Open ↗
Showing 3 of 51 on file for this type
▸BISADMINISTRATIVE OBJECTIONS40
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 40 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter36
09/05/2026M00270753-I1Open ↗
09/05/2026M00270633-I1Open ↗
09/04/2026M00472225-P1Open ↗
Showing 3 of 36 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSUPERSEDING LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter3
09/04/2026M00478625-I1Open ↗
Showing 1 of 3 on file for this type
▸Cost, Insurance & Ownership318
▸BISCOST AFFIDAVIT307
02/14/2022123725727Open ↗
12/14/2020123777662Open ↗
09/16/2020140870001Open ↗
Showing 3 of 307 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW37
02/21/2025121576678Open ↗
11/08/2022121234832Open ↗
09/26/2022123820268Open ↗
Showing 3 of 7 on file for this type
▸BISDEPT OF FINANCE VERIFICATION4
04/20/2022123915139Open ↗
Showing 1 of 4 on file for this type
▸Filing & Intake Forms476
▸BISEFILING COVER SHEET170
08/18/2023123918537Open ↗
04/20/2022123915139Open ↗
07/01/2020123725727Open ↗
Showing 3 of 170 on file for this type
▸BISBOROUGH INTAKE FORM148
04/20/2022123915139Open ↗
07/15/2020121189089Open ↗
07/01/2020123725727Open ↗
Showing 3 of 148 on file for this type
▸BISADDITIONAL INFORMATION131
05/09/2024123353691Open ↗
03/01/2024123353691Open ↗
02/26/2024123353691Open ↗
Showing 3 of 131 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸Other Documents43
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION22
06/06/2022123915139Open ↗
06/06/2022123915139Open ↗
06/06/2022123915139Open ↗
Showing 3 of 22 on file for this type
▸BISPLOT DIAGRAM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSupporting Document: Fee Exempt3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWAlternate Plan 13
09/03/2026M00562207-I1Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type