Whole building & multi-floor projectsSystem scaffold leg1 filing
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
On file for this project
4 documents
RoofTherabody, Accenture3p · 8 filings · 20 docs
ElectricalFire ProtectionMechanicalPlumbingStructuralOther
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
OPEN SPACE WAYFINDING: MINOR STRUCTURAL WORK IN CONJUNCTION WITH ON-SITE WAYFINDING PROGRAM FOR THE DIRECTION & CONVENIENCE OF THE PUBLIC. ALL WORK IS EXTERIOR AND WITHIN THE PROPERTY LINE. (BROOKFIELD-1 MANHATTAN WEST)
On file for this project
6 documents · 1 drawing sheet
Tenant buildout as shown on the plans. No change to use egress or occupancy.
On file for this project
16 documents · 1 drawing sheet
Installation and use of suspended scaffold on track system as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Bulkhead3p · 1 filing · 12 docs
ElectricalGeneral
No filed description on record for this project.
On file for this project
12 documents · 3 drawing sheets
PenthouseAccenture1p · 3 filings · 20 docs
MechanicalStructural
Issued Permit Scope
Mechanical Systems · Structural
MODIFICATION TO EXISTING HVAC SYSTEMS
On file for this project
16 documents · 1 drawing sheet
MODIFICATION TO EXISTING HVAC SYSTEMS
On file for this project
23 documents · 1 drawing sheet
Structural modifications as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
20 documents
Floor 701 filing · 6 docs
Structural
Issued Permit Scope
Supported Scaffold
INSTALLATION OF A TEMPORARY SHAFT SCAFFOLD AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHAFT SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
On file for this project
6 documents
Floor 69Accenture2p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Standpipe · Supported Scaffold
MODIFICATION TO EXISTING HVAC SYSTEMS
On file for this project
16 documents · 1 drawing sheet
MODIFICATION TO EXISTING HVAC SYSTEMS
On file for this project
23 documents · 1 drawing sheet
INSTALLATION OF A TEMPORARY SHAFT SCAFFOLD AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHAFT SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 68Accenture2p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Standpipe · Supported Scaffold
MODIFICATION TO EXISTING HVAC SYSTEMS
On file for this project
16 documents · 1 drawing sheet
MODIFICATION TO EXISTING HVAC SYSTEMS
On file for this project
23 documents · 1 drawing sheet
INSTALLATION OF A TEMPORARY SHAFT SCAFFOLD AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHAFT SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 67Accenture, EllynsUnder Construction7p · 10 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Replacing AC units with related ductwork as per drawings no change in use egress or occupancy
On file for this project
5 documents · 3 drawing sheets
Installation of a 3 ton water sourced heatpump to serve CEOs Office on 67th floor. Mechanical work as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
2 documents
Installation of HVAC System and related Dutcwork. No change in user, egress or occupancy is involved.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 66AccentureUnder Construction9p · 8 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Replacing AC units with related ductwork as per drawings no change in use egress or occupancy
On file for this project
5 documents · 3 drawing sheets
SLAB OPENINGS FOR NEW STAIRS AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
MODIFICATION TO EXISTING HVAC SYSTEMS
On file for this project
23 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 65Accenture16p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Sprinkler work to include relocation of 3 sprinkler heads. Plumbing work to include added floor sinks, added sink and ice machine. No change to use, egress, or occupancy.
On file for this project
2 documents · 3 drawing sheets
Mechanical work in conjunction with partial demo to accommodate new prep warming pantry. No change to use, egress, or occupancy.
On file for this project
2 documents · 2 drawing sheets
Demolition of team conference rooms to accommodate new prep warming pantry. No change to use, egress, or occupancy.
On file for this project
4 documents · 3 drawing sheets
Latest 3 of 11 filings on this floor.
Floor 64AccentureUnder Construction12p · 13 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Replacing AC units with related ductwork as per drawings no change in use egress or occupancy
On file for this project
5 documents · 2 drawing sheets
Interior renovation of an existing business-use, tenant space. Demolition scope includes removal of existing partitions, finishes & ceilings. New work includes new interior partitions, doors, demountable glazed partitions, finishes & ceilings.
On file for this project
2 documents · 1 drawing sheet
Adjustment of existing sprinkler heads to accommodate new layout. Revision from upright to pendant heads in spaces where ceiling is being added.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 13 filings on this floor.
Floor 63Accenture5p · 8 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Structural modifications as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
11 documents · 1 drawing sheet
SLAB OPENINGS FOR NEW STAIRS AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
MODIFICATION TO EXISTING HVAC SYSTEMS
On file for this project
16 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 62Accenture5p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Structural modifications as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
11 documents · 1 drawing sheet
SLAB OPENINGS FOR NEW STAIRS AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
MODIFICATION TO EXISTING HVAC SYSTEMS
On file for this project
16 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 61Accenture7p · 8 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
SLAB OPENINGS FOR NEW STAIRS AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
Structural modifications as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
MODIFICATION TO EXISTING HVAC SYSTEMS
On file for this project
13 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 60AccentureUnder Construction8p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
Replacing AC units with related ductwork as per drawings no change in use egress or occupancy
On file for this project
5 documents · 3 drawing sheets
SLAB OPENINGS FOR NEW STAIRS AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
Structural modifications as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 59Accenture8p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
SLAB OPENINGS FOR NEW STAIRS AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
Structural modifications as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
12 documents · 2 drawing sheets
MODIFICATION TO EXISTING HVAC SYSTEMS
On file for this project
13 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 58W. P. Carey Headquarters NYC, W.P. Carey6p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural modifications taking place on the 57th & 58th floor as per plans filed herewith. No change in use, egress or occupancy
On file for this project
9 documents
Mechanical modifications taking place on the 57 & 58th floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
22 documents · 4 drawing sheets
Sprinkler modifications taking place on the 57th & 58th floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
13 documents
Latest 3 of 5 filings on this floor.
Floor 57W. P. Carey Headquarters NYC, W.P. Carey11p · 13 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Mechanical work as shown on plans. No change in egress, use, or occupancy
On file for this project
13 documents
General Construction work as shown on plans. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Sprinkler work as shown on plans. No change in use, egress or occupancy.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 13 filings on this floor.
Floor 56Pharo Management5p · 9 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
PAA being filed to reflect updated plans.(Corridor)
On file for this project
30 documents · 1 drawing sheet
Additions/Modifications to existing sprinkler system.
On file for this project
7 documents · 1 drawing sheet
Plumbing work as shown on plans filed herewith. (Prebuild)
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
Floor 55Brookfield11p · 7 filings · 20 docs
ArchitectureCivilFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Installation of interior partitions for public corridor and tenant separation. Application filed in conjunction with NB # 121187143.
On file for this project
8 documents · 2 drawing sheets
Mechanical work as filed on plans herewith. No change in egress, use, or occupancy
On file for this project
17 documents · 1 drawing sheet
Sprinkler work as filed on plans herewith. No change in egress, use, or occupancy
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 54World Wide Technology8p · 5 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Sprinkler work including installation of new sprinklers and piping. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Installation of new plumbing features including sinks, drinking fountains and electric water heaters. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Interior renovation with mechanical work including new ducting off existing main unit, IT room supplemental split water-cooled unit, hot water-heated fan power box installations, and all associated air terminals. No change to use, egress, or occupancy.
On file for this project
9 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 53Immobiliare, BrookfieldUnder Construction36p · 10 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
SPRINKLER WORK AS SHOWN ON PLANS
On file for this project
17 documents · 15 drawing sheets
Sprinkler work as shown on plans filed herewith.
On file for this project
4 documents · 14 drawing sheets
Modifications to the existing ductwork system. No change in use, egress or occupancy.
On file for this project
15 documents · 7 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 52Hedge10p · 15 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Mechanical work as shown on plans filed herewith.
On file for this project
15 documents
Sprinkler work as shown on plans filed herewith.
On file for this project
3 documents · 1 drawing sheet
INTERIOR RENOVATION AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 15 filings on this floor.
Floor 51Susman Godfrey10p · 5 filings · 11 docs
ArchitectureDMFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
MINOR MODIFICATIONS TO THE EXSITING SPRINKLER SYSTEM
On file for this project
2 documents · 1 drawing sheet
New branch ductwork, new diffusers, rebalancing existing diffusers
On file for this project
2 documents · 2 drawing sheets
Tenant alterations to commercial interior. Interior demolition only.
On file for this project
2 documents · 6 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 50Susman Godfrey11p · 7 filings · 15 docs
ArchitectureDMFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
MINOR MODIFICATIONS TO THE EXSITING SPRINKLER SYSTEM
On file for this project
2 documents · 1 drawing sheet
New branch ductwork, new diffusers, rebalancing existing diffusers
On file for this project
2 documents · 2 drawing sheets
Tenant alterations to commercial interior. Interior demolition only.
On file for this project
2 documents · 6 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 49
Floor 48Ernst & Young12p · 12 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
MODIFICATION TO THE EXISTING SPRINKLER / STANDPIPE / PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
17 documents · 2 drawing sheets
Structural modifications, reframing of floor structure to accomodate new slab openings as per plans filed. No change in use, egress or occupancy.
On file for this project
20 documents · 2 drawing sheets
MODIFICATION TO THE EXISTING HVAC SYSTEM AND RELATED DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
37 documents · 4 drawing sheets
Latest 3 of 12 filings on this floor.
Floor 47Darktrace NY16p · 13 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Mechanical work as shown on plans filed herewith.
On file for this project
17 documents · 1 drawing sheet
Mechanical work as shown on plans. No change in egress, use, or occupancy
On file for this project
14 documents · 2 drawing sheets
Plumbing work as shown on plans. No change in egress, use or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 13 filings on this floor.
Floor 46
Floor 45
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40
Floor 391p · 2 filings · 13 docs
General
No filed description on record for this project.
On file for this project
11 documents
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Floor 38Skadden Arps2p · 5 filings · 20 docs
ArchitectureGeneralMechanical
Issued Permit Scope
Mechanical Systems
Filing for new mechanical recirculating hood
On file for this project
5 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
9 documents
No filed description on record for this project.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 301 filing · 6 docs
ArchitectureElectricalGeneralStructural
Issued Permit Scope
Supported Scaffold
No filed description on record for this project.
On file for this project
6 documents
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22Ernst & Young5p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
MODIFICATION TO THE EXISTING SPRINKLER / STANDPIPE / PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 1 drawing sheet
STRUCTURAL MODIFICATIONS IN CONJUCTION WITH STAIR WORK (FLOORS: 20TH-22ND). NO CHANGE OF USE, EGRESS, OR OCCUPANCY
On file for this project
13 documents · 1 drawing sheet
Structural modifications, reframing of floor structure to accomodate new slab openings as per plans filed. No change in use, egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 21Ernst & Young6p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
MODIFICATION TO THE EXISTING SPRINKLER / STANDPIPE / PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 3 drawing sheets
STRUCTURAL MODIFICATIONS IN CONJUCTION WITH STAIR WORK (FLOORS: 20TH-22ND). NO CHANGE OF USE, EGRESS, OR OCCUPANCY
On file for this project
13 documents
Structural modifications, reframing of floor structure to accomodate new slab openings as per plans filed. No change in use, egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 20Ernst & Young9p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
MODIFICATION TO THE EXISTING SPRINKLER / STANDPIPE / PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
STRUCTURAL MODIFICATIONS IN CONJUCTION WITH STAIR WORK (FLOORS: 20TH-22ND). NO CHANGE OF USE, EGRESS, OR OCCUPANCY
On file for this project
13 documents · 1 drawing sheet
Structural modifications, reframing of floor structure to accomodate new slab openings as per plans filed. No change in use, egress or occupancy.
On file for this project
14 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 19Ernst & Young5p · 3 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
MODIFICATION TO THE EXISTING SPRINKLER / STANDPIPE / PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Structural modifications, reframing of floor structure to accomodate new slab openings as per plans filed. No change in use, egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
MODIFICATION TO THE EXISTING HVAC SYSTEM AND RELATED DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
36 documents · 2 drawing sheets
Floor 18Ernst & Young6p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
MODIFICATION TO THE EXISTING SPRINKLER / STANDPIPE / PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 3 drawing sheets
Structural modifications, reframing of floor structure to accomodate new slab openings as per plans filed. No change in use, egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
STRUCTURAL MODIFICATIONS IN CONJUCTION WITH STAIR WORK (FLOORS:12TH-14TH, 16TH-18TH). NO CHANGE OF USE, EGRESS, OR OCCUPANCY
On file for this project
9 documents
Latest 3 of 4 filings on this floor.
Floor 17Ernst & Young8p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
MODIFICATION TO THE EXISTING HVAC SYSTEM & INSTALLATION OF (1) NEW AC UNIT ON 17TH FL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 2 drawing sheets
MODIFICATION TO THE EXISTING SPRINKLER / STANDPIPE / PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
17 documents · 3 drawing sheets
STRUCTURAL MODIFICATIONS IN CONJUCTION WITH STAIR WORK (FLOORS:12TH-14TH, 16TH-18TH). NO CHANGE OF USE, EGRESS, OR OCCUPANCY
On file for this project
9 documents
Latest 3 of 6 filings on this floor.
Floor 16Ernst & Young5p · 5 filings · 20 docs
EquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Standpipe · Structural · Supported Scaffold
MODIFICATION TO THE EXISTING SPRINKLER / STANDPIPE / PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
17 documents · 2 drawing sheets
Structural modifications, reframing of floor structure to accomodate new slab openings as per plans filed. No change in use, egress or occupancy.
On file for this project
22 documents · 1 drawing sheet
STRUCTURAL MODIFICATIONS IN CONJUCTION WITH STAIR WORK (FLOORS:12TH-14TH, 16TH-18TH). NO CHANGE OF USE, EGRESS, OR OCCUPANCY
On file for this project
9 documents
Latest 3 of 5 filings on this floor.
Floor 15Ernst & Young3p · 4 filings · 20 docs
EquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Standpipe · Structural · Supported Scaffold
MODIFICATION TO THE EXISTING SPRINKLER / STANDPIPE / PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
17 documents · 1 drawing sheet
Structural modifications, reframing of floor structure to accomodate new slab openings as per plans filed. No change in use, egress or occupancy.
On file for this project
22 documents · 1 drawing sheet
MODIFICATION TO THE EXISTING HVAC SYSTEM AND RELATED DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
16 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 14Ernst & Young4p · 5 filings · 20 docs
EquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Standpipe · Structural · Supported Scaffold
MODIFICATION TO THE EXISTING SPRINKLER / STANDPIPE / PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
17 documents · 2 drawing sheets
Structural modifications, reframing of floor structure to accomodate new slab openings as per plans filed. No change in use, egress or occupancy.
On file for this project
22 documents · 1 drawing sheet
STRUCTURAL MODIFICATIONS IN CONJUCTION WITH STAIR WORK (FLOORS:12TH-14TH, 16TH-18TH). NO CHANGE OF USE, EGRESS, OR OCCUPANCY
On file for this project
9 documents
Latest 3 of 5 filings on this floor.
Floor 13Ernst & Young4p · 5 filings · 20 docs
EquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
MODIFICATION TO THE EXISTING SPRINKLER AND PLUMBING SYSTEM AS PER PANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
13 documents · 2 drawing sheets
Structural modifications, reframing of floor structure to accomodate new slab openings as per plans filed. No change in use, egress or occupancy.
On file for this project
15 documents
STRUCTURAL MODIFICATIONS IN CONJUCTION WITH STAIR WORK (FLOORS:12TH-14TH, 16TH-18TH). NO CHANGE OF USE, EGRESS, OR OCCUPANCY
On file for this project
9 documents
Latest 3 of 5 filings on this floor.
Floor 12Ernst & Young3p · 5 filings · 20 docs
EquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
MODIFICATION TO THE EXISTING SPRINKLER AND PLUMBING SYSTEM AS PER PANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
13 documents · 1 drawing sheet
Structural modifications, reframing of floor structure to accomodate new slab openings as per plans filed. No change in use, egress or occupancy.
On file for this project
15 documents
STRUCTURAL MODIFICATIONS IN CONJUCTION WITH STAIR WORK (FLOORS:12TH-14TH, 16TH-18TH). NO CHANGE OF USE, EGRESS, OR OCCUPANCY
On file for this project
9 documents
Latest 3 of 5 filings on this floor.
Floor 11Ernst & Young3p · 4 filings · 20 docs
EquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
MODIFICATION TO THE EXISTING SPRINKLER AND PLUMBING SYSTEM AS PER PANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
13 documents · 1 drawing sheet
Structural modifications, reframing of floor structure to accomodate new slab openings as per plans filed. No change in use, egress or occupancy.
On file for this project
15 documents
MODIFICATION TO THE EXISTING HVAC SYSTEM AND RELATED DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
33 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 10Ernst & Young15p · 8 filings · 20 docs
ArchitectureEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Modification to existing plumbing systems and installation of fixtures. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Removal of existing temporary sprinkler loop and installation of new sprinkler systems on 8-10 floors and installation of (1) new hose on 9th floor. No changes in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Removal and renovation of interior non-load bearing partitions as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 9 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 9Ernst & Young12p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modification to existing plumbing systems and installation of fixtures. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Removal of existing temporary sprinkler loop and installation of new sprinkler systems on 8-10 floors and installation of (1) new hose on 9th floor. No changes in use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Removal and renovation of interior non-load bearing partitions as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 7 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 8Ernst & Young15p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modification to existing plumbing systems and installation of fixtures. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Removal of existing temporary sprinkler loop and installation of new sprinkler systems on 8-10 floors and installation of (1) new hose on 9th floor. No changes in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Removal and renovation of interior non-load bearing partitions as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 10 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 7Ernst & Young2p · 1 filing · 6 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Sprinklers
MODIFICATION TO THE EXISTING SPRINKLER AND PLUMBING SYSTEM AS PER PANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
6 documents · 2 drawing sheets
Floor 6Ernst & Young6p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Standpipe · Structural
MODIFICATION TO THE EXISTING SPRINKLER / STANDPIPE / PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
17 documents · 4 drawing sheets
Structural modifications, reframing of floor structure to accomodate new slab openings as per plans filed. No change in use, egress or occupancy.
On file for this project
22 documents · 1 drawing sheet
MODIFICATION TO THE EXISTING HVAC SYSTEM AND RELATED DUCTWORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
16 documents · 1 drawing sheet
Floor 5Brookfield1 filing · 13 docs
Plumbing
Issued Permit Scope
Plumbing
Removal of all gas piping from the scope of work
On file for this project
13 documents
Floor 4Brookfield1p · 5 filings · 20 docs
ArchitectureCivilFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
Installation of temporary tent, no alt to exist structures for a private event Sept 21, 2022A TPA permit is not required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion
On file for this project
4 documents
Plumbing work as shown on plans filed herewith.
On file for this project
7 documents
Description: Modification of sprinkler system in conjunction with NB # 121187143. Post Approval Amendment filed to increase the number of sprinkler heads on the 4th floor.
On file for this project
13 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 3Brookfield1p · 2 filings · 20 docs
Fire ProtectionPlumbing
Issued Permit Scope
Plumbing · Sprinklers
Description: Modification of sprinkler system in conjunction with NB # 121187143. Post Approval Amendment filed to increase the number of sprinkler heads on the 4th floor.
On file for this project
13 documents · 1 drawing sheet
Removal of all gas piping from the scope of work
On file for this project
13 documents
Floor 2Therabody, Reset by Therabody +2Under Construction31p · 18 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M01417537Permit Issued · 09/14/2026
Plumbing work as shown on plans subsequent to GC work type.
On file for this project
10 documents
Plumbing work as shown on plans filed herewith for a tenant fitout.
On file for this project
9 documents · 1 drawing sheet
Mechanical work as shown on plans for tenant fitout
On file for this project
15 documents · 2 drawing sheets
Latest 3 of 18 filings on this floor.
Floor 1Silver Mirror, Therabody +4Under Construction24p · 25 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sign · Sprinklers · Standpipe · Structural · Supported Scaffold
Project M01417537Permit Issued · 09/14/2026
Plumbing work as shown on plans subsequent to GC work type.
On file for this project
10 documents
INSTALLATION OF ILLUMINATED WALL SIGN AND BLADE SIGN.
On file for this project
2 documents
Standpipe work as shown on plans. Removal of 1 FHVC and a Relocation of 1 FHVC. No change in use, egress, or occupancy.
On file for this project
9 documents · 3 drawing sheets
Latest 3 of 25 filings on this floor.
MezzanineNorth Retail5p · 3 filings · 20 docs
GeneralMechanical
Issued Permit Scope
Mechanical Systems
Mechanical work as shown on plans (Retail 105).
On file for this project
26 documents · 3 drawing sheets
Mechanical work as shown on plans (Retail 106).
On file for this project
30 documents · 2 drawing sheets
Mechanical work as shown on plans filed herewith
On file for this project
12 documents · 1 drawing sheet
CellarReset by Therabody, Accenture +1Under Construction5p · 9 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Sprinkler work as shown on plans. No change in use, egress or occupancy.
On file for this project
2 documents · 1 drawing sheet
Mechanical work as shown on plans for tenant fitout
On file for this project
15 documents
Mechanical work as shown on plans filed herewith
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
Site & exteriorSolidcore, Therabody +2Under Construction25 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalStructuralOther
Issued Permit Scope
Construction Fence · General Construction · Sidewalk Shed · Sign · Structural · Supported Scaffold
Propose to install non-advertising sign. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Temporary dome for an event in the plaza. To be removed at the end of the programing. No changes to existing structures, use or egress.
On file for this project
3 documents · 3 drawing sheets
Temporary outdoor sculpture platform on the plaza. Island of Warmth. Removed at the end of the programing. No changes to existing structures, use or egress.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 25 filings on this floor.
Filed — no permit issued1 filing · 2 docs
General
No filed description on record for this project.
On file for this project
2 documents · 2 drawing sheets