Whole building & multi-floor projectsD. E. Shaw7 filings
Structural work as shown on plans. Phase 2 - Floor 55 (Construction)/56 (Marketing)
On file for this project
57 documents · 12 drawing sheets
Interconnecting stair from 25th-37th construction floor, design support for moveable partitions, structural support for mechanical/AV equipment. No change in use, egress or occupancy.
On file for this project
2 documents
(SHAFT HOIST CAR B) INSTALLATION OF SINGLE 3000# CAPACITY PERSONNEL/MATERIAL HOIST DURING NB CONST, FILED SEPARATELY. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APP. ELEVATOR APPLICATION SUBMITTED SEP.
On file for this project
11 documents
Latest 3 of 7 filings on this floor.
RoofD. E. Shaw, Clifford Chance8p · 11 filings
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe
Structural work as shown on plans. Phase 2 - 48-50 (Construction)/49-51 (Marketing)
On file for this project
46 documents · 3 drawing sheets
Structural work as shown on plans. Phase 2 - Floors 51-54 (Construction)/52-55 (Marketing).
On file for this project
42 documents · 3 drawing sheets
Structural work as shown on plans
On file for this project
43 documents · 4 drawing sheets
Latest 3 of 11 filings on this floor.
Floor 63Manhattan West Southeast Tower monorail system8p · 2 filings
ArchitectureElectricalEquipmentMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
APPLICATION FOR THE INSTALLATION OF MONORAIL FILED HEREIN. NO CHNAGE IN EGRESS, USE, OR OCCUPANCY
On file for this project
4 documents · 8 drawing sheets
INSTALLATION OF A TEMPORARY WORK PLATFORM AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORM TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
On file for this project
6 documents
Floor 62Temporary work platform installation1 filing
ArchitectureElectricalMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
INSTALLATION OF A TEMPORARY WORK PLATFORM AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORM TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
On file for this project
6 documents
Floor 61Temporary work platform installation1 filing
ArchitectureElectricalMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
INSTALLATION OF A TEMPORARY WORK PLATFORM AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORM TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
On file for this project
6 documents
Floor 60Temporary work platform installation1 filing
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Standpipe
INSTALLATION OF A TEMPORARY WORK PLATFORM AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORM TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
On file for this project
6 documents
Floor 59
Floor 58VistaUnder Construction1p · 1 filing · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Standpipe · Structural
Steel work / supports for skyfold partition for new office tenant space. No change in use, egress or occupancy.
On file for this project
20 documents · 1 drawing sheet
Floor 57VistaUnder Construction7p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Steel work / supports for skyfold partition for new office tenant space. No change in use, egress or occupancy.
On file for this project
20 documents · 7 drawing sheets
Floor 56D. E. Shaw11p · 3 filings
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural work as shown on plans to include new slab openings for convenience stair and reinforcement for new moveable partitions. Floors 47-56 (Construction)/48-57 (Marketing). [CASA - Phase 1]
On file for this project
4 documents · 1 drawing sheet
Scope of work includes interior fit-out of a multi-tenant corridor on 56C/57M. Related BIS NB is filed under #121204295, under 2014 BC. This tenant fit-out is pursuant to 2014 BC. No change in use, egress or occupancy.
On file for this project
18 documents · 4 drawing sheets
Modifications to existing ventilation system and related piping. No change in use, egress, or occupancy.
On file for this project
31 documents · 6 drawing sheets
Floor 55D. E. ShawUnder Construction11p · 7 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to existing HVAC system equipment and related piping for existing office tenant. No change in use, egress or occupancy.
On file for this project
6 documents
Structural work as shown on plans to include new slab openings for convenience stair and reinforcement for new moveable partitions. Floors 47-56 (Construction)/48-57 (Marketing). [CASA - Phase 1]
On file for this project
4 documents · 1 drawing sheet
Modifications to an existing sprinkler system Floors 47-55 (Construction)/48-56 (Marketing) [CASA - Phase 1]
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 54D. E. Shaw28p · 6 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural work as shown on plans. Phase 2 - Floors 51-54 (Construction)/52-55 (Marketing).
On file for this project
42 documents · 23 drawing sheets
Structural work as shown on plans to include new slab openings for convenience stair and reinforcement for new moveable partitions. Floors 47-56 (Construction)/48-57 (Marketing). [CASA - Phase 1]
On file for this project
4 documents · 1 drawing sheet
Modifications to an existing sprinkler system Floors 47-55 (Construction)/48-56 (Marketing) [CASA - Phase 1]
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 53D. E. Shaw28p · 5 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural work as shown on plans. Phase 2 - Floors 51-54 (Construction)/52-55 (Marketing).
On file for this project
42 documents · 22 drawing sheets
Structural work as shown on plans to include new slab openings for convenience stair and reinforcement for new moveable partitions. Floors 47-56 (Construction)/48-57 (Marketing). [CASA - Phase 1]
On file for this project
4 documents · 1 drawing sheet
Modifications to an existing sprinkler system Floors 47-55 (Construction)/48-56 (Marketing) [CASA - Phase 1]
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 52D. E. ShawUnder Construction25p · 6 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to existing HVAC system. No change in use, egress or occupancy.
On file for this project
18 documents
Structural work as shown on plans. Phase 2 - Floors 51-54 (Construction)/52-55 (Marketing).
On file for this project
42 documents · 17 drawing sheets
Structural work as shown on plans to include new slab openings for convenience stair and reinforcement for new moveable partitions. Floors 47-56 (Construction)/48-57 (Marketing). [CASA - Phase 1]
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 51D. E. ShawUnder Construction21p · 6 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to existing HVAC system equipment and related piping for existing office tenant. No change in use, egress or occupancy.
On file for this project
6 documents
Structural work as shown on plans. Phase 2 - Floors 51-54 (Construction)/52-55 (Marketing).
On file for this project
42 documents · 11 drawing sheets
Structural work as shown on plans to include new slab openings for convenience stair and reinforcement for new moveable partitions. Floors 47-56 (Construction)/48-57 (Marketing). [CASA - Phase 1]
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 50D. E. ShawUnder Construction23p · 6 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to existing HVAC system. No change in use, egress or occupancy.
On file for this project
18 documents
Structural work as shown on plans. Phase 2 - 48-50 (Construction)/49-51 (Marketing)
On file for this project
46 documents · 15 drawing sheets
Structural work as shown on plans to include new slab openings for convenience stair and reinforcement for new moveable partitions. Floors 47-56 (Construction)/48-57 (Marketing). [CASA - Phase 1]
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 49D. E. Shaw25p · 5 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural work as shown on plans. Phase 2 - 48-50 (Construction)/49-51 (Marketing)
On file for this project
46 documents · 18 drawing sheets
Structural work as shown on plans to include new slab openings for convenience stair and reinforcement for new moveable partitions. Floors 47-56 (Construction)/48-57 (Marketing). [CASA - Phase 1]
On file for this project
4 documents · 1 drawing sheet
Modifications to an existing sprinkler system Floors 47-55 (Construction)/48-56 (Marketing) [CASA - Phase 1]
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 48D. E. Shaw18p · 5 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural work as shown on plans. Phase 2 - 48-50 (Construction)/49-51 (Marketing)
On file for this project
46 documents · 8 drawing sheets
Structural work as shown on plans to include new slab openings for convenience stair and reinforcement for new moveable partitions. Floors 47-56 (Construction)/48-57 (Marketing). [CASA - Phase 1]
On file for this project
4 documents · 1 drawing sheet
Modifications to an existing sprinkler system Floors 47-55 (Construction)/48-56 (Marketing) [CASA - Phase 1]
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 47D. E. Shaw4p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural work as shown on plans
On file for this project
43 documents · 4 drawing sheets
Structural work as shown on plans to include new slab openings for convenience stair and reinforcement for new moveable partitions. Floors 47-56 (Construction)/48-57 (Marketing). [CASA - Phase 1]
On file for this project
4 documents
Modifications to an existing sprinkler system Floors 47-55 (Construction)/48-56 (Marketing) [CASA - Phase 1]
On file for this project
6 documents
Latest 3 of 6 filings on this floor.
Floor 46Crowell & Moring, D. E. Shaw2 filings · 20 docs
Fire ProtectionPlumbingStructural
Issued Permit Scope
Plumbing · Standpipe · Structural
Structural work as shown on plans
On file for this project
35 documents
Structural work as shown on plans
On file for this project
43 documents
Floor 45Crowell & Moring7p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural work as shown on plans
On file for this project
35 documents
Modifications to existing sprinkler system for 45C/46M floor common corridor. No change in use, egress or occupancy.
On file for this project
25 documents · 7 drawing sheets
Floor 44Crowell & Moring2p · 8 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural work as shown on plans
On file for this project
35 documents
Plumbing work as shown on plans (Crowell & Moring).
On file for this project
2 documents · 1 drawing sheet
Modifications to an existing sprinkler system (Crowell & Moring).
On file for this project
6 documents
Latest 3 of 8 filings on this floor.
Floor 43Crowell & Moring8 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural work as shown on plans
On file for this project
35 documents
Plumbing work as shown on plans (Crowell & Moring).
On file for this project
2 documents
Modifications to an existing sprinkler system (Crowell & Moring).
On file for this project
6 documents
Latest 3 of 8 filings on this floor.
Floor 42Clifford ChanceUnder Construction15p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Mechanical works as shown on plans filed herewith. No Change in use, egress, or occupancy.
On file for this project
10 documents · 6 drawing sheets
Interior fit-out of partitions, ceilings, and door for pre-built suites. No change in use, egress, or occupancy.
On file for this project
2 documents
Steel work, reinforcement and framing for new stairs and operable partitions. No change in use, egress or occupancy.
On file for this project
15 documents
Latest 3 of 5 filings on this floor.
Floor 41Clifford ChanceUnder Construction10p · 9 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Standpipe work as shown on plans filed herewith.
On file for this project
22 documents · 8 drawing sheets
Steel work, reinforcement and framing for new stairs and operable partitions. No change in use, egress or occupancy.
On file for this project
15 documents
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORM TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE 2022.
On file for this project
2 documents
Latest 3 of 9 filings on this floor.
Floor 40Clifford ChanceUnder Construction9p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Standpipe work as shown on plans filed herewith.
On file for this project
22 documents · 8 drawing sheets
Steel work, reinforcement and framing for new stairs and operable partitions. No change in use, egress or occupancy.
On file for this project
15 documents
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORM TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE 2022.
On file for this project
2 documents
Latest 3 of 7 filings on this floor.
Floor 39Clifford ChanceUnder Construction8p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Standpipe work as shown on plans filed herewith.
On file for this project
22 documents · 8 drawing sheets
Steel work, reinforcement and framing for new stairs and operable partitions. No change in use, egress or occupancy.
On file for this project
15 documents
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORM TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE 2022.
On file for this project
2 documents
Latest 3 of 7 filings on this floor.
Floor 38Clifford ChanceUnder Construction9p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Standpipe work as shown on plans filed herewith.
On file for this project
22 documents · 8 drawing sheets
Steel work, reinforcement and framing for new stairs and operable partitions. No change in use, egress or occupancy.
On file for this project
15 documents
Installation of new sprinkler heads and related piping on 38-41C/39-42M floors. Installation of new combination fire extinguisher / fire hose valve cabinets and related piping on 38-41C / 39-42M floors. No change in use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 6 filings on this floor.
Floor 37Prudential Financial3p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to existing SP system for tenant on 37C/38M floor. No change in use, egress or occupancy.
On file for this project
27 documents · 3 drawing sheets
Floor 36Cravath, Swaine & Moore10p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to existing ventilation system and related piping. No change in use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to existing sprinkler system and related piping as shown on plans. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Modifications to existing plumbing system and related piping. No change in use, egress or occupancy.
On file for this project
3 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 35Cravath, Swaine & Moore11p · 7 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Standpipe · Structural
Modifications to existing ventilation system and related piping. No change in use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modification to existing sprinkler/standpipe system and related piping. No change in use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Modifications to existing plumbing system and related piping. No change in use, egress or occupancy.
On file for this project
9 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 34Cravath, Swaine & Moore5p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to existing plumbing system and related piping. No change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to existing sprinkler system and related piping. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Modifications to existing HVAC system and related piping including AC units within tenant space on 32nd - 34th construction / 33rd - 35th marketing floor. No change in use, egress or occupancy.
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 33Cravath, Swaine & Moore9p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to existing plumbing system and related piping. No change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to existing sprinkler system and related piping. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Modifications to existing HVAC system and related piping including AC units within tenant space on 32nd - 34th construction / 33rd - 35th marketing floor. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 32Cravath, Swaine & Moore, Irm Fifid Office7p · 5 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to existing plumbing system and related piping. No change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to existing sprinkler system and related piping. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
INSTALLATION OF NONLOAD BEARING PARTITIONS & RELATED FINISHES IN SUPPORT OF A TEMPORARY CONSTRUCTION FIELD OFFICE; ALL TEMPORARY PARTITIONS ERECTED SHALL BE REMOVED AT THE TIME OF PROJECT COMPLETION. THERE IS NO CHANGE TO OCCUPANCY, USE OR EGRESS
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 31Cravath, Swaine & Moore8p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Addition of new check valve and butterfly valve within Stair D. No change in use, egress or occupancy.
On file for this project
2 documents · 1 drawing sheet
Modifications to existing plumbing system and related piping. No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Modifications to existing sprinkler/standpipe system and related piping. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 30Cravath, Swaine & Moore7p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to existing plumbing system and related piping. No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Modifications to existing sprinkler/standpipe system and related piping. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Modifications to existing HVAC system and related piping including AC units within tenant space on 29th-31st construction / 30th-32nd marketing floors. No change in use, egress or occupancy.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 29Cravath, Swaine & Moore6p · 4 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Modifications to existing plumbing system and related piping. No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Modifications to existing sprinkler/standpipe system and related piping. No change in use, egress or occupancy.
On file for this project
6 documents
Modifications to existing HVAC system and related piping including AC units within tenant space on 29th-31st construction / 30th-32nd marketing floors. No change in use, egress or occupancy.
On file for this project
11 documents
Latest 3 of 4 filings on this floor.
Floor 28Cravath, Swaine & Moore5p · 4 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Modifications to existing sprinkler system and related piping. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modifications to existing plumbing system and related piping. No change in use, egress or occupancy.
On file for this project
2 documents · 1 drawing sheet
Modifications to existing HVAC system and related piping including AC units within tenant space on 26th-28th construction / 27th -29th marketing floor. No change in use, egress or occupancy.
On file for this project
8 documents
Latest 3 of 4 filings on this floor.
Floor 27Cravath, Swaine & Moore6p · 4 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Modifications to existing sprinkler system and related piping. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modifications to existing plumbing system and related piping. No change in use, egress or occupancy.
On file for this project
2 documents · 1 drawing sheet
Modifications to existing HVAC system and related piping including AC units within tenant space on 26th-28th construction / 27th -29th marketing floor. No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 26Cravath, Swaine & Moore7p · 5 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Modifications to existing sprinkler system and related piping. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modifications to existing plumbing system and related piping. No change in use, egress or occupancy.
On file for this project
2 documents · 2 drawing sheets
Modifications to existing HVAC system and related piping including AC units within tenant space on 26th-28th construction / 27th -29th marketing floor. No change in use, egress or occupancy.
On file for this project
8 documents
Latest 3 of 5 filings on this floor.
Floor 25Cravath, Swaine & Moore12p · 4 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Modifications to existing plumbing system and related piping. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modifications to existing sprinkler/standpipe system and related piping. No change in use, egress or occupancy.
On file for this project
9 documents · 2 drawing sheets
Modifications to existing HVAC system and related piping including AC units within tenant space on 24th-25th construction / 25th-26th marketing floors. No change in use, egress or occupancy.
On file for this project
13 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 24KPMG, Cravath, Swaine & Moore8p · 5 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural mod. including new floor openings for convenience stair and new structural framing and reinforcement to accommodate new floor openings, new hanging partitions and new live load associated with tenant fit-out. No change in use, egress occupancy.
On file for this project
40 documents
Modifications to existing plumbing system and related piping. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modifications to existing sprinkler/standpipe system and related piping. No change in use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 23KPMG13p · 3 filings · 20 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
INSTALLATION OF A TEMPORARY WORK PLATFORM AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORM INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33
On file for this project
2 documents
Structural mod. including new floor openings for convenience stair and new structural framing and reinforcement to accommodate new floor openings, new hanging partitions and new live load associated with tenant fit-out. No change in use, egress occupancy.
On file for this project
40 documents · 12 drawing sheets
No filed description on record for this project.
On file for this project
15 documents · 1 drawing sheet
Floor 22KPMG19p · 3 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural mod. including new floor openings for convenience stair and new structural framing and reinforcement to accommodate new floor openings, new hanging partitions and new live load associated with tenant fit-out. No change in use, egress occupancy.
On file for this project
40 documents · 17 drawing sheets
No filed description on record for this project.
On file for this project
11 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
8 documents · 1 drawing sheet
Floor 21KPMG16p · 2 filings · 20 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Structural mod. including new floor openings for convenience stair and new structural framing and reinforcement to accommodate new floor openings, new hanging partitions and new live load associated with tenant fit-out. No change in use, egress occupancy.
On file for this project
40 documents · 15 drawing sheets
No filed description on record for this project.
On file for this project
6 documents · 1 drawing sheet
Floor 20KPMG9p · 1 filing · 20 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Steel work and framing for new tenant. No change in use, egress or occupancy
On file for this project
37 documents · 9 drawing sheets
Floor 19KPMG8p · 1 filing · 20 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Steel work and framing for new tenant. No change in use, egress or occupancy
On file for this project
37 documents · 8 drawing sheets
Floor 18KPMG8p · 1 filing · 20 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Steel work and framing for new tenant. No change in use, egress or occupancy
On file for this project
37 documents · 8 drawing sheets
Floor 17KPMG7p · 1 filing · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Steel work and framing for new tenant. No change in use, egress or occupancy
On file for this project
38 documents · 7 drawing sheets
Floor 16KPMG7p · 1 filing · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Steel work and framing for new tenant. No change in use, egress or occupancy
On file for this project
38 documents · 7 drawing sheets
Floor 15KPMG6p · 1 filing · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Steel work and framing for new tenant. No change in use, egress or occupancy
On file for this project
38 documents · 6 drawing sheets
Floor 14KPMG10p · 1 filing · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Steel work and framing for new tenant. No change in use, egress or occupancy
On file for this project
49 documents · 10 drawing sheets
Floor 13KPMG9p · 1 filing · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Steel work and framing for new tenant. No change in use, egress or occupancy
On file for this project
49 documents · 9 drawing sheets
Floor 12KPMG9p · 2 filings · 20 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Steel work and framing for new tenant. No change in use, egress or occupancy
On file for this project
49 documents · 9 drawing sheets
Modifications to existing SP system and related piping; removal of temp SP loop heads for mock up. No change in use, egress or occupancy.
On file for this project
8 documents
Floor 11LMR Partners, KPMGUnder Construction13p · 5 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Sprinkler work as shown on plans filed herewith.
On file for this project
25 documents · 5 drawing sheets
Steel work and framing for new tenant. No change in use, egress or occupancy
On file for this project
49 documents · 1 drawing sheet
Scope of work includes interior fit-out of a multi-tenant corridor on 11C/12M. Related BIS NB is filed under #121204295, under 2014 BC. This tenant fit-out is pursuant to 2014 BC. No change in use, egress or occupancy.
On file for this project
12 documents · 4 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 10Cravath, Swaine & MooreUnder Construction23p · 2 filings · 17 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Modifications to existing plumbing system and related piping for office tenant. No change in use, egress or occupancy.
On file for this project
11 documents · 22 drawing sheets
General construction for elevator bank modifications, as shown on plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Floor 9Cravath, Swaine & Moore, KPMG +1Under Construction12p · 3 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Modifications to existing plumbing system and related piping for office tenant. No change in use, egress or occupancy.
On file for this project
11 documents · 1 drawing sheet
Modifications to existing SP system and related piping for new tenant space. No change in use, egress or occupancy.
On file for this project
34 documents · 10 drawing sheets
structural work as shown on plans
On file for this project
48 documents · 1 drawing sheet
Floor 8BBVA13p · 1 filing · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
structural work as shown on plans
On file for this project
48 documents · 13 drawing sheets
Floor 7BBVA14p · 1 filing · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
structural work as shown on plans
On file for this project
48 documents · 14 drawing sheets
Floor 6BBVAUnder Construction7p · 2 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Modifications to existing HVAC system & related piping including installation of AC units. No change in use, egress or occupancy.
On file for this project
28 documents · 7 drawing sheets
Modifications of steel framing to support modernfold partition. Slab cores for pokethroughs and trenching for conduits and floor boxes. No change in use, egress or occupancy.
On file for this project
8 documents
Floor 5BBVA21p · 16 filings · 20 docs
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sign · Sprinklers · Standpipe
Modifications to existing sprinkler system and related piping. No change in use, egress or occupancy.
On file for this project
39 documents · 12 drawing sheets
FIT-OUT THE WESTERN PORTION OF LEVEL 5 (CONST. MARKETING LEVEL 6) WITH A NEW HVAC LAYOUT INCLUDING NEW VAVTERMINALS, NEW FAN POWERED BOXES, AND A NEW AC UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 1 drawing sheet
Interior renovation of partitions, ceilings and doors on 5th construction / 6th marketing floor. No change in use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 16 filings on this floor.
Floor 4Bop West 31st Street LLC2p · 5 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Plumbing · Protection and Mechanical Methods · Sign · Standpipe
Modifications to existing plumbing system and related piping. No change in use, egress or occupancy.
On file for this project
18 documents
NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES TWO MANHATTAN WEST. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES TWO MANHATTAN WEST. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Latest 3 of 5 filings on this floor.
Floor 3Bop West 31st Street LLC4 filings · 9 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Boiler Equipment · Protection and Mechanical Methods · Sign · Standpipe
NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES TWO MANHATTAN WEST. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES TWO MANHATTAN WEST. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Fuel oil storage and piping for emergency generators in conjunction w/NB #121204295.
On file for this project
8 documents
Latest 3 of 4 filings on this floor.
Floor 2Bop West 31st Street LLC2p · 4 filings · 8 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Boiler Equipment · Protection and Mechanical Methods · Sign · Standpipe
NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES TWO MANHATTAN WEST. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES TWO MANHATTAN WEST. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Fuel oil storage and piping for emergency generators in conjunction w/NB #121204295.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 1Bop West 31st Street LLC1p · 11 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Boiler Equipment · Construction Fence · Protection and Mechanical Methods · Sidewalk Shed · Sign · Standpipe · Supported Scaffold
NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES TWO MANHATTAN WEST. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES TWO MANHATTAN WEST. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014. SIDEWALK SHED PARTIALLY PLACED ON THE ROADWAY.
On file for this project
22 documents
Latest 3 of 11 filings on this floor.
CellarCravath, Swaine & Moore8p · 6 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Modifications to existing sprinkler/standpipe system and related piping. No change in use, egress or occupancy.
On file for this project
9 documents · 3 drawing sheets
Modifications to existing plumbing system and related piping. No change in use, egress or occupancy.
On file for this project
9 documents
Modifications to existing HVAC system and related piping including AC units within tenant space on 24th-25th construction / 25th-26th marketing floors. No change in use, egress or occupancy.
On file for this project
13 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Sub-CellarCompassUnder Construction1p · 2 filings · 12 docs
Fire ProtectionMechanical
Issued Permit Scope
Boiler Equipment · Sprinklers · Standpipe
Modifications to existing SP system as shown on plans. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Fuel oil storage and piping for emergency generators in conjunction w/NB #121204295.
On file for this project
8 documents
BasementBop West 31st Street LLC2p · 2 filings · 10 docs
MechanicalStructural
TEMPORARY SHORING AS PER DRAWINGS. TEMPORARY SHORING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Fuel oil storage and piping for emergency generators in conjunction w/NB #121204295.
On file for this project
8 documents · 1 drawing sheet
Sub-BasementTemporary west scaffold stair tower installation2 filings · 5 docs
Structural
Issued Permit Scope
Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF A TEMPORARY WEST SCAFFOLD STAIR TOWER AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33,
On file for this project
3 documents
TEMPORARY SHORING AS PER DRAWINGS. TEMPORARY SHORING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Site & exteriorMontefiore Einstein16 filings · 20 docs
ArchitectureCivilElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Protection and Mechanical Methods · Sidewalk Shed · Sign · Supported Scaffold
ERECT A NON-ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
ERECT A NON-ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
ERECT A NON-ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 16 filings on this floor.