💬 Discuss this project
1900Year Built
16Stories
W6Building Class
C6-4Zoning
125,840 sfGross Floor Area
1Units
LL97 Covered0 Active ViolationsFISP: SAFEFDNY Report ↗
Other college and university · 7,865 sf lot · 16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsPace University1 filing
RoofPace University11p · 3 filings · 18 docs
Floor 16Pace University17p · 6 filings · 17 docs
Floor 15
Floor 14
Floor 13Pace University3p · 4 filings · 17 docs
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6Pace University1p · 1 filing · 6 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Pace University1p · 2 filings · 17 docs
CellarPace University2p · 2 filings · 17 docs
Sub-CellarPace University1p · 3 filings · 17 docs
Site & exteriorPace University4 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Pace University9207/08/2026
NYC Department of Housing Preservation and Development103/21/2026
City103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Walter T Gorman PE5203/21/2026
A1 Expediting Service603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Benchmark BuildersGeneral Contractor507/08/2026
Safway AtlanticScaffold404/09/2026
King Rose of NYGeneral Contractor407/08/2026
Advanced PlumbingFire Protection307/08/2026
Shawmut Woodworking & SupplyGeneral Contractor307/08/2026
Soh Par SprinklerFire Protection207/08/2026
FSG ElectricElectrical203/22/2026
Apex Building SolutionsGeneral Contractor203/21/2026
Cercone Exterior RestorationGeneral Contractor203/21/2026
J. Phelan Construction CoGeneral Contractor203/21/2026
Rockledge ScaffoldScaffold203/21/2026
Advanced PlumbingPlumbing207/08/2026
V. Vass ElectricElectrical103/21/2026
Anthony G FerryElectrical103/22/2026
Deboccia Electric ConstructionElectrical103/21/2026
Lipsky & RosenthalPlumbing107/08/2026
The Sci ConstructionGeneral Contractor107/08/2026
NYC Fire SprinklerFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Socotec Engineering4983405/20/2025
PSI Agency2541011/20/2023
Walter T. Gorman, P.E., P268101/11/2023
Kce Consulting Engineering3712608/04/2022
Building Lifecycle
All (216)Filed (30)Permit Issued (27)Signed Off (19)Facade (FISP) (15)Violation (60)Inspection (8)Objection (27)Special Inspection (30)
09/23/2026
Signed off — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01422563-I1
07/07/2026
Permit issued — Suspended Scaffold
M01422563-I1-SC
07/06/2026
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01422563-I1
07/02/2026
Special inspection requirement — Post-installed anchors in masonry
Michael Lombardo
12/02/2025
Signed off — Alteration
INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00022412-I1
12/02/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00020314-I1
12/02/2025
Signed off — Alteration
Modification of existing sprinkler system as per plans. No change to use, egress or occupancy.
M00422976-I1
10/31/2025
Signed off — Alteration
Proposed Installation of water-cooled air conditioning unit with associated piping in Sub-cellar vault area as per plan. No change of egress or occupancy, or use.
M01225320-I1
10/15/2025
Permit issued — Sprinklers
M00422976-I1-EW-SP
08/13/2025
Signed off — Alteration
Proposed chiller replacement on the 6th floor with all associate piping. No change to use, occupancy or use.
M01111775-I1
05/28/2025
Permit issued — Mechanical Systems
M01225320-I1-MS
05/20/2025
Filed — Alteration
Proposed Installation of water-cooled air conditioning unit with associated piping in Sub-cellar vault area as per plan. No change of egress or occupancy, or use.
M01225320-I1
05/13/2025
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
05/13/2025
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
05/13/2025
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
04/25/2025
Permit issued — Mechanical Systems
M01111775-I1-MS
10/16/2024
Filed — Alteration
Proposed chiller replacement on the 6th floor with all associate piping. No change to use, occupancy or use.
M01111775-I1
10/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
09/16/2024
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
09/16/2024
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
04/16/2024
Signed off — Alteration
Proposed facade repair and restoration, as per plan. No change to use, occupancy or use.
M00848160-I1
04/15/2024
Filed — Alteration
Proposed facade repair and restoration, as per plan. No change to use, occupancy or use.
M00848160-P1
04/15/2024
Special inspection requirement — Final
David Briggs
04/12/2024
Special inspection requirement — Final
David Briggs
03/11/2024
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00866053-I1
03/09/2024
Violation issued (FDNY_NOV, closed)
03/04/2024
Signed off — Alteration
Proposed replacement of the existing HVAC units on 16th floor and roof with all the ductwork and related piping. No change to Use, Occupancy or egress.
M00853064-I1
02/20/2024
Cycle 9 facade report submitted
02/19/2024
Cycle 9 facade report signed — SAFE
02/08/2024
Signed off — Alteration
Proposed modification of Sprinkler system and plumbing fixtures on the 16th floor, all as per plan. No change to Use, occupancy or use.
M00853072-I1
02/08/2024
Signed off — Alteration
M00888191-I1
02/05/2024
Cycle 9 facade inspection completed
01/04/2024
Permit issued — Mechanical Systems
M00853064-I1-MS
01/02/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/11/2023
Special inspection requirement — Final
MAURICIO ANDRADE
12/11/2023
Special inspection requirement — Mechanical Systems
MAURICIO ANDRADE
12/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
12/11/2023
Special inspection requirement — Fire-Resistance Rated Construction
MAURICIO ANDRADE
12/04/2023
Objection resolved — Addressed
11/24/2023
Objection raised — Other
11/20/2023
Filed — Alteration
Proposed replacement of the existing HVAC units on 16th floor and roof with all the ductwork and related piping. No change to Use, Occupancy or egress.
M00853064-P2
11/13/2023
Signed off — Alteration
M00839902-I1
11/13/2023
Signed off — Alteration
Proposed to demo non-bearing partitions, floor and ceiling tiles and finishes (existing plaster ceiling to remain) on the 16th floor, all as per plan. No change to use, occupancy or egress.
M00866833-I1
11/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
11/03/2023
Special inspection requirement — Fire-Resistance Rated Construction
MAURICIO ANDRADE
11/03/2023
Special inspection requirement — Mechanical Systems
MAURICIO ANDRADE
11/03/2023
Special inspection requirement — Final
MAURICIO ANDRADE
10/23/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/17/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/21/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/15/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/15/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/11/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/05/2023
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
09/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
08/31/2023
Filed — Alteration
Proposed modification of Sprinkler system and plumbing fixtures on the 16th floor, all as per plan. No change to Use, occupancy or use.
M00853072-P2
08/31/2023
Special inspection requirement — Sprinkler Systems
MAURICIO ANDRADE
08/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
07/25/2023
Special inspection requirement — Final
Bennett Fradkin
07/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
Latest 60 of 216 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offPalladium Window Solution07/07/2026
DOB NOWSprinklersSigned-offNYC Fire Sprinkler10/15/2025
DOB NOWMechanical SystemsSigned-offApex Building Solutions05/28/2025
DOB NOWMechanical SystemsSigned-offThe Sci Construction04/25/2025
DOB NOWMechanical SystemsSigned-offBenchmark Builders01/04/2024
DOB NOWSprinklersSigned-offSoh Par Sprinkler06/27/2023
DOB NOWMechanical SystemsSigned-offBenchmark Builders06/27/2023
DOB NOWPlumbingSigned-offA&M Warshaw Plumbing & Heating06/20/2023
DOB NOWSprinklersSigned-offSoh Par Sprinkler06/20/2023
DOB NOWGeneral ConstructionSigned-offBenchmark Builders06/19/2023
DOB NOWGeneral ConstructionSigned-offCercone Exterior Restoration06/02/2023
DOB NOWSidewalk ShedSigned-offRockledge Scaffold05/12/2023
DOB NOWGeneral ConstructionSigned-offBenchmark Builders05/11/2023
DOB NOWGeneral ConstructionSigned-offKing Rose of NY01/23/2023
DOB NOWMechanical SystemsSigned-offShawmut Woodworking & Supply01/13/2023
DOB NOWStructuralSigned-offKing Rose of NY01/12/2023
DOB NOWMechanical SystemsSigned-offJ Phelan Construction08/09/2021
DOB NOWSprinklersSigned-offAdvanced Plumbing04/29/2021
DOB NOWPlumbingSigned-offAdvanced Plumbing04/02/2021
DOB NOWSprinklersSigned-offAdvanced Plumbing04/02/2021
DOB NOWMechanical SystemsSigned-offShawmut Woodworking & Supply01/28/2021
DOB NOWPlumbingSigned-offAdvanced Plumbing01/20/2021
DOB NOWSprinklersSigned-offAdvanced Plumbing01/19/2021
DOB NOWSidewalk ShedSigned-offSafway Atlantic09/24/2018
DOB NOWConstruction FenceSigned-offSafway Atlantic09/24/2018
DOB NOWConstruction FenceSigned-offSafway Atlantic02/27/2018
DOB NOWSidewalk ShedSigned-offSafway Atlantic02/22/2018
BISOTISSUEDShawmut Woodworking & Supply01/21/2021
BISOTISSUEDAll Boroughs01/11/2021
BISPLISSUEDMac Felder10/31/2019
BISOTISSUEDJ.V.S. Contracting Group10/04/2019
BIS—ISSUEDSciame Construction08/15/2019
BISPLISSUEDR.J.C. Mechanical01/10/2019
BISSDISSUEDPeak Fire Protection01/08/2019
BISSPISSUEDPeak Fire Protection01/03/2019
BISSPISSUEDAllstate Sprinkler12/17/2018
BISMHISSUEDL & M Construction/DRY WA12/10/2018
BISOTISSUEDL & M Construction/DRY WA12/10/2018
BIS—ISSUEDJ.V.S. Contracting Group12/05/2018
BISEQISSUEDSafway Atlantic09/07/2018
+ 37 more permits on file
10 projects · most recent 05/12/2026
General Wiring Lighting
FiledStatusContractorScope
05/12/2026CompleteEco Electrical Servcs—
01/23/2026CompleteJSP Electl CNTNGGeneral Wiring
06/12/2023CompleteL.E.A. ElectricGeneral Wiring
06/12/2023CompleteL.E.A. Electric—
05/11/2023CompleteAnthony G Ferry—
04/26/2023CompleteTransel Elev. & ElectricGeneral Wiring
03/03/2023CompleteFSG ElectricGeneral Wiring, Lighting
02/19/2021CompleteJSP Electl CNTNGGeneral Wiring
12/20/2018CompleteShuir Electrical ContractorsGeneral Wiring
02/20/2018CompleteStar-Delta Electric—
1 project · most recent 07/06/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/06/2026Signed-offPalladium Window SolutionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/02/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/23/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/17/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/21/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/15/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/15/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
07/02/2026Post-installed anchors in masonryMichael Lombardospecial
05/13/2025FinalALEXIS SCHLESSINGERMANprogress
05/13/2025Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
05/13/2025Mechanical SystemsALEXIS SCHLESSINGERMANspecial
10/14/2024Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
09/16/2024Mechanical SystemsALEXIS SCHLESSINGERMANspecial
09/16/2024FinalALEXIS SCHLESSINGERMANprogress
04/15/2024FinalDavid Briggsprogress
04/12/2024FinalDavid Briggsprogress
12/11/2023FinalMAURICIO ANDRADEprogress
12/11/2023Mechanical SystemsMAURICIO ANDRADEspecial
12/11/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
12/11/2023Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
11/03/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
11/03/2023Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
11/03/2023Mechanical SystemsMAURICIO ANDRADEspecial
11/03/2023FinalMAURICIO ANDRADEprogress
09/05/2023Sprinkler SystemsMAURICIO ANDRADEspecial
09/05/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
08/31/2023Sprinkler SystemsMAURICIO ANDRADEspecial
08/31/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
07/25/2023FinalBennett Fradkinprogress
07/25/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
07/25/2023Sprayed fire-resistant materialsMAURICIO ANDRADEspecial
06/27/2023Sprayed fire-resistant materialsMAURICIO ANDRADEspecial
Latest 25 of 60.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Pace UniversityEducationSub-cellar, Cellar, Floors 1, 6, 13, 16, Roof
Project M01225320 Alteration · LOC Issued · 05/20/2025
Project M01111775 Alteration · LOC Issued · 10/16/2024
Project M00760582 Alteration · LOC Issued · 01/11/2023
Project M00422957 Alteration · LOC Issued · 01/08/2021
Project M00422976 Alteration · LOC Issued · 01/08/2021
Project M00419921 Alteration · LOC Issued · 01/05/2021
Project M01422563 Alteration · LOC Issued · 07/06/2026
Project M00888191 Alteration · LOC Issued · 06/12/2023
Project M00866053 Alteration · LOC Issued · 05/12/2023
Project M00866833 Alteration · LOC Issued · 05/02/2023
Project M00848160 Alteration · LOC Issued · 04/26/2023
Project M00839902 Alteration · LOC Issued · 04/04/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 823 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch23
09/06/2026M00020314-I1Request digital key ↗
09/06/2026M00022412-I1Request digital key ↗
09/01/2026M00802359-P1Request digital key ↗
Showing 3 of 23 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/04/2026M00422976-I1Request digital key ↗
08/15/2026M00422976-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00437418-I1Request digital key ↗
09/04/2026M00419921-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/15/2026M00459376-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00422957-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/15/2026M00459387-I1Request digital key ↗
▸Applications & Permits166
▸BISPLAN / WORK APPROVAL APPLICATION86
01/08/2026120206874Open ↗
11/10/2025123478165Open ↗
09/03/2025123027492Open ↗
Showing 3 of 86 on file for this type
▸BISWORK PERMIT APPLICATION56
01/21/2021140993806Open ↗
01/11/2021140993806Open ↗
12/17/2019123531357Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWLPC Approval/Permit20
09/04/2026M00437418-I1Open ↗
09/04/2026M00422957-I1Open ↗
08/31/2026M00853064-P1Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLACE OF ASSEMBLY2
12/29/2025123478165Open ↗
08/17/2018123478165Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
09/27/2023123027492Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/13/2023123027492Open ↗
▸Seals & Professional Certifications180
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION85
04/17/2024123869563Open ↗
04/17/2024123869563Open ↗
12/10/2019123590168Open ↗
Showing 3 of 85 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/06/2026M00020314-I1Open ↗
09/06/2026M00022412-I1Open ↗
09/04/2026M00437418-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/25/2026M00802359-P1Open ↗
09/25/2026M00802359-I1Open ↗
09/12/2026M00839902-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT15
12/22/2020140993806Open ↗
06/19/2019123869563Open ↗
12/10/2018123590168Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/25/2026M00802359-P1Open ↗
09/25/2026M00802359-I1Open ↗
09/12/2026M00839902-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
06/19/2019123869563Open ↗
12/10/2018123590168Open ↗
Showing 2 of 13 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
12/22/2020140993806Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
12/22/2020140993806Open ↗
Showing 1 of 3 on file for this type
▸Trade Schedules & Equipment28
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
12/10/2018123590168Open ↗
09/17/2018123531357Open ↗
Showing 2 of 11 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
06/14/2024123073985Open ↗
12/24/2020123543237Open ↗
Showing 2 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS4
12/10/2019123590168Open ↗
12/03/2019123590168Open ↗
Showing 2 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
12/10/2019123590168Open ↗
12/03/2019123590168Open ↗
Showing 2 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTANDPIPE SYSTEMS1
09/17/2020123531357Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos39
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
12/10/2018123590168Open ↗
12/05/2018123543237Open ↗
Showing 2 of 11 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/01/2026M00802359-I1Open ↗
09/01/2026M00802359-P1Open ↗
09/01/2026M00814087-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
09/04/2026M00422957-I1Open ↗
08/30/2026M00888191-I1Open ↗
08/30/2026M00839902-I1Open ↗
Showing 3 of 8 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM5
09/20/2024123027492Open ↗
12/22/2020140993806Open ↗
09/17/2018123531357Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
09/03/2019123073985Open ↗
09/03/2019123073985Open ↗
Showing 2 of 3 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU1015MN171
09/27/2024123027492Open ↗
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE2
12/10/2018123590168Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
09/04/2026M00437418-I1Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY6
01/20/2026123478165Open ↗
10/14/2021140993806Open ↗
07/07/2021123305404Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
04/29/2019123027492Open ↗
04/29/2019123027492Open ↗
04/29/2019123027492Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
10/14/2021140993806Open ↗
09/17/2020123531357Open ↗
07/28/2020123073994Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
12/19/2022123869563Open ↗
▸BISMECHANICAL SYSTEMS1
07/28/2020123073994Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
07/28/2020123073994Open ↗
▸Approvals, Objections & Sign-offs113
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter30
09/06/2026M00020314-I1Open ↗
09/06/2026M00022412-I1Open ↗
09/04/2026M00437418-I1Open ↗
Showing 3 of 30 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST29
06/18/2024123073985Open ↗
04/17/2024123869563Open ↗
04/09/2024123869563Open ↗
Showing 3 of 29 on file for this type
▸BISLANDMARKS APPROVAL23
12/22/2020140993806Open ↗
06/19/2019123869563Open ↗
06/19/2019123869563Open ↗
Showing 3 of 23 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSUPERSEDING LETTER3
01/21/2021140993806Open ↗
Showing 1 of 3 on file for this type
▸BISLANDMARKS SIGNOFF3
06/16/2025123027492Open ↗
12/20/2022123869563Open ↗
11/12/2021140993806Open ↗
▸BISFINAL3
10/14/2021140993806Open ↗
09/17/2020123531357Open ↗
07/28/2020123073994Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
11/01/2018123027492Open ↗
Showing 1 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership64
▸BISCOST AFFIDAVIT51
12/19/2022123869563Open ↗
11/11/2021140993806Open ↗
12/22/2020140993806Open ↗
Showing 3 of 51 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW37
06/14/2024123073985Open ↗
04/16/2024123027492Open ↗
12/19/2022123869563Open ↗
Showing 3 of 7 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
08/15/2019123027492Open ↗
Showing 1 of 3 on file for this type
▸BISDEPT OF FINANCE VERIFICATION3
12/22/2020140993806Open ↗
07/31/2020123027492Open ↗
12/07/2018123590168Open ↗
▸Filing & Intake Forms85
▸BISBOROUGH INTAKE FORM35
12/10/2019123590168Open ↗
12/06/2019123590168Open ↗
07/29/2019120311215Open ↗
Showing 3 of 35 on file for this type
▸BISEFILING COVER SHEET32
06/19/2019123869563Open ↗
12/10/2018123590168Open ↗
12/10/2018123590168Open ↗
Showing 3 of 32 on file for this type
▸BISADDITIONAL INFORMATION15
07/08/2021140993806Open ↗
01/30/2020123073994Open ↗
01/08/2019123027492Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
12/22/2020140993806Open ↗
Showing 1 of 3 on file for this type
▸Other Documents55
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION32
03/05/2026123478165Open ↗
05/14/2025102741053Open ↗
01/21/2021140993806Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProof of Historic Building16
08/31/2026M00853064-P1Open ↗
08/15/2026M00853064-I1Open ↗
08/13/2026M00866833-I1Open ↗
Showing 3 of 16 on file for this type
▸BISSupporting Document: Fee Deferment2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/16/2026M01422563-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026M01422563-I1Open ↗