| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01310724 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 01/08/2026 | 08/18/2026 | Owner PACE UNIVERSITY Contractor TURNER CONSTRUCTION COMPANY Filer WALTER T. GORMAN, PE, PC | Proposed repair of the underside of the existing walking bridge in the courtyard, replacement of the existing fence in the courtyard, all as… |
| M01422563 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 07/06/2026 | 07/07/2026 | Contractor PALLADIUM WINDOW SOLUTION | Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy. |
| M01363261 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 03/22/2026 | 04/14/2026 | Design GRM CONSULTANTS LLC Owner PACE UNIVERSITY Contractor ACTIVE SIGNS INC Filer LOUIS STRIAR INC. | NON-ILLUMINATED NON-ADVERTISING ACCESSORY BANNER ON FENCE FOR PACE UNIVERSITY - IN PROPERTY LINES. NO CHANGE OF USE, EGRESS OR OCCUPANCY. |
| M01319165 | 1 PACE PLAZA MANHATTAN | Alteration | Filed — no permit on record | 11/14/2025 | — | Design BEDNASH CONSULTING, INC. Owner PACE UNIVERSITY | — |
| M01312533 | 1 PACE PLAZA MANHATTAN | Alteration | Filed — no permit on record | 11/05/2025 | — | Design BEDNASH CONSULTING, INC. Owner PACE UNIVERSITY | — |
| M00422976 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 01/08/2021 | 10/15/2025 | Design JFK&M CONSULTING ENGINEERS Owner PACE UNIVERSITY Contractor ADVANCED PLUMBING LLC Filer WALTER T. GORMAN, PE, PC | Modification of existing sprinkler system as per plans. No change to use, egress or occupancy. |
| Name | Projects together | Most recent |
|---|---|---|
| JFK & M Consulting Engineers | 25 | 10/16/2024 |
| Ensign Engineering | 6 | 11/20/2023 |
| Mohammad Ahead, PE | 5 | 09/11/2023 |
| Goldman Copeland Associates | 4 | 03/22/2022 |
| Method Design Architecture + Urbani | 3 | 08/03/2023 |
| Architecture Research Office | 2 | 05/14/2024 |
| Bednash Consulting | 2 | 11/14/2025 |
| Brand Access Solutions | 2 | 02/27/2018 |
| Design Republic | 2 | 04/11/2022 |
| Fradkin & McAlpin Architects | 2 | 06/29/2023 |
| Perkins Eastman | 2 | 10/04/2021 |
| 2LS Consulting Engineering | 1 | 05/20/2025 |
| Fxcollaborative Architects | 1 | 07/22/2026 |
| Graf & Lewent Architects | 1 | 05/23/2022 |
| GRM Consultants | 1 | 03/22/2026 |
| Highland Associates | 1 | 06/07/2023 |
| Joel Phagoo P.E | 1 | 05/12/2023 |
| Loci Architecture | 1 | 04/15/2024 |
| Lombardo Professional Engineering | 1 | 07/06/2026 |
| Rodney D. Gibble Consulting Engineering | 1 | 10/21/2021 |
| S.B. Gescher Consulting Engineers | 1 | 03/24/2023 |
| Silman | 1 | 05/09/2022 |
| Sole Proprietor | 1 | 01/20/2023 |
| Tribute Restoration | 1 | 07/25/2025 |
| Walter T. Gorman, P.E | 1 | 10/15/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| Archstone Builders | 9 | 04/11/2022 |
| Benchmark Builders | 9 | 11/20/2023 |
| Active Signs | 5 | 03/22/2026 |
| Ashlar Mechanical | 4 | 08/07/2023 |
| Advanced Plumbing | 3 | 08/04/2022 |
| Shawmut Woodworking & Sup | 3 | 01/11/2023 |
| A + Sprinkler | 2 | 04/26/2023 |
| Allstate Sprinkler | 2 | 02/23/2021 |
| JRM Construction Management | 2 | 07/13/2023 |
| King Rose of NY | 2 | 03/24/2023 |
| Safway Atlantic | 2 | 02/27/2018 |
| Soh Par Sprinkler | 2 | 08/31/2023 |
| Tri-C Mechanical | 2 | 08/07/2023 |
| Advanced Plumbing | 1 | 01/08/2021 |
| Advantagecontracting | 1 | 05/23/2022 |
| Apex Building Solutions | 1 | 05/20/2025 |
| Bedrock Plumbing & Heating | 1 | 02/23/2021 |
| Capitol Design & Maintenance | 1 | 09/11/2023 |
| Cercone Exterior Restoration | 1 | 04/15/2024 |
| Commerical Plumbing Svces | 1 | 08/07/2023 |
| Donato Plumbing | 1 | 11/07/2022 |
| J. Phelan Construction Co | 1 | 12/15/2020 |
| Lipsky & Rosenthal | 1 | 08/31/2023 |
| MCLNY Plumbing & Heating | 1 | 10/03/2021 |
| NYC Fire Sprinkler | 1 | 08/04/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| 161 William St | 27 | 08/07/2023 |
| Pace University | 23 | 07/22/2026 |
| SL Green Realty | 5 | 07/13/2023 |
| Safway Atlantic | 2 | 02/27/2018 |
| Crikos | 1 | 05/23/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| Walter T. Gorman, PE | 21 | 07/22/2026 |
| Jam Consultants | 15 | 08/07/2023 |
| Rizzo Group | 5 | 07/13/2023 |
| Louis Striar | 4 | 03/22/2026 |
| A1 Expediting Service | 3 | 05/12/2023 |
| Lombardo Building Consultants | 1 | 07/06/2026 |
| PS Engineers | 1 | 07/25/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01310724 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 01/08/2026 | 08/18/2026 | Owner PACE UNIVERSITY Contractor TURNER CONSTRUCTION COMPANY Filer WALTER T. GORMAN, PE, PC | Proposed repair of the underside of the existing walking bridge in the courtyard, replacement of the existing fence in the courtyard, all as… |
| M01422563 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 07/06/2026 | 07/07/2026 | Contractor PALLADIUM WINDOW SOLUTION | Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy. |
| M01363261 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 03/22/2026 | 04/14/2026 | Design GRM CONSULTANTS LLC Owner PACE UNIVERSITY Contractor ACTIVE SIGNS INC Filer LOUIS STRIAR INC. | NON-ILLUMINATED NON-ADVERTISING ACCESSORY BANNER ON FENCE FOR PACE UNIVERSITY - IN PROPERTY LINES. NO CHANGE OF USE, EGRESS OR OCCUPANCY. |
| M01319165 | 1 PACE PLAZA MANHATTAN | Alteration | Filed — no permit on record | 11/14/2025 | — | Design BEDNASH CONSULTING, INC. Owner PACE UNIVERSITY | — |
| M01312533 | 1 PACE PLAZA MANHATTAN | Alteration | Filed — no permit on record | 11/05/2025 | — | Design BEDNASH CONSULTING, INC. Owner PACE UNIVERSITY | — |
| M00422976 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 01/08/2021 | 10/15/2025 | Design JFK&M CONSULTING ENGINEERS Owner PACE UNIVERSITY Contractor ADVANCED PLUMBING LLC Filer WALTER T. GORMAN, PE, PC | Modification of existing sprinkler system as per plans. No change to use, egress or occupancy. |
| M01300654 | 1 PACE PLAZA MANHATTAN | Alteration | Filed — no permit on record | 10/15/2025 | — | Design WALTER T. GORMAN, P.E., P.C. Owner PACE UNIVERSITY Filer WALTER T. GORMAN, PE, PC | — |
| M01261430 | 1 PACE PLAZA MANHATTAN | Alteration | Signed-off | 07/25/2025 | 10/02/2025 | Design TRIBUTE RESTORATION INC Owner PACE UNIVERSITY Contractor TRIBUTE RESTORATION INC Filer PS ENGINEERS INC | File SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION. |
| M01225320 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 05/20/2025 | 05/28/2025 | Owner PACE UNIVERSITY Contractor APEX BUILDING SOLUTIONS Filer WALTER T. GORMAN, PE, PC | Proposed Installation of water-cooled air conditioning unit with associated piping in Sub-cellar vault area as per plan. No change of egres… |
| M01111775 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 10/16/2024 | 04/25/2025 | Design JFK&M CONSULTING ENGINEERS Owner PACE UNIVERSITY Contractor THE SCI CONSTRUCTION Filer WALTER T. GORMAN, PE, PC | Proposed chiller replacement on the 6th floor with all associate piping. No change to use, occupancy or use. |
| M00853064 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 04/04/2023 | 01/04/2024 | Design ENSIGN ENGINEERING, P.C. Owner PACE UNIVERSITY Contractor BENCHMARK BUILDERS LLC Filer WALTER T. GORMAN, PE, PC | Proposed replacement of the existing HVAC units on 16th floor and roof with all the ductwork and related piping. No change to Use, Occupancy… |
| M00926341 ↗ | 15 BEEKMAN STREET MANHATTAN | Alteration | Signed-off | 09/11/2023 | 09/14/2023 | Design MOHAMMAD AHEAD, PE Contractor CAPITOL DESIGN & MAINT IN | ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON EXISTING SCHOOL MARQUEE FOR PACE ACADEMIC CENTER - PACE UNIVERSITY. NO CHANGE OF USE, EGRESS O… |
| M00885053 | 33 BEEKMAN STREET MANHATTAN | Alteration | Signed-off | 06/07/2023 | 06/30/2023 | Design HIGHLAND ASSOCIATES Owner PACE UNIVERSITY Contractor BENCHMARK BUILDERS LLC Filer WALTER T. GORMAN, PE, PC | Proposed sprinkler system modification within security office. No change to use, occupancy or egress. |
| M00853072 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 04/04/2023 | 06/27/2023 | Design ENSIGN ENGINEERING, P.C. Owner PACE UNIVERSITY Contractor A&M WARSHAW PLUMBNG & HTG Filer WALTER T. GORMAN, PE, PC | Proposed modification of Sprinkler system and plumbing fixtures on the 16th floor, all as per plan. No change to Use, occupancy or use. |
| M00888191 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 06/12/2023 | 06/20/2023 | Design ENSIGN ENGINEERING, P.C. Contractor SOH PAR SPRINKLER LLC | Proposed to install Temporary Sprinkler loop on the 16th floor, all as per plan. No change of egress or occupancy or use. |
| M00839902 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 04/04/2023 | 06/19/2023 | Contractor BENCHMARK BUILDERS LLC | Proposed interior alteration on 16th floor office area, as per plan. No change of Egress, Occupancy or Use. |
| M00873735 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 05/18/2023 | 06/09/2023 | Design JFK&M CONSULTING ENGINEERS Owner 161 WILLIAM STREET,LLC Contractor MAC FELDER INC Filer JAM CONSULTANTS, INC. | plumbing work during renovation on 6th floor |
| M00858836 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 05/18/2023 | 06/08/2023 | Design JFK&M CONSULTING ENGINEERS Owner 161 WILLIAM STREET,LLC Contractor COMMERICAL PLBG SVCES LLC Filer JAM CONSULTANTS, INC. | plumbing work during renovation on 2nd & 3rd floors |
| M00858843 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 05/18/2023 | 06/08/2023 | Design JFK&M CONSULTING ENGINEERS Owner 161 WILLIAM STREET,LLC Contractor ASHLAR MECHANICAL CORP Filer JAM CONSULTANTS, INC. | sprinkler work during renovation on 2nd & 3rd floors |
| M00873741 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 05/18/2023 | 06/08/2023 | Design JFK&M CONSULTING ENGINEERS Owner 161 WILLIAM STREET,LLC Contractor ASHLAR MECHANICAL CORP Filer JAM CONSULTANTS, INC. | sprinkler work during renovation on 6th floor |
| M00872921 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 05/18/2023 | 06/05/2023 | Design JFK&M CONSULTING ENGINEERS Owner 161 WILLIAM STREET,LLC Contractor ASHLAR MECHANICAL CORP Filer JAM CONSULTANTS, INC. | Installation of temporary sprinkler loop. during renovation on 2nd & 3rd floors |
| M00848160 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 04/26/2023 | 06/02/2023 | Design LOCI ARCHITECTURE PLLC Owner PACE UNIVERSITY Contractor CERCONE EXTERIOR REST COR Filer WALTER T. GORMAN, PE, PC | Proposed facade repair and restoration, as per plan. No change to use, occupancy or use. |
| M00858832 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 05/18/2023 | 06/02/2023 | Design JFK&M CONSULTING ENGINEERS Owner 161 WILLIAM STREET,LLC Contractor BENCHMARK BUILDERS LLC Filer JAM CONSULTANTS, INC. | mechanical work during renovation on 2nd & 3rd floors |
| M00873729 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 05/18/2023 | 06/02/2023 | Design JFK&M CONSULTING ENGINEERS Owner 161 WILLIAM STREET,LLC Contractor BENCHMARK BUILDERS LLC Filer JAM CONSULTANTS, INC. | mechanical work during renovation on 6th floor |
| M00866053 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 05/12/2023 | 05/12/2023 | Design JOEL PHAGOO P.E. PLLC Owner PACE UNIVERSITY Contractor ROCKLEDGE SCAFFOLD CORP | HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANC… |
| M00866833 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 05/02/2023 | 05/11/2023 | Owner PACE UNIVERSITY Contractor BENCHMARK BUILDERS LLC Filer WALTER T. GORMAN, PE, PC | Proposed to demo non-bearing partitions, floor and ceiling tiles and finishes (existing plaster ceiling to remain) on the 16th floor, all as… |
| M00851180 | 161 WILLIAM MANHATTAN | Alteration CO | Permit Issued | 04/24/2023 | 05/08/2023 | Owner 161 WILLIAM STREET,LLC Contractor BENCHMARK BUILDERS LLC Filer JAM CONSULTANTS, INC. | ALT-CO application filed to change the use of second and third floors, at 161 William Street, to a new educational occupancy. |
| M00851281 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 04/24/2023 | 05/05/2023 | Owner 161 WILLIAM STREET,LLC Contractor BENCHMARK BUILDERS LLC Filer JAM CONSULTANTS, INC. | interior demolition and construction for PACE on 6th floor |
| M00851264 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 04/24/2023 | 05/03/2023 | Owner 161 WILLIAM STREET,LLC Contractor BENCHMARK BUILDERS LLC Filer JAM CONSULTANTS, INC. | interior renovation on 2nd and 3rd floors. |
| M07997395 ↗ | 15 BEEKMAN STREET MANHATTAN | Alteration | Signed-off | 11/07/2022 | 03/07/2023 | Design JFK&M CONSULTING ENGINEERS Owner SL GREEN REALTY CORP. Contractor A + SPRINKLER CORP Filer RIZZO GROUP | Installation of new sprinkler heads and associated piping (Pace University) as per plans. No change to use, egress or occupancy. |
| M00814087 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 01/20/2023 | 01/23/2023 | Design SOLE PROPRIETOR Owner PACE UNIVERSITY Contractor KING ROSE OF NY, INC Filer WALTER T. GORMAN, PE, PC | Proposed restoration of existing sub-cellar vault area as per plan. No change of occupancy, use or egress. |
| M00760582 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 01/11/2023 | 01/13/2023 | Design JFK&M CONSULTING ENGINEERS Owner PACE UNIVERSITY Contractor SHAWMUT WOODWORKING & SUPPLY Filer WALTER T. GORMAN, PE, PC | Proposed to replace existing HVAC unit with new in mechanical room on 13th floor. No change to egress, occupancy or use. |
| M00802359 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 01/10/2023 | 01/12/2023 | Owner PACE UNIVERSITY Contractor KING ROSE OF NY, INC Filer WALTER T. GORMAN, PE, PC | proposed temporary stabilization of existing sub-cellar vault area as per plan. No change of occupancy, egress or use. |
| M07997361 ↗ | 15 BEEKMAN STREET MANHATTAN | Alteration | Signed-off | 11/07/2022 | 12/21/2022 | Design JFK&M CONSULTING ENGINEERS Owner SL GREEN REALTY CORP. Contractor ARCON PLBG SOLUTIONS Filer RIZZO GROUP | Installation of new plumbing fixtures and associated piping (Pace University) as per plans. No change to use, egress or occupancy. |
| M00729822 ↗ | 15 BEEKMAN STREET MANHATTAN | Alteration | Signed-off | 05/10/2022 | 11/14/2022 | Design JFK&M CONSULTING ENGINEERS Owner SL GREEN REALTY CORP. Contractor A + SPRINKLER CORP Filer RIZZO GROUP | Installation of new sprinkler heads and associated piping (Pace University) as per plans. No change to use, egress or occupancy. |
| M08034499 ↗ | 15 BEEKMAN STREET MANHATTAN | No Work | Filed — no permit on record | 11/04/2022 | — | Design ARCHITECTURE RESEARCH OFFICE | — |
| M00689552 ↗ | 15 BEEKMAN STREET MANHATTAN | Alteration | Signed-off | 05/03/2022 | 10/21/2022 | Design ARCHITECTURE RESEARCH OFFICE Owner SL GREEN REALTY CORP. Contractor JRM CONSTRUCTION MGMT LLC Filer RIZZO GROUP | Installation of new interior partitions, doors, suspended ceilings and finishes (Pace University) as per plans. No change to use, egress or… |
| M00724827 ↗ | 15 BEEKMAN STREET MANHATTAN | Alteration | Signed-off | 05/09/2022 | 10/20/2022 | Design SILMAN Owner SL GREEN REALTY CORP. Contractor JRM CONSTRUCTION MGMT LLC Filer RIZZO GROUP | Structural modifications (Pace University) as per plans. No change to use, egress or occupancy. |
| M00727861 | 140 WILLIAM STREET MANHATTAN | Alteration | Signed-off | 05/23/2022 | 06/17/2022 | Owner CRIKOS LLC Contractor ADVANTAGECONTRACTING COR Filer WALTER T. GORMAN, PE, PC | Proposed to remove non-bearing partition and repair all finishes, all as per plan. No change of use, egress or occupancy. |
| M00339809 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 04/20/2021 | 06/08/2022 | Design GOLDMAN COPELAND ASSOCIATES Owner 161 WILLIAM STREET,LLC Contractor ADVANCED PLUMBING LLC Filer JAM CONSULTANTS, INC. | sprinkler work |
| M00579462 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 10/03/2021 | 06/03/2022 | Design JFK&M CONSULTING ENGINEERS Owner 161 WILLIAM STREET,LLC Contractor MAC FELDER INC Filer WALTER T. GORMAN, PE, PC | Plumbing fixtures modification/replacement on 7th and 8th floors as per plan. No change of use, egress, or occupancy. |
| M00671836 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 02/23/2022 | 02/25/2022 | Design MOHAMMAD AHEAD, PE Owner 161 WILLIAM STREET,LLC Contractor ACTIVE SIGNS INC Filer LOUIS STRIAR INC. | NON ILLUMINATED NON ADVERTISING ACCESSORY WALL SIGN - PACE UNIVERSITY. NO CHANGE OF USE, EGRESS OR OCCUPANCY. |
| M00671837 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 02/23/2022 | 02/25/2022 | Design MOHAMMAD AHEAD, PE Contractor ACTIVE SIGNS INC | NON ILLUMINATED NON ADVERTISING DOUBLE SIDED PROJECTING BANNER SIGN - PACE UNIVERSITY. NO CHANGE OF USE, EGRESS OR OCCUPANCY. |
| M00671838 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 02/23/2022 | 02/25/2022 | Design MOHAMMAD AHEAD, PE Owner 161 WILLIAM STREET,LLC Contractor ACTIVE SIGNS INC Filer LOUIS STRIAR INC. | NON ILLUMINATED NON ADVERTISING DOUBLE SIDED PROJECTING BANNER SIGN - PACE UNIVERSITY. NO CHANGE OF USE, EGRESS OR OCCUPANCY. |
| M00671839 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 02/23/2022 | 02/25/2022 | Design MOHAMMAD AHEAD, PE Owner 161 WILLIAM STREET,LLC Contractor ACTIVE SIGNS INC Filer LOUIS STRIAR INC. | NON ILLUMINATED NON ADVERTISING DOUBLE SIDED PROJECTING BANNER SIGN - PACE UNIVERSITY. NO CHANGE OF USE, EGRESS OR OCCUPANCY. |
| M00339805 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 04/20/2021 | 12/03/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner 161 WILLIAM STREET,LLC Contractor ARCHSTONE BUILDERS LLC Filer JAM CONSULTANTS, INC. | Removal of duct work two steam radiators and on electric radiator. No new equipment is being added. |
| M00460999 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 04/20/2021 | 12/03/2021 | Design DESIGN REPUBLIC Owner 161 WILLIAM STREET,LLC Contractor ARCHSTONE BUILDERS LLC Filer JAM CONSULTANTS, INC. | ELEVATOR REMOVAL & INFILL |
| M00461011 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 04/20/2021 | 12/03/2021 | Owner 161 WILLIAM STREET,LLC Contractor ARCHSTONE BUILDERS LLC Filer JAM CONSULTANTS, INC. | PARTIAL INTERIOR FLOOR FRAMING RENOVATIONS AND NEW INTERIOR SLABS. |
| M00510501 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 05/20/2021 | 12/03/2021 | Design DESIGN REPUBLIC Owner 161 WILLIAM STREET,LLC Contractor ARCHSTONE BUILDERS LLC Filer JAM CONSULTANTS, INC. | interior renovation |
| M00510552 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 05/20/2021 | 12/03/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner 161 WILLIAM STREET,LLC Contractor ARCHSTONE BUILDERS LLC Filer JAM CONSULTANTS, INC. | mechanical work |
| M00579451 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 10/04/2021 | 12/03/2021 | Design PERKINS EASTMAN Owner 161 WILLIAM STREET,LLC Contractor ARCHSTONE BUILDERS LLC Filer WALTER T. GORMAN, PE, PC | Interior renovation within 7th and 8th floor as per plan. No change of use, egress or occupancy. |
| M00579482 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 10/03/2021 | 12/03/2021 | Design JFK&M CONSULTING ENGINEERS Contractor ARCHSTONE BUILDERS LLC | Modification of existing duct work for existing mechanical unit systems on 7th and 8th floors. No change to use, occupancy or egress. |
| M00579472 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 10/03/2021 | 10/08/2021 | Design JFK&M CONSULTING ENGINEERS Owner 161 WILLIAM STREET,LLC Contractor TPC THIRD PARTY CONSULT L Filer WALTER T. GORMAN, PE, PC | Modification of existing sprinkler system within 7th and 8th floors as per plan. No change of use, occupancy or egress. |
| M00437418 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 12/15/2020 | 08/09/2021 | Design ENSIGN ENGINEERING, P.C. Owner PACE UNIVERSITY Contractor J PHELAN CONSTRUCTION Filer WALTER T. GORMAN, PE, PC | Replace existing condenser pumps with new on 16th floor mechanical room. No change to occupancy, egress, use. |
| M00510572 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 05/20/2021 | 06/23/2021 | Design GOLDMAN COPELAND ASSOCIATES Owner 161 WILLIAM STREET,LLC Contractor ADVANCED PLUMBING LLC Filer JAM CONSULTANTS, INC. | sprinkler work |
| M00422957 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 01/08/2021 | 04/02/2021 | Design JFK&M CONSULTING ENGINEERS Owner PACE UNIVERSITY Contractor ADVANCED PLBG LLC Filer WALTER T. GORMAN, PE, PC | Modification of one plumbing fixture as per plans. No change to use, egress or occupancy. |
| M00459376 | 41 PARK ROW MANHATTAN | Alteration | Filed — no permit on record | 03/26/2021 | — | Design ENSIGN ENGINEERING, P.C. Owner PACE UNIVERSITY Filer WALTER T. GORMAN, PE, PC | — |
| M00459387 | 41 PARK ROW MANHATTAN | Alteration | Filed — no permit on record | 03/26/2021 | — | Design ENSIGN ENGINEERING, P.C. Owner PACE UNIVERSITY Filer WALTER T. GORMAN, PE, PC | — |
| M00441028 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 02/23/2021 | 03/05/2021 | Design JFK&M CONSULTING ENGINEERS Owner 161 WILLIAM STREET,LLC Contractor ALLSTATE SPRINKLER LLC Filer WALTER T. GORMAN, PE, PC | Install construction temporary sprinkler loop within construction area. No change to occupancy, use or occupancy. |
| M00466878 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 02/23/2021 | 03/05/2021 | Design JFK&M CONSULTING ENGINEERS Owner 161 WILLIAM STREET,LLC Contractor BEDROCK PLBG. & HTG., INC Filer WALTER T. GORMAN, PE, PC | Removal and installation of plumbing fixtures on 18th floor, as per plan. No Change to use, occupancy or Use. |
| M00435731 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 02/23/2021 | 03/03/2021 | Design JFK&M CONSULTING ENGINEERS Contractor ALLSTATE SPRINKLER LLC | Removal and installation of sprinkler heads on 18th floor. No change of use, egress or occupancy. |
| M00467424 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 02/23/2021 | 03/01/2021 | Design JFK&M CONSULTING ENGINEERS Owner 161 WILLIAM STREET,LLC Contractor ARCHSTONE BUILDERS LLC Filer WALTER T. GORMAN, PE, PC | Removal of existing duct work, install new HVAC Unit on 18th floor and associate ducts, as per plan. No change of use, occupancy or use. |
| M00468491 | 161 WILLIAM MANHATTAN | Alteration | Signed-off | 02/22/2021 | 03/01/2021 | Design PERKINS EASTMAN Owner 161 WILLIAM STREET,LLC Contractor ARCHSTONE BUILDERS LLC Filer WALTER T. GORMAN, PE, PC | removal and installation of interior non-bearing partitions and finishes as per plans. |
| M00419921 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 01/05/2021 | 01/28/2021 | Design JFK&M CONSULTING ENGINEERS Owner PACE UNIVERSITY Contractor SHAWMUT WOODWORKING & SUPPLY Filer WALTER T. GORMAN, PE, PC | Removal and installation of existing HVAC duct works for the 13th floor, all as per plan. No change to occupancy, egress or use. |
| M00300954 | 52 BROADWAY MANHATTAN | Alteration | Signed-off | 02/27/2020 | 03/12/2020 | Design JFK&M CONSULTING ENGINEERS Contractor PAR PLUMBING CO., INC Filer WALTER T. GORMAN, PE, PC | Installation of plumbing fixtures as per plan. No change to use, egress or occupancy. |
| M00300828 | 52 BROADWAY MANHATTAN | Alteration | Signed-off | 02/27/2020 | 03/11/2020 | Design JFK&M CONSULTING ENGINEERS Contractor LAWRENCE J. LEVINE Filer WALTER T. GORMAN, PE, PC | Installation of new sprinkler heads. No change to use, egress or occupancy. |
| M00295518 | 52 BROADWAY MANHATTAN | Alteration | Signed-off | 02/27/2020 | 03/03/2020 | Design JFK&M CONSULTING ENGINEERS Contractor SHAWMUT WOODWORKING & SUPPLY Filer WALTER T. GORMAN, PE, PC | Removal of existing mechanical duct system, installation of new mechanical duct system and replace existing AC units with new. No change to … |
| M00020314 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 02/21/2018 | 09/24/2018 | Design BRAND ACCESS SOLUTIONS Owner SAFWAY ATLANTIC, LLC Contractor SAFWAY ATLANTIC, LLC | INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NY… |
| M00022412 | 41 PARK ROW MANHATTAN | Alteration | Signed-off | 02/27/2018 | 09/24/2018 | Design BRAND ACCESS SOLUTIONS Owner SAFWAY ATLANTIC, LLC Contractor SAFWAY ATLANTIC, LLC | INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCU… |
| Building | Filings | Most Recent |
|---|---|---|
| 1 PACE PLAZA ↗ | 6 | 07/22/2026 |
| 41 PARK ROW ↗ | 21 | 07/06/2026 |
| 15 BEEKMAN STREET ↗ | 7 | 05/14/2024 |
| 161 WILLIAM ↗ | 30 | 08/07/2023 |
| 33 BEEKMAN STREET ↗ | 1 | 06/07/2023 |
| 140 WILLIAM STREET ↗ | 1 | 05/23/2022 |
| 52 BROADWAY ↗ | 3 | 06/23/2020 |