← Back
Zoned commercial or Manhattan residential
427 GANSEVOORT STREET
MANHATTAN · West Village · BIN 1091665
💬 Discuss this project
0Year Built
—Stories
V1Building Class
M3-2Zoning
0 sfGross Floor Area
0Units
0 Open Violations
Zoned commercial or Manhattan residential · Owner of record: NYS DEPARTMENT OF TRANSPORTATION · 323,300 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
Roof18p · 3 filings · 20 docs
Floor 1Under Construction77p · 5 filings · 20 docs
Cellar4p · 1 filing · 4 docs
Site & exteriorUnder Construction64p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HUDSON RIVER PARK TRUST4307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANB ENGINEERING PC206/13/2025
BERINO ARCHITECTURAL DESIGN PLLC106/11/2025
NARCHITECTS205/13/2024
PLUS GROUP CONSULTING ENGINEERING310/30/2023
SIGMA ENGINEERING P.C.306/30/2023
SILMAN301/04/2023
THETA CONSULTING LLC105/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DISTINCT ENTERPRISES603/21/2026
PADILLA CONSTRUCTION SERV303/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
JAM CONSULTANTS, INC.1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PADILLA CONSTRUCTION SERVICESGeneral Contractor1907/08/2026
C. D. E. AIR-CONDITIONINGGeneral Contractor603/21/2026
AUTOMOTIVE FACILITY SVCSGeneral Contractor207/08/2026
E-J ELEC. INSTALLATION COElectrical203/22/2026
EASTERN PLBG & MECH CONTRPlumbing207/08/2026
STAMFORD TENT & EQUIP COGeneral Contractor107/08/2026
JOE PARZIALE PLUMBING COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397206/13/2025
BUREAU VERITAS NA6902510/30/2023
Building Lifecycle
All (107)Filed (15)Permit Issued (25)Signed Off (6)Inspection (13)Objection (18)Special Inspection (30)
03/24/2026
Inspection — Pass-Final Construction Permit Withdrawal
Pass
View inspection ↗
09/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/02/2025
Permit issued — Mechanical Systems
M01235887-S2-MS
09/02/2025
Permit issued — General Construction
M01235887-I1-GC
09/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/26/2025
Permit issued — Plumbing
M01235887-S1-PL
07/03/2025
Objection resolved — Addressed
07/02/2025
Objection raised — Scope
07/02/2025
Objection resolved — Addressed
06/27/2025
Objection resolved — Addressed
06/25/2025
Objection raised — Scope
06/25/2025
Objection raised — Scope
06/13/2025
Filed — Alteration
Prop. mech. work at exist, first floor of comm. bldg. (volume 3) in conjunction with GC application# M01235887-I1, to include installation of new type-1 exhaust hood with Ansul, to be connected to exist. grease ductwork to exist. fan on roof.
M01235887-S2
06/13/2025
Filed — Alteration
Prop. mech. work at exist, first floor of comm. bldg. (volume 3) in conjunction with GC application# M01235887-I1, to include installation of new type-1 exhaust hood with Ansul, to be connected to exist. grease ductwork to exist. fan on roof.
M01235887-S1
06/11/2025
Filed — Alteration
Prop. mech. work at exist, first floor of comm. bldg. (volume 3) in conjunction with GC application# M01235887-I1, to include installation of new type-1 exhaust hood with Ansul, to be connected to exist. grease ductwork to exist. fan on roof.
M01235887-I1
06/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
06/04/2025
Special inspection requirement — Final
JEFFREY BERINO
10/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/13/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
ENLARGE EXISTING BUILDING FOR HUDSON RIVER PARK.
M00477663-P1
05/13/2024
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
05/13/2024
Special inspection requirement — Lowest Floor Elevation
IBRAHIM MOURAD
05/13/2024
Special inspection requirement — Fenestration areas
IBRAHIM MOURAD
05/13/2024
Special inspection requirement — Fenestration air leakage
IBRAHIM MOURAD
05/13/2024
Special inspection requirement — Air barrier - visual inspection
IBRAHIM MOURAD
05/13/2024
Special inspection requirement — Insulation placement and R values
IBRAHIM MOURAD
05/13/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
IBRAHIM MOURAD
05/13/2024
Special inspection requirement — Interior lighting power
IBRAHIM MOURAD
05/13/2024
Special inspection requirement — Lighting controls
IBRAHIM MOURAD
05/13/2024
Special inspection requirement — Exterior lighting power
IBRAHIM MOURAD
05/13/2024
Special inspection requirement — Protection of exposed foundation insulation
IBRAHIM MOURAD
05/13/2024
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
IBRAHIM MOURAD
05/01/2024
Signed off — Alteration
STRUCTURAL WORK BEING FILED IN CONJUNCTION WITH ALT-CO APPLICATION M00477663.
M00474890-I1
05/01/2024
Signed off — Alteration
FOUNDATION WORK BEING FILED IN CONJUNCTION WITH ALT-CO APPLICATION M00477663.
M00517131-I1
04/29/2024
Signed off — Alteration
MECHANICAL WORK BEING FILED IN CONJUNCTION WITH ALT-CO APPLICATION M00477663.
M00474894-I1
03/29/2024
Signed off — Alteration
PLUMBING WORK BEING FILED IN CONJUNCTION WITH ALT-CO APPLICATION M00477663.
M00474896-I1
03/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/22/2024
Permit issued — Structural
M00474890-I1-ST
03/18/2024
Permit issued — Mechanical Systems
M00474894-I1-MS
03/07/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/06/2024
Signed off — Alteration
M00682373-I1
12/19/2023
Permit issued — Construction Fence
M00682373-I1-FN
11/21/2023
Permit issued — General Construction
M00477663-I1-GC
11/20/2023
Permit issued — Foundation
M00517131-I1-FO
11/06/2023
Special inspection requirement — Mechanical Systems
IBRAHIM MOURAD
11/06/2023
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
IBRAHIM MOURAD
11/06/2023
Special inspection requirement — Final
IBRAHIM MOURAD
11/06/2023
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
11/06/2023
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
11/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
11/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
11/06/2023
Special inspection requirement — Metering
IBRAHIM MOURAD
10/30/2023
Filed — Alteration
MECHANICAL WORK BEING FILED IN CONJUNCTION WITH ALT-CO APPLICATION M00477663.
M00474894-P1
10/30/2023
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
10/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
10/30/2023
Special inspection requirement — Metering
IBRAHIM MOURAD
10/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
10/30/2023
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
IBRAHIM MOURAD
10/30/2023
Special inspection requirement — Mechanical Systems
IBRAHIM MOURAD
10/30/2023
Special inspection requirement — Final
IBRAHIM MOURAD
10/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedAUTOMOTIVE FACILITY SVCS09/02/2025
DOB NOWGeneral ConstructionPermit IssuedAUTOMOTIVE FACILITY SVCS09/02/2025
DOB NOWPlumbingSigned-offJOE PARZIALE PLUMBING CO08/26/2025
DOB NOWStructuralSigned-offPADILLA CONSTRUCTION SERVICES03/22/2024
DOB NOWMechanical SystemsSigned-offC. D. E. AIR-CONDITIONING03/18/2024
DOB NOWConstruction FenceSigned-offPADILLA CONSTRUCTION SERVICES12/19/2023
DOB NOWGeneral ConstructionPermit IssuedPADILLA CONSTRUCTION SERVICES11/21/2023
DOB NOWFoundationSigned-offPADILLA CONSTRUCTION SERVICES11/20/2023
DOB NOWGeneral ConstructionPermit IssuedPADILLA CONSTRUCTION SERVICES10/27/2023
DOB NOWMechanical SystemsSigned-offC. D. E. AIR-CONDITIONING04/17/2023
DOB NOWPlumbingSigned-offEASTERN PLBG & MECH CONTR02/22/2023
DOB NOWFoundationSigned-offPADILLA CONSTRUCTION SERVICES12/20/2022
DOB NOWConstruction FenceSigned-offPADILLA CONSTRUCTION SERVICES12/20/2022
DOB NOWStructuralSigned-offPADILLA CONSTRUCTION SERVICES12/20/2022
DOB NOWGeneral ConstructionPermit IssuedPADILLA CONSTRUCTION SERVICES11/03/2022
DOB NOWConstruction FenceSigned-offPADILLA CONSTRUCTION SERVICES10/31/2022
DOB NOWStructuralSigned-offPADILLA CONSTRUCTION SERVICES10/31/2022
DOB NOWFoundationSigned-offPADILLA CONSTRUCTION SERVICES10/31/2022
DOB NOWStructuralSigned-offPADILLA CONSTRUCTION SERVICES05/06/2022
DOB NOWMechanical SystemsSigned-offC. D. E. AIR-CONDITIONING04/26/2022
DOB NOWGeneral ConstructionPermit IssuedPADILLA CONSTRUCTION SERVICES04/20/2022
DOB NOWFoundationSigned-offPADILLA CONSTRUCTION SERVICES04/13/2022
DOB NOWPlumbingSigned-offEASTERN PLBG & MECH CONTR03/21/2022
DOB NOWConstruction FenceSigned-offPADILLA CONSTRUCTION SERVICES03/14/2022
DOB NOWGeneral ConstructionSigned-offSTAMFORD TENT & EQUIP CO05/13/2021
1 project · most recent 06/13/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/13/2025Permit IssuedAUTOMOTIVE FACILITY SVCSVentilation Systems
Ventilation
Greenheck CUBE-180 HP-10 2,500 CFM · Exhaust Fan ×4
1 project · most recent 06/13/2025
Water/Sanitary
FiledStatusContractorScope
06/13/2025Signed-offJOE PARZIALE PLUMBING COWater/Sanitary
3 projects · most recent 09/25/2024
General Wiring
FiledStatusContractorScope
09/25/2024CompleteE-J ELEC. INSTALLATION COGeneral Wiring
06/23/2023CompleteINTERPHASE ELECTRIC CORP.General Wiring
05/20/2022CompleteE-J ELEC. INSTALLATION COGeneral Wiring
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
03/24/2026Pass-Final Construction Permit WithdrawalPassView ↗
09/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/07/2024Pass-Final General Construction Non-Directive 14PassView ↗
06/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/21/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/15/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/31/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/31/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/29/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/29/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
06/11/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
06/04/2025FinalJEFFREY BERINOprogress
05/13/2024Energy Code Compliance InspectionsIBRAHIM MOURADprogress
05/13/2024Lowest Floor ElevationIBRAHIM MOURADprogress
05/13/2024Fenestration areasIBRAHIM MOURADenergy_progress
05/13/2024Fenestration air leakageIBRAHIM MOURADenergy_progress
05/13/2024Air barrier - visual inspectionIBRAHIM MOURADenergy_progress
05/13/2024Insulation placement and R valuesIBRAHIM MOURADenergy_progress
05/13/2024Fenestration and door U-factor and product ratingsIBRAHIM MOURADenergy_progress
05/13/2024Interior lighting powerIBRAHIM MOURADenergy_progress
05/13/2024Lighting controlsIBRAHIM MOURADenergy_progress
05/13/2024Exterior lighting powerIBRAHIM MOURADenergy_progress
05/13/2024Protection of exposed foundation insulationIBRAHIM MOURADenergy_progress
05/13/2024Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)IBRAHIM MOURADspecial
11/06/2023Mechanical SystemsIBRAHIM MOURADspecial
11/06/2023Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)IBRAHIM MOURADspecial
11/06/2023FinalIBRAHIM MOURADprogress
11/06/2023Maintenance informationIBRAHIM MOURADenergy_progress
11/06/2023HVAC-R and service water heating equipmentIBRAHIM MOURADenergy_progress
11/06/2023HVAC-R and service water heating system controlsIBRAHIM MOURADenergy_progress
11/06/2023HVAC-R and service water piping design and insulationIBRAHIM MOURADenergy_progress
11/06/2023MeteringIBRAHIM MOURADenergy_progress
10/30/2023Maintenance informationIBRAHIM MOURADenergy_progress
10/30/2023HVAC-R and service water piping design and insulationIBRAHIM MOURADenergy_progress
10/30/2023MeteringIBRAHIM MOURADenergy_progress
Latest 25 of 58.
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch11
09/03/2026M00519844-I1Request digital key ↗
09/03/2026M00517131-I1Request digital key ↗
09/03/2026M00517131-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/28/2026M00474894-I1Request digital key ↗
08/28/2026M00474894-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/03/2026M00474896-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/03/2026M00474890-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026M00477663-I1Open ↗
08/13/2026M00477663-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00477663-I1Open ↗
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/03/2026M00474890-I1Open ↗
09/03/2026M00517131-I1Open ↗
09/03/2026M00517131-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026M00517131-I1Open ↗
08/31/2026M00474894-P1Open ↗
08/31/2026M00474894-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026M00517131-I1Open ↗
08/31/2026M00474894-P1Open ↗
08/29/2026M01235887-S1Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026M00477663-I1Open ↗
08/13/2026M00477663-P1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00474894-I1Open ↗
08/13/2026M00477663-I1Open ↗
08/13/2026M00474896-I1Open ↗
▸Approvals, Objections & Sign-offs15
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
09/03/2026M00474890-I1Open ↗
09/03/2026M00517131-P1Open ↗
09/03/2026M00517131-I1Open ↗
Showing 3 of 15 on file for this type
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026M00477663-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026M00477663-I1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/13/2026M00477663-I1Open ↗
08/13/2026M00477663-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026M00477663-I1Open ↗
08/13/2026M00477663-P1Open ↗
▸DOB NOWFlood Plan Emergency Temporary Flood Shields2
08/27/2026M00477663-P1Open ↗
08/15/2026M00477663-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026M00477663-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M00477663-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026M00477663-I1Open ↗