One story retail building
438 PORT RICHMOND AVENUE
STATEN ISLAND · Port Richmond · BIN 5025959
💬 Discuss this project
1931Year Built
1Stories
K1Building Class
C8-1Zoning
7,660 sfGross Floor Area
4Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: 438 PORT RICHMOND AVE LLC · 17,892 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivil
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 13 docs
Floor 1Under Construction29p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RW 705 FRANKLIN2609/13/2026
FIRST CLASS MANAGEMENT1009/25/2026
WR GROUP 434 PORT RICHMOND AVE203/21/2026
WR GROUP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYDE109/10/2026
CHON ENGINEERING1003/25/2026
CHUN ENGINEERING CONSULTANT PLLC504/27/2025
ASHRAF CORP110/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CHUN ENGINEERING CONSULTANT603/21/2026
MA DESIGNS NYC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TREND 21 MANAGEMENT INCGeneral Contractor407/08/2026
AVON PLBG & HTG INCPlumbing307/08/2026
TISHEH CONSTRUCTION CORPGeneral Contractor203/21/2026
C & L MANAGEMENT USA CORPGeneral Contractor104/09/2026
MEDRA EXHAUST SYSTEMS CORGeneral Contractor107/08/2026
KING ROSE OF NY, INCGeneral Contractor109/25/2026
HT PLUMBING & HEATING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAL H CHUN ENGINEER PC1972504/27/2025
CHON ENGINEERING PC2454801/27/2025
JAY KAVI CORPORATION8500110/13/2023
Building Lifecycle
All (81)Filed (17)Permit Issued (10)Signed Off (7)Violation (5)Inspection (10)Objection (2)Special Inspection (30)
09/24/2026
Permit issued — Mechanical Systems
S01419815-I1-GC-CX
09/10/2026
Filed — Alteration
Interior fitout and alteration of existing commercial unit to new office space.
S01419815-I1
06/19/2026
Special inspection requirement — Mechanical Systems
William Ryan
06/19/2026
Special inspection requirement — Final
Rasesh Doshi
05/20/2026
Signed off — Alteration
LAUNDROMAT DEMOLITION. WORK INCLUDES REMOVE CONCRETE PADS, NON-BEARING PARTITIONS, DOORS, DUCT WORK BELOW ROOF AND CEILING TILE PATCH.
S01369019-S1
05/19/2026
Signed off — Alteration
LAUNDROMAT DEMOLITION. WORK INCLUDES REMOVE CONCRETE PADS, NON-BEARING PARTITIONS, DOORS, DUCT WORK BELOW ROOF AND CEILING TILE PATCH.
S01369019-I1
03/27/2026
Permit issued — General Construction
S01369019-I1-GC
03/27/2026
Permit issued — Plumbing
S01369019-S1-PL
03/25/2026
Filed — Alteration
LAUNDROMAT DEMOLITION. WORK INCLUDES REMOVE CONCRETE PADS, NON-BEARING PARTITIONS, DOORS, DUCT WORK BELOW ROOF AND CEILING TILE PATCH.
S01369019-S1
03/25/2026
Filed — Alteration
LAUNDROMAT DEMOLITION. WORK INCLUDES REMOVE CONCRETE PADS, NON-BEARING PARTITIONS, DOORS, DUCT WORK BELOW ROOF AND CEILING TILE PATCH.
S01369019-I1
03/09/2026
Special inspection requirement — Final
Steve Chon
05/06/2025
Special inspection requirement — Energy Code Compliance Inspections
DAL CHUN
05/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
DAL CHUN
05/06/2025
Special inspection requirement — Lighting controls
DAL CHUN
05/06/2025
Special inspection requirement — Interior lighting power
DAL CHUN
05/06/2025
Special inspection requirement — Metering
DAL CHUN
05/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
DAL CHUN
05/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAL CHUN
04/27/2025
Filed — Alteration CO
SUBDIVIDE EXISTING RETAIL SPACE INTO TWO RETAIL SPACE FOR A BUILDING WITH A TOTAL OF 5 RETAIL STORES AND REMOVE BUSINESS ACCESSORY SIGN TO ADDRESS ECB VIOLATIONS. NO CHANGE IN BULK.
S00958311-P3
04/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAL CHUN
04/25/2025
Special inspection requirement — Energy Code Compliance Inspections
DAL CHUN
04/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
DAL CHUN
04/25/2025
Special inspection requirement — Lighting controls
DAL CHUN
04/25/2025
Special inspection requirement — Metering
DAL CHUN
04/25/2025
Special inspection requirement — Interior lighting power
DAL CHUN
04/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
DAL CHUN
04/07/2025
Signed off — Alteration
MODIFY EXHAUST HOOD DUCT AND EXHAUST FAN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S00944932-I1
03/20/2025
Permit issued — Mechanical Systems
S00944932-I1-MS
03/12/2025
Violation issued (ECB, closed)
Construction
03/11/2025
Filed — Alteration CO
SUBDIVIDE EXISTING RETAIL SPACE INTO TWO RETAIL SPACE FOR A BUILDING WITH A TOTAL OF 5 RETAIL STORES AND REMOVE BUSINESS ACCESSORY SIGN TO ADDRESS ECB VIOLATIONS. NO CHANGE IN BULK.
S00958311-P2
02/12/2025
Signed off — Alteration
REMOVE EXSTING SP. HEADS, WASHERS AND DRYERS
S00789203-I1
01/27/2025
Filed — Alteration
REMOVE EXSTING SP. HEADS, WASHERS AND DRYERS
S00789203-P5
01/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steve Chon
12/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/16/2024
Permit issued — Plumbing
S00789203-I1-PL
11/13/2024
Filed — Alteration
REMOVE EXSTING SP. HEADS, WASHERS AND DRYERS
S00789203-P4
10/11/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/05/2024
Signed off — Alteration CO
SUBDIVIDE EXISTING RETAIL SPACE INTO TWO RETAIL SPACE FOR A BUILDING WITH A TOTAL OF 5 RETAIL STORES AND REMOVE BUSINESS ACCESSORY SIGN TO ADDRESS ECB VIOLATIONS. NO CHANGE IN BULK.
S00958311-S2
07/24/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/12/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/08/2024
Filed — Alteration CO
SUBDIVIDE EXISTING RETAIL SPACE INTO TWO RETAIL SPACE FOR A BUILDING WITH A TOTAL OF 5 RETAIL STORES AND REMOVE BUSINESS ACCESSORY SIGN TO ADDRESS ECB VIOLATIONS. NO CHANGE IN BULK.
S00958311-P1
07/03/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/03/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/28/2024
Permit issued — Plumbing
S00958311-S2-PL
06/27/2024
Permit issued — General Construction
S00958311-I1-GC
03/25/2024
Objection resolved — Addressed
02/16/2024
Objection raised — Scope
01/10/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/15/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/11/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/11/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/07/2023
Filed — Alteration
REMOVE EXSTING SP. HEADS, WASHERS AND DRYERS
S00789203-P2
12/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steve Chon
11/14/2023
Filed — Alteration CO
SUBDIVIDE EXISTING RETAIL SPACE INTO TWO RETAIL SPACE FOR A BUILDING WITH A TOTAL OF 5 RETAIL STORES AND REMOVE BUSINESS ACCESSORY SIGN TO ADDRESS ECB VIOLATIONS. NO CHANGE IN BULK.
S00958311-S2
11/13/2023
Filed — Alteration CO
SUBDIVIDE EXISTING RETAIL SPACE INTO TWO RETAIL SPACE FOR A BUILDING WITH A TOTAL OF 5 RETAIL STORES AND REMOVE BUSINESS ACCESSORY SIGN TO ADDRESS ECB VIOLATIONS. NO CHANGE IN BULK.
S00958311-I1
10/24/2023
Signed off — Alteration
S00789128-I1
10/23/2023
Violation issued (ECB, closed)
Construction
10/19/2023
Filed — Alteration
S00789128-P1
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedKING ROSE OF NY, INC09/24/2026
DOB NOWGeneral ConstructionSigned-offC & L MANAGEMENT USA CORP03/27/2026
DOB NOWPlumbingSigned-offAVON PLBG & HTG INC03/27/2026
DOB NOWMechanical SystemsSigned-offMEDRA EXHAUST SYSTEMS COR03/20/2025
DOB NOWPlumbingSigned-offAVON PLBG & HTG INC12/16/2024
DOB NOWPlumbingSigned-offHT PLUMBING & HEATING COR06/28/2024
DOB NOWGeneral ConstructionPermit IssuedTISHEH CONSTRUCTION CORP06/27/2024
DOB NOWGeneral ConstructionSigned-offTREND 21 MANAGEMENT INC04/11/2023
DOB NOWPlumbingSigned-offAVON PLBG & HTG INC08/12/2022
DOB NOWMechanical SystemsSigned-offTREND 21 MANAGEMENT INC08/12/2022
BISOTISSUEDD & B BROTHERS CONSTRUCTI09/19/2012
BISPLISSUEDLIBERTY WATER AND SEWER12/16/2008
BIS—ISSUEDNEW YORK SIGN CONTRACTORS INC06/13/2008
BISPLISSUEDPINNACLE PLBG & HTG CORP11/28/2007
BISOTISSUEDNEW EMPIRE CONSTRUCTION INC.11/20/2007
BISPLISSUEDAVON PLBG & HTG INC07/17/2003
BISEQISSUEDNOVA PLBG & HTG INC.07/17/2003
BIS—ISSUEDNOVA PLBG & HTG INC.07/17/2003
BISMHISSUEDSKTLINE CONSTRUCTION CORP09/27/2000
1 project · most recent 09/10/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/10/2026Permit IssuedKING ROSE OF NY, INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg KNUAB121A 1 tons · Vrf Outdoor ×1
KUSAB121A 1 tons · Vrf Outdoor ×1
Ventilation
Greenheck SP-A70 30 CFM · Exhaust Fan ×1
1 project · most recent 03/25/2026
Sprinkler System
FiledStatusContractorScope
03/25/2026——Sprinkler System
2 projects · most recent 03/25/2026
Water/Sanitary Gas Plumbing-Sprinkler
FiledStatusContractorScope
03/25/2026Signed-offAVON PLBG & HTG INCGas, Plumbing-Sprinkler, Water/Sanitary
04/27/2025Signed-offHT PLUMBING & HEATING CORWater/Sanitary
2 projects · most recent 08/14/2025
General Wiring
FiledStatusContractorScope
08/14/2025Complete5 J'S ELECTL CONTS CORPGeneral Wiring
09/29/2023Complete5 J'S ELECTL CONTS CORPGeneral Wiring
1 project · most recent 04/27/2025
FiledStatusContractorScope
04/27/2025Signed-offHT PLUMBING & HEATING COR1 scope_items
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/11/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/03/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/15/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
06/19/2026Mechanical SystemsWilliam Ryanspecial
06/19/2026FinalRasesh Doshiprogress
03/09/2026FinalSteve Chonprogress
05/06/2025Energy Code Compliance InspectionsDAL CHUNprogress
05/06/2025Fire-Resistance Rated ConstructionDAL CHUNprogress
05/06/2025Lighting controlsDAL CHUNenergy_progress
05/06/2025Interior lighting powerDAL CHUNenergy_progress
05/06/2025MeteringDAL CHUNenergy_progress
05/06/2025Fenestration and door U-factor and product ratingsDAL CHUNenergy_progress
05/06/2025Fire-Resistant Penetrations and JointsDAL CHUNspecial
04/25/2025Fire-Resistant Penetrations and JointsDAL CHUNspecial
04/25/2025Energy Code Compliance InspectionsDAL CHUNprogress
04/25/2025Fire-Resistance Rated ConstructionDAL CHUNprogress
04/25/2025Lighting controlsDAL CHUNenergy_progress
04/25/2025MeteringDAL CHUNenergy_progress
04/25/2025Interior lighting powerDAL CHUNenergy_progress
04/25/2025Fenestration and door U-factor and product ratingsDAL CHUNenergy_progress
01/27/2025Fire-Resistant Penetrations and JointsSteve Chonspecial
12/06/2023Fire-Resistant Penetrations and JointsSteve Chonspecial
10/17/2023Fire-Resistance Rated ConstructionSteve Chonprogress
10/17/2023Fire-Resistant Penetrations and JointsSteve Chonspecial
10/17/2023Fire-Resistant Penetrations and JointsSteve Chonspecial
10/17/2023FinalSteve Chonprogress
10/07/2023FinalKAMRUL AHSANprogress
10/07/2023Mechanical SystemsJay Kavispecial
Latest 25 of 30.
▾Documents — 118 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
09/14/2026S01419815-I1Request digital key ↗
08/24/2026S00789157-I1Request digital key ↗
08/22/2026S00944932-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits8
▸BISWORK PERMIT APPLICATION6
09/19/2012520110549Open ↗
12/16/2008510058688Open ↗
11/24/2008510058688Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
09/08/2012520110549Open ↗
11/12/2008510058688Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00958311-I1Open ↗
▸Seals & Professional Certifications48
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/14/2026S01419815-I1Open ↗
08/24/2026S00789157-I1Open ↗
08/22/2026S00789128-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
08/28/2026S00789157-I1Open ↗
08/28/2026S00789157-I1Open ↗
08/28/2026S00789157-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/31/2026S00789203-P1Open ↗
08/28/2026S00789157-I1Open ↗
08/26/2026S00944932-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
12/18/2012520110549Open ↗
09/19/2012520110549Open ↗
03/10/2009510058688Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/12/2008510058688Open ↗
11/15/2007510021307Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/12/2008510058688Open ↗
11/15/2007510021307Open ↗
▸BISPC FULL REPORT1
11/15/2007510021307Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
11/12/2008510058688Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/20/2026S00958311-P2Open ↗
08/20/2026S00958311-P1Open ↗
08/20/2026S00958311-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/14/2026S01419815-I1Open ↗
08/24/2026S00789157-I1Open ↗
08/22/2026S00789128-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
11/12/2008510058688Open ↗
11/15/2007510021307Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/08/2012520110549Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/20/2012520110549Open ↗
09/19/2012520110549Open ↗
09/08/2012520110549Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/18/2012520110549Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00958311-S2Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
12/20/2012520110549Open ↗
12/18/2012520110549Open ↗
03/10/2009510058688Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
09/08/2012520110549Open ↗
11/12/2008510058688Open ↗
11/15/2007510021307Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
12/18/2012520110549Open ↗
09/08/2012520110549Open ↗
11/12/2008510058688Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
09/08/2012520110549Open ↗
11/12/2008510058688Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/20/2026S00958311-P1Open ↗
08/20/2026S00958311-P2Open ↗
08/20/2026S00958311-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026S00958311-I1Open ↗