1940Year Built
7Stories
D4Building Class
R6Zoning
62,088 sfGross Floor Area
68Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SWARMP
Elevator cooperative · 16,325 sf lot · 3.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Bulkhead1p · 1 filing · 16 docs
Floor 11p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FERRARA MANAGEMENT GROUP108/29/2026
KINGS GROUP NY707/08/2026
MARCINKUS103/22/2026
4445 POST ROAD OWNER INC103/22/2026
THE OWNER OF103/22/2026
OWNER OF 4445 POST ROA103/22/2026
HORN RESTORATION CO.103/22/2026
4445 POST OWNERS3103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAHITA ENGINEERING LLC104/22/2026
ROBAK ARCHITECTURE, LLC101/08/2024
MOHAMMAD AHEAD, PE112/08/2021
MVN ARCHITECT LLC206/24/2021
SYED ENGINEERING, P.C.105/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOMMA DESIGN CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LAWRENCE EXTERIOR RESTORATIONGeneral Contractor307/08/2026
KINGS GROUP NY CORPGeneral Contractor207/08/2026
WTC PLBG & HEATING CORPPlumbing203/22/2026
EAGLE EMPIRE CONTRACTINGGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C.M. TESTING LABORATORY,1352104/22/2026
ROBAK ARCHITECTURE, LLC7952101/08/2024
LEO Y LEE ASSOCIATES2481406/24/2021
Building Lifecycle
All (101)Filed (6)Permit Issued (5)Signed Off (4)Facade (FISP) (9)Violation (60)Objection (8)Special Inspection (9)
04/30/2026
Violation issued (HPD, open)
A
04/22/2026
Filed — Alteration
Repair of Undermined Partition Wall & Floor in Unit 1G
X01309185-I1
06/05/2025
Violation issued (HPD, closed)
A
03/05/2025
Violation issued (ECB, closed)
Unknown
04/08/2024
Signed off — Alteration
Combination of Apt's 8A & 8B by removing an approx. 9' length of non-load-bearing partition between the units. Remove the kitchen and misc. closets in Apt 8A, other minor partition alterations. Apartment combination as per TPPN 3/97
X00982107-I1
01/16/2024
Permit issued — General Construction
X00982107-I1-GC
01/08/2024
Filed — Alteration
Combination of Apt's 8A & 8B by removing an approx. 9' length of non-load-bearing partition between the units. Remove the kitchen and misc. closets in Apt 8A, other minor partition alterations. Apartment combination as per TPPN 3/97
X00982107-I1
12/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Robak
12/26/2023
Special inspection requirement — Final
David Robak
11/21/2022
Signed off — Alteration
X00636751-I1
11/10/2022
Signed off — Alteration
application filed for misc facade repairs as per drawings filed herewith; repairs as required to comply with LL11. No change to Use, egress or occupancy as a part of this application.
X00456630-I1
11/09/2022
Permit issued — Structural
X00456630-I1-ST
02/18/2022
Violation issued (HPD, closed)
A
02/06/2022
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALLL COMPLY WITH CHATPER 33 OF NYCC.
X00519297-I1
01/05/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/10/2021
Permit issued — Sidewalk Shed
X00636751-I1-SH
12/08/2021
Filed — Alteration
X00636751-I1
10/12/2021
Violation issued (ECB, closed)
Construction
10/12/2021
Violation issued (ECB, closed)
Construction
10/12/2021
Violation issued (ECB, closed)
Construction
10/12/2021
Violation issued (ECB, closed)
Construction
10/12/2021
Violation issued (ECB, closed)
Site Safety
09/01/2021
Permit issued — Structural
X00456630-I1-GC
08/25/2021
Special inspection requirement — Structural Steel - Welding
Leo Lee
08/25/2021
Special inspection requirement — Structural Steel - Details
Leo Lee
08/25/2021
Special inspection requirement — Post-installed Anchors
Leo Lee
08/25/2021
Special inspection requirement — Final
Michael Notaro
08/25/2021
Special inspection requirement — Masonry
Leo Lee
08/25/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Leo Lee
08/11/2021
Objection resolved — Addressed
08/11/2021
Objection resolved — Addressed
08/11/2021
Objection resolved — Addressed
08/11/2021
Objection resolved — Addressed
07/19/2021
Objection raised — Inspections
07/19/2021
Objection raised — Admin
07/19/2021
Objection raised — Inspections
07/02/2021
Objection raised — Other
06/24/2021
Filed — Alteration
application filed for misc facade repairs as per drawings filed herewith; repairs as required to comply with LL11. No change to Use, egress or occupancy as a part of this application.
X00456630-P1
05/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/12/2021
Permit issued — Sidewalk Shed
X00519297-I1-SH
05/10/2021
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALLL COMPLY WITH CHATPER 33 OF NYCC.
X00519297-I1
05/10/2021
Special inspection requirement — Final
RAFI HAMID
04/05/2021
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
I
02/10/2021
Filed — Alteration
application filed for misc facade repairs as per drawings filed herewith; repairs as required to comply with LL11. No change to Use, egress or occupancy as a part of this application.
X00456630-I1
09/16/2020
Cycle 9 facade report submitted
09/15/2020
Cycle 9 facade report signed — SWARMP
08/25/2020
Violation issued (ECB, closed)
Local Law
07/29/2020
Cycle 9 facade inspection completed
05/22/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/23/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/21/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/24/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/27/2014
Violation issued (ECB, closed)
Construction
08/19/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/21/2013
Cycle 7 facade report submitted
02/19/2013
Cycle 7 facade report signed — SAFE
02/15/2013
Cycle 7 facade inspection completed
10/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offEAGLE EMPIRE CONTRACTING01/16/2024
DOB NOWStructuralSigned-offLAWRENCE EXTERIOR RESTORA11/09/2022
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP12/10/2021
DOB NOWStructuralSigned-offLAWRENCE EXTERIOR RESTORA09/01/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP05/12/2021
BISOTISSUEDBEST ENERGY POWER 2015 LL02/17/2017
BISMHISSUEDZKC NY LLC03/20/2014
BISPLISSUEDABSOLUTE PLBG HTG & MECH09/23/2013
BISEQISSUEDCS BRIDGE CORP04/03/2012
BISEQISSUEDCS BRIDGE CORP03/21/2012
BISEQISSUEDCS BRIDGE CORP03/21/2012
BISOTISSUEDJANBAR INC03/06/2012
BISOTISSUEDJANBAR INC11/16/2011
BISEQISSUEDCS BRIDGE CORP10/04/2011
BISEQISSUEDCS BRIDGE CORP10/04/2011
BISEQISSUEDCS BRIDGE CORP10/04/2011
BISOTISSUEDJANBAR INC09/28/2011
BISOTISSUEDJANBAR INC03/03/2011
BISOTISSUEDPCF STATE RESTORATION01/09/2007
BISEQISSUEDCSC OF NEW YORK INC.01/04/2007
BISOTISSUEDPCF STATE RESTORATION09/05/2006
BISPLISSUEDPLUMB-IT MECHANICAL INC08/19/2004
BISBLISSUEDMARLANDE HEATING CORP.12/27/1996
BIS—ISSUEDBIG APPLE RESTORATION, INC.10/04/1990
BISEQISSUEDWILCOX CONSTRUCTION09/11/1990
8 projects · most recent 04/28/2025
General Wiring
FiledStatusContractorScope
04/28/2025CompleteFUSION ELECTL CONTRNG LLCGeneral Wiring
04/24/2025CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
04/24/2025CompleteFUSION ELECTL CONTRNG LLCGeneral Wiring
03/20/2025CompleteGIA ELECTRICAL CORPGeneral Wiring
03/08/2024CompleteGIA ELECTRICAL CORPGeneral Wiring
04/25/2023CompleteGIA ELECTRICAL CORPGeneral Wiring
06/17/2021CompleteHIGH QUALITY ELECTRIC OF—
07/28/2020CompleteKVA ELECTRIC, INCGeneral Wiring
1 project · most recent 04/22/2026
Concrete Wood
FiledStatusContractorScope
04/22/2026——Concrete, Wood
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
12/27/2023Fire-Resistant Penetrations and JointsDavid Robakspecial
12/26/2023FinalDavid Robakprogress
08/25/2021Structural Steel - WeldingLeo Leespecial
08/25/2021Structural Steel - DetailsLeo Leespecial
08/25/2021Post-installed AnchorsLeo Leespecial
08/25/2021FinalMichael Notaroprogress
08/25/2021MasonryLeo Leespecial
08/25/2021Structural Stability – Alterations of existing buildingsLeo Leespecial
05/10/2021FinalRAFI HAMIDprogress
▾Documents — 151 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch4
08/25/2026X00519297-I1Request digital key ↗
08/25/2026X00636751-I1Request digital key ↗
08/21/2026X00982107-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
08/25/2026X00456630-I1Request digital key ↗
08/15/2026X00456630-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/25/2026X00456630-I1Request digital key ↗
08/15/2026X00456630-P1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION14
02/01/2017240170836Open ↗
12/17/2013220336900Open ↗
09/27/2013220336900Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION13
02/17/2017240170836Open ↗
03/21/2014220336900Open ↗
09/23/2013220336900Open ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications41
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
06/19/2014220336900Open ↗
09/27/2013220336900Open ↗
05/03/2013220143556Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026X00456630-I1Open ↗
09/02/2026X00456630-I1Open ↗
09/02/2026X00456630-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026X00456630-I1Open ↗
08/25/2026X00456630-P1Open ↗
08/25/2026X00519297-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
09/27/2013220336900Open ↗
10/06/2011220143547Open ↗
10/05/2011220143565Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
10/06/2011220143547Open ↗
10/05/2011220143565Open ↗
10/05/2011220143556Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026X00456630-I1Open ↗
09/02/2026X00519297-I1Open ↗
08/24/2026X00982107-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/27/2013220336900Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/01/2017240170836Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING2
12/17/2013220336900Open ↗
09/27/2013220336900Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
01/16/2014220336900Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
02/01/2017240170836Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
02/01/2017240170836Open ↗
09/27/2013220336900Open ↗
10/05/2011220143565Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026X00456630-I1Open ↗
08/21/2026X00982107-I1Open ↗
08/15/2026X00456630-P1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
09/12/2011220137876Open ↗
09/07/2011220137876Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
03/04/2011220079821Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/17/2026X01309185-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/18/2017240170836Open ↗
02/01/2017240170836Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
12/18/2017240170836Open ↗
03/22/2013220137876Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/22/2013220137876Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
12/18/2017240170836Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
02/01/2017240170836Open ↗
▸BISTECHNICAL REPORT: ENERGY1
09/07/2011220137876Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/18/2017240170836Open ↗
02/01/2017240170836Open ↗
▸Approvals, Objections & Sign-offs21
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
12/18/2017240170836Open ↗
06/19/2014220336900Open ↗
05/03/2013220143556Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
12/18/2017240170836Open ↗
06/19/2014220336900Open ↗
05/03/2013220143556Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
10/06/2011220143547Open ↗
10/05/2011220143565Open ↗
10/05/2011220143556Open ↗
Showing 3 of 5 on file for this type
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
12/18/2017240170836Open ↗
▸BISSHED LETTER1
03/05/2013220143547Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT9
12/18/2017240170836Open ↗
02/01/2017240170836Open ↗
06/19/2014220336900Open ↗
Showing 3 of 9 on file for this type
▸BISLL58-88 CIVIL PENALTY AFFIDAVIT1
03/04/2011220079821Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION9
12/18/2017240170836Open ↗
02/15/2017240170836Open ↗
03/04/2014220336900Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET6
09/27/2013220336900Open ↗
10/06/2011220143547Open ↗
10/05/2011220143565Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
02/01/2017240170836Open ↗
▸Other Documents4
▸DOB NOWDHCR Document2
08/13/2026X00456630-P1Open ↗
08/13/2026X00456630-I1Open ↗
▸BISTax Abatement Miscellaneous1
12/18/2017240170836Open ↗
▸DOB NOWAdjoining Owners Notification1
08/17/2026X01309185-I1Open ↗