| Owner | Filings | Most Recent |
|---|---|---|
| CIRCLE REALTY GROUP | 620 | 09/12/2026 |
| RKA ARCHITECTS | 10 | 07/08/2026 |
| NEXTG TECH LIMITED | 10 | 03/22/2026 |
| PLATINUM SERVICES NY | 7 | 03/22/2026 |
| PARK AVENUE PROPERTIES ASSOC | 277 | 03/22/2026 |
| 451-453 PARK AV SOUTH | 1 | 03/22/2026 |
| DAKOTA REALTY GROUP | 15 | 03/22/2026 |
| DAKOTA REALTY | 14 | 03/22/2026 |
| DAICOTA REALTY GROUP | 1 | 03/22/2026 |
| NEW YORK TELEPHONE CO | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| M. CHETRIT CONSULTING ENGINEERS, PC | 25 | 07/08/2026 |
| MKNH ARCHITECTS | 39 | 07/07/2026 |
| SONI ENGINEERING CONSULTING | 1 | 06/22/2026 |
| MOLONEY CONSULTING ENGINEERING PLLC | 10 | 03/26/2026 |
| AGT ARCHITECTURE P.C. | 4 | 11/05/2025 |
| LOFFREDO BROOKS ARCHITECTS P.C. | 5 | 08/08/2025 |
| M. CHETRIT CONSULTING ENGINEERS P.C | 82 | 04/03/2025 |
| NEW AIR SOLUTION INC. | 4 | 02/24/2025 |
| ASHRAF CORP | 2 | 10/03/2023 |
| SOCOTEC, INC. | 1 | 06/26/2023 |
| CARRY D. MCLAIN - ARCHITECT | 1 | 05/23/2023 |
| LORING CONSULTING ENGINEERS, INC. | 2 | 04/25/2023 |
| RODNEY D. GIBBLE CONSULTING ENGINEE | 1 | 12/08/2020 |
| PATUXENT ENGINEERING LLC | 1 | 10/23/2020 |
| N.E.E.D. ARCHITECTURE LLC | 2 | 09/16/2019 |
| DOOLING & COMPANY ARCHITECTS | 1 | 05/16/2019 |
| MKNS ARCHITECTS LLC | 1 | 03/08/2019 |
| SCALAR ARCHITECTURE PC | 1 | 04/07/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| EA DESIGN GROUP | 288 | 03/21/2026 |
| AGT ARCHITECTURE P C | 8 | 03/21/2026 |
| LC EXPEDITING SERVICES | 6 | 03/21/2026 |
| RIGGINING CONSULTANTS | 1 | 03/21/2026 |
| RETHY ASSOCIATES | 18 | 03/21/2026 |
| PLATINUM SERVICES NY | 4 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 6 | 03/21/2026 |
| PATUXENT ENGINEERING | 2 | 03/21/2026 |
| AE DESIGN SOLUTION | 4 | 03/21/2026 |
| HTX BUILDING CONSULTING | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| THEODORE WILLIAMS CONSTR | General Contractor | 50 | 07/08/2026 |
| A.W. & S. CONSTRUCTION CO | General Contractor | 23 | 07/08/2026 |
| RINNOVO CONSTRUCTION, LLC | General Contractor | 21 | 07/08/2026 |
| UNISOL INC | General Contractor | 14 | 07/08/2026 |
| D.B.J. CONTRACTING CORP | General Contractor | 14 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 12 | 07/08/2026 |
| ASCO SPRINKLER CO.,INC | Fire Protection | 11 | 07/08/2026 |
| NPF CONSTRUCTION CORP | General Contractor | 10 | 07/08/2026 |
| EVEREST SCAFFOLDING INC | General Contractor | 7 | 07/08/2026 |
| FLOW-RIGHT FIRE SUPP CORP | Fire Protection | 7 | 07/08/2026 |
| MONUMENTAL CONSTRUCTION * | General Contractor | 6 | 07/08/2026 |
| BEDROCK PLBG. & HTG., INC | Plumbing | 6 | 07/08/2026 |
| JTONIC DESIGN & CONSTRUCT | General Contractor | 5 | 07/08/2026 |
| A + SPRINKLER CORP | Fire Protection | 5 | 07/08/2026 |
| DV PLUMBING INC | Plumbing | 5 | 07/08/2026 |
| METROPOLITAN OPERA ASSOCI | Electrical | 4 | 03/21/2026 |
| DARBY CONSTRUCTION SVC LL | General Contractor | 4 | 07/08/2026 |
| CAMENZULI, CARMINE | Electrical | 4 | 03/21/2026 |
| PFL MECHANICAL CORP | Plumbing | 4 | 07/08/2026 |
| GRUSHINSKY PIPNG & HTG IN | Fire Protection | 4 | 07/08/2026 |
| NYC DISTRICT COUNCIL OF C | Electrical | 4 | 03/21/2026 |
| ON POINT ELECTRIC INC | Electrical | 3 | 03/22/2026 |
| TRISTATE PLBG SVCS CORP | Fire Protection | 3 | 07/08/2026 |
| PSI PARTNERS, LLC | Fire Protection | 3 | 07/08/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 3 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ASSURE PROFESSIONAL ENGIN | 6962 | 6 | 07/08/2026 |
| SONI ENGINEERING CONSULTI | 9819 | 1 | 06/22/2026 |
| CROSSCHECK INSPECTION SER | 544 | 12 | 03/19/2026 |
| WEI STUDIO | 7998 | 7 | 11/05/2025 |
| JOSEPH MARTINES PE, PLLC | 1428 | 133 | 06/30/2025 |
| NKM ENGINEERING PLLC | 6244 | 2 | 02/24/2025 |
| SOCOTEC ENGINEERING | 4983 | 1 | 12/04/2023 |
| SOCOTEC, INC. | 301 | 3 | 06/26/2023 |
| MILROSE CONSULTANTS LLC | 2003 | 2 | 04/25/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Suspended Scaffold | Permit Issued | DEMARI SERVICES INC | 06/25/2026 |
| DOB NOW | Sprinklers | Signed-off | A PLUS PLUMBING CORP | 04/23/2026 |
| DOB NOW | Plumbing | Permit Issued | BEDROCK PLBG. & HTG., INC | 04/21/2026 |
| DOB NOW | Sprinklers | Signed-off | ACCESS PLUMBING CORP | 04/14/2026 |
| DOB NOW | Structural | Permit Issued | A.W. & S. CONSTRUCTION CO | 03/30/2026 |
| DOB NOW | General Construction | Permit Issued | A.W. & S. CONSTRUCTION CO | 03/30/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | A.W. & S. CONSTRUCTION CO | 03/30/2026 |
| DOB NOW | Plumbing | Signed-off | ACCESS PLUMBING CORP | 12/04/2025 |
| DOB NOW | Plumbing | Signed-off | JAMES CRUZ | 12/02/2025 |
| DOB NOW | Mechanical Systems | Signed-off | DARBY CONSTRUCTION SVC LL | 12/01/2025 |
| DOB NOW | Sprinklers | Signed-off | ALLSTATE SPRINKLER LLC | 12/01/2025 |
| DOB NOW | General Construction | Signed-off | DARBY CONSTRUCTION SVC LL | 11/25/2025 |
| DOB NOW | Sprinklers | Signed-off | UNIVERSAL FIRE SPR LLC | 10/22/2025 |
| DOB NOW | Plumbing | Signed-off | METROTECH MECHANICAL CORP | 10/01/2025 |
| DOB NOW | Mechanical Systems | Signed-off | DARBY CONSTRUCTION SVC LL | 09/30/2025 |
| DOB NOW | General Construction | Signed-off | DARBY CONSTRUCTION SVC LL | 09/25/2025 |
| DOB NOW | Sprinklers | Signed-off | A + SPRINKLER CORP | 09/12/2025 |
| DOB NOW | Structural | Signed-off | A.W. & S. CONSTRUCTION CO | 09/12/2025 |
| DOB NOW | General Construction | Permit Issued | ARCHSTONE BUILDERS LLC | 09/10/2025 |
| DOB NOW | Mechanical Systems | Signed-off | A.W. & S. CONSTRUCTION CO | 09/08/2025 |
| DOB NOW | Plumbing | Signed-off | FLUID MECHANICS CORP | 09/08/2025 |
| DOB NOW | General Construction | Signed-off | A.W. & S. CONSTRUCTION CO | 09/08/2025 |
| DOB NOW | Plumbing | Signed-off | M&D FIRE SPRINKLER INC | 08/15/2025 |
| DOB NOW | Sprinklers | Signed-off | M&D FIRE SPRINKLER INC | 08/15/2025 |
| DOB NOW | Plumbing | Signed-off | PFL MECHANICAL CORP | 07/15/2025 |
| DOB NOW | Sprinklers | Signed-off | GRUSHINSKY PIPNG & HTG IN | 07/08/2025 |
| DOB NOW | Mechanical Systems | Signed-off | A.W. & S. CONSTRUCTION CO | 07/01/2025 |
| DOB NOW | General Construction | Signed-off | PHASE 3 INTERIORS LLC | 07/01/2025 |
| DOB NOW | Mechanical Systems | Signed-off | PHASE 3 INTERIORS LLC | 07/01/2025 |
| DOB NOW | General Construction | Signed-off | A.W. & S. CONSTRUCTION CO | 06/26/2025 |
| DOB NOW | General Construction | Signed-off | A.W. & S. CONSTRUCTION CO | 06/26/2025 |
| DOB NOW | General Construction | Signed-off | A.W. & S. CONSTRUCTION CO | 06/26/2025 |
| DOB NOW | Sprinklers | Signed-off | GREGG NY PLUMBING, INC | 06/01/2025 |
| DOB NOW | Mechanical Systems | Signed-off | UNISOL INC | 05/28/2025 |
| DOB NOW | General Construction | Signed-off | UNISOL INC | 05/13/2025 |
| DOB NOW | Structural | Signed-off | UNISOL INC | 05/13/2025 |
| DOB NOW | Mechanical Systems | Signed-off | UNISOL INC | 05/13/2025 |
| DOB NOW | General Construction | Signed-off | MONUMENTAL CONSTRUCTION * | 04/23/2025 |
| DOB NOW | Mechanical Systems | Signed-off | MONUMENTAL CONSTRUCTION * | 04/23/2025 |
| DOB NOW | Sprinklers | Signed-off | A + SPRINKLER CORP | 04/04/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/08/2026 | Permit Issued | A.W. & S. CONSTRUCTION CO | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Trane PEFY-P318NMAU-E5 18,000 BTU · Vrf Indoor ×4 PEFY-P08NMAU-E4 8,000 BTU · Vrf Indoor ×3 PEFY-P12NMAU-E4 12,000 BTU · Vrf Indoor ×3 PLFY-P08NFMU-ER1.TH 8,000 BTU · Vrf Indoor ×2 PEFY-15NMAU-E4 15,000 BTU · Vrf Indoor ×1 PEFY-P24NMAU-E4 24,000 BTU · Vrf Indoor ×1 PEFY-P24NMHU-E2 24,000 BTU · Vrf Indoor ×1 PEFY-P27NMAU-E4 27,000 BTU · Vrf Indoor ×1 PEFY-P30NMAU-E5 30,000 BTU · Vrf Indoor ×1 PEFY-P36NMHU-E2 36,000 BTU · Vrf Indoor ×1 Mitsubishi Electric PUHY-EP120TNU-A1 120,000 BTU · Vrf Outdoor ×1 PUHY-EP192TSNU-A1 192,000 BTU · Vrf Outdoor ×1 |
| 11/25/2025 | Signed-off | DARBY CONSTRUCTION SVC LL | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric MXZ-SM36NL 36,000 BTU · Condensing Unit ×1 PEFY-L24NMAU-A 24,000 BTU · Vrf Indoor ×1 PLFY-L18NFMU-A 18,000 BTU · Vrf Indoor ×1 Ventilation Greenheck CSP-A510-VG 100 CFM · Exhaust Fan ×1 |
| 11/05/2025 | Permit Issued | JTONIC DESIGN & CONSTRUCT | Heating Systems | Heating Warren Technology SL15T 100,000 BTU · Electric Heater ×1 |
| 09/09/2025 | Signed-off | A.W. & S. CONSTRUCTION CO | Ventilation Systems | Ventilation Greenheck SP-A710 -VG 400 CFM · Exhaust Fan ×4 CSP-A1050 -VG 800 CFM · Exhaust Fan ×1 CSP-A710 -VG 400 CFM · Exhaust Fan ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/08/2026 | Signed-off | A PLUS PLUMBING CORP | 345 heads |
| 11/25/2025 | Signed-off | ALLSTATE SPRINKLER LLC | 32 heads |
| 11/05/2025 | Permit Issued | CMP PIPING INC | Sprinkler System |
| 09/09/2025 | Signed-off | A + SPRINKLER CORP | 533 heads |
| 10/07/2019 | Signed-off | AQUEDUCT MECHANICAL CORP | 214 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/08/2026 | Permit Issued | BEDROCK PLUMBING & HEATING INC | Water/Sanitary |
| 11/25/2025 | Signed-off | SHAW MECHANICAL INC | Water/Sanitary |
| 11/05/2025 | Signed-off | LG ELITE PLUMBING INC | Water/Sanitary |
| 09/09/2025 | Signed-off | FLUID MECHANICS CORP | — |
| 10/07/2019 | Signed-off | AQUEDUCT MECHANICAL CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/15/2026 | Complete | CROSSWIRE ELECTRICAL INC | General Wiring |
| 03/24/2026 | Permit Issued | VALENTIS ELECTRIC, INC. | General Wiring |
| 12/08/2025 | Complete | VALENTIS ELECTRIC, INC. | General Wiring |
| 10/02/2025 | Complete | VALENTIS ELECTRIC, INC. | General Wiring |
| 09/02/2025 | Permit Issued | A2K ELECTRIC CORP | General Wiring |
| 06/30/2025 | Complete | VALENTIS ELECTRIC, INC. | General Wiring |
| 05/14/2025 | Complete | TIKVAH ELECTRIC CO, INC. | General Wiring |
| 03/11/2025 | Permit Issued | GMC ELECTRICAL INC | General Wiring |
| 11/19/2024 | Complete | GOODALL ELECTRIC CORP | — |
| 07/31/2024 | Complete | MRD ELEC'L SERVICES, INC | General Wiring |
| 07/16/2024 | Permit Issued | DENMAR ELECTRIC CORP | General Wiring |
| 06/19/2024 | Complete | VALENTIS ELECTRIC, INC. | General Wiring |
| 04/23/2024 | Complete | VALENTIS ELECTRIC, INC. | General Wiring |
| 03/23/2024 | Complete | VALENTIS ELECTRIC, INC. | General Wiring |
| 12/21/2023 | Permit Issued | ELECTL CONTG SOLUTIONS CO | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/08/2026 | Signed-off | A PLUS PLUMBING CORP | Steel, Concrete |
| 09/09/2025 | Signed-off | A + SPRINKLER CORP | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/05/2025 | Permit Issued | JTONIC DESIGN & CONSTRUCT | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/22/2026 | Permit Issued | TOWER SERVICES INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/01/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/01/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/31/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/31/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/27/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/26/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/26/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/23/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/17/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/17/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/17/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/12/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/11/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/05/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/19/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/18/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/13/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/14/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/30/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/23/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/02/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 11/05/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/05/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/10/2026 | Fire-Resistant Penetrations and Joints | GUNJAN KHANDWALA | special |
| 07/10/2026 | Sprinkler Systems | GUNJAN KHANDWALA | special |
| 07/10/2026 | Final | MICHAEL KAZAZIS | progress |
| 07/10/2026 | Fire-Resistance Rated Construction | GUNJAN KHANDWALA | progress |
| 07/07/2026 | Final | MICHAEL KAZAZIS | progress |
| 07/07/2026 | Fire-Resistant Penetrations and Joints | GUNJAN KHANDWALA | special |
| 07/07/2026 | Fire-Resistance Rated Construction | GUNJAN KHANDWALA | progress |
| 07/07/2026 | Sprinkler Systems | GUNJAN KHANDWALA | special |
| 06/03/2026 | Alternative Materials - OTCR Buildings Bulletin Number | nayan soni | special |
| 06/03/2026 | Post-installed Anchors | nayan soni | special |
| 06/03/2026 | Structural Stability – Alterations of existing buildings | nayan soni | special |
| 03/23/2026 | Sprayed fire-resistant materials | GUNJAN KHANDWALA | special |
| 03/23/2026 | Concrete - Cast-In-Place | GUNJAN KHANDWALA | special |
| 03/23/2026 | Structural Steel - High Strength Bolting | GUNJAN KHANDWALA | special |
| 03/23/2026 | Structural Stability – Alterations of existing buildings | GUNJAN KHANDWALA | special |
| 03/23/2026 | Structural Steel - Welding | GUNJAN KHANDWALA | special |
| 03/23/2026 | Structural Steel - Details | GUNJAN KHANDWALA | special |
| 03/20/2026 | HVAC-R and service water heating system controls | EUGENE BIFULCO | energy_progress |
| 03/20/2026 | Energy Code Compliance Inspections | EUGENE BIFULCO | progress |
| 03/20/2026 | Lighting controls | EUGENE BIFULCO | energy_progress |
| 03/20/2026 | Post-installed Anchors | EUGENE BIFULCO | special |
| 03/20/2026 | HVAC-R and service water heating equipment | EUGENE BIFULCO | energy_progress |
| 03/20/2026 | Final | EUGENE BIFULCO | progress |
| 03/20/2026 | Maintenance information | EUGENE BIFULCO | energy_progress |
| 03/20/2026 | Mechanical Systems | EUGENE BIFULCO | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Gabriel Capital | Office | Floor 17 | Project M01363996 |
| Oak North Bank | Office | Floors 4, 6, 8 | Project M01287375 Project M08049879 Project M08049897 Project M00234760 Project M00228802 |
| General Consulate of ROK | Office | Floor 5 | Project M01265934 |
| Phenix | Office | Floor 10 | Project M01245419 |
| Arbol | Office | Floor 6 | Project M01199759 |
| NextG Art Gallery | Retail | Cellar, Ground | Project M01115924 |
| CDIB. Jesselson. & Chasbro | Office | Floor 16 | Project M01065184 |
| Steinhardt/Cremieux/SurvivorNet | Office | Floor 8 | Project M01021071 |
| Essex Capital | Office | Floor 7 | Project M00968722 |
| F.L. Putnam | Office | Floor 6 | Project M00939745 |
| TriArtisan Capital Advisors | Office | Floor 17 | Project M00928585 |
| Heritage Auctions | Other | Sub-cellar, Cellar, Ground, Floor 1 | Project M00927494 Project M00927353 Project M00572854 Project M00572856 Project M00572858 Project M00553292 Project M00553328 |
| Novita Pharmaceuticals | Office | Floor 19 | Project M00858322 Project M00858314 |
| International Workplace Group | Office | Floor 9 | Project M00830043 |
| Somerset | Office | Floor 7 | Project M08038865 |
| Damaghi | Office | Floors 21, 22 | Project M08028673 |
| Further Global | Office | Floors 14, 15 | Project M00798048 |
| Elion Partners | Office | Floor 7 | Project M00751903 Project M00751936 |
| Oberon | Office | Floor 4 | Project M00664401 |
| Eden Capital | Office | Floor 5 | Project M00615617 |
| Eden Capital Realty | Office | Floor 5 | Project M00615613 |
| Eden Global Partners | Office | Floor 5 | Project M00615608 |
| Phenix Circle Realty | Office | Floor 10 | Project M00558871 |
| Vectra Capital | Office | Floor 10 | Project M00461619 |
| Gabriel & Standish | Office | Floor 17 | Project M00319214 |
| 22C Capital | Office | Floor 13 | Project M00326718 Project M00326799 |