← Back
BuildNYC
Home for indigent children, aged, homeless
4499 MANHATTAN COLLEGE PARKWAY
BRONX · BIN 2084228
💬 Discuss this project
1928Year Built
5Stories
N2Building Class
R4Zoning
135,135 sfGross Floor Area
1Units
LL97 Covered0 Active ViolationsFDNY Report ↗
Home for indigent children, aged, homeless · Owner of record: Methodist Church Home · 65,750 sf lot · 2.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMethodist Home for Nursing and Rehabilitation, J.C. & Engine20p · 2 filings · 5 docs
BulkheadThe Rogosin Institute at Dialysis Separation1p · 1 filing · 4 docs
Floor 5Methodist Home for Nursing and Rehabilitation, J.C. & Engine34p · 6 filings · 15 docs
Floor 4Methodist Home for Nursing and Rehabilitation, J.C. & Engine34p · 6 filings · 15 docs
Floor 3Methodist Home for Nursing and Rehabilitation, J.C. & Engine35p · 6 filings · 15 docs
Floor 2Methodist Home for Nursing and Rehabilitation, J.C. & Engine54p · 9 filings · 18 docs
Floor 1Methodist Home for Nursing and Rehabilitation, J.C. & Engine71p · 8 filings · 15 docs
CellarJ.C. & Engineering17p · 3 filings · 8 docs
BasementThe Rogosin Institute at Dialysis Separation1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The Rogosin Institute203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Built Engineers, P. C201/14/2025
Gilsanz Murray Steficek102/02/2024
Steven Leone201/15/2024
Key Civil Engineering103/03/2023
Costa Arch & Engineering306/24/2022
JFK Associates404/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants703/21/2026
Costa603/21/2026
CSR Expediters203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Central Consulting & ContGeneral Contractor1607/08/2026
Aljer Plumbing & HeatingPlumbing407/08/2026
Aljer Plumbing & HeatingFire Protection307/08/2026
Capital Contracting P&HPlumbing307/08/2026
New Age Electrical ContractingElectrical203/21/2026
Capital Contracting P & HFire Protection207/08/2026
Capital Contracting P HPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Built Engineers8962201/14/2025
Gilsanz Murray Steficek240202/02/2024
Costa Architects & Engineering1321306/24/2022
Special Testing & Consulting1688404/23/2021
Building Lifecycle
All (112)Filed (13)Permit Issued (23)Signed Off (10)Violation (38)Inspection (11)Special Inspection (17)
09/08/2025
Violation issued (FDNY_ORDER, closed)
05/22/2025
Signed off — Alteration
REPLACE CONCRETE RAMP AND HANDRAILS FOR THE ENTRANCE TO THE EXISTING PARKING GARAGE ON 2ND FLOOR AS PER PLANS FILED HEREWITH, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X00974164-I1
05/06/2025
Signed off — Alteration
INSTALLATION OF SPRINKLER PIPING, HEADS, AND APPURTANCES AT FIRST FLOOR GARAGE. TIE INTO EXISTING BUILDING SPRINKLER SYSTEM.
X01049513-I1
02/26/2025
Signed off — Alteration
STRUCTURAL FRAMING AND CONCRETE RAMP CONSTRUCTION FOR THE OPEN GARAGE ON 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X00995939-I1
01/15/2025
Special inspection requirement — Sprinkler Systems
David Brinkman
01/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Brinkman
01/14/2025
Filed — Alteration
INSTALLATION OF SPRINKLER PIPING, HEADS, AND APPURTANCES AT FIRST FLOOR GARAGE. TIE INTO EXISTING BUILDING SPRINKLER SYSTEM.
X01049513-P1
01/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Brinkman
01/09/2025
Special inspection requirement — Sprinkler Systems
David Brinkman
12/09/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/05/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/21/2024
Signed off — Alteration
Removal of existing stormwater trench drain and installation of the new inlet with associated underground stormwater piping. All work is outside the building.
X00829140-I1
11/19/2024
Permit issued — Sprinklers
X01049513-I1-EW-SP
10/24/2024
Violation issued (ECB, closed)
Construction
10/22/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/17/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/02/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/26/2024
Permit issued — Sprinklers
X01049513-I1-EW-SP
09/25/2024
Permit issued — Plumbing
X00829140-I1-PL
09/23/2024
Violation issued (FDNY_ORDER, closed)
09/23/2024
Violation issued (FDNY_ORDER, closed)
09/23/2024
Violation issued (FDNY_ORDER, closed)
07/22/2024
Filed — Alteration
INSTALLATION OF SPRINKLER PIPING, HEADS, AND APPURTANCES AT FIRST FLOOR GARAGE. TIE INTO EXISTING BUILDING SPRINKLER SYSTEM.
X01049513-I1
07/03/2024
Permit issued — General Construction
X00974164-I1-GC
07/02/2024
Permit issued — Structural
X00995939-I1-ST
02/22/2024
Permit issued — Structural
X00995939-I1-ST
02/07/2024
Permit issued — General Construction
X00974164-I1-GC
02/02/2024
Filed — Alteration
STRUCTURAL FRAMING AND CONCRETE RAMP CONSTRUCTION FOR THE OPEN GARAGE ON 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X00995939-I1
01/25/2024
Special inspection requirement — Structural Steel - Welding
Philip Murray
01/25/2024
Special inspection requirement — Post-installed Anchors
Philip Murray
01/25/2024
Special inspection requirement — Sprayed fire-resistant materials
Philip Murray
01/25/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Philip Murray
01/25/2024
Special inspection requirement — Final
Philip Murray
01/25/2024
Special inspection requirement — Structural Steel - Details
Philip Murray
01/25/2024
Special inspection requirement — Concrete - Cast-In-Place
Philip Murray
01/15/2024
Filed — Alteration
REPLACE CONCRETE RAMP AND HANDRAILS FOR THE ENTRANCE TO THE EXISTING PARKING GARAGE ON 2ND FLOOR AS PER PLANS FILED HEREWITH, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
X00974164-I1
01/12/2024
Signed off — Alteration
PLUMBING FIXTURES INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OROCCUPANCY
X00401460-I1
12/08/2023
Special inspection requirement — Final
STEVEN LEONE
12/08/2023
Special inspection requirement — Concrete - Cast-In-Place
Philip Murray
11/30/2023
Permit issued — Plumbing
X34243545-I1-PL
11/27/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/12/2023
Permit issued — Plumbing
X11205520-I1-PL
06/21/2023
Signed off — Alteration
X00457968-I1
05/01/2023
Signed off — Alteration
SPRINKLER HEADS REMOVAL, RELOCATION AND INSTALLATION AS PER PLANS FILEDHEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
X00427440-I1
03/13/2023
Permit issued — Sprinklers
X00427440-I1-EW-SP
03/03/2023
Filed — Alteration
Removal of existing stormwater trench drain and installation of the new inlet with associated underground stormwater piping. All work is outside the building.
X00829140-I1
02/27/2023
Signed off — Alteration
AC UNITS INSTALLATION AND ASSOCIATED DUCT WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
X00427473-I1
07/29/2022
Signed off — Alteration
Herewith filing application to supersede proposed work under application # 200119585 for sign - off purposes only.
X00523905-I1
07/12/2022
Permit issued — Sprinklers
X00427440-I1-EW-SP
06/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Antonio
06/24/2022
Filed — Alteration
Herewith filing application to supersede proposed work under application # 200119585 for sign - off purposes only.
X00523905-P1
06/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Antonio
06/23/2022
Permit issued — General Construction
X00457968-I1-GC
06/23/2022
Permit issued — Mechanical Systems
X00427473-I1-MS
04/12/2022
Permit issued — Mechanical Systems
X00427473-I1-MS
03/23/2022
Permit issued — Plumbing
X00401460-I1-PL
02/18/2022
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
02/11/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offCapital Contracting P & H11/19/2024
DOB NOWSprinklersSigned-offCapital Contracting P & H09/26/2024
DOB NOWPlumbingSigned-offCapital Contracting P&H09/25/2024
DOB NOWGeneral ConstructionSigned-offCentral Consulting & Cont07/03/2024
DOB NOWStructuralSigned-offCentral Consulting & Cont07/02/2024
DOB NOWStructuralSigned-offCentral Consulting & Cont02/22/2024
DOB NOWGeneral ConstructionSigned-offCentral Consulting & Cont02/07/2024
DOB NOWPlumbingSigned-offCapital Contracting P&H11/30/2023
DOB NOWPlumbingSigned-offCapital Contracting P&H10/12/2023
DOB NOWSprinklersSigned-offAljer Plumbing & Heating03/13/2023
DOB NOWSprinklersSigned-offAljer Plumbing & Heating07/12/2022
DOB NOWGeneral ConstructionSigned-offCentral Consulting & Cont06/23/2022
DOB NOWMechanical SystemsSigned-offCentral Consulting & Cont06/23/2022
DOB NOWMechanical SystemsSigned-offCentral Consulting & Cont04/12/2022
DOB NOWPlumbingSigned-offAljer Plumbing & Heating03/23/2022
DOB NOWPlumbingSigned-offAljer Plumbing & Heating08/26/2021
DOB NOWMechanical SystemsSigned-offCentral Consulting & Cont07/21/2021
DOB NOWGeneral ConstructionSigned-offCentral Consulting & Cont06/18/2021
DOB NOWSprinklersSigned-offAljer Plumbing & Heating04/29/2021
DOB NOWPlumbingSigned-offAljer Plumbing & Heating04/20/2021
DOB NOWMechanical SystemsSigned-offCentral Consulting & Cont04/15/2021
DOB NOWMechanical SystemsSigned-offCentral Consulting & Cont03/31/2021
DOB NOWPlumbingSigned-offAljer Plumbing & Heating12/16/2020
BIS—ISSUEDCentral Consulting & Contracting06/28/2022
BIS—ISSUEDCentral Consulting & Contracting06/23/2021
BISOTISSUEDCentral Consulting & Cont06/16/2021
BISOTISSUEDCentral Consulting & Cont10/28/2020
BISPLISSUEDAljer Plumbing & Heating07/31/2020
BISOTISSUEDCity Signs07/28/2020
BISOTISSUEDCentral Consulting & Cont06/16/2020
BISMHISSUEDCentral Consulting & Cont06/16/2020
BISSPISSUEDAljer Plumbing & Heating03/19/2020
BISPLISSUEDAljer Plumbing & Heating12/10/2019
BISOTISSUEDCentral Consulting & Cont06/12/2019
BISMHISSUEDCentral Consulting & Cont06/12/2019
BISSPISSUEDAljer Plumbing & Heating01/15/2019
BISPLISSUEDAljer Plumbing & Heating11/13/2018
BISMHISSUEDCentral Consulting & Cont11/02/2018
BISOTISSUEDCentral Consulting & Cont11/02/2018
BISFSISSUEDManhattan Boiler & Equipment04/11/2013
+ 24 more permits on file
1 project · most recent 09/16/2025
General Wiring
FiledStatusContractorScope
09/16/2025CompleteNew Age Electrical ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/09/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/05/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/22/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/17/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/18/2022No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
02/11/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/07/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
01/15/2025Sprinkler SystemsDavid Brinkmanspecial
01/15/2025Fire-Resistant Penetrations and JointsDavid Brinkmanspecial
01/09/2025Fire-Resistant Penetrations and JointsDavid Brinkmanspecial
01/09/2025Sprinkler SystemsDavid Brinkmanspecial
01/25/2024Structural Steel - WeldingPhilip Murrayspecial
01/25/2024Post-installed AnchorsPhilip Murrayspecial
01/25/2024Sprayed fire-resistant materialsPhilip Murrayspecial
01/25/2024Structural Steel - High Strength BoltingPhilip Murrayspecial
01/25/2024FinalPhilip Murrayprogress
01/25/2024Structural Steel - DetailsPhilip Murrayspecial
01/25/2024Concrete - Cast-In-PlacePhilip Murrayspecial
12/08/2023FinalSTEVEN LEONEprogress
12/08/2023Concrete - Cast-In-PlacePhilip Murrayspecial
06/27/2022Fire-Resistant Penetrations and JointsPaul Antoniospecial
06/24/2022Fire-Resistant Penetrations and JointsPaul Antoniospecial
04/27/2021Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
04/21/2021Sprinkler SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Methodist Home for Nursing and RehabilitationMedical / HealthcareFloors 1–5, Roof
Project X01049513 Alteration · LOC Issued · 07/22/2024
Project X00974164 Alteration · LOC Issued · 01/15/2024
Project X00427440 Alteration · LOC Issued · 12/10/2020
Project X00401460 Alteration · LOC Issued · 09/23/2020
Project X00427473 Alteration · LOC Issued · 11/25/2020
J.C. & EngineeringOtherCellar, Floors 1–5, Roof
Project X00523905 Alteration · LOC Issued · 05/27/2021
Project X00523914 Alteration · LOC Issued · 05/26/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 458 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch8
08/25/2026X00523914-I1Request digital key ↗
08/24/2026X00523905-I1Request digital key ↗
08/24/2026X00523905-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
08/25/2026X00427440-I1Request digital key ↗
08/15/2026X00427440-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/25/2026X00457968-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/26/2026X00401460-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/25/2026X00427473-I1Request digital key ↗
▸Applications & Permits88
▸BISPLAN / WORK APPROVAL APPLICATION48
10/28/2025220736675Open ↗
10/23/2025220736675Open ↗
04/05/2023240344999Open ↗
Showing 3 of 48 on file for this type
▸BISWORK PERMIT APPLICATION32
07/06/2022220736675Open ↗
06/23/2021220736675Open ↗
10/28/2020240284349Open ↗
Showing 3 of 32 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
05/17/2021220736675Open ↗
05/14/2020220628088Open ↗
05/05/2020220628088Open ↗
Showing 3 of 4 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/07/2023220736675Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/07/2023220736675Open ↗
▸Seals & Professional Certifications100
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION52
02/25/2019220628088Open ↗
11/05/2018220628088Open ↗
11/05/2018220628088Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/25/2026X00427473-I1Open ↗
08/25/2026X00427440-P1Open ↗
08/25/2026X00427440-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/29/2026X00995939-I1Open ↗
09/29/2026X00995939-I1Open ↗
09/29/2026X00995939-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/05/2023240344999Open ↗
09/01/2020240284349Open ↗
06/01/2020240274065Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
10/23/2018220674063Open ↗
Showing 1 of 4 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/05/2023240344999Open ↗
09/01/2020240284349Open ↗
06/01/2020240274065Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
04/05/2023240344999Open ↗
09/01/2020240284349Open ↗
06/01/2020240274065Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/29/2026X00995939-I1Open ↗
09/23/2026X00974164-I1Open ↗
▸Trade Schedules & Equipment49
▸BISSELF-CERT PLUMBING NOTICE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISEQUIPMENT USE PERMITS8
11/12/2020220628088Open ↗
11/12/2020220628088Open ↗
09/18/2013220065989Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING7
09/18/2020220628088Open ↗
05/11/2020220628088Open ↗
04/17/2020220628097Open ↗
Showing 3 of 7 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION6
06/15/2021220736675Open ↗
Showing 1 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
03/12/2015220232512Open ↗
Showing 1 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
11/12/2020220628088Open ↗
09/18/2013220065989Open ↗
09/18/2013220065989Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
01/10/2024220628818Open ↗
05/30/2014220065998Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/18/2017220628088Open ↗
12/15/2017220628097Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes3
10/23/2018220674063Open ↗
12/15/2017220628088Open ↗
12/15/2017220628097Open ↗
▸BISSTREET TREE CHECKLIST1
03/22/2021220736675Open ↗
▸BISSTREET TREE SIGNOFF1
06/07/2023220736675Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/21/2021220736675Open ↗
▸Environmental & Asbestos21
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)4
08/01/2022220065998Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/25/2026X00427473-I1Open ↗
08/25/2026X00427440-I1Open ↗
08/25/2026X00457968-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP FORM V5 - ASBESTOS VARIANCE2
01/15/2019220628097Open ↗
11/05/2018220628088Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/01/2020240274065Open ↗
10/23/2018220674063Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORM PRIOR TO SIGN OFF: TRU6126BX182
03/04/2021220628097Open ↗
10/30/2020220628088Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
10/28/2020240284349Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
02/27/2023240284349Open ↗
03/22/2021220736675Open ↗
10/30/2020220628088Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
11/05/2018220628088Open ↗
11/05/2018220628088Open ↗
10/23/2018220674063Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
02/27/2023240284349Open ↗
10/30/2020220628088Open ↗
09/06/2016220232512Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
04/05/2023240344999Open ↗
09/01/2020240284349Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00523914-I1Open ↗
08/13/2026X00457968-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/07/2023220736675Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY10
02/27/2023240284349Open ↗
02/27/2023240284349Open ↗
03/22/2021220736675Open ↗
Showing 3 of 10 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS6
10/19/2018220628097Open ↗
10/19/2018220628097Open ↗
10/19/2018220628097Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs59
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
01/12/2024220628818Open ↗
03/02/2023240284349Open ↗
08/01/2022220065998Open ↗
Showing 3 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION15
06/18/2021220736675Open ↗
03/03/2021220736675Open ↗
03/03/2021220736675Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/25/2026X00427440-I1Open ↗
08/25/2026X00427440-P1Open ↗
08/25/2026X00457968-I1Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
05/21/2021220736675Open ↗
05/19/2021220736675Open ↗
03/22/2021220736675Open ↗
▸BISBSA-CPC APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
10/29/2020240274065Open ↗
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT30
01/11/2024220628818Open ↗
04/05/2023240344999Open ↗
02/27/2023240284349Open ↗
Showing 3 of 30 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/07/2023220736675Open ↗
▸Filing & Intake Forms38
▸BISADDITIONAL INFORMATION18
05/05/2020220628088Open ↗
05/05/2020220628088Open ↗
05/04/2020220628097Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING COVER SHEET14
03/03/2021220736675Open ↗
10/23/2018220674063Open ↗
12/18/2017220628088Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM3
07/06/2022220736675Open ↗
03/03/2021220736675Open ↗
11/12/2020220628088Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
04/05/2023240344999Open ↗
09/01/2020240284349Open ↗
06/01/2020240274065Open ↗
▸Other Documents13
▸BISDRY PIPE VALVE TEST : FP-106
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSupporting Document: Fee Exempt4
03/22/2021220736675Open ↗
05/05/2020220628088Open ↗
05/04/2020220628097Open ↗
Showing 3 of 4 on file for this type
▸BISLAA - Supporting Documentation1
12/18/2017220628088Open ↗
▸BISPLOT DIAGRAM1
03/22/2021220736675Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
09/01/2020240284349Open ↗