← Back
Office with commercial, 1-6 stories
45-18 COURT SQUARE
QUEENS · BIN 4441059
💬 Discuss this project
1920Year Built
6Stories
O5Building Class
M1-5/R7-3Zoning
213,103 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: 45-18 COURT SQUARE LLC · 36,875 sf lot · 5.78 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalGeneralOther
Roof11p · 7 filings · 20 docs
Penthouse6p · 5 filings · 20 docs
Floor 52p · 1 filing · 20 docs
Floor 4
Floor 3
Floor 22p · 3 filings · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar2p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KING STREET PROPERTIES20307/08/2026
ROCK GROUP NY4107/08/2026
TRIDENT GENERAL CONTRACTING907/08/2026
GFP REAL ESTATE307/08/2026
AVARGA CONSTRUCTION404/09/2026
RC3 ELECTRIC504/09/2026
HVAC CONSTRUCTION INC503/22/2026
SPRING SCAFFOLDING LLC503/22/2026
45-18 COURT SQUARE2803/22/2026
PAVARINI MCGOVERN4003/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.21603/21/2026
A1 EXPEDITING SERVICE403/21/2026
AE DESIGN SOLUTION403/21/2026
BUILDING BROTHERS403/21/2026
JMG CONSULTANTS203/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
GREEN STUDIO2603/21/2026
HIGHRISE GROUP NYC, INC203/21/2026
LOMBARDO BUILDING CONSULTANTS203/21/2026
AVARGA CONSTRUCTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PAVARINI MCGOVERN LLCGeneral Contractor5507/08/2026
STAT FIRE SPRINKLER NYC CFire Protection1907/08/2026
ROCK GROUP NY CORPGeneral Contractor1503/21/2026
SAFWAY ATLANTIC, LLCGeneral Contractor1007/08/2026
TRIDENT GENERAL CONTRACTGeneral Contractor807/08/2026
TRISTATE PLBG SVCS CORPPlumbing607/08/2026
J.E.S. PLBG & HTG CORPPlumbing407/08/2026
FRANKIE PLBG & HTG L.L.CPlumbing407/08/2026
LONG ISLAND CONCRETE INCGeneral Contractor307/08/2026
ALLIANCE PLUMBING CORPPlumbing307/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor307/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor303/21/2026
SPRING SCAFFOLDING LLCGeneral Contractor303/21/2026
ACTIVE SIGNSScaffold207/08/2026
CARDOZA PLUMBING CORPPlumbing207/08/2026
GRAMERCY GROUP, INCGeneral Contractor207/08/2026
PARKVIEW P&H INCPlumbing107/08/2026
AVARGA CONSTRUCTION CORPGeneral Contractor104/09/2026
AMP COMMUNICATIONS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ATLAS ATC ENGINEERING INC80112409/19/2025
ATLANTIC ENGINEERINGLABOR13817807/08/2024
Building Lifecycle
All (300)Filed (73)Permit Issued (62)Signed Off (39)Violation (41)Inspection (50)Objection (5)Special Inspection (30)
02/19/2026
Signed off — Alteration
Q01356357-I1
02/18/2026
Permit issued — Sidewalk Shed
Q01356357-I1-SH
02/17/2026
Signed off — Alteration
T-Mobile: Relocate antenna sectors, install kickbacks, remove equipment platform with cabinets and related dunnage, and install new equipment platform with cabinets on the roof. All work is in compliance with TPPN 5/98. No change in use/egress/occupancy
Q01124795-I1
02/16/2026
Signed off — Alteration
Q01279116-I1
02/12/2026
Violation issued (FDNY_ORDER, closed)
02/12/2026
Violation issued (FDNY_ORDER, closed)
02/12/2026
Violation issued (FDNY_ORDER, closed)
02/12/2026
Violation issued (FDNY_ORDER, closed)
02/12/2026
Violation issued (FDNY_ORDER, closed)
02/05/2026
Filed — Alteration
Q01356357-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/07/2025
Signed off — Alteration
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Q01164725-I1
10/09/2025
Signed off — Alteration
Modification to Sprinkler System and Plumbing Fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Q01164733-I1
10/08/2025
Permit issued — Suspended Scaffold
Q01279116-I1-SC
10/03/2025
Signed off — Alteration
Installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Q01163731-I1
09/19/2025
Filed — Alteration
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Q01164725-P2
09/16/2025
Inspection — Certified Medical Gas - MG - PL - Finish
Certified
View inspection ↗
09/16/2025
Inspection — Certified Medical Gas - MG - PL - Roughing
Certified
View inspection ↗
09/16/2025
Inspection — Certified Medical Gas - MG - PL - Test
Certified
View inspection ↗
09/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/05/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/02/2025
Permit issued — Suspended Scaffold
Q01279116-I1-SC
09/02/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/28/2025
Filed — Alteration
Q01279116-I1
08/20/2025
Signed off — Alteration
Q01154306-I1
08/19/2025
Signed off — Alteration
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Q01154287-I1
08/06/2025
Signed off — Alteration
Q01153615-I1
06/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
06/11/2025
Special inspection requirement — Final
Robert Goodwin
06/10/2025
Filed — Alteration
Installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Q01163731-P1
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
06/10/2025
Special inspection requirement — Sprinkler Systems
RONALD GRAPIN
06/10/2025
Special inspection requirement — Post-installed Anchors
RONALD GRAPIN
06/09/2025
Filed — Alteration
Modification to Sprinkler System and Plumbing Fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Q01164733-P1
06/04/2025
Filed — Alteration
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Q01164725-P1
05/15/2025
Special inspection requirement — Final
RONALD GRAPIN
05/15/2025
Special inspection requirement — Mechanical Systems
RONALD GRAPIN
05/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
RONALD GRAPIN
05/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
RONALD GRAPIN
05/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RONALD GRAPIN
05/14/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONALD GRAPIN
05/14/2025
Special inspection requirement — Final
Robert Goodwin
03/26/2025
Permit issued — Antenna
Q01124795-I1-AN
03/03/2025
Permit issued — Sprinklers
Q01164733-I1-EW-SP
03/03/2025
Permit issued — Sprinklers
Q01154306-I1-EW-SP
02/28/2025
Permit issued — Sprinklers
Q01164733-I1-PL
02/28/2025
Permit issued — Sprinklers
Q01154306-I1-PL
02/18/2025
Permit issued — Mechanical Systems
Q01164725-I1-MS
02/11/2025
Permit issued — General Construction
Q01163731-I1-GC
02/11/2025
Permit issued — General Construction
Q01153615-I1-GC
02/10/2025
Permit issued — Mechanical Systems
Q01154287-I1-MS
02/05/2025
Filed — Alteration
T-Mobile: Relocate antenna sectors, install kickbacks, remove equipment platform with cabinets and related dunnage, and install new equipment platform with cabinets on the roof. All work is in compliance with TPPN 5/98. No change in use/egress/occupancy
Q01124795-I1
02/05/2025
Filed — Alteration
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Q01164725-I1
02/05/2025
Filed — Alteration
Installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Q01163731-I1
02/04/2025
Filed — Alteration
Modification to Sprinkler System and Plumbing Fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Q01164733-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offAVARGA CONSTRUCTION CORP02/18/2026
DOB NOWSuspended ScaffoldSigned-offPPM TELECOM LLC10/08/2025
DOB NOWSuspended ScaffoldSigned-offPPM TELECOM LLC09/02/2025
DOB NOWAntennaSigned-offAMP COMMUNICATIONS LLC03/26/2025
DOB NOWSprinklersSigned-offSTAT FIRE SPRINKLER NYC C03/03/2025
DOB NOWSprinklersSigned-offSTAT FIRE SPRINKLER NYC C03/03/2025
DOB NOWSprinklersSigned-offTRISTATE PLBG SVCS CORP02/28/2025
DOB NOWSprinklersSigned-offTRISTATE PLBG SVCS CORP02/28/2025
DOB NOWMechanical SystemsSigned-offPAVARINI MCGOVERN LLC02/18/2025
DOB NOWGeneral ConstructionSigned-offPAVARINI MCGOVERN LLC02/11/2025
DOB NOWGeneral ConstructionSigned-offPAVARINI MCGOVERN LLC02/11/2025
DOB NOWMechanical SystemsSigned-offPAVARINI MCGOVERN LLC02/10/2025
DOB NOWMechanical SystemsSigned-offPAVARINI MCGOVERN LLC04/10/2024
DOB NOWGeneral ConstructionSigned-offPAVARINI MCGOVERN LLC04/10/2024
DOB NOWSprinklersSigned-offSTAT FIRE SPRINKLER NYC C01/12/2024
DOB NOWPlumbingSigned-offTRISTATE PLBG SVCS CORP01/08/2024
DOB NOWStructuralSigned-offPAVARINI MCGOVERN LLC01/02/2024
DOB NOWStructuralSigned-offPAVARINI MCGOVERN LLC01/02/2024
DOB NOWMechanical SystemsSigned-offPAVARINI MCGOVERN LLC12/26/2023
DOB NOWGeneral ConstructionSigned-offPAVARINI MCGOVERN LLC12/26/2023
DOB NOWGeneral ConstructionSigned-offPAVARINI MCGOVERN LLC12/26/2023
DOB NOWMechanical SystemsSigned-offPAVARINI MCGOVERN LLC12/26/2023
DOB NOWGeneral ConstructionSigned-offPAVARINI MCGOVERN LLC12/26/2023
DOB NOWMechanical SystemsSigned-offPAVARINI MCGOVERN LLC12/26/2023
DOB NOWMechanical SystemsSigned-offPAVARINI MCGOVERN LLC12/26/2023
DOB NOWSprinklersSigned-offTRISTATE PLBG SVCS CORP10/31/2023
DOB NOWSprinklersSigned-offCARDOZA PLUMBING WMBE09/29/2023
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE09/19/2023
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC08/25/2023
DOB NOWSprinklersSigned-offCARDOZA PLUMBING WMBE08/11/2023
DOB NOWPlumbingSigned-offSTAT FIRE SPRINKLER NYC C08/01/2023
DOB NOWStructuralSigned-offPAVARINI MCGOVERN LLC07/27/2023
DOB NOWStructuralSigned-offPAVARINI MCGOVERN LLC07/21/2023
DOB NOWGeneral ConstructionSigned-offPAVARINI MCGOVERN LLC06/27/2023
DOB NOWMechanical SystemsSigned-offPAVARINI MCGOVERN LLC06/26/2023
DOB NOWPlumbingSigned-offSTAT FIRE SPRINKLER NYC C05/18/2023
DOB NOWGeneral ConstructionSigned-offPAVARINI MCGOVERN LLC05/04/2023
DOB NOWMechanical SystemsSigned-offPAVARINI MCGOVERN LLC04/25/2023
DOB NOWPlumbingSigned-offCARDOZA PLUMBING CORP04/20/2023
DOB NOWPlumbingSigned-offSTAT FIRE SPRINKLER NYC C01/09/2023
+ 60 more permits on file
25 projects · most recent 05/04/2026
General Wiring
FiledStatusContractorScope
05/04/2026CompleteHABER ELECTRIC CO., INC.—
03/19/2026Permit IssuedM.C. ELECTRICAL NY INCGeneral Wiring
02/11/2026CompleteE-J ELEC. INSTALLATION CO—
02/02/2026CompleteHIGH QUALITY ELEC.OF NYC—
11/17/2025CompleteM.C. ELECTRICAL NY INCGeneral Wiring
07/14/2025CompleteAGIR ELEC'L LTD. D/B/AGeneral Wiring
06/19/2025CompleteM.C. ELECTRICAL NY INCGeneral Wiring
03/11/2024CompleteM.C. ELECTRICAL NY INC—
03/11/2024CompleteM.C. ELECTRICAL NY INC—
09/20/2023CompleteM.C. ELECTRICAL NY INCGeneral Wiring
08/07/2023CompleteAGIR ELEC'L LTD. D/B/AGeneral Wiring
02/28/2023CompleteM.C. ELECTRICAL NY INCGeneral Wiring
02/28/2023CompleteM.C. ELECTRICAL NY INCGeneral Wiring
02/06/2023CompleteM.C. ELECTRICAL NY INCGeneral Wiring
02/06/2023CompleteM.C. ELECTRICAL NY INCGeneral Wiring
▾Field Inspections (DOB CAP) — 51
DateTypeResultReport
09/16/2025Certified Medical Gas - MG - PL - FinishCertifiedView ↗
09/16/2025Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
09/16/2025Certified Medical Gas - MG - PL - TestCertifiedView ↗
09/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/05/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/14/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/07/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/24/2024Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
01/24/2024Certified Medical Gas - MG - PL - TestCertifiedView ↗
01/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/06/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/14/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
Latest 25 of 51.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/11/2025FinalRobert Goodwinprogress
06/11/2025Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
06/10/2025Post-installed AnchorsRONALD GRAPINspecial
06/10/2025Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
06/10/2025Sprinkler SystemsRONALD GRAPINspecial
05/15/2025HVAC-R and service water piping design and insulationRONALD GRAPINenergy_progress
05/15/2025HVAC-R and service water heating equipmentRONALD GRAPINenergy_progress
05/15/2025Mechanical SystemsRONALD GRAPINspecial
05/15/2025FinalRONALD GRAPINprogress
05/15/2025HVAC-R and service water heating system controlsRONALD GRAPINenergy_progress
05/14/2025FinalRobert Goodwinprogress
05/14/2025Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
12/20/2024Fire-Resistant Penetrations and JointsRONALD GRAPINspecial
12/11/2024FinalRONALD GRAPINprogress
12/11/2024Mechanical SystemsRONALD GRAPINspecial
12/10/2024FinalRobert Goodwinprogress
07/10/2024HVAC-R and service water heating equipmentChristopher O'Malleyenergy_progress
07/10/2024Mechanical SystemsChristopher O'Malleyspecial
07/10/2024HVAC-R and service water heating system controlsChristopher O'Malleyenergy_progress
07/10/2024FinalChristopher O'Malleyprogress
07/10/2024HVAC-R and service water piping design and insulationChristopher O'Malleyenergy_progress
07/10/2024Energy Code Compliance InspectionsChristopher O'Malleyprogress
07/01/2024HVAC-R and service water heating system controlsChristopher O'Malleyenergy_progress
07/01/2024HVAC-R and service water heating equipmentChristopher O'Malleyenergy_progress
07/01/2024Mechanical SystemsChristopher O'Malleyspecial
Latest 25 of 150.
▾Documents — 1,349 on file (BIS + DOB NOW)
▸Plans & Drawings149
▸DOB NOWPlans/Sketch82
08/27/2026Q00238350-S1Request digital key ↗
08/27/2026Q00567665-P2Request digital key ↗
08/27/2026Q00567665-I1Request digital key ↗
Showing 3 of 82 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence13
08/28/2026Q00221071-I1Request digital key ↗
08/28/2026Q00248869-I1Request digital key ↗
08/28/2026Q00240341-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed12
08/28/2026Q00240341-A1Request digital key ↗
08/28/2026Q00240341-I1Request digital key ↗
08/28/2026Q00373746-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems7
08/28/2026Q00297872-I1Request digital key ↗
08/27/2026Q00429580-I1Request digital key ↗
Showing 2 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler6
08/27/2026Q00297889-I1Request digital key ↗
08/27/2026Q00429594-P2Request digital key ↗
08/27/2026Q00429594-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment6
08/28/2026Q00361633-I1Request digital key ↗
08/27/2026Q00238350-I1Request digital key ↗
Showing 2 of 6 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold6
08/28/2026Q00343656-I1Request digital key ↗
08/28/2026Q00374013-I1Request digital key ↗
08/27/2026Q00441989-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
08/27/2026Q00297889-I1Request digital key ↗
08/27/2026Q00429594-I1Request digital key ↗
Showing 2 of 6 on file for this type
▸DOB NOWPlans/Sketch - Structural4
08/28/2026Q00203405-I1Request digital key ↗
08/28/2026Q00383019-I1Request digital key ↗
Showing 2 of 4 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWPlans/Sketch - Sign2
08/27/2026Q00464922-I1Request digital key ↗
08/27/2026Q00464927-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
08/28/2026Q00311156-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits158
▸BISPLAN / WORK APPROVAL APPLICATION112
10/23/2025400028313Open ↗
07/31/2025402007378Open ↗
07/09/2025421945612Open ↗
Showing 3 of 112 on file for this type
▸BISWORK PERMIT APPLICATION44
12/17/2020440648300Open ↗
Showing 1 of 44 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT II: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications486
▸DOB NOWProgress Inspector Seal & Signature153
09/29/2026Q00374013-I1Open ↗
09/25/2026Q00191017-P1Open ↗
09/23/2026Q01163731-P1Open ↗
Showing 3 of 153 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature135
08/28/2026Q00203405-I1Open ↗
08/28/2026Q00248869-I1Open ↗
08/28/2026Q00311156-I1Open ↗
Showing 3 of 135 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature118
09/25/2026Q00191017-P1Open ↗
09/25/2026Q00191017-P1Open ↗
09/23/2026Q00830926-I1Open ↗
Showing 3 of 118 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
12/14/2020440648300Open ↗
Showing 1 of 12 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
12/14/2020440648300Open ↗
Showing 1 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
12/14/2020440648300Open ↗
Showing 1 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment41
▸BISSCHEDULE B - PLUMBING21
09/21/2022440550734Open ↗
03/31/2022440550734Open ↗
02/08/2022440550734Open ↗
Showing 3 of 21 on file for this type
▸BISSELF-CERT PLUMBING NOTICE11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS2
11/18/2021420665462Open ↗
11/18/2021420665462Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/28/2021420665462Open ↗
10/13/2021420665462Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTANDPIPE SYSTEMS1
04/11/2022440550734Open ↗
▸Safety & Tenant Protection11
▸BISSTREET TREE CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos111
▸DOB NOWDEP ACP-5: Asbestos Assessment Report89
08/27/2026Q00429594-P1Open ↗
08/27/2026Q00429594-P2Open ↗
08/27/2026Q00429594-P3Open ↗
Showing 3 of 89 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/28/2026Q00203405-I1Open ↗
08/28/2026Q00361633-I1Open ↗
08/28/2026Q00383019-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
12/14/2020440648300Open ↗
Showing 1 of 4 on file for this type
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance53
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY16
04/15/2022420665462Open ↗
04/15/2022420665462Open ↗
08/17/2021420665462Open ↗
Showing 3 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
08/15/2022440592468Open ↗
04/15/2022420665462Open ↗
08/13/2021440648300Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
12/14/2020440648300Open ↗
Showing 1 of 3 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
08/13/2024440590576Open ↗
07/29/2022420665462Open ↗
12/20/2021440593145Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
08/13/2024440590576Open ↗
07/29/2022420665462Open ↗
02/03/2022440593145Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
01/30/2023420665462Open ↗
▸Inspections & Test Reports68
▸BISTECHNICAL REPORT: RESPONSIBILITY56
08/15/2022440592468Open ↗
04/15/2022420665462Open ↗
04/14/2022420665462Open ↗
Showing 3 of 56 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION3
08/20/2021420665462Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
08/19/2021420665462Open ↗
Showing 1 of 2 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
12/29/2021440593145Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs65
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST22
11/19/2024400874791Open ↗
09/10/2024440590576Open ↗
08/19/2024421945612Open ↗
Showing 3 of 22 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
03/17/2021420665462Open ↗
Showing 1 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
07/24/2023420665462Open ↗
06/07/2023420665462Open ↗
05/31/2023420665462Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISFINAL5
08/28/2024440590576Open ↗
08/15/2024421945612Open ↗
04/07/2022440578055Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/27/2026Q00297889-I1Open ↗
Showing 1 of 3 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
11/23/2021420665462Open ↗
05/13/2021420665462Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership43
▸BISCOST AFFIDAVIT35
09/09/2024440590576Open ↗
11/08/2022440550734Open ↗
09/03/2021440546090Open ↗
Showing 3 of 35 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
03/17/2021420665462Open ↗
Showing 1 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
11/06/2024420665462Open ↗
08/15/2024421945612Open ↗
08/15/2024421945612Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms97
▸BISADDITIONAL INFORMATION61
02/02/2023440574861Open ↗
01/30/2023420665462Open ↗
10/04/2022440550734Open ↗
Showing 3 of 61 on file for this type
▸BISEFILING COVER SHEET16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET15
12/14/2020440648300Open ↗
Showing 1 of 15 on file for this type
▸BISBOROUGH INTAKE FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Other Documents32
▸BISBPP - SUPPORTING DOCUMENTATION15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWAlternate Plan 13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP-PARKS: PLANT NEW TREE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/28/2026Q00203405-I1Open ↗
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type