45 SUTTON PLACE SOUTH
MANHATTAN · BIN 1040721
💬 Discuss this project
1958Year Built
20Stories
D4Building Class
R10Zoning
510,547 sfGross Floor Area
279Units
LL97 CoveredRent Stabilized5 Active Violations 3 unresolved · 2 paperwork only 1 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · Owner of record: Cannon Point South · 30,463 sf lot · 16.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsDouglas Elliman Property Management3 filings
RoofDouglas Elliman Property ManagementUnder Construction2p · 3 filings · 20 docs
PenthouseUnit PHC, Unit PHDUnder Construction2 filings
Floor 20Unit 20D, Unit 20K2 filings · 8 docs
Floor 19Unit 19E, Unit 19H, Unit 19J +18p · 5 filings · 20 docs
Floor 18
Floor 17Unit 17F, Unit 17LUnder Construction2 filings · 5 docs
Floor 16Unit 16B1 filing
Floor 15Unit 15E2 filings
Floor 14Unit 14I1 filing · 19 docs
Floor 13
Floor 12Unit 12B2 filings
Floor 11Unit 11H, Unit 11KUnder Construction3 filings · 6 docs
Floor 10Unit 10F, Unit 10H, Unit 10KUnder Construction5 filings · 18 docs
Floor 9Unit 9D2p · 2 filings · 11 docs
Floor 8
Floor 7
Floor 6
Floor 5Unit 5C, Unit 5H, Unit 5K +2Under Construction10p · 6 filings · 10 docs
Floor 4Unit 4J, Unit 4MN2 filings · 19 docs
Floor 3Unit 30, Unit 3D, Unit 3F +3Under Construction1p · 5 filings · 20 docs
Floor 2Unit 2C1 filing · 7 docs
Floor 1Chiller and lobby AC replacementUnder Construction1 filing · 12 docs
Sub-CellarParking garage steel and concrete repair1 filing · 3 docs
Site & exteriorDouglas Elliman Property Management4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Cannon Point South13603/22/2026
Boulevard Gardens Owners1010/13/2026
William Herbst Group903/22/2026
NYC Department of Housing Preservation and Development503/21/2026
Shareholder303/21/2026
Canon Point So Corp Inc Doug E P303/21/2026
Canon Point South Corp C Odougla303/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Socotec603/21/2026
AB Works Processing203/21/2026
Code403/21/2026
Yao W Guo Architect403/21/2026
CJS Expediting303/21/2026
Dina Vedmed Architect203/21/2026
Howard L Zimmerman Architects603/21/2026
Maryclare Nepogoda603/21/2026
Noel Building Consulting603/21/2026
Evan Chan Architect P203/21/2026
Niza Works of Architecture303/21/2026
Hlzae203/21/2026
EA Design Group403/21/2026
Platinum Services NY403/21/2026
BG & Associates203/21/2026
Municipal Building Consultants103/21/2026
Green Light Expediting603/21/2026
J A Expediting403/21/2026
Riggining Consultants203/21/2026
Synergy Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Services NYScaffold1307/08/2026
The Metro GroupGeneral Contractor707/08/2026
Home Impro Servs GroupGeneral Contractor509/19/2026
Structural Preserv SystemGeneral Contractor507/08/2026
Xinos ConstructionGeneral Contractor507/08/2026
Code MechanicalPlumbing307/08/2026
Systems 2000 Plumbing Servicesspecialty_contractor303/21/2026
Ceprine ConstructionScaffold303/21/2026
Aurous Construction Coll*General Contractor303/21/2026
Division One ConstructionGeneral Contractor303/21/2026
M Construction NYCGeneral Contractor308/20/2026
TMS Plumbing & HeatingPlumbing207/08/2026
Courtesy PlumbingPlumbing207/08/2026
Next Generation Restorationspecialty_contractor207/08/2026
A T ConceptGeneral Contractor207/08/2026
Hard Rock BuildersGeneral Contractor203/21/2026
Hudson Plumbing & MCHPlumbing207/08/2026
Impact PlumbingPlumbing208/27/2026
BSH ContractingGeneral Contractor207/08/2026
BNL ConstructionGeneral Contractor203/21/2026
Manhattanites ConstructionGeneral Contractor107/08/2026
Masci & MasciGeneral Contractor107/08/2026
New Era Development GroupGeneral Contractor103/21/2026
PD Construction GroupGeneral Contractor107/08/2026
Pyznar ConstructionGeneral Contractor104/09/2026
TssnycGeneral Contractor107/08/2026
Amm General ContractingPlumbing107/08/2026
A.M.NPlumbing106/28/2026
ApecPlumbing107/08/2026
Apollo Plumbing & HeatingPlumbing107/08/2026
CBB PlumbingPlumbing107/08/2026
Crossfield Plumbing & HeatingPlumbing107/08/2026
EH Plumbing & HeatingPlumbing107/08/2026
Flint MechanicalPlumbing110/26/2026
Forsythe Plumbing & HeatingPlumbing107/08/2026
Go Pro Plumbing and HeatingPlumbing107/08/2026
G.P. MechanicalPlumbing107/08/2026
Hod Piping & HeatingPlumbing107/08/2026
Argon ElectricalElectrical103/22/2026
Monarch Plumbing & HeatingPlumbing107/08/2026
Orbit Plumbing & HeatingPlumbing107/08/2026
Plumbing P & HPlumbing107/08/2026
Practical Plumbing & HeatingPlumbing107/08/2026
P.S.I. MechanicalPlumbing109/22/2026
Systems 2000 Plumbing ServicesPlumbing107/08/2026
Tec PlumbingPlumbing107/08/2026
M&G Plumbing and HeatingPlumbing107/08/2026
Accurate ElectricalElectrical103/21/2026
Cambria Electric CoElectrical103/21/2026
Conductor Electrical ServicesElectrical103/22/2026
Shuir Electrical ContractorsElectrical103/21/2026
Gsa ElectricElectrical103/22/2026
Arma ElectricElectrical103/21/2026
K & G Electric CoElectrical103/21/2026
Lintech ElectricElectrical103/22/2026
Serenity ElectricElectrical103/21/2026
Modern Voltage NYCElectrical103/22/2026
New KC ElectricElectrical103/22/2026
Riviera ElectricElectrical103/22/2026
Stellmann ElectricalElectrical103/22/2026
V. Vass ElectricElectrical103/22/2026
Brosna ConstructionGeneral Contractor104/09/2026
Crystal ComfortGeneral Contractor109/15/2026
GLYNN GroupGeneral Contractor111/08/2026
Gramercy Electricspecialty_contractor110/31/2026
Legend 3 ConstructionGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA Planning & Expediting5677110/24/2026
Ronald Nemec Architect, P8386110/07/2026
Fuhrmann Architecture8109209/26/2026
Evan Chan Architect5605609/08/2026
O'Rourke Engineering5873208/27/2026
Davi Architecture5168308/12/2026
Carusone & Cherres Architects6166308/12/2026
Ryan Special Engineering2018407/13/2026
Darian Fernando Architect8129107/10/2026
A2 Architect2504205/28/2026
Prudigm Engineering Llcu4304104/14/2026
Nicolas Baratto Architect847202/10/2026
H. A. Bader Consultants2332211/04/2025
Stephan R Thimme Architects3696209/09/2025
Chanda Engineering Consultant6842104/25/2025
Howard L Zimmerman Architects1712508/19/2024
Cortney Walleston Architects3881201/17/2024
Wong Architect1272301/05/2023
Niza Works of Architects6101311/18/2022
Special Testing & Consulting1688305/13/2022
Kimberly Peck Architect6812304/22/2022
Bumpzoid4416106/29/2021
Integrity Consulting Service666306/28/2021
Malcolm Goodspeed, Architects3384205/27/2021
Mark Gould Architect1933102/23/2021
Amp Architecture6889109/12/2020
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
11/02/2026
Permit issued — General Construction
M01462973-I1-GC
10/30/2026
Permit issued — General Construction
M01463366-I1-GC
10/29/2026
Objection raised — Fire_Protection
10/29/2026
Objection raised — Other
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGLYNN Group11/02/2026
DOB NOWGeneral ConstructionPermit IssuedGramercy Electric10/30/2026
DOB NOWPlumbingPermit IssuedFlint Mechanical10/23/2026
DOB NOWPlumbingPermit IssuedP.S.I. Mechanical09/21/2026
DOB NOWGeneral ConstructionPermit IssuedHome Impro Servs Group09/18/2026
DOB NOWMechanical SystemsPermit IssuedCrystal Comfort09/14/2026
DOB NOWGeneral ConstructionSigned-offHome Impro Servs Group09/02/2026
DOB NOWPlumbingPermit IssuedImpact Plumbing08/26/2026
DOB NOWGeneral ConstructionPermit IssuedM Construction NYC08/18/2026
DOB NOWGeneral ConstructionPermit IssuedHome Impro Servs Group08/03/2026
DOB NOWGeneral ConstructionPermit IssuedBSH Contracting06/18/2026
DOB NOWPlumbingPermit IssuedMonarch Plumbing & Heating06/15/2026
DOB NOWGeneral ConstructionPermit IssuedManhattanites Construction06/12/2026
DOB NOWPlumbingPermit IssuedTec Plumbing05/06/2026
DOB NOWGeneral ConstructionPermit IssuedBSH Contracting04/29/2026
DOB NOWPlumbingPermit IssuedA.M.N04/08/2026
DOB NOWPlumbingSigned-offHudson Plumbing & MCH04/08/2026
DOB NOWMechanical SystemsPermit IssuedPyznar Construction04/07/2026
DOB NOWPlumbingSigned-offHudson Plumbing & MCH03/23/2026
DOB NOWGeneral ConstructionSigned-offBrosna Construction03/11/2026
DOB NOWMechanical SystemsSigned-offHome Impro Servs Group01/23/2026
DOB NOWPlumbingSigned-offPractical Plumbing & Heating12/15/2025
DOB NOWGeneral ConstructionSigned-offHome Impro Servs Group12/09/2025
DOB NOWPlumbingSigned-offForsythe Plumbing & Heating11/17/2025
DOB NOWGeneral ConstructionSigned-offLegend 3 Construction11/13/2025
DOB NOWPlumbingSigned-offCBB Plumbing09/02/2025
DOB NOWGeneral ConstructionSigned-offM Construction NYC08/25/2025
DOB NOWGeneral ConstructionSigned-offHard Rock Builders08/20/2025
DOB NOWGeneral ConstructionPermit IssuedNext Generation Restoration05/28/2025
DOB NOWPlumbingSigned-offAmm General Contracting05/15/2025
DOB NOWGeneral ConstructionPermit IssuedNext Generation Restoration05/14/2025
DOB NOWSuspended ScaffoldSigned-offRosenwach Tank Co03/24/2025
DOB NOWSuspended ScaffoldSigned-offRosenwach Tank Co01/31/2025
DOB NOWPlumbingSigned-offImpact Plumbing06/27/2024
DOB NOWGeneral ConstructionSigned-offM Construction NYC04/22/2024
DOB NOWPlumbingPermit IssuedG.P. Mechanical04/01/2024
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY03/21/2024
DOB NOWPlumbingSigned-offSystems 2000 Plumbing Services03/07/2024
DOB NOWGeneral ConstructionSigned-offSystems 2000 Plumbing Services03/04/2024
DOB NOWGeneral ConstructionPermit IssuedBNL Construction03/01/2024
+ 60 more permits on file
2 projects · most recent 08/27/2026
Air Conditioning Systems
FiledStatusContractorScope
08/27/2026Permit IssuedCrystal ComfortAir Conditioning Systems
11/04/2025Permit IssuedPyznar ConstructionAir Conditioning Systems
13 projects · most recent 10/15/2026
Water/Sanitary Gas
FiledStatusContractorScope
10/15/2026——Gas, Water/Sanitary
09/26/2026Permit IssuedBletsas P&HGas, Water/Sanitary
09/08/2026Permit IssuedP.S.I. MechanicalWater/Sanitary
08/12/2026Signed-offCBB PlumbingGas, Water/Sanitary
07/13/2026Permit IssuedImpact PlumbingWater/Sanitary
05/28/2026Permit IssuedMonarch Plumbing & HeatingGas, Water/Sanitary
04/14/2026Permit IssuedPlatinum Plumbing & HeatingGas, Water/Sanitary
02/18/2026Signed-offPractical Plumbing & HeatingGas, Water/Sanitary
11/04/2025Permit IssuedA.M.NGas, Water/Sanitary
04/25/2025Signed-offAmm General ContractingGas, Water/Sanitary
01/17/2024Permit IssuedG.P. MechanicalGas, Water/Sanitary
05/27/2021Permit IssuedApollo Plumbing & HeatingWater/Sanitary
09/12/2020Signed-offHausman PlumbingWater/Sanitary
25 projects · most recent 11/02/2026
General Wiring
FiledStatusContractorScope
11/02/2026Permit IssuedGramercy ElectricGeneral Wiring
10/06/2026Permit IssuedE & M Electrical NYGeneral Wiring
10/06/2026Permit IssuedDeluxe Electrical & MaintenanceGeneral Wiring
08/27/2026Permit IssuedArma ElectricGeneral Wiring
08/27/2026Permit IssuedArma ElectricGeneral Wiring
06/16/2026Permit IssuedE & M Electrical NYGeneral Wiring
05/01/2026Permit IssuedLightnin ElectricGeneral Wiring
04/07/2026Permit IssuedNY City ElectricGeneral Wiring
03/26/2026CompleteJumper ElectricGeneral Wiring
12/14/2025Permit IssuedArma ElectricGeneral Wiring
09/10/2025CompleteE & M Electrical NYGeneral Wiring
09/10/2025CompleteE & M Electrical NYGeneral Wiring
07/14/2025CompleteModern Voltage NYC—
07/03/2025CompleteArgon ElectricalGeneral Wiring
02/19/2025CompleteArma ElectricGeneral Wiring
2 projects · most recent 07/21/2022
Sidewalk Shed Scaffold
FiledStatusContractorScope
07/21/2022Permit IssuedPlatinum Services NYSidewalk Shed
01/14/2022Permit IssuedPlatinum Services NYScaffold
1 project · most recent 02/18/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
02/18/2026Signed-offHome Impro Servs GroupTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 41
DateTypeResultReport
08/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/20/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/13/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/01/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/18/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/18/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/15/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/10/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
07/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/30/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
04/23/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
05/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
Latest 25 of 41.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/16/2026Lighting in dwelling units—energy_progress
10/16/2026Energy Code Compliance Inspections—progress
10/02/2026Final—progress
09/29/2026FinalMark Bearakprogress
09/22/2026Energy Code Compliance Inspections—progress
09/22/2026Insulation placement and R values—energy_progress
09/22/2026Fenestration air leakage—energy_progress
09/22/2026Fenestration and door U-factor and product ratings—energy_progress
09/22/2026Fire-Resistant Penetrations and Joints—special
09/22/2026Lighting in dwelling units—energy_progress
09/22/2026Fire-Resistant Penetrations and Joints—special
09/21/2026Tenant Protection Plan ComplianceWILLIAM MONTAGUEspecial
09/21/2026Final—progress
09/21/2026FinalStanislav Pilipenkoprogress
09/02/2026Lighting controlsEvan Chanenergy_progress
09/02/2026Energy Code Compliance InspectionsEvan Chanprogress
09/02/2026Interior lighting powerEvan Chanenergy_progress
08/11/2026FinalRonald Nemecprogress
08/11/2026Energy Code Compliance InspectionsRonald Nemecprogress
08/11/2026Fire-Resistant Penetrations and JointsRonald Nemecspecial
08/11/2026Fire-Resistance Rated ConstructionGIANMARCO CARUSONEprogress
08/11/2026FinalGIANMARCO CARUSONEprogress
08/11/2026Energy Code Compliance InspectionsGIANMARCO CARUSONEprogress
08/11/2026Tenant Protection Plan ComplianceBenedetto Davispecial
08/11/2026Fire-Resistant Penetrations and JointsJORGE CHERRESspecial
Latest 25 of 150.