← Back
Elevator apt, luxury type
Battery Park by Sunrise
455 NORTH END AVENUE · BIN 1085815
💬 Discuss this project
1998Year Built
14Stories
D8Building Class
BPCZoning
239,185 sfGross Floor Area
218Units
LL97 CoveredRent Stabilized18 Open Violations ▸FISP: SWARMP
Elevator apt, luxury type · Owner of record: BROOKDALE DEVELOPMENT, LLC · 19,600 sf lot · 12.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction22p · 2 filings · 20 docs
Floor 14Under Construction7p · 1 filing · 20 docs
Floor 13Under Construction6p · 1 filing · 20 docs
Floor 12Under Construction6p · 1 filing · 20 docs
Floor 11Under Construction6p · 1 filing · 20 docs
Floor 10Under Construction6p · 1 filing · 20 docs
Floor 9Under Construction6p · 1 filing · 20 docs
Floor 8Under Construction6p · 1 filing · 20 docs
Floor 7Under Construction6p · 1 filing · 20 docs
Floor 6Under Construction6p · 1 filing · 20 docs
Floor 5Under Construction6p · 1 filing · 20 docs
Floor 4Under Construction6p · 1 filing · 20 docs
Floor 3Under Construction6p · 1 filing · 20 docs
Floor 2Under Construction13p · 2 filings · 20 docs
Floor 1Under Construction13p · 3 filings · 20 docs
CellarUnder Construction13p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY CORP503/22/2026
BROOKDALE DEVELOPMENT1203/22/2026
BATTERY PARK SITE 20/HALL203/22/2026
H.R.H. CONSTRUCTION103/22/2026
HRH CONST CORP303/22/2026
OWNER OF 455 NORTH END AV103/22/2026
TO OWNER OF 455 NORTH END103/22/2026
PRESIDENT303/21/2026
BROOKDALE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHVISION DESIGN STUDIO803/21/2026
METROPOLIS GROUP INC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOUTH COAST IMPROVEMENT*General Contractor907/08/2026
F.L. PINTO COMPANIES LLCGeneral Contractor809/07/2026
SMART PLBG & HTG CORPPlumbing507/08/2026
ECOSYSTEM ENERGY SERVICESGeneral Contractor407/08/2026
KINGS GROUP NY CORPGeneral Contractor303/21/2026
SKH MECHANICAL CORPFire Protection307/08/2026
MMI PLUMBING & HEATING INC.Plumbing206/28/2026
PANILI PLUMBING & HTG LLCPlumbing207/08/2026
CRAFT DESIGN CONSTR CORPGeneral Contractor204/09/2026
A J IANNI ELECL CONTS INCElectrical203/22/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor209/07/2026
DAVEN ELECTRIC CORPElectrical103/22/2026
SKYLINE RESTORATION INCGeneral Contractor109/16/2026
JOSEPH BRAMANElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SONI ENGINEERING CONSULTI9819108/05/2026
SHAHRISH SHUVO ENGINEERIN85241006/11/2026
AHT ENGINEERING PLLC8836810/22/2025
STUDIO NYANDAK ARCHITECTU8378103/06/2025
DEVIN MILLS ARCHITECT79061308/31/2022
Building Lifecycle
All (215)Filed (33)Permit Issued (36)Signed Off (11)Facade (FISP) (12)Violation (60)Inspection (21)Objection (12)Special Inspection (30)
09/15/2026
Permit issued — Structural
M01393261-I1-GC-CX
09/01/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/01/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/31/2026
Permit issued — Protection and Mechanical Methods
M01452232-I1-PMM
08/31/2026
Permit issued — Suspended Scaffold
M01440542-I1-SC
08/31/2026
Permit issued — Sidewalk Shed
M01449416-I1-SH
08/31/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/18/2026
Permit issued — General Construction
M01212758-S4-GC
08/18/2026
Permit issued — Mechanical Systems
M01212758-S5-MS
08/17/2026
Permit issued — Mechanical Systems
M01212758-S1-MS
08/17/2026
Permit issued — General Construction
M01183695-I1-GC
08/17/2026
Permit issued — General Construction
M01212758-I1-GC
08/05/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
M01440542-I1
08/04/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
08/04/2026
Special inspection requirement — Post-installed Anchors
nayan soni
06/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/11/2026
Filed — Alteration
Herewith filing for LL11/98 facade repairs and restoration on the north, south, east, west elevations and roof as indicated on plans. No change in use, occupancy, or egress.
M01393261-I1
05/27/2026
Permit issued — Plumbing
M01212758-S6-PL
05/19/2026
Permit issued — Sprinklers
M01212758-S7-EW-SP
05/13/2026
Violation issued (HPD, open)
C
05/07/2026
Violation issued (HPD, open)
A
04/27/2026
Special inspection requirement — Masonry
Shahrish Shuvo
04/27/2026
Special inspection requirement — Final
Yifeng Zhang
04/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
Shahrish Shuvo
04/27/2026
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
04/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/31/2026
Permit issued — Mechanical Systems
M01164884-I1-MS
03/31/2026
Permit issued — Structural
M01164884-S3-ST
03/31/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/26/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/25/2026
Filed — Alteration
INTERIOR RENOVATIONS OF RESIDENTIAL ACCESSORY SPACES ON CELLAR AND 1ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. RELATED ALT-CO #M01183695-I1.
M01212758-S5
03/25/2026
Filed — Alteration
INTERIOR RENOVATIONS OF RESIDENTIAL ACCESSORY SPACES ON CELLAR AND 1ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. RELATED ALT-CO #M01183695-I1.
M01212758-S6
03/25/2026
Filed — Alteration
INTERIOR RENOVATIONS OF RESIDENTIAL ACCESSORY SPACES ON CELLAR AND 1ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. RELATED ALT-CO #M01183695-I1.
M01212758-S7
03/25/2026
Filed — Alteration
INTERIOR RENOVATIONS OF RESIDENTIAL ACCESSORY SPACES ON CELLAR AND 1ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. RELATED ALT-CO #M01183695-I1.
M01212758-S4
03/24/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/24/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/19/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/19/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/12/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/02/2026
Permit issued — Mechanical Systems
M01164884-I1-MS
03/02/2026
Permit issued — Structural
M01164884-S3-ST
11/17/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/13/2025
Permit issued — Structural
M01164884-S3-ST
10/22/2025
Filed — Alteration
MODIFICATIONS & REPLACEMENT TO EXISTING HVAC SYSTEM THROUGHOUT BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01164884-P5
10/22/2025
Special inspection requirement — Maintenance information
ABRAHAM TAWIL
10/22/2025
Special inspection requirement — Energy Code Compliance Inspections
ABRAHAM TAWIL
10/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
ABRAHAM TAWIL
10/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ABRAHAM TAWIL
10/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABRAHAM TAWIL
10/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
ABRAHAM TAWIL
10/21/2025
Special inspection requirement — Energy Code Compliance Inspections
ABRAHAM TAWIL
10/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABRAHAM TAWIL
10/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
ABRAHAM TAWIL
10/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ABRAHAM TAWIL
10/21/2025
Special inspection requirement — Maintenance information
ABRAHAM TAWIL
10/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
ABRAHAM TAWIL
Latest 60 of 215 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedSKYLINE RESTORATION INC09/15/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPOWERS BRIDGING & SCAFFOLDING08/31/2026
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC08/31/2026
DOB NOWSidewalk ShedPermit IssuedPOWERS BRIDGING & SCAFFOLDING08/31/2026
DOB NOWGeneral ConstructionPermit IssuedF.L. PINTO COMPANIES LLC08/18/2026
DOB NOWMechanical SystemsPermit IssuedF.L. PINTO COMPANIES LLC08/18/2026
DOB NOWMechanical SystemsPermit IssuedF.L. PINTO COMPANIES LLC08/17/2026
DOB NOWGeneral ConstructionPermit IssuedF.L. PINTO COMPANIES LLC08/17/2026
DOB NOWGeneral ConstructionPermit IssuedF.L. PINTO COMPANIES LLC08/17/2026
DOB NOWPlumbingPermit IssuedMMI PLUMBING & HEATING INC.05/27/2026
DOB NOWSprinklersPermit IssuedSKH MECHANICAL CORP05/19/2026
DOB NOWMechanical SystemsPermit IssuedECOSYSTEM ENERGY SERVICES03/31/2026
DOB NOWStructuralPermit IssuedECOSYSTEM ENERGY SERVICES03/31/2026
DOB NOWMechanical SystemsPermit IssuedCRAFT DESIGN CONSTR CORP03/02/2026
DOB NOWStructuralPermit IssuedCRAFT DESIGN CONSTR CORP03/02/2026
DOB NOWStructuralPermit IssuedECOSYSTEM ENERGY SERVICES11/13/2025
DOB NOWSprinklersPermit IssuedSKH MECHANICAL CORP09/16/2025
DOB NOWPlumbingPermit IssuedMICHAEL ITSKOVICH09/09/2025
DOB NOWSprinklersPermit IssuedSKH MECHANICAL CORP08/27/2025
DOB NOWGeneral ConstructionPermit IssuedF.L. PINTO COMPANIES LLC07/30/2025
DOB NOWMechanical SystemsPermit IssuedF.L. PINTO COMPANIES LLC07/25/2025
DOB NOWGeneral ConstructionPermit IssuedF.L. PINTO COMPANIES LLC07/25/2025
DOB NOWPlumbingPermit IssuedPANILI PLUMBING & HTG LLC04/08/2025
DOB NOWBoiler EquipmentSigned-offPANILI PLUMBING & HTG LLC04/08/2025
DOB NOWMechanical SystemsPermit IssuedECOSYSTEM ENERGY SERVICES04/02/2025
DOB NOWGeneral ConstructionSigned-offSOUTH COAST IMPROVEMENT*04/13/2023
DOB NOWGeneral ConstructionSigned-offSOUTH COAST IMPROVEMENT*04/13/2023
DOB NOWGeneral ConstructionSigned-offSOUTH COAST IMPROVEMENT*04/13/2023
DOB NOWGeneral ConstructionSigned-offSOUTH COAST IMPROVEMENT*04/13/2023
DOB NOWGeneral ConstructionSigned-offSOUTH COAST IMPROVEMENT*04/12/2023
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP10/14/2022
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP10/14/2022
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP10/14/2022
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP09/29/2022
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP09/29/2022
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP09/23/2019
BISOTISSUEDTITAN CONSTRUCTION SERVIC09/23/2019
BISPLISSUEDALJER PLBG & HTG CORP06/01/2018
BISPLISSUEDALJER PLBG & HTG CORP03/01/2017
BISFPISSUEDSENTINEL FIRE CONTROL INC12/05/2012
+ 26 more permits on file
2 projects · most recent 03/25/2026
Air Conditioning Systems Cooling Towers Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/25/2026Permit IssuedF.L. PINTO COMPANIES LLCAir Conditioning Systems
Cooling
Mars ×12
10/22/2025Permit IssuedECOSYSTEM ENERGY SERVICESCooling Towers, Heating and Air Conditioning Systems
Heat / Cool
Climatemaster SMS18 18,000 BTU · Wshp ×147
SMS12 12,000 BTU · Wshp ×57
SMS09 9,000 BTU · Wshp ×8
SC018 18,000 BTU · Wshp ×5
SC024 24,000 BTU · Wshp ×2
SC030 30,000 BTU · Wshp ×1
SC036 36,000 BTU · Wshp ×1
SC048 48,000 BTU · Wshp ×1
SC060 60,000 BTU · Wshp ×1
York YMAE0140 35 tons · Heat Pump Outdoor ×4
Cooling Tower
1 project · most recent 03/25/2026
Sprinkler System
FiledStatusContractorScope
03/25/2026Permit IssuedSKH MECHANICAL CORPSprinkler System
2 projects · most recent 03/25/2026
Water/Sanitary Storm Gas
FiledStatusContractorScope
03/25/2026Permit IssuedMMI PLUMBING & HEATING INStorm, Water/Sanitary
10/22/2025Permit IssuedPANILI PLUMBING & HTG LLCGas, Water/Sanitary
18 projects · most recent 08/26/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
08/26/2026Permit IssuedOPTIMAL ELECTRIC, INC—
05/11/2026Permit IssuedDENALI ELECTRIC CORP—
05/04/2026Permit IssuedDENALI ELECTRIC CORP—
11/20/2025Permit IssuedINTERNATIONAL EMPIRE ELECGeneral Wiring
09/04/2025Permit IssuedHIGH LEG 208 VOLTS ELECLGeneral Wiring
08/20/2025Permit IssuedTROON ELECTRIC OF NEW YORHVAC Wiring
04/02/2025CompleteDAVEN ELECTRIC CORP—
09/26/2024CompleteDAVEN ELECTRIC CORP—
09/26/2024CompleteOCNYC ELECL CONTNG INCGeneral Wiring
05/02/2023CompleteDAVEN ELECTRIC CORP—
03/21/2023CompleteA J IANNI ELECL CONTS INCGeneral Wiring
03/21/2023CompleteA J IANNI ELECL CONTS INCGeneral Wiring
03/21/2023CompleteA J IANNI ELECL CONTS INCGeneral Wiring
03/21/2023CompleteA J IANNI ELECL CONTS INCGeneral Wiring
03/20/2023CompleteA J IANNI ELECL CONTS INCGeneral Wiring
2 projects · most recent 06/11/2026
Steel Concrete
FiledStatusContractorScope
06/11/2026Permit IssuedSKYLINE RESTORATION INC1 scope_items
10/22/2025Permit IssuedECOSYSTEM ENERGY SERVICESSteel, Concrete
1 project · most recent 08/05/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/05/2026Permit IssuedSKYLINE RESTORATION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
09/01/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/01/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/31/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/31/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/24/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/24/2026Pass-Final PL - UndergroundPassView ↗
03/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/12/2026Pass-Final PL - UndergroundPassView ↗
03/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/07/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/30/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/23/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 141
DateRequirementInspectorRole
08/04/2026Post-installed Anchorsnayan sonispecial
08/04/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
04/27/2026Tenant Protection Plan ComplianceShahrish Shuvospecial
04/27/2026MasonryShahrish Shuvospecial
04/27/2026Post-installed AnchorsShahrish Shuvospecial
04/27/2026FinalYifeng Zhangprogress
10/22/2025HVAC-R and service water heating system controlsABRAHAM TAWILenergy_progress
10/22/2025Fire-Resistant Penetrations and JointsABRAHAM TAWILspecial
10/22/2025Tenant Protection Plan Compliance—special
10/22/2025Energy Code Compliance InspectionsABRAHAM TAWILprogress
10/22/2025HVAC-R and service water heating equipmentABRAHAM TAWILenergy_progress
10/22/2025HVAC-R and service water piping design and insulationABRAHAM TAWILenergy_progress
10/22/2025Maintenance informationABRAHAM TAWILenergy_progress
10/21/2025HVAC-R and service water heating system controlsABRAHAM TAWILenergy_progress
10/21/2025Maintenance informationABRAHAM TAWILenergy_progress
10/21/2025HVAC-R and service water heating equipmentABRAHAM TAWILenergy_progress
10/21/2025Energy Code Compliance InspectionsABRAHAM TAWILprogress
10/21/2025Fire-Resistant Penetrations and JointsABRAHAM TAWILspecial
10/21/2025Tenant Protection Plan Compliance—special
10/21/2025HVAC-R and service water piping design and insulationABRAHAM TAWILenergy_progress
10/16/2025HVAC-R and service water piping design and insulationABRAHAM TAWILenergy_progress
10/16/2025HVAC-R and service water heating equipmentABRAHAM TAWILenergy_progress
10/16/2025Maintenance informationABRAHAM TAWILenergy_progress
10/16/2025HVAC-R and service water heating system controlsABRAHAM TAWILenergy_progress
10/16/2025Tenant Protection Plan ComplianceABRAHAM TAWILspecial
Latest 25 of 141.
▾Documents — 223 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch31
09/02/2026M00685299-I1Request digital key ↗
09/02/2026M00685229-I1Request digital key ↗
09/02/2026M00685337-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00222698-I1Request digital key ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION9
03/22/2023123691861Open ↗
07/12/2019123691861Open ↗
05/02/2018122945288Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION6
12/30/2019123691861Open ↗
09/23/2019123691861Open ↗
03/06/2017122945288Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications114
▸DOB NOWDPL-1: Design Professional Seal & Signature36
09/05/2026M00222698-I1Open ↗
09/02/2026M00685299-I1Open ↗
09/02/2026M00685337-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/23/2026M01164884-S2Open ↗
09/19/2026M01164884-P3Open ↗
09/02/2026M01164884-P4Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
09/25/2026M01212758-S7Open ↗
09/23/2026M01164884-S2Open ↗
09/23/2026M01164884-S2Open ↗
Showing 3 of 29 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
09/23/2019123691861Open ↗
09/23/2019123691861Open ↗
07/12/2019123691861Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/12/2019123691861Open ↗
08/09/2011120780850Open ↗
07/28/2011120765323Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/09/2011120780850Open ↗
07/28/2011120765323Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/12/2019123691861Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
05/01/2018122945288Open ↗
11/15/2016122945288Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes2
07/12/2019123691861Open ↗
11/15/2016122945288Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026M01183695-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M01183695-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026M01183695-I1Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/24/2026M01183695-I1Open ↗
08/23/2026M01212758-S4Open ↗
08/23/2026M01212758-S7Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/15/2016122945288Open ↗
11/26/2012121443875Open ↗
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
08/03/2011120765323Open ↗
08/03/2011120765323Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/23/2019123691861Open ↗
11/15/2016122945288Open ↗
11/15/2016122945288Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/17/2014120765323Open ↗
▸BISTR8: Energy Code Progress Inspections1
07/28/2011120765323Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/04/2023123691861Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/15/2023123691861Open ↗
▸Inspections & Test Reports1
▸BISPOST-INSTALLED ANCHORS1
05/11/2023123691861Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/15/2023123691861Open ↗
06/17/2014120765323Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
08/09/2011120780850Open ↗
08/03/2011120765323Open ↗
▸BISFINAL1
05/15/2023123691861Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
07/12/2019123691861Open ↗
06/17/2014120765323Open ↗
11/26/2012121443875Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/04/2023123691861Open ↗
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET5
07/12/2019123691861Open ↗
11/15/2016122945288Open ↗
11/26/2012121443875Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION3
09/27/2019123691861Open ↗
09/23/2019123691861Open ↗
08/09/2019123691861Open ↗
▸BISBOROUGH INTAKE FORM2
05/02/2018122945288Open ↗
05/01/2018122945288Open ↗
▸Other Documents11
▸DOB NOWWaiver Document8
08/23/2026M01212758-S7Open ↗
08/23/2026M01212758-S6Open ↗
08/23/2026M01212758-S4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWManufacturer's Specifications1
08/16/2026M01440542-I1Open ↗
▸DOB NOWCalculations1
08/16/2026M01440542-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/24/2026M01183695-I1Open ↗