Hospital, sanitarium, mental institution
462 1 AVENUE
MANHATTAN · Murray Hill-Kips Bay · BIN 1091053
💬 Discuss this project
1910Year Built
17Stories
I1Building Class
R8Zoning
2,124,441 sfGross Floor Area
1Units
LL97 Covered28 Open Violations 3 unresolved · 25 paperwork only ▸FISP: UNSAFE
Hospital, sanitarium, mental institution · 753,175 sf lot · 2.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof18p · 3 filings · 20 docs
Floor 912p · 1 filing · 20 docs
Floor 812p · 1 filing · 20 docs
Floor 712p · 1 filing · 20 docs
Floor 612p · 1 filing · 20 docs
Floor 512p · 1 filing · 20 docs
Floor 412p · 1 filing · 20 docs
Floor 314p · 2 filings · 20 docs
Floor 213p · 3 filings · 20 docs
Floor 113p · 2 filings · 20 docs
Mezzanine15p · 2 filings · 20 docs
Cellar18p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BELLEVUE HOSPITAL8007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HC PEC208/04/2026
SUPERSTRUCTURES ENG. + ARCH.102/13/2026
ARRAY ARCHITECTS1206/13/2025
LAKHANI & JORDAN1301/08/2025
YU & ASSOCIATES208/16/2023
YSRAEL A. SEINUK, P.C.306/27/2022
URBAN FOUNDATION/ENGINEERING106/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC6103/21/2026
SUPERSTRUCTURES ENG + ARCH103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSIGLI CONSTRUCTION COGeneral Contractor10007/08/2026
SIRINA FIRE PROT CORPFire Protection607/08/2026
PAR ENVIRONMENTAL CORPORAGeneral Contractor507/08/2026
URBAN FOUNDATION ENGINEERINGGeneral Contractor403/21/2026
NORTHSTAR CONTRACTING GROGeneral Contractor407/08/2026
ALLIANCE PLUMBING CORPPlumbing307/08/2026
PJP INSTALLERS INCGeneral Contractor208/26/2026
CARDOZA PLUMBING CORPPlumbing207/08/2026
PACE PLUMBING CORPPlumbing107/08/2026
DNA CONTRACTING LLCGeneral Contractor107/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUREAU VERITAS NA69022206/13/2025
FUTURE TECH CONSULTANTS O589311/16/2023
Building Lifecycle
All (233)Filed (33)Permit Issued (80)Signed Off (19)Facade (FISP) (9)Violation (1)Inspection (22)Objection (39)Special Inspection (30)
08/04/2026
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01439432-I1
08/04/2026
Filed — Alteration
STORAGE OF MATERIAL / EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. STORAGE SHALL NOT EXCEED 25 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M01440261-I1
08/04/2026
Permit issued — Protection and Mechanical Methods
M01440261-I1-PMM
08/04/2026
Permit issued — Sidewalk Shed
M01439432-I1-SH
07/20/2026
Permit issued — General Construction
M01356904-I1-GC
02/13/2026
Filed — Alteration
Bellevue Hospital Bldg H Exterior facade repairs as per the plans filed including: Repair of spalled concrete and deteriorated reinforcement of exterior precast cladding and reinforced concrete entrance canopies. Replacement of cracked window glazing.
M01356904-I1
08/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/30/2025
Signed off — Alteration CO
HEREWITH FILING FOR CHANGE OF OCCUPANCY FROM HOSPITAL TO INPATIENT JAIL TREATMENT ON THE 3RD FLOOR (MARKETING FLR 2) AND ACCESSORY OUTDOOR RECREATION DECK PER PLANS.
M00622055-S2
07/28/2025
Signed off — Alteration
HEREWITH FILING FOR ROOF REPAIR WORK PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M07994761-I1
07/15/2025
Special inspection requirement — Lowest Floor Elevation
IBRAHIM MOURAD
07/11/2025
Signed off — Alteration CO
HEREWITH FILING FOR CHANGE OF OCCUPANCY FROM HOSPITAL TO INPATIENT JAIL TREATMENT ON THE 3RD FLOOR (MARKETING FLR 2) AND ACCESSORY OUTDOOR RECREATION DECK PER PLANS.
M00622055-S4
06/27/2025
Special inspection requirement — Lowest Floor Elevation
IBRAHIM MOURAD
06/27/2025
Special inspection requirement — Preliminary
Noah Tolson
06/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
06/27/2025
Special inspection requirement — Lowest Floor Elevation
IBRAHIM MOURAD
06/27/2025
Special inspection requirement — Preliminary
Noah Tolson
06/27/2025
Special inspection requirement — Sprayed fire-resistant materials
IBRAHIM MOURAD
06/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
IBRAHIM MOURAD
06/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
IBRAHIM MOURAD
06/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
06/27/2025
Special inspection requirement — Sprayed fire-resistant materials
IBRAHIM MOURAD
06/13/2025
Filed — Alteration CO
HEREWITH FILING FOR CHANGE OF OCCUPANCY FROM HOSPITAL TO INPATIENT JAIL TREATMENT ON THE 3RD FLOOR (MARKETING FLR 2) AND ACCESSORY OUTDOOR RECREATION DECK PER PLANS.
M00622055-P7
06/12/2025
Special inspection requirement — Preliminary
Noah Tolson
06/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
06/12/2025
Special inspection requirement — Sprayed fire-resistant materials
IBRAHIM MOURAD
06/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
IBRAHIM MOURAD
06/12/2025
Special inspection requirement — Lowest Floor Elevation
IBRAHIM MOURAD
05/14/2025
Filed — Alteration CO
HEREWITH FILING FOR CHANGE OF OCCUPANCY FROM HOSPITAL TO INPATIENT JAIL TREATMENT ON THE 3RD FLOOR (MARKETING FLR 2) AND ACCESSORY OUTDOOR RECREATION DECK PER PLANS.
M00622055-P6
05/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
05/08/2025
Special inspection requirement — Sprayed fire-resistant materials
IBRAHIM MOURAD
05/08/2025
Special inspection requirement — Preliminary
Noah Tolson
05/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
IBRAHIM MOURAD
05/08/2025
Special inspection requirement — Lowest Floor Elevation
IBRAHIM MOURAD
05/07/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/24/2025
Signed off — Alteration
HEREWITH FILING FOR CONDENSATE PIPING RELOCATION PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00715227-I1
04/08/2025
Permit issued — Mechanical Systems
M00715227-I1-MS
04/08/2025
Permit issued — General Construction
M00622055-S2-GC
04/08/2025
Permit issued — General Construction
M07994761-I1-GC
02/28/2025
Cycle 9 facade report signed — UNSAFE
02/26/2025
Cycle 9 facade inspection completed
02/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/29/2025
Special inspection requirement — Heating Systems
IBRAHIM MOURAD
01/29/2025
Special inspection requirement — Mechanical Systems
IBRAHIM MOURAD
01/29/2025
Special inspection requirement — Final
IBRAHIM MOURAD
01/29/2025
Special inspection requirement — Smoke Control Systems Testing
IBRAHIM MOURAD
01/28/2025
Signed off — Alteration
HEREWITH FILING FOR MECHANICAL SYSTEMS FOR OUTDOOR RECREATION DECK/TOWERS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00896251-S2
01/27/2025
Objection resolved — Addressed
01/17/2025
Signed off — Alteration
HEREWITH FILING FOR STANDPIPE MODIFICATIONS IN CONJUNCTION WITH 3RD FLR (MARKETING 2) CHANGE OF OCCUPANCY PER PLANS.
M01082464-I1
01/10/2025
Signed off — Alteration
HEREWITH FILING FOR MECHANICAL SYSTEMS FOR OUTDOOR RECREATION DECK/TOWERS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00896251-S6
01/10/2025
Signed off — Alteration
HEREWITH FILING FOR MECHANICAL SYSTEMS FOR OUTDOOR RECREATION DECK/TOWERS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00896251-S1
01/10/2025
Signed off — Alteration
HEREWITH FILING FOR MECHANICAL SYSTEMS FOR OUTDOOR RECREATION DECK/TOWERS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00896251-S8
01/10/2025
Signed off — Alteration
HEREWITH FILING FOR MECHANICAL SYSTEMS FOR OUTDOOR RECREATION DECK/TOWERS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00896251-I1
01/10/2025
Signed off — Alteration CO
HEREWITH FILING FOR CHANGE OF OCCUPANCY FROM HOSPITAL TO INPATIENT JAIL TREATMENT ON THE 3RD FLOOR (MARKETING FLR 2) AND ACCESSORY OUTDOOR RECREATION DECK PER PLANS.
M00622055-S6
01/10/2025
Objection resolved — Addressed
01/09/2025
Signed off — Alteration
HEREWITH FILING FOR FOUNDATION AND STRUCTURAL WORK FOR OUTDOOR RECREATION SPACE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00759305-I1
01/09/2025
Objection raised — Other
01/09/2025
Objection raised — Other
01/09/2025
Objection raised — Other
Latest 60 of 233 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedPJP INSTALLERS INC08/04/2026
DOB NOWSidewalk ShedPermit IssuedPJP INSTALLERS INC08/04/2026
DOB NOWGeneral ConstructionPermit IssuedDNA CONTRACTING LLC07/20/2026
DOB NOWMechanical SystemsSigned-offCONSIGLI CONSTRUCTION CO04/08/2025
DOB NOWGeneral ConstructionSigned-offCONSIGLI CONSTRUCTION CO04/08/2025
DOB NOWGeneral ConstructionSigned-offCONSIGLI CONSTRUCTION CO04/08/2025
DOB NOWFoundationSigned-offCONSIGLI CONSTRUCTION CO01/08/2025
DOB NOWMechanical SystemsSigned-offCONSIGLI CONSTRUCTION CO12/27/2024
DOB NOWGeneral ConstructionSigned-offCONSIGLI CONSTRUCTION CO12/27/2024
DOB NOWMechanical SystemsSigned-offCONSIGLI CONSTRUCTION CO12/27/2024
DOB NOWGeneral ConstructionSigned-offCONSIGLI CONSTRUCTION CO12/27/2024
DOB NOWStandpipeSigned-offSIRINA FIRE PROT CORP09/05/2024
DOB NOWGeneral ConstructionSigned-offCONSIGLI CONSTRUCTION CO07/10/2024
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP04/01/2024
DOB NOWEarth WorkSigned-offCONSIGLI CONSTRUCTION CO03/14/2024
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP02/01/2024
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP01/31/2024
DOB NOWGeneral ConstructionSigned-offCONSIGLI CONSTRUCTION CO01/09/2024
DOB NOWMechanical SystemsSigned-offCONSIGLI CONSTRUCTION CO01/09/2024
DOB NOWGeneral ConstructionSigned-offCONSIGLI CONSTRUCTION CO12/29/2023
DOB NOWGeneral ConstructionSigned-offCONSIGLI CONSTRUCTION CO12/29/2023
DOB NOWGeneral ConstructionSigned-offCONSIGLI CONSTRUCTION CO12/29/2023
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO12/29/2023
DOB NOWMechanical SystemsSigned-offCONSIGLI CONSTRUCTION CO12/29/2023
DOB NOWFoundationSigned-offCONSIGLI CONSTRUCTION CO12/29/2023
DOB NOWStructuralSigned-offCONSIGLI CONSTRUCTION CO12/27/2023
DOB NOWMechanical SystemsSigned-offCONSIGLI CONSTRUCTION CO12/27/2023
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO12/27/2023
DOB NOWGeneral ConstructionSigned-offCONSIGLI CONSTRUCTION CO12/27/2023
DOB NOWGeneral ConstructionSigned-offCONSIGLI CONSTRUCTION CO12/27/2023
DOB NOWGeneral ConstructionSigned-offCONSIGLI CONSTRUCTION CO12/27/2023
DOB NOWGeneral ConstructionSigned-offCONSIGLI CONSTRUCTION CO12/27/2023
DOB NOWGeneral ConstructionSigned-offCONSIGLI CONSTRUCTION CO12/27/2023
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE09/08/2023
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE08/09/2023
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE07/28/2023
DOB NOWPlumbingSigned-offCARDOZA PLUMBING CORP03/17/2023
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP01/27/2023
DOB NOWGeneral ConstructionSigned-offCONSIGLI CONSTRUCTION CO01/17/2023
DOB NOWStructuralSigned-offCONSIGLI CONSTRUCTION CO01/17/2023
+ 10 more permits on file
1 project · most recent 06/13/2025
Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/13/2025Signed-offCONSIGLI CONSTRUCTION COAssociated Ducts and Piping, Heating Systems, Ventilation Systems
Heating
Price ACBR 7,273 BTU · Ductwork ×6
Ventilation
Price DDS5 3,000 BTU · Ductwork ×8
TDSOL 700 CFM · Ductwork ×6
Greenheck 180 CPS CL1 3,000 CFM · Exhaust Fan ×4
270 CPS CL1 7,000 CFM ×4
Ducts & Piping
N/A n/a 1 CFM · Ductwork ×2
1 project · most recent 06/13/2025
Sprinkler System
FiledStatusContractorScope
06/13/2025Signed-offSIRINA FIRE PROT CORPSprinkler System
4 projects · most recent 09/22/2026
General Wiring
FiledStatusContractorScope
09/22/2026Permit IssuedSPICE ELECTRIC COMPANY—
07/31/2026Permit IssuedTOP SHELF ELECTRIC CORP—
03/11/2022CompleteADCO ELEC'L CORPGeneral Wiring
02/07/2022CompleteADCO ELEC'L CORP—
1 project · most recent 06/13/2025
Steel Concrete
FiledStatusContractorScope
06/13/2025Signed-offCONSIGLI CONSTRUCTION COSteel, Concrete
1 project · most recent 08/04/2026
Sidewalk Shed
FiledStatusContractorScope
08/04/2026Permit IssuedPJP INSTALLERS INCSidewalk Shed
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
08/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/05/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
11/27/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/26/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
11/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/23/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/22/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/22/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/28/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/15/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/15/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 93
DateRequirementInspectorRole
07/15/2025Lowest Floor ElevationIBRAHIM MOURADprogress
06/27/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
06/27/2025Lowest Floor ElevationIBRAHIM MOURADprogress
06/27/2025Sprayed fire-resistant materialsIBRAHIM MOURADspecial
06/27/2025Fire-Resistance Rated ConstructionIBRAHIM MOURADprogress
06/27/2025PreliminaryNoah Tolsonprogress
06/27/2025Sprayed fire-resistant materialsIBRAHIM MOURADspecial
06/27/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
06/27/2025Fire-Resistance Rated ConstructionIBRAHIM MOURADprogress
06/27/2025PreliminaryNoah Tolsonprogress
06/27/2025Lowest Floor ElevationIBRAHIM MOURADprogress
06/12/2025Lowest Floor ElevationIBRAHIM MOURADprogress
06/12/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
06/12/2025PreliminaryNoah Tolsonprogress
06/12/2025Sprayed fire-resistant materialsIBRAHIM MOURADspecial
06/12/2025Fire-Resistance Rated ConstructionIBRAHIM MOURADprogress
05/08/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
05/08/2025Sprayed fire-resistant materialsIBRAHIM MOURADspecial
05/08/2025PreliminaryNoah Tolsonprogress
05/08/2025Lowest Floor ElevationIBRAHIM MOURADprogress
05/08/2025Fire-Resistance Rated ConstructionIBRAHIM MOURADprogress
01/29/2025FinalIBRAHIM MOURADprogress
01/29/2025Heating SystemsIBRAHIM MOURADspecial
01/29/2025Mechanical SystemsIBRAHIM MOURADspecial
01/29/2025Smoke Control Systems TestingIBRAHIM MOURADspecial
Latest 25 of 93.
▾Documents — 247 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch29
09/03/2026M00610202-P2Request digital key ↗
09/03/2026M00610202-P5Request digital key ↗
09/03/2026M00610202-P4Request digital key ↗
Showing 3 of 29 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram6
09/03/2026M00622055-P7Open ↗
09/03/2026M00622055-P3Open ↗
09/03/2026M00622055-P6Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications95
▸DOB NOWProgress Inspector Seal & Signature38
09/02/2026M00622055-S2Open ↗
09/02/2026M00622055-S2Open ↗
09/02/2026M00622055-S2Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature36
09/03/2026M00610202-P5Open ↗
09/03/2026M00610202-P4Open ↗
09/03/2026M00610202-P3Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/02/2026M00622055-S2Open ↗
09/01/2026M01082464-I1Open ↗
08/29/2026M00622055-P7Open ↗
Showing 3 of 21 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
09/03/2026M00622055-S2Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist9
09/03/2026M00622055-P6Open ↗
09/03/2026M00622055-P7Open ↗
09/03/2026M00622055-S2Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form15
09/03/2026M00610202-I1Open ↗
09/03/2026M00610202-S1Open ↗
09/03/2026M00610202-S2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026M01356904-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWOER: Notice to Proceed1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWOER: Notice of Satisfaction1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs53
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter35
09/03/2026M00610202-P5Open ↗
09/03/2026M00610202-P4Open ↗
09/03/2026M00610202-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)9
09/03/2026M00622055-S2Open ↗
Showing 1 of 9 on file for this type
▸DOB NOWDEP Variance (V5) letter9
09/03/2026M00610202-I1Open ↗
09/03/2026M00610202-S1Open ↗
09/03/2026M00610202-S2Open ↗
Showing 3 of 9 on file for this type
▸Other Documents32
▸DOB NOWFlood Plan Emergency Temporary Flood Shields8
09/03/2026M00622055-P6Open ↗
09/03/2026M00622055-P7Open ↗
09/03/2026M00622055-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
09/03/2026M00622055-P4Open ↗
09/03/2026M00622055-P6Open ↗
09/03/2026M00622055-P7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlot Diagram7
09/03/2026M00622055-P6Open ↗
09/03/2026M00622055-P7Open ↗
09/03/2026M00622055-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSite Survey: Initial6
09/03/2026M00622055-P6Open ↗
09/03/2026M00622055-P7Open ↗
09/03/2026M00622055-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProof of Historic Building2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWWaiver Document1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type