← Back
BuildNYC
Elevator co-op, conversion from loft/warehouse
Romanoff Condominium
463 GREENWICH STREET · BIN 1002929
💬 Discuss this project
1910Year Built
6Stories
D0Building Class
C6-2AZoning
82,548 sfGross Floor Area
35Units
Rent Stabilized0 Active Violations 4 likely answered ▸FDNY Report ↗
Elevator co-op, conversion from loft/warehouse · Owner of record: C. True Building · 15,700 sf lot · 5.26 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMechanical workUnder Construction38p · 6 filings · 20 docs
Floor 5Unit 5A, Unit 5WUnder Construction85p · 4 filings · 20 docs
Floor 45p · 1 filing · 9 docs
Floor 3Under Construction9p · 1 filing · 10 docs
Floor 26p · 1 filing · 7 docs
Floor 1Zoning analysis and interior alterationsUnder Construction14p · 5 filings · 20 docs
MezzanineZoning analysis and interior alterationsUnder Construction9p · 3 filings · 19 docs
CellarZoning analysis and interior alterationsUnder Construction18p · 4 filings · 20 docs
Sub-BasementStructural repairs to first floor framingUnder Construction1p · 1 filing · 10 docs
Site & exteriorTemporary heavy duty sidewalk shed installationUnder Construction9p · 3 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
C True Building19203/22/2026
Andrews Building2003/21/2026
Romanoff Condominium1003/21/2026
941 Park Avenue803/21/2026
Greenwich Desbrosses Realty603/21/2026
Ten Seventy One Associates JV % Adams203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Synergy Building Consultants203/21/2026
Epac Building Consulting803/21/2026
Socotec803/21/2026
Enkay Design Consulting203/21/2026
Code403/21/2026
LGML Group203/21/2026
Resolution Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
West New York Restoration of CTScaffold908/11/2026
New EntityGeneral Contractor507/08/2026
Advance Team Consultant *General Contractor510/04/2026
West New York Restoration of CTspecialty_contractor307/19/2026
Safepipe PlumbingPlumbing209/26/2026
Crossfield Plumbing & HeatingPlumbing210/16/2026
Almo Mechanicalspecialty_contractor203/21/2026
Venezia InteriorsGeneral Contractor207/08/2026
Simple Choice Plumbing and HTPlumbing207/08/2026
Demar MechanicalPlumbing207/08/2026
Home AirGeneral Contractor207/08/2026
Lech W ConstructionGeneral Contractor207/08/2026
Vip Fire SprinklerFire Protection107/08/2026
Dececk & LeonardElectrical103/22/2026
Aurous Construction Coll*General Contractor104/09/2026
Mark Brady ContractingGeneral Contractor107/08/2026
Flint MechanicalPlumbing108/12/2026
Fluid MechanicsFire Protection107/08/2026
Safepipe PlumbingFire Protection107/08/2026
Smart Plumbing & HeatingPlumbing107/08/2026
TMS Plumbing & HeatingPlumbing107/08/2026
AMC Electrical ServicesElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
P.a.collins Inspections P2168307/20/2026
Maletz Design3250206/05/2026
Green Solutions Engineering5478305/18/2026
Sag Engineering & Consulting608205/15/2026
Etna Consulting Structural8263105/15/2026
Fuhrmann Architecture8109204/07/2026
New Age Engineering7746210/09/2025
O'Rourke Engineering5873208/11/2025
Seth P Roye Architect8554107/18/2025
KZ Engineering4665105/29/2025
Mohammad Ahead - Professi9286104/01/2025
Ishac Design Architects P3918103/27/2025
City-Wide Testing416103/27/2025
Edward F Zevallos Architects1025311/13/2024
Engineering Solutions, PL6492111/10/2023
McKay Architecture and de3458107/26/2023
Building Lifecycle
All (258)Filed (36)Permit Issued (41)Signed Off (7)Violation (60)Inspection (14)Objection (70)Special Inspection (30)
10/19/2026
Signed off — Alteration
CONNECT REPLACEMENT GAS-FIRED BOILER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01277736-S1
10/19/2026
Signed off — Alteration
CONNECT REPLACEMENT GAS-FIRED BOILER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01277736-I1
10/15/2026
Permit issued — Plumbing
M01110070-S1-PL
09/28/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/25/2026
Permit issued — Plumbing
M01221354-S1-PL
09/15/2026
Objection resolved — Resolved
09/14/2026
Objection raised — Structural
09/04/2026
Permit issued — Mechanical Systems
M01199177-I1-MS
08/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/17/2026
Permit issued — General Construction
M01221354-I1-GC
08/11/2026
Permit issued — Plumbing
M01377272-S1-PL
08/10/2026
Permit issued — Sidewalk Shed
M01207323-I1-SH
08/06/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/03/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/30/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIZABETH MALETZ
07/29/2026
Objection raised — Other
07/29/2026
Objection raised — Other
07/27/2026
Objection resolved — Resolved
07/27/2026
Objection resolved — Resolved
07/22/2026
Objection raised — Structural
07/22/2026
Objection raised — Scope
07/21/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/20/2026
Filed — Alteration
FILNG HEREWITH FOR THE PROPOSED NEW BATHROOM, INSTALLATION OF NEW PLUMBING FIXTURESON NEW ROUGH-INS, CONNECTION TO EXISTING BASE-BUILDING PLUMBINGRISERS. NO CHANGE IN USE OR EGRESS PROPOSED UNDER THIS APPLICATION.
M01311737-P3
07/20/2026
Filed — Alteration
FILNG HEREWITH FOR THE PROPOSED NEW BATHROOM, INSTALLATION OF NEW PLUMBING FIXTURESON NEW ROUGH-INS, CONNECTION TO EXISTING BASE-BUILDING PLUMBINGRISERS. NO CHANGE IN USE OR EGRESS PROPOSED UNDER THIS APPLICATION.
M01311737-P2
07/17/2026
Permit issued — General Construction
M01182331-I1-GC
07/08/2026
Special inspection requirement — Sprinkler Systems
Paul Collins
07/06/2026
Filed — Alteration
CONNECT REPLACEMENT GAS-FIRED BOILER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01277736-P3
07/06/2026
Special inspection requirement — Maintenance information
Stephen Shishko
07/06/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Stephen Shishko
07/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
07/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
07/02/2026
Permit issued — Structural
M01397633-I1-ST
06/19/2026
Special inspection requirement — Maintenance information
Stephen Shishko
06/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
06/19/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Stephen Shishko
06/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
06/19/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/05/2026
Filed — Alteration
interior renovation of an existing fifth floor space in residential apartment, sprinkler work as per plan.
M01110070-P2
06/05/2026
Filed — Alteration
interior renovation of an existing fifth floor space in residential apartment, sprinkler work as per plan.
M01110070-P1
06/05/2026
Permit issued — General Construction
M01377272-I1-GC
06/05/2026
Objection resolved — Addressed
06/05/2026
Objection resolved — Addressed
06/03/2026
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
05/28/2026
Permit issued — Sidewalk Shed
M01207323-I1-SH
05/28/2026
Objection raised — Other
05/28/2026
Objection raised — Other
05/20/2026
Special inspection requirement — Sprinkler Systems
Brian Bisram
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brian Bisram
05/18/2026
Filed — Alteration
interior renovation of an existing fifth floor space in residential apartment, sprinkler work as per plan.
M01110070-P3
05/15/2026
Filed — Alteration
STRUCTURAL REPAIRS TO FIRST FLOOR FRAMING. NO CHANGE IN USE OR EGRESS
M01397633-I1
05/15/2026
Special inspection requirement — Sprinkler Systems
Brian Bisram
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brian Bisram
05/11/2026
Objection resolved — Addressed
05/11/2026
Objection resolved — Addressed
05/11/2026
Objection resolved — Addressed
05/08/2026
Special inspection requirement — Post-installed Anchors
Adam Cohen
Latest 60 of 258 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCrossfield Plumbing & Heating10/15/2026
DOB NOWPlumbingPermit IssuedSafepipe Plumbing09/25/2026
DOB NOWMechanical SystemsPermit IssuedAdvance Team Consultant *09/04/2026
DOB NOWGeneral ConstructionPermit IssuedAdvance Team Consultant *08/17/2026
DOB NOWPlumbingPermit IssuedFlint Mechanical08/11/2026
DOB NOWSidewalk ShedPermit IssuedWest New York Restoration of CT08/10/2026
DOB NOWGeneral ConstructionPermit IssuedWest New York Restoration of CT07/17/2026
DOB NOWStructuralPermit IssuedWest New York Restoration of CT07/02/2026
DOB NOWGeneral ConstructionPermit IssuedMark Brady Contracting06/05/2026
DOB NOWSidewalk ShedPermit IssuedWest New York Restoration of CT05/28/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedWest New York Restoration of CT05/01/2026
DOB NOWSidewalk ShedPermit IssuedWest New York Restoration of CT05/01/2026
DOB NOWMechanical SystemsPermit IssuedLech W Construction04/20/2026
DOB NOWPlumbingPermit IssuedSimple Choice Plumbing and HT03/25/2026
DOB NOWSprinklersPermit IssuedFluid Mechanics03/02/2026
DOB NOWMechanical SystemsPermit IssuedHome Air01/26/2026
DOB NOWBoiler EquipmentSigned-offDemar Mechanical01/12/2026
DOB NOWPlumbingSigned-offDemar Mechanical01/12/2026
DOB NOWPlumbingPermit IssuedSimple Choice Plumbing and HT12/15/2025
DOB NOWGeneral ConstructionPermit IssuedLech W Construction12/12/2025
DOB NOWMechanical SystemsPermit IssuedHome Air11/07/2025
DOB NOWSprinklersSigned-offBellerose Plumbing & Heating11/07/2025
DOB NOWStructuralSigned-offAdvance Team Consultant *10/29/2025
DOB NOWSprinklersPermit IssuedVip Fire Sprinkler10/23/2025
DOB NOWPlumbingPermit IssuedCrossfield Plumbing & Heating10/08/2025
DOB NOWGeneral ConstructionPermit IssuedAurous Construction Coll*10/03/2025
DOB NOWPlumbingPermit IssuedBellerose Plumbing & Heating09/26/2025
DOB NOWMechanical SystemsPermit IssuedAdvance Team Consultant *09/05/2025
DOB NOWGeneral ConstructionPermit IssuedAdvance Team Consultant *08/06/2025
DOB NOWGeneral ConstructionPermit IssuedA. Peter Luger Construction08/01/2025
DOB NOWGeneral ConstructionSigned-offNew Entity07/02/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedA. Peter Luger Construction05/29/2025
DOB NOWSidewalk ShedPermit IssuedA. Peter Luger Construction05/29/2025
DOB NOWSidewalk ShedPermit IssuedA. Peter Luger Construction05/29/2025
DOB NOWMechanical SystemsPermit IssuedAlmo Mechanical03/06/2024
DOB NOWGeneral ConstructionSigned-offVenezia Interiors01/08/2024
DOB NOWMechanical SystemsSigned-offNew Entity12/14/2023
DOB NOWPlumbingSigned-offTMS Plumbing & Heating09/21/2023
DOB NOWGeneral ConstructionSigned-offVenezia Interiors09/18/2023
DOB NOWPlumbingSigned-offSmart Plumbing & Heating08/21/2023
+ 51 more permits on file
2 projects · most recent 07/20/2026
FiledStatusContractorScope
07/20/2026Permit IssuedFluid Mechanics14 heads
06/05/2026Permit IssuedVip Fire Sprinkler72 heads
5 projects · most recent 07/20/2026
Water/Sanitary Gas
FiledStatusContractorScope
07/20/2026Permit IssuedSimple Choice Plumbing and HTWater/Sanitary
07/06/2026Signed-offDemar MechanicalGas
06/05/2026Permit IssuedCrossfield Plumbing & HeatingGas, Water/Sanitary
04/07/2026Permit IssuedBletsas P&HGas, Water/Sanitary
08/11/2025Permit IssuedSafepipe PlumbingGas, Water/Sanitary
21 projects · most recent 07/24/2026
General Wiring
FiledStatusContractorScope
07/24/2026Permit IssuedAccurate ElectricalGeneral Wiring
07/08/2026Permit IssuedIntelogic ElectricGeneral Wiring
06/15/2026Permit IssuedBLZ ElectricGeneral Wiring
12/10/2025Permit IssuedGlendale Electl ContngGeneral Wiring
09/05/2025CompleteBLZ ElectricGeneral Wiring
08/12/2025CompleteCL Electrical—
05/29/2025Permit IssuedOmd Electrical1 meters, 1 new_meters
04/07/2025Permit IssuedNash Electric Services—
03/29/2024Permit IssuedFraccavento ElectricGeneral Wiring
01/11/2024CompleteA.L. Electrical—
09/21/2023Permit IssuedInfinity ElectricGeneral Wiring
06/27/2022CompleteCole ElectricGeneral Wiring
09/27/2020CompleteA&E Electrical Systems CoGeneral Wiring
08/21/2020CompleteDececk & LeonardGeneral Wiring
09/30/2019CompleteResponse Electric—
2 projects · most recent 05/15/2026
Steel Wood
FiledStatusContractorScope
05/15/2026Permit IssuedWest New York RestorationSteel
04/01/2025Signed-offAdvance Team Consultant *Steel, Wood
1 project · most recent 05/29/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/29/2025Permit IssuedWest New York RestorationScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
09/28/2026Pass-Final General Construction Non-Directive 14PassView ↗
08/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/21/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/03/2026Pass-Final Sign Permit InspectionPassView ↗
04/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/03/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/03/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/12/2026Pass-Final Boiler Equipment InspectionPassView ↗
01/21/2026Fail-Final Boiler Equipment InspectionFailView ↗
12/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
07/30/2026Fire-Resistant Penetrations and JointsELIZABETH MALETZspecial
07/08/2026Sprinkler SystemsPaul Collinsspecial
07/06/2026Tenant Protection Plan Compliance—special
07/06/2026Maintenance informationStephen Shishkoenergy_progress
07/06/2026HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
07/06/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Stephen Shishkospecial
07/06/2026HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
06/19/2026Maintenance informationStephen Shishkoenergy_progress
06/19/2026HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
06/19/2026Tenant Protection Plan Compliance—special
06/19/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Stephen Shishkospecial
06/19/2026HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
05/20/2026Fire-Resistant Penetrations and JointsBrian Bisramspecial
05/20/2026Sprinkler SystemsBrian Bisramspecial
05/15/2026Sprinkler SystemsBrian Bisramspecial
05/15/2026Fire-Resistant Penetrations and JointsBrian Bisramspecial
05/08/2026Post-installed AnchorsAdam Cohenspecial
05/05/2026Tenant Protection Plan ComplianceChester Kowalskispecial
05/05/2026Structural Steel - DetailsAdam Cohenspecial
05/05/2026Structural Stability – Alterations of existing buildingsAdam Cohenspecial
05/05/2026Structural Steel - WeldingAdam Cohenspecial
05/05/2026FinalAdam Cohenprogress
04/29/2026Lighting controlsELIZABETH MALETZenergy_progress
04/29/2026Lighting in dwelling unitsELIZABETH MALETZenergy_progress
04/29/2026Interior lighting powerELIZABETH MALETZenergy_progress
Latest 25 of 61.
▾Documents — 1,178 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch36
08/29/2026M00902880-S2Request digital key ↗
08/29/2026M00902880-S1Request digital key ↗
08/29/2026M00902880-P1Request digital key ↗
Showing 3 of 36 on file for this type
▸Applications & Permits268
▸BISWORK PERMIT APPLICATION122
09/11/2020140936192Open ↗
08/19/2020122049924Open ↗
02/24/2020123553868Open ↗
Showing 3 of 122 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION117
03/26/2022123553868Open ↗
06/14/2021123907834Open ↗
06/02/2021123907834Open ↗
Showing 3 of 117 on file for this type
▸DOB NOWLPC Approval/Permit25
08/29/2026M00902880-I1Open ↗
08/20/2026M01311737-P1Open ↗
08/15/2026M01110070-P1Open ↗
Showing 3 of 25 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
09/18/2020122049924Open ↗
09/18/2020122049924Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
08/11/2021123908432Open ↗
06/08/2021123907834Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
08/14/2020140936192Open ↗
▸Seals & Professional Certifications233
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION124
03/26/2020123561225Open ↗
03/26/2020123561225Open ↗
03/12/2020123561225Open ↗
Showing 3 of 124 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature36
08/29/2026M00902880-I1Open ↗
08/28/2026M00932446-I1Open ↗
08/24/2026M01199177-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
10/19/2026M01277736-S1Open ↗
10/19/2026M01277736-S1Open ↗
10/19/2026M01277736-S1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
10/19/2026M01277736-S1Open ↗
09/30/2026M00902880-I1Open ↗
09/23/2026M01110070-S3Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/14/2020140936192Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment130
▸BISSELF-CERT PLUMBING NOTICE47
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 47 on file for this type
▸BISSCHEDULE B - PLUMBING44
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 44 on file for this type
▸BISEQUIPMENT USE PERMITS12
04/20/2017122478363Open ↗
Showing 1 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
03/27/2019123553868Open ↗
08/17/2018123561225Open ↗
08/14/2018123553868Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
04/20/2017122478363Open ↗
Showing 1 of 8 on file for this type
▸BISSPRINKLER INSP REPORT : FP-856
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISJAMAICA: DEP SEWER CONNECTION APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸BISTenant Protection Plan and Notes4
08/17/2018123561225Open ↗
08/14/2018123553868Open ↗
Showing 2 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISST-1 Street Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWStreet Tree Checklist1
08/13/2026M01221354-I1Open ↗
▸Environmental & Asbestos66
▸DOB NOWDEP ACP-5: Asbestos Assessment Report28
08/29/2026M00902880-I1Open ↗
08/28/2026M00932446-I1Open ↗
08/24/2026M01199486-I1Open ↗
Showing 3 of 28 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
08/14/2020140936192Open ↗
08/17/2018123561225Open ↗
08/14/2018123553868Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance45
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
04/10/2019122715838Open ↗
08/31/2018122988794Open ↗
08/14/2018123553868Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
02/23/2021140936192Open ↗
05/31/2019122049924Open ↗
04/10/2019122715838Open ↗
Showing 3 of 12 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/23/2022123553868Open ↗
02/23/2021140936192Open ↗
08/14/2020140936192Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/14/2020140936192Open ↗
▸BISLIGHTING IN DWELLING UNITS1
05/20/2022123553868Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/20/2022123553868Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/23/2022123553868Open ↗
02/23/2021140936192Open ↗
08/14/2020140936192Open ↗
Showing 3 of 5 on file for this type
▸BISMECHANICAL SYSTEMS1
05/20/2022123553868Open ↗
▸Approvals, Objections & Sign-offs130
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST59
05/25/2022123553868Open ↗
02/23/2021140936192Open ↗
09/18/2020122049924Open ↗
Showing 3 of 59 on file for this type
▸BISLANDMARKS APPROVAL32
08/14/2020140936192Open ↗
10/29/2019122049924Open ↗
08/20/2018123553868Open ↗
Showing 3 of 32 on file for this type
▸BISADMINISTRATIVE OBJECTIONS23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
11/07/2019122049924Open ↗
04/10/2019122715838Open ↗
Showing 2 of 7 on file for this type
▸BISLANDMARKS SIGNOFF3
05/24/2022123553868Open ↗
02/23/2021140936192Open ↗
09/03/2020122049924Open ↗
▸BISSCHEDULE A - OCCUPANCY - USE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLETTERS - APPRVD FAB CERT-INTENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
05/20/2022123553868Open ↗
▸Cost, Insurance & Ownership86
▸BISCOST AFFIDAVIT83
02/23/2021140936192Open ↗
08/14/2020140936192Open ↗
03/26/2020123561225Open ↗
Showing 3 of 83 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
05/23/2022123553868Open ↗
09/03/2020122049924Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms136
▸BISADDITIONAL INFORMATION54
05/17/2022123553868Open ↗
08/14/2020140936192Open ↗
05/14/2019123553868Open ↗
Showing 3 of 54 on file for this type
▸BISEFILING COVER SHEET50
08/02/2021123908432Open ↗
05/04/2021123907834Open ↗
08/17/2018123561225Open ↗
Showing 3 of 50 on file for this type
▸BISBOROUGH INTAKE FORM29
08/19/2020122049924Open ↗
08/07/2020122049924Open ↗
03/26/2020123561225Open ↗
Showing 3 of 29 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
08/14/2020140936192Open ↗
Showing 1 of 3 on file for this type
▸Other Documents18
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
10/30/2018123553868Open ↗
07/06/2017122478363Open ↗
Showing 2 of 6 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProof of Historic Building4
08/29/2026M00902880-I1Open ↗
08/13/2026M00902880-P1Open ↗
08/13/2026M00859338-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSupporting Document: Fee Exempt3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type