← Back
Elevator apt, semi-fireproof with stores
Hudson Crossing
400 WEST 37 STREET · BIN 1087624
💬 Discuss this project
2002Year Built
13Stories
D7Building Class
C1-7AZoning
214,594 sfGross Floor Area
261Units
LL97 CoveredRent Stabilized18 Open Violations 14 unresolved · 4 paperwork only ▸FISP: SAFE
Elevator apt, semi-fireproof with stores · 20,775 sf lot · 10.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionGeneral
Roof4p · 2 filings · 20 docs
Floor 110p · 4 filings · 20 docs
Sub-Cellar2p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EQUITY RESIDENTIAL4009/13/2026
ACCESS 37 PARKING LLC103/22/2026
THE OWNER OF803/22/2026
PORT OF NY AUTHORITY STE203/22/2026
SIX APPLE PARKING CORP1103/22/2026
C O EQUITY RESIDENTIAL503/21/2026
DERMOT203/21/2026
EQUITY RESIDENTIAL MANAGEMENT503/21/2026
ALMARK HOLDING103/21/2026
475 NITH AVENUE ASS303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J BUILDING CONSULTING1003/21/2026
DI DIO ARCHITECTURE, PC803/21/2026
CONVERSANO ASSOCIATES, INC.203/21/2026
K M DOB CONSULTING803/21/2026
ROBERT S SCHNITZER203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WORLD DESIGN NY INCGeneral Contractor407/08/2026
TRV MECHANICAL CONTRACTORGeneral Contractor204/09/2026
K.E.S CONSTRUCTION CO INCGeneral Contractor207/08/2026
DENAIR HVAC INCGeneral Contractor207/08/2026
HECTOR MEJIAElectrical103/21/2026
YOUNG CHOEElectrical103/21/2026
AVON PLBG & HTG INCFire Protection107/08/2026
KALE CONSTRUCTION INCGeneral Contractor104/09/2026
LTB MECHANICAL CORPGeneral Contractor109/07/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
BEARD, JOIElectrical103/21/2026
AVON PLBG & HTG INCPlumbing107/08/2026
COSIMO CURCIOElectrical103/21/2026
CURCIO COSIMOElectrical103/21/2026
FABCON PRECAST LLCElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MARCY ENGINEERING9601206/12/2026
SYNERGY ENGINEERING784103/11/2026
AMME CONSULTING LLC8207112/12/2025
SD TESTING & INSPECTION S7010510/15/2025
AMKA & ASSOCIATES LLC8239105/19/2025
PIRO STUDIO LLC7503403/26/2025
MG NEW YORK ARCHITECTS, P3444202/26/2024
CHONG ENGINEERING P.C.7411512/11/2023
VENTROP ENGINEERING CONSU450112/04/2019
Building Lifecycle
All (157)Filed (19)Permit Issued (13)Signed Off (9)Facade (FISP) (9)Violation (60)Inspection (13)Objection (4)Special Inspection (30)
09/03/2026
Permit issued — Mechanical Systems
M01354214-I1-MS
07/22/2026
Filed — Alteration
Facade Inspection
M01408064-I1
06/25/2026
Violation issued (HPD, open)
A
06/25/2026
Violation issued (HPD, open)
A
06/12/2026
Filed — Alteration
Installation of (2) new ducted split heat pump systems to replace indoor packaged air cooled units for existing retail space (Step Soul Spa).
M01324960-P1
06/12/2026
Special inspection requirement — Mechanical Systems
Jacob Stone
06/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Jacob Stone
06/12/2026
Special inspection requirement — Maintenance information
Jacob Stone
06/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jacob Stone
06/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
Jacob Stone
06/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
JAMES CALLAHAN
06/12/2026
Special inspection requirement — Final
Jacob Stone
06/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
Jacob Stone
05/12/2026
Special inspection requirement — Final
Jacob Stone
05/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Jacob Stone
05/12/2026
Special inspection requirement — Maintenance information
Jacob Stone
05/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jacob Stone
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
Jacob Stone
05/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
Jacob Stone
05/12/2026
Special inspection requirement — Mechanical Systems
Jacob Stone
05/04/2026
Violation issued (ECB, open)
Elevators
03/16/2026
Signed off — Alteration
(1) 15 ton rooftop unit will be replaced with new (1) 15 ton RTU, located on the exact same existing roof curb.
M00664725-I1
03/16/2026
Signed off — Alteration
(1) 25 Ton RTU to be replaced with new 25 ton RTU located on exact same existing roof curb.
M00664722-I1
03/11/2026
Filed — Alteration
Filing herewith to replace and alter existing lobby HVAC system with new air source VRF Heat pump systems including ductwork, piping, and control.
M01354214-I1
02/16/2026
Violation issued (HPD, open)
B
02/10/2026
Signed off — Alteration
Installation of (2) new ducted split heat pump systems to replace indoor packaged air cooled units for existing retail space (Step Soul Spa).
M01324960-I1
02/02/2026
Special inspection requirement — Final
Alec Strongin
02/02/2026
Special inspection requirement — Mechanical Systems
Alec Strongin
02/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
Alec Strongin
02/02/2026
Special inspection requirement — Post-installed Anchors
Alec Strongin
02/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Alec Strongin
02/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Alec Strongin
02/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
Alec Strongin
02/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Alec Strongin
02/02/2026
Special inspection requirement — Maintenance information
Alec Strongin
02/02/2026
Special inspection requirement — Electrical motors and elevators
Alec Strongin
01/08/2026
Permit issued — Mechanical Systems
M01324960-I1-MS
01/07/2026
Permit issued — Mechanical Systems
M00664725-I1-MS
01/07/2026
Permit issued — Mechanical Systems
M00664722-I1-MS
12/12/2025
Filed — Alteration
Installation of (2) new ducted split heat pump systems to replace indoor packaged air cooled units for existing retail space (Step Soul Spa).
M01324960-I1
12/05/2025
Violation issued (HPD, open)
B
12/02/2025
Signed off — Alteration
INTERIOR RENOVATION AT 1ST FLOOR BEAUTY SALON OF EXISTING 13-STORY BUILDING WITH GENERAL CONSTRUCTION WORK AS PER PLAN FILED HEREWITH. RELATED PLUMBING WORK WILL BE FILED SUBSEQUENTLY. NO CHANGE IN USE, EGREE OR CERTIFICATE OF OCCUPANCY.
M01152987-S1
12/02/2025
Signed off — Alteration
INTERIOR RENOVATION AT 1ST FLOOR BEAUTY SALON OF EXISTING 13-STORY BUILDING WITH GENERAL CONSTRUCTION WORK AS PER PLAN FILED HEREWITH. RELATED PLUMBING WORK WILL BE FILED SUBSEQUENTLY. NO CHANGE IN USE, EGREE OR CERTIFICATE OF OCCUPANCY.
M01152987-I1
11/17/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/03/2025
Special inspection requirement — Exterior lighting power
XIUCHENG LI
11/03/2025
Special inspection requirement — Interior lighting power
XIUCHENG LI
11/03/2025
Special inspection requirement — Lighting controls
XIUCHENG LI
11/03/2025
Special inspection requirement — Maintenance information
XIUCHENG LI
10/28/2025
Objection resolved — Addressed
10/23/2025
Objection raised — Admin
10/15/2025
Filed — Alteration
INTERIOR RENOVATION AT 1ST FLOOR BEAUTY SALON OF EXISTING 13-STORY BUILDING WITH GENERAL CONSTRUCTION WORK AS PER PLAN FILED HEREWITH. RELATED PLUMBING WORK WILL BE FILED SUBSEQUENTLY. NO CHANGE IN USE, EGREE OR CERTIFICATE OF OCCUPANCY.
M01152987-P4
10/14/2025
Signed off — Alteration
Garage repairs as per plans; no change to use, occupancy, or egress. No change to number of parking spaces.
M01220178-I1
09/23/2025
Violation issued (ECB, closed)
Unknown
09/06/2025
Violation issued (HPD, open)
B
09/06/2025
Violation issued (HPD, open)
A
08/11/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/22/2025
Permit issued — Structural
M01220178-I1-ST
07/22/2025
Permit issued — Structural
M01220178-I1-GC
07/11/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
Latest 60 of 157 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedLTB MECHANICAL CORP09/03/2026
DOB NOWMechanical SystemsSigned-offDENAIR HVAC INC01/08/2026
DOB NOWMechanical SystemsSigned-offTRV MECHANICAL CONTRACTOR01/07/2026
DOB NOWMechanical SystemsSigned-offTRV MECHANICAL CONTRACTOR01/07/2026
DOB NOWStructuralSigned-offK.E.S CONSTRUCTION CO INC07/22/2025
DOB NOWStructuralSigned-offK.E.S CONSTRUCTION CO INC07/22/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.02/07/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC01/16/2025
DOB NOWSprinklersSigned-offAVON PLBG & HTG INC06/07/2023
DOB NOWSprinklersPermit IssuedAVON PLBG & HTG INC06/06/2023
DOB NOWMechanical SystemsSigned-offWORLD DESIGN NY INC06/06/2023
DOB NOWGeneral ConstructionSigned-offWORLD DESIGN NY INC06/06/2023
DOB NOWMechanical SystemsSigned-offDENAIR HVAC INC01/17/2020
BISOTISSUEDH&K NY CORP03/22/2019
BISSPISSUEDPACIFIC PLBG. & HTG. CORP03/18/2019
BISPLISSUEDPACIFIC PLBG&HTG CORP03/18/2019
BISOTISSUEDDOW CAD INC03/11/2019
BISPLISSUEDPUMPING SOL PLBG & MECH I07/12/2018
BISPLISSUEDSUPERB PLUMBING & HEATING02/13/2018
BISBLISSUEDC C CONTROLLED COMBUSTION05/17/2017
BISPLISSUEDSUPERB PLUMBING & HEATING09/09/2016
BISOTISSUEDBINDELA CONSTRUCTION LLC08/24/2016
BISEQISSUEDROCKLEDGE SCAFFOLD CORP06/23/2014
BISOTISSUEDCANIDO BASONAS CONSTRUCTI04/04/2014
BISEQISSUEDROCKLEDGE SCAFFOLD CORP07/23/2013
BISOTISSUEDCANIDO BASONAS CONSTRUCTI04/04/2013
BISOTISSUEDCANIDO BASONAS CONSTRUCTI01/23/2013
BISOTISSUEDBASONAS CONSTRUCTION CORP09/10/2012
BISEQISSUEDROCKLEDGE SCAFFOLD CORP08/20/2012
BISPLISSUEDPARAMOUNT PLUMBING SERVICES & AL02/20/2008
BISMHISSUEDCONSTRUCTOMICS LLC10/18/2006
BIS—ISSUEDSIGNS CAD CORP12/15/2004
BIS—ISSUEDSIGNS CAD CORP12/15/2004
BISSPISSUEDRAM FIRE PROTECTION CORP06/11/2004
BIS—ISSUEDNY SIGN CITY INC.05/14/2004
BIS—ISSUEDNY SIGN CITY INC.05/14/2004
BIS—ISSUEDBERGER SIGN FABR. INC.04/21/2004
BIS—ISSUEDBERGER SIGN FABR. INC.04/21/2004
BIS—ISSUEDVJB CONSTRUCTION CORP08/19/2003
BIS—ISSUEDVJB CONSTRUCTION CORP04/21/2003
+ 14 more permits on file
2 projects · most recent 06/12/2026
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/12/2026Signed-offDENAIR HVAC INCHeating and Air Conditioning Systems
Heat / Cool
Cooper & Hunter CHV6-RS48URBM 96,000 BTU · Vrf Outdoor ×4
03/11/2026Permit IssuedLTB MECHANICAL CORPAir Conditioning Systems
Cooling
Lg ZRUM192BTE6 16 tons · Vrf Outdoor ×1
1 project · most recent 05/16/2023
FiledStatusContractorScope
05/16/2023Permit IssuedAVON PLBG & HTG INC—
1 project · most recent 05/16/2023
Water/Sanitary
FiledStatusContractorScope
05/16/2023Signed-offAVON PLBG & HTG INCWater/Sanitary
6 projects · most recent 08/10/2026
General Wiring
FiledStatusContractorScope
08/10/2026Permit IssuedINTERSTATE ELECTRIC, LLCGeneral Wiring
10/13/2025CompleteHECMAR ELECTRICGeneral Wiring
05/24/2024Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
06/07/2023CompleteDELTA POWER ELECTRICALGeneral Wiring
04/08/2019Permit IssuedPAGS ELECTRICAL CONTNG LLGeneral Wiring
03/29/2019Permit IssuedRESPONSE ELECTRIC INC.General Wiring
1 project · most recent 07/22/2026
FiledStatusContractorScope
07/22/2026———
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
11/17/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/11/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/01/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/28/2024Pass-Final General Construction Non-Directive 14PassView ↗
07/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/07/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/06/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 94
DateRequirementInspectorRole
06/12/2026Mechanical SystemsJacob Stonespecial
06/12/2026HVAC-R and service water heating system controlsJacob Stoneenergy_progress
06/12/2026Maintenance informationJacob Stoneenergy_progress
06/12/2026HVAC-R and service water piping design and insulationJacob Stoneenergy_progress
06/12/2026HVAC-R and service water heating equipmentJacob Stoneenergy_progress
06/12/2026FinalJacob Stoneprogress
06/12/2026Energy Code Compliance InspectionsJacob Stoneprogress
06/12/2026Tenant Protection Plan ComplianceJAMES CALLAHANspecial
05/12/2026HVAC-R and service water piping design and insulationJacob Stoneenergy_progress
05/12/2026Mechanical SystemsJacob Stonespecial
05/12/2026Tenant Protection Plan Compliance—special
05/12/2026Energy Code Compliance InspectionsJacob Stoneprogress
05/12/2026FinalJacob Stoneprogress
05/12/2026HVAC-R and service water heating system controlsJacob Stoneenergy_progress
05/12/2026HVAC-R and service water heating equipmentJacob Stoneenergy_progress
05/12/2026Maintenance informationJacob Stoneenergy_progress
02/02/2026HVAC-R and service water heating system controlsAlec Stronginenergy_progress
02/02/2026Post-installed AnchorsAlec Stronginspecial
02/02/2026Tenant Protection Plan ComplianceAlec Stronginspecial
02/02/2026Mechanical SystemsAlec Stronginspecial
02/02/2026FinalAlec Stronginprogress
02/02/2026Energy Code Compliance InspectionsAlec Stronginprogress
02/02/2026Electrical motors and elevatorsAlec Stronginenergy_progress
02/02/2026HVAC-R and service water heating equipmentAlec Stronginenergy_progress
02/02/2026Maintenance informationAlec Stronginenergy_progress
Latest 25 of 94.
▾Documents — 318 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch16
08/31/2026M00871854-I1Request digital key ↗
08/31/2026M00871790-I1Request digital key ↗
08/31/2026M00871879-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00273708-I1Request digital key ↗
▸Applications & Permits48
▸BISPLAN / WORK APPROVAL APPLICATION31
09/12/2024103155210Open ↗
09/12/2024103741569Open ↗
09/12/2024103741578Open ↗
Showing 3 of 31 on file for this type
▸BISWORK PERMIT APPLICATION13
03/22/2019123826002Open ↗
03/18/2019123826002Open ↗
03/18/2019123826002Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit4
08/13/2026M01152987-P4Open ↗
08/13/2026M01152987-P2Open ↗
08/13/2026M00871790-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications124
▸DOB NOWProgress Inspector Seal & Signature58
09/27/2026M01152987-S1Open ↗
09/18/2026M00871790-I1Open ↗
09/18/2026M00871790-I1Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
09/27/2026M01152987-S1Open ↗
09/27/2026M01152987-S1Open ↗
09/23/2026M00871879-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/05/2026M00273708-I1Open ↗
08/31/2026M00871854-I1Open ↗
08/31/2026M00871854-P1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
03/11/2019123826002Open ↗
03/06/2019123826002Open ↗
10/05/2018122630322Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
03/06/2019123826002Open ↗
05/29/2018123454323Open ↗
05/08/2017122853527Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/06/2019123826002Open ↗
05/29/2018123454323Open ↗
05/08/2017122853527Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/21/2012121344367Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
03/06/2019123826002Open ↗
06/06/2018122630322Open ↗
05/29/2018123454323Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING1
07/09/2020123454323Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/02/2014121344367Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/08/2017122853527Open ↗
▸Safety & Tenant Protection28
▸DOB NOWHPD-1: Anti-Harassment Area Checklist18
09/05/2026M00273708-I1Open ↗
08/20/2026M01324960-P1Open ↗
08/13/2026M00664725-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWCertificate of No Harassment4
08/13/2026M00871790-I1Open ↗
08/13/2026M01152987-I1Open ↗
08/13/2026M01152987-P4Open ↗
Showing 3 of 4 on file for this type
▸BISANTI-HARASSMENT CHECKLIST3
03/06/2019123826002Open ↗
07/09/2018123454323Open ↗
07/11/2016122630322Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES2
11/26/2021122853527Open ↗
05/29/2018123454323Open ↗
▸DOB NOWTenant Protection Plan1
09/05/2026M00273708-I1Open ↗
▸Environmental & Asbestos30
▸DOB NOWOER: Notice to Proceed13
08/20/2026M01324960-I1Open ↗
08/20/2026M01324960-P1Open ↗
08/18/2026M01354214-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWOER: Notice of Satisfaction9
08/28/2026M00664725-I1Open ↗
08/20/2026M01324960-P1Open ↗
08/20/2026M01324960-I1Open ↗
Showing 3 of 9 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
07/06/2018123454323Open ↗
07/22/2016122630322Open ↗
▸BISASBESTOS-CERTIFICATION (DEP ACP5)2
09/14/2012121110476Open ↗
03/06/2019123826002Open ↗
▸BISASBESTOS: EXEMPTION (ASB4)1
07/11/2016122630322Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
06/11/2021123454323Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/21/2012121344367Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026M01354214-I1Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
03/11/2019123826002Open ↗
03/06/2019123826002Open ↗
10/05/2018122630322Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
10/05/2018122630322Open ↗
12/09/2015121110476Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/11/2021123454323Open ↗
06/11/2021123454323Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/11/2021123454323Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/05/2026M00273708-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/11/2021123454323Open ↗
06/11/2021123454323Open ↗
▸Approvals, Objections & Sign-offs13
▸BISLETTERS - SUPPORTING DOCUMENTATION5
08/27/2021122853527Open ↗
10/05/2018122630322Open ↗
05/23/2017122853527Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
06/11/2021123454323Open ↗
10/05/2018122630322Open ↗
12/09/2015121110476Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
08/21/2012121344367Open ↗
06/14/2012121110476Open ↗
▸BISSHED LETTER1
07/30/2013121344367Open ↗
▸BISSUPERSEDING LETTER1
03/22/2019123826002Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT10
03/06/2019123826002Open ↗
10/05/2018122630322Open ↗
05/29/2018123454323Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/11/2021123454323Open ↗
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION10
07/09/2020123454323Open ↗
11/30/2018123454323Open ↗
11/21/2018123454323Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET6
03/06/2019123826002Open ↗
05/29/2018123454323Open ↗
05/08/2017122853527Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
10/22/2019123454323Open ↗
10/16/2019123454323Open ↗
11/21/2018123454323Open ↗
Showing 3 of 5 on file for this type
▸Other Documents1
▸DOB NOWIRA Certification1
08/16/2026M01408064-I1Open ↗