← Back
BuildNYC
Hospital, sanitarium, mental institution
Bellevue Hospital
478 REAR 1 AVENUE · BIN 1091053
💬 Discuss this project
1910Year Built
17Stories
I1Building Class
R8Zoning
2,124,441 sfGross Floor Area
1Units
LL97 Covered28 Active Violations 4 unresolved · 24 paperwork only ▸FISP: UNSAFE
Hospital, sanitarium, mental institution · 753,175 sf lot · 2.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsBellevue Hospital1 filing
RoofBellevue Hospital20p · 3 filings
Floor 3Outposted therapeutic housing units2p · 1 filing
Floor 2Bellevue Hospital4p · 3 filings
Floor 1Bellevue Hospital11p · 2 filings
MezzanineOutposted Therapeutic Housing Units3p · 1 filing
CellarBellevue Hospital6p · 3 filings
Site & exteriorBellevue HospitalUnder Construction6 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bellevue Hospital8007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HC Pec208/04/2026
Superstructures Engineering + Architects102/13/2026
Array Architects1206/13/2025
Lakhani & Jordan1301/08/2025
Yu & Associates208/16/2023
Ysrael A. Seinuk306/27/2022
Urban Foundation106/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Metropolis Group6103/21/2026
Superstructures Engineering + Architects103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Consigli Construction CoGeneral Contractor10007/08/2026
Sirina Fire ProtectionFire Protection607/08/2026
Par EnvironmentalGeneral Contractor507/08/2026
Urban Foundation EngineeringScaffold403/21/2026
Northstar Contracting GroupGeneral Contractor407/08/2026
Alliance PlumbingPlumbing307/08/2026
PJP InstallersScaffold208/26/2026
Cardoza PlumbingPlumbing207/08/2026
Pace PlumbingPlumbing107/08/2026
DNA ContractingGeneral Contractor107/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bureau Veritas Na69022206/13/2025
Future Tech Consultants O589311/16/2023
Building Lifecycle
All (226)Filed (33)Permit Issued (80)Signed Off (19)Facade (FISP) (9)Violation (1)Inspection (15)Objection (39)Special Inspection (30)
08/04/2026
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01439432-I1
08/04/2026
Filed — Alteration
STORAGE OF MATERIAL / EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. STORAGE SHALL NOT EXCEED 25 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M01440261-I1
08/04/2026
Permit issued — Protection and Mechanical Methods
M01440261-I1-PMM
08/04/2026
Permit issued — Sidewalk Shed
M01439432-I1-SH
07/20/2026
Permit issued — General Construction
M01356904-I1-GC
02/13/2026
Filed — Alteration
Bellevue Hospital Bldg H Exterior facade repairs as per the plans filed including: Repair of spalled concrete and deteriorated reinforcement of exterior precast cladding and reinforced concrete entrance canopies. Replacement of cracked window glazing.
M01356904-I1
07/30/2025
Signed off — Alteration CO
HEREWITH FILING FOR CHANGE OF OCCUPANCY FROM HOSPITAL TO INPATIENT JAIL TREATMENT ON THE 3RD FLOOR (MARKETING FLR 2) AND ACCESSORY OUTDOOR RECREATION DECK PER PLANS.
M00622055-S2
07/28/2025
Signed off — Alteration
HEREWITH FILING FOR ROOF REPAIR WORK PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M07994761-I1
07/15/2025
Special inspection requirement — Lowest Floor Elevation
IBRAHIM MOURAD
07/11/2025
Signed off — Alteration CO
HEREWITH FILING FOR CHANGE OF OCCUPANCY FROM HOSPITAL TO INPATIENT JAIL TREATMENT ON THE 3RD FLOOR (MARKETING FLR 2) AND ACCESSORY OUTDOOR RECREATION DECK PER PLANS.
M00622055-S4
06/27/2025
Special inspection requirement — Lowest Floor Elevation
IBRAHIM MOURAD
06/27/2025
Special inspection requirement — Preliminary
Noah Tolson
06/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
06/27/2025
Special inspection requirement — Lowest Floor Elevation
IBRAHIM MOURAD
06/27/2025
Special inspection requirement — Preliminary
Noah Tolson
06/27/2025
Special inspection requirement — Sprayed fire-resistant materials
IBRAHIM MOURAD
06/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
IBRAHIM MOURAD
06/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
IBRAHIM MOURAD
06/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
06/27/2025
Special inspection requirement — Sprayed fire-resistant materials
IBRAHIM MOURAD
06/13/2025
Filed — Alteration CO
HEREWITH FILING FOR CHANGE OF OCCUPANCY FROM HOSPITAL TO INPATIENT JAIL TREATMENT ON THE 3RD FLOOR (MARKETING FLR 2) AND ACCESSORY OUTDOOR RECREATION DECK PER PLANS.
M00622055-P7
06/12/2025
Special inspection requirement — Preliminary
Noah Tolson
06/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
06/12/2025
Special inspection requirement — Sprayed fire-resistant materials
IBRAHIM MOURAD
06/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
IBRAHIM MOURAD
06/12/2025
Special inspection requirement — Lowest Floor Elevation
IBRAHIM MOURAD
05/14/2025
Filed — Alteration CO
HEREWITH FILING FOR CHANGE OF OCCUPANCY FROM HOSPITAL TO INPATIENT JAIL TREATMENT ON THE 3RD FLOOR (MARKETING FLR 2) AND ACCESSORY OUTDOOR RECREATION DECK PER PLANS.
M00622055-P6
05/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
05/08/2025
Special inspection requirement — Sprayed fire-resistant materials
IBRAHIM MOURAD
05/08/2025
Special inspection requirement — Preliminary
Noah Tolson
05/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
IBRAHIM MOURAD
05/08/2025
Special inspection requirement — Lowest Floor Elevation
IBRAHIM MOURAD
05/07/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/24/2025
Signed off — Alteration
HEREWITH FILING FOR CONDENSATE PIPING RELOCATION PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00715227-I1
04/08/2025
Permit issued — Mechanical Systems
M00715227-I1-MS
04/08/2025
Permit issued — General Construction
M00622055-S2-GC
04/08/2025
Permit issued — General Construction
M07994761-I1-GC
02/28/2025
Cycle 9 facade report signed — UNSAFE
02/26/2025
Cycle 9 facade inspection completed
02/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/29/2025
Special inspection requirement — Heating Systems
IBRAHIM MOURAD
01/29/2025
Special inspection requirement — Mechanical Systems
IBRAHIM MOURAD
01/29/2025
Special inspection requirement — Final
IBRAHIM MOURAD
01/29/2025
Special inspection requirement — Smoke Control Systems Testing
IBRAHIM MOURAD
01/28/2025
Signed off — Alteration
HEREWITH FILING FOR MECHANICAL SYSTEMS FOR OUTDOOR RECREATION DECK/TOWERS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00896251-S2
01/27/2025
Objection resolved — Addressed
01/17/2025
Signed off — Alteration
HEREWITH FILING FOR STANDPIPE MODIFICATIONS IN CONJUNCTION WITH 3RD FLR (MARKETING 2) CHANGE OF OCCUPANCY PER PLANS.
M01082464-I1
01/10/2025
Signed off — Alteration
HEREWITH FILING FOR MECHANICAL SYSTEMS FOR OUTDOOR RECREATION DECK/TOWERS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00896251-S8
01/10/2025
Signed off — Alteration
HEREWITH FILING FOR MECHANICAL SYSTEMS FOR OUTDOOR RECREATION DECK/TOWERS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00896251-S1
01/10/2025
Signed off — Alteration
HEREWITH FILING FOR MECHANICAL SYSTEMS FOR OUTDOOR RECREATION DECK/TOWERS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00896251-S6
01/10/2025
Signed off — Alteration
HEREWITH FILING FOR MECHANICAL SYSTEMS FOR OUTDOOR RECREATION DECK/TOWERS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00896251-I1
01/10/2025
Signed off — Alteration CO
HEREWITH FILING FOR CHANGE OF OCCUPANCY FROM HOSPITAL TO INPATIENT JAIL TREATMENT ON THE 3RD FLOOR (MARKETING FLR 2) AND ACCESSORY OUTDOOR RECREATION DECK PER PLANS.
M00622055-S6
01/10/2025
Objection resolved — Addressed
01/09/2025
Signed off — Alteration
HEREWITH FILING FOR FOUNDATION AND STRUCTURAL WORK FOR OUTDOOR RECREATION SPACE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00759305-I1
01/09/2025
Objection raised — Other
01/09/2025
Objection raised — Other
01/09/2025
Objection resolved — Addressed
01/09/2025
Objection raised — Other
01/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
01/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
Latest 60 of 226 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedPJP Installers08/04/2026
DOB NOWSidewalk ShedPermit IssuedPJP Installers08/04/2026
DOB NOWGeneral ConstructionPermit IssuedDNA Contracting07/20/2026
DOB NOWMechanical SystemsSigned-offConsigli Construction Co04/08/2025
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co04/08/2025
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co04/08/2025
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co01/08/2025
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co12/27/2024
DOB NOWMechanical SystemsSigned-offConsigli Construction Co12/27/2024
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co12/27/2024
DOB NOWMechanical SystemsSigned-offConsigli Construction Co12/27/2024
DOB NOWStandpipeSigned-offSirina Fire Protection09/05/2024
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co07/10/2024
DOB NOWSprinklersSigned-offSirina Fire Protection04/01/2024
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co03/14/2024
DOB NOWSprinklersSigned-offSirina Fire Protection02/01/2024
DOB NOWStandpipeSigned-offSirina Fire Protection01/31/2024
DOB NOWEarth WorkSigned-offConsigli Construction Co01/09/2024
DOB NOWMechanical SystemsSigned-offConsigli Construction Co01/09/2024
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co12/29/2023
DOB NOWStructuralSigned-offConsigli Construction Co12/29/2023
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co12/29/2023
DOB NOWFoundationSigned-offConsigli Construction Co12/29/2023
DOB NOWMechanical SystemsSigned-offConsigli Construction Co12/29/2023
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co12/29/2023
DOB NOWGeneral ConstructionPermit IssuedConsigli Construction Co12/27/2023
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co12/27/2023
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co12/27/2023
DOB NOWStructuralSigned-offConsigli Construction Co12/27/2023
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co12/27/2023
DOB NOWMechanical SystemsSigned-offConsigli Construction Co12/27/2023
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co12/27/2023
DOB NOWStructuralSigned-offConsigli Construction Co12/27/2023
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe09/08/2023
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe08/09/2023
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe07/28/2023
DOB NOWPlumbingSigned-offCardoza Plumbing03/17/2023
DOB NOWSprinklersSigned-offSirina Fire Protection01/27/2023
DOB NOWGeneral ConstructionSigned-offConsigli Construction Co01/17/2023
DOB NOWStructuralSigned-offConsigli Construction Co01/17/2023
+ 10 more permits on file
1 project · most recent 06/13/2025
Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/13/2025Signed-offConsigli Construction CoAssociated Ducts and Piping, Heating Systems, Ventilation Systems
Heating
Price ACBR 7,273 BTU · Ductwork ×6
Ventilation
Price DDS5 3,000 BTU · Ductwork ×8
TDSOL 700 CFM · Ductwork ×6
Greenheck 180 CPS CL1 3,000 CFM · Exhaust Fan ×4
270 CPS CL1 7,000 CFM ×4
Ducts & Piping
N/A n/a 1 CFM · Ductwork ×2
1 project · most recent 06/13/2025
Sprinkler System
FiledStatusContractorScope
06/13/2025Signed-offSirina Fire ProtectionSprinkler System
4 projects · most recent 09/22/2026
General Wiring
FiledStatusContractorScope
09/22/2026Permit IssuedSpice Electric Company—
07/31/2026Permit IssuedTop Shelf Electric—
03/11/2022CompleteAdco ElectricalGeneral Wiring
02/07/2022CompleteAdco Electrical—
1 project · most recent 06/13/2025
Steel Concrete
FiledStatusContractorScope
06/13/2025Signed-offConsigli Construction CoSteel, Concrete
1 project · most recent 08/04/2026
Sidewalk Shed
FiledStatusContractorScope
08/04/2026Permit IssuedPJP InstallersSidewalk Shed
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
02/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/05/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
11/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/26/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
09/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/23/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/22/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/22/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/28/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/15/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/15/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 93
DateRequirementInspectorRole
07/15/2025Lowest Floor ElevationIBRAHIM MOURADprogress
06/27/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
06/27/2025Lowest Floor ElevationIBRAHIM MOURADprogress
06/27/2025Sprayed fire-resistant materialsIBRAHIM MOURADspecial
06/27/2025Fire-Resistance Rated ConstructionIBRAHIM MOURADprogress
06/27/2025PreliminaryNoah Tolsonprogress
06/27/2025Sprayed fire-resistant materialsIBRAHIM MOURADspecial
06/27/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
06/27/2025Fire-Resistance Rated ConstructionIBRAHIM MOURADprogress
06/27/2025PreliminaryNoah Tolsonprogress
06/27/2025Lowest Floor ElevationIBRAHIM MOURADprogress
06/12/2025Lowest Floor ElevationIBRAHIM MOURADprogress
06/12/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
06/12/2025PreliminaryNoah Tolsonprogress
06/12/2025Sprayed fire-resistant materialsIBRAHIM MOURADspecial
06/12/2025Fire-Resistance Rated ConstructionIBRAHIM MOURADprogress
05/08/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
05/08/2025Sprayed fire-resistant materialsIBRAHIM MOURADspecial
05/08/2025PreliminaryNoah Tolsonprogress
05/08/2025Lowest Floor ElevationIBRAHIM MOURADprogress
05/08/2025Fire-Resistance Rated ConstructionIBRAHIM MOURADprogress
01/29/2025FinalIBRAHIM MOURADprogress
01/29/2025Heating SystemsIBRAHIM MOURADspecial
01/29/2025Mechanical SystemsIBRAHIM MOURADspecial
01/29/2025Smoke Control Systems TestingIBRAHIM MOURADspecial
Latest 25 of 93.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Bellevue HospitalMedical / HealthcareEntire building
Project M01356904 Alteration · Permit Entire · 02/13/2026
Project M00759305 Alteration · LOC Issued · 06/27/2022
Project M00715227 Alteration · LOC Issued · 04/13/2022
Project M00622055 Alteration CO · Permit Entire · 12/01/2021
Project M00610202 Alteration · LOC Issued · 11/01/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 247 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch29
09/03/2026M00610202-S1Request digital key ↗
09/03/2026M00610202-P3Request digital key ↗
09/03/2026M00610202-P4Request digital key ↗
Showing 3 of 29 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram6
09/03/2026M00622055-P3Open ↗
09/03/2026M00622055-P6Open ↗
09/03/2026M00622055-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications95
▸DOB NOWProgress Inspector Seal & Signature38
09/02/2026M00622055-S2Open ↗
09/02/2026M00622055-S2Open ↗
09/02/2026M00622055-S2Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature36
09/03/2026M00610202-P2Open ↗
09/03/2026M00610202-P3Open ↗
09/03/2026M00610202-P4Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/02/2026M00622055-S2Open ↗
09/01/2026M01082464-I1Open ↗
08/29/2026M00622055-P7Open ↗
Showing 3 of 21 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
09/03/2026M00622055-S2Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist9
09/03/2026M00622055-P3Open ↗
09/03/2026M00622055-P4Open ↗
09/03/2026M00622055-P7Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form15
09/03/2026M00610202-I1Open ↗
09/03/2026M00610202-S1Open ↗
09/03/2026M00610202-S2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026M01356904-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWOER: Notice to Proceed1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWOER: Notice of Satisfaction1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs53
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter35
09/03/2026M00610202-S1Open ↗
09/03/2026M00610202-P2Open ↗
09/03/2026M00610202-P3Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)9
09/03/2026M00622055-S2Open ↗
Showing 1 of 9 on file for this type
▸DOB NOWDEP Variance (V5) letter9
09/03/2026M00610202-S1Open ↗
09/03/2026M00610202-S2Open ↗
09/03/2026M00610202-I1Open ↗
Showing 3 of 9 on file for this type
▸Other Documents32
▸DOB NOWFlood Plan Emergency Temporary Flood Shields8
09/03/2026M00622055-P3Open ↗
09/03/2026M00622055-P7Open ↗
09/03/2026M00622055-P6Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
09/03/2026M00622055-P3Open ↗
09/03/2026M00622055-P4Open ↗
09/03/2026M00622055-P7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlot Diagram7
09/03/2026M00622055-P3Open ↗
09/03/2026M00622055-P7Open ↗
09/03/2026M00622055-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSite Survey: Initial6
09/03/2026M00622055-P3Open ↗
09/03/2026M00622055-P4Open ↗
09/03/2026M00622055-P7Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProof of Historic Building2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWWaiver Document1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type