← Back
Television studio
48-02 48TH AVENUE
QUEENS · BIN 4437366
💬 Discuss this project
2024Year Built
5Stories
J6Building Class
M1-2Zoning
234,839 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Television studio · Owner of record: SUNNYSIDE STUDIOS OWNER, LLC · 110,445 sf lot · 2.13 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EAST END CAPITAL1307/08/2026
LEEDING BUILDERS GROUP LL203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BAUER STRUCTURES INCGeneral Contractor507/08/2026
FORWARD MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FUTURE TECH CONSULTANTS O589408/23/2023
RA ENGINEERING LLP6986108/23/2023
SIMPSON GUMPERTZ & HEGER23152—
Building Lifecycle
All (6)Filed (1)Permit Issued (4)Signed Off (1)
12/06/2024
Signed off — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-Z1
08/05/2024
Permit issued — Support of Excavation
Q00704893-Z1-SE
01/03/2024
Permit issued — Support of Excavation
Q00704893-Z1-SE
10/16/2023
Permit issued — Plumbing
Q00704893-S8-PL
10/11/2023
Permit issued — Support of Excavation
Q00704893-Z1-SE
08/23/2023
Filed — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-Z1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationSigned-offBAUER STRUCTURES INC08/05/2024
DOB NOWSupport of ExcavationSigned-offBAUER STRUCTURES INC01/03/2024
DOB NOWPlumbingSigned-offFORWARD HEATING CORP10/16/2023
DOB NOWSupport of ExcavationSigned-offBAUER STRUCTURES INC10/11/2023
BISEQISSUEDTITAN INDUSTRIAL SVC CORP04/25/2023
BIS—ISSUEDTITAN INDUSTRIAL SVC CORP04/25/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/01/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/20/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/20/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/18/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
07/10/2025Fenestration areasSEAN OBRIENenergy_progress
07/10/2025VestibulesStephen Marcheseenergy_progress
07/10/2025Insulation placement and R valuesSEAN OBRIENenergy_progress
07/10/2025Fenestration air leakageSEAN OBRIENenergy_progress
07/10/2025Wall Panels, Curtain Walls, and VeneersSEAN OBRIENspecial
07/10/2025Fire-Resistant Penetrations and JointsStephen Marchesespecial
07/10/2025Mastic and Intumescent Fire-resistant CoatingsStephen Marchesespecial
07/10/2025Sprayed fire-resistant materialsStephen Marchesespecial
07/10/2025Energy Code Compliance InspectionsSEAN OBRIENprogress
07/10/2025Fire-Resistance Rated ConstructionStephen Marcheseprogress
07/10/2025Maintenance informationStephen Marcheseenergy_progress
07/10/2025Fenestration and door U-factor and product ratingsSEAN OBRIENenergy_progress
07/10/2025Air barrier continuity plan testingSEAN OBRIENenergy_progress
07/10/2025Air barrier - visual inspectionSEAN OBRIENenergy_progress
07/10/2025Protection of exposed foundation insulationSEAN OBRIENenergy_progress
09/28/2023Structural Steel - WeldingStephen Marchesespecial
09/28/2023Excavations - Sheeting, Shoring, and BracingNIDAL ABISAABspecial
09/28/2023Subgrade InspectionsStephen Marchesespecial
▾Documents — 18 on file (BIS + DOB NOW)
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
07/21/2022421810295Open ↗
▸Seals & Professional Certifications3
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/22/2023421810295Open ↗
07/19/2023421810295Open ↗
07/21/2022421810295Open ↗
▸Trade Schedules & Equipment2
▸BISELECTRIC CUT-OFF1
08/22/2023421810295Open ↗
▸BISGAS CUT-OFF1
08/22/2023421810295Open ↗
▸Safety & Tenant Protection3
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
08/22/2023421810295Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
08/22/2023421810295Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/22/2023421810295Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION3
08/22/2023421810295Open ↗
08/22/2023421810295Open ↗
08/22/2023421810295Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
08/22/2023421810295Open ↗
▸Cost, Insurance & Ownership2
▸BISDEPT OF FINANCE VERIFICATION1
08/22/2023421810295Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
08/22/2023421810295Open ↗
▸Filing & Intake Forms3
▸BISBOROUGH INTAKE FORM2
08/22/2023421810295Open ↗
07/21/2022421810295Open ↗
▸BISEFILING COVER SHEET1
07/21/2022421810295Open ↗