← Back
Television studio
East End Studios Sunnyside Campus
48-02 48TH AVENUE · BIN 4621041
💬 Discuss this project
2024Year Built
5Stories
J6Building Class
M1-2Zoning
234,839 sfGross Floor Area
1Units
LL97 Covered0 Open Violations
Television studio · Owner of record: SUNNYSIDE STUDIOS OWNER, LLC · 110,445 sf lot · 2.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionFire AlarmEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof3p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 8 docs
Floor 61p · 1 filing · 10 docs
Floor 53p · 1 filing · 10 docs
Floor 4
Floor 31p · 1 filing · 9 docs
Floor 23p · 1 filing · 9 docs
Floor 1Under Construction243p · 3 filings · 20 docs
MezzanineUnder Construction279p · 1 filing · 20 docs
CellarUnder Construction243p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EAST END CAPITAL18709/13/2026
PLATINUM SERVICES NY3707/08/2026
LEEDING BUILDERS GROUP LL403/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.4603/21/2026
A1 EXPEDITING SERVICE CORP.603/21/2026
PATUXENT ENGINEERING1003/21/2026
HOWARD I SHAPIRO ASSOCIATES403/21/2026
PLATINUM SERVICES NY803/21/2026
KD DESIGNS903/21/2026
AE DESIGN SOLUTION203/21/2026
LOUIS STRIAR1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BAUER STRUCTURES INCGeneral Contractor2007/08/2026
LEEDING BUILDERS GROUP LLGeneral Contractor1606/28/2026
PLATINUM SERVICES NY LLCGeneral Contractor1207/08/2026
FM95 NYScaffold707/08/2026
BUNLIN LLCGeneral Contractor607/08/2026
FORWARD MECHANICAL CORPPlumbing407/08/2026
NYFF EVENTS LLCGeneral Contractor303/21/2026
W & W GLASS LLCGeneral Contractor307/08/2026
METRO FIRE PROTECTION INCFire Protection307/08/2026
FSG ELECTRIC INCElectrical203/22/2026
ACCORD POWER INCGeneral Contractor203/21/2026
FORWARD MECHANICAL CORPGeneral Contractor204/09/2026
TITAN INDUSTRIAL SVC CORPGeneral Contractor104/09/2026
TF ELECTRICAL CORPElectrical103/22/2026
NEW LEAF DEVELOPMENT LLCGeneral Contractor107/08/2026
ADVANCED SCAFFOLD SERVICEGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983805/15/2026
FUTURE TECH CONSULTANTS O5891512/17/2025
SIMPSON GUMPERTZ & HEGER2315512/17/2025
RA ENGINEERING LLP6986207/04/2025
SYNERGIC DESIGN LLC8561105/13/2025
Building Lifecycle
All (300)Filed (73)Permit Issued (62)Signed Off (30)Violation (4)Inspection (27)Objection (74)Special Inspection (30)
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Other
08/17/2026
Signed off — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-S6
07/23/2026
Filed — Alteration
Install 127 ft curb cut as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# Q00704893-I1
Q08051845-P1
07/08/2026
Signed off — Alteration
Install 25 ft curb cut as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# Q00704893-I1
Q08052051-I1
07/08/2026
Signed off — Alteration
Install 19 ft curb cut as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# Q00704893-I1
Q08051915-I1
07/02/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/23/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/22/2026
Special inspection requirement — Sprinkler Systems
MARISA HARTE
05/22/2026
Special inspection requirement — Standpipe Systems
MARISA HARTE
05/22/2026
Special inspection requirement — Post-installed Anchors
MARISA HARTE
05/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
05/15/2026
Filed — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-C7
05/13/2026
Signed off — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-S5
05/13/2026
Signed off — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-S4
05/13/2026
Signed off — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-S9
05/13/2026
Signed off — Alteration
Q01018998-I1
05/13/2026
Signed off — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-Z7
05/11/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/11/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
03/05/2026
Signed off — Alteration
Q01338700-I1
02/02/2026
Signed off — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-Z9
02/02/2026
Signed off — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-Y1
02/02/2026
Signed off — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-Z8
01/20/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, ROOF PROTECTION AND CONSTRUCTION FENCE AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00912156-I1
01/08/2026
Filed — No Work
Q01338693-P1
01/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/05/2026
Permit issued — General Construction
Q01338700-I1-GC
12/31/2025
Objection resolved — Addressed
12/27/2025
Objection raised — Admin
12/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/24/2025
Filed — Alteration
Q01338700-I1
12/24/2025
Filed — No Work
Q01338693-I1
12/24/2025
Special inspection requirement — Final
Christopher Carrano
12/17/2025
Filed — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-C6
12/17/2025
Permit issued — General Construction
Q00704893-I1-GC
12/04/2025
Signed off — Alteration
Q00841006-I1
12/01/2025
Special inspection requirement — Public Assembly Emergency Lighting
MARISA HARTE
12/01/2025
Special inspection requirement — Public Assembly Emergency Lighting
MARISA HARTE
11/24/2025
Filed — No Work
Q01219971-P1
11/24/2025
Filed — No Work
Q01221363-P1
11/20/2025
Special inspection requirement — Public Assembly Emergency Lighting
MARISA HARTE
10/27/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/17/2025
Filed — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-C5
10/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
MARISA HARTE
10/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MARISA HARTE
10/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
MARISA HARTE
10/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MARISA HARTE
10/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
MARISA HARTE
10/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
MARISA HARTE
10/08/2025
Filed — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-C4
10/08/2025
Filed — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-C3
10/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Marchese
10/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Marchese
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNYFF EVENTS LLC01/05/2026
DOB NOWGeneral ConstructionPermit IssuedLEEDING BUILDERS GROUP LL12/17/2025
DOB NOWBoiler EquipmentSigned-offRANSHAW PLBG & HTG LLC09/12/2025
DOB NOWBoiler EquipmentSigned-offFORWARD HEATING CORP09/05/2025
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC08/04/2025
DOB NOWConstruction FenceSigned-offPLATINUM SERVICES NY LLC08/04/2025
DOB NOWBoiler EquipmentSigned-offRANSHAW PLBG & HTG LLC07/16/2025
DOB NOWMechanical SystemsSigned-offFORWARD MECHANICAL CORP07/16/2025
DOB NOWCurb CutPermit IssuedLEEDING BUILDERS GROUP LL07/15/2025
DOB NOWCurb CutPermit IssuedLEEDING BUILDERS GROUP LL07/15/2025
DOB NOWCurb CutPermit IssuedLEEDING BUILDERS GROUP LL07/15/2025
DOB NOWCurb CutSigned-offLEEDING BUILDERS GROUP LL07/15/2025
DOB NOWCurb CutSigned-offLEEDING BUILDERS GROUP LL07/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offPLATINUM SERVICES NY LLC07/02/2025
DOB NOWSolarSigned-offACCORD POWER INC05/15/2025
DOB NOWGeneral ConstructionPermit IssuedLEEDING BUILDERS GROUP LL05/05/2025
DOB NOWGeneral ConstructionPermit IssuedLEEDING BUILDERS GROUP LL03/31/2025
DOB NOWBoiler EquipmentSigned-offFORWARD HEATING CORP03/05/2025
DOB NOWGeneral ConstructionPermit IssuedLEEDING BUILDERS GROUP LL01/08/2025
DOB NOWSuspended ScaffoldSigned-offBUNLIN LLC12/30/2024
DOB NOWSupported ScaffoldSigned-offBUNLIN LLC12/30/2024
DOB NOWPlumbingSigned-offFORWARD HEATING CORP11/20/2024
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT09/23/2024
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT09/23/2024
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT09/23/2024
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT09/23/2024
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT09/20/2024
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT09/20/2024
DOB NOWSignSigned-offRED HOOK SIGN AND ELECT09/20/2024
DOB NOWConstruction FenceSigned-offPLATINUM SERVICES NY LLC08/12/2024
DOB NOWConstruction FenceSigned-offPLATINUM SERVICES NY LLC08/09/2024
DOB NOWSupported ScaffoldSigned-offBUNLIN LLC08/07/2024
DOB NOWSuspended ScaffoldSigned-offBUNLIN LLC08/07/2024
DOB NOWFoundationSigned-offBAUER STRUCTURES INC08/05/2024
DOB NOWProtection and Mechanical MethodsSigned-offW W GLASS07/22/2024
DOB NOWProtection and Mechanical MethodsSigned-offW W GLASS07/18/2024
DOB NOWProtection and Mechanical MethodsSigned-offPLATINUM SERVICES NY LLC07/15/2024
DOB NOWEarth WorkSigned-offBAUER STRUCTURES INC05/09/2024
DOB NOWFoundationSigned-offBAUER STRUCTURES INC05/09/2024
DOB NOWFoundationSigned-offBAUER STRUCTURES INC04/17/2024
+ 10 more permits on file
1 project · most recent 05/15/2026
Air Conditioning Systems Heating Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/15/2026Permit IssuedLEEDING BUILDERS GROUP LLAir Conditioning Systems, Heating Systems, Refrigeration Systems, Ventilation Systems
Cooling
Trane RNA-060-D-A-3-EABOB-CB2LO 27,670 CFM · Fan Coil Indoor ×10
RNA-031-D-A-3-EJAOB-CB2LO 15,160 CFM · Fan Coil Indoor ×4
RNA-050-D-A-3-EAAOB-CB2LO 23,440 CFM · Fan Coil Indoor ×4
RNA-050-D-A-3-EABOB-CB2LO 23,440 CFM · Fan Coil Indoor ×2
RNA-060-D-A-3-EABOB-CB3LO 27,640 CFM · Fan Coil Indoor ×2
Aaon RNA-060-D-A-3-EABOB-CB2LO 27,670 CFM · Fan Coil Indoor ×4
Friedrich FRIEDRICH/PDH15K 14,500 BTU · Ptac ×1
Heating
Cleaver-Brooks BMK-1500 1,025 kW · Boiler ×1
Ventilation
Greenheck HPA-24-85-A-150 57,000 CFM · Makeup Air ×1
Refrigeration
Lg LUU360HV 3 tons · Condensing Unit ×8
LUU480HHV 4 tons · Vrf Outdoor ×5
LUU420HHV 4 tons · Condensing Unit ×4
ARUN060G554 5 tons · Vrf Outdoor ×3
LSU363HLV3 3 tons · Condensing Unit ×3
LSU243HLV3 2 tons · Condensing Unit ×2
LSN243HLV3 2 tons · Vrf Indoor ×1
LUU120HV 1 tons · Condensing Unit ×1
LUU360HHV 3 tons · Condensing Unit ×1
Mitsubishi Electric LUU360HV 3 tons · Vrf Outdoor ×2
LUU420HHV 4 tons · Vrf Indoor ×2
LUU480HHV 4 tons · Vrf Indoor ×2
1 project · most recent 05/15/2026
Sprinkler System
FiledStatusContractorScope
05/15/2026Signed-offMETRO FIRE PROTECTION INCSprinkler System
1 project · most recent 05/15/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/15/2026Signed-offFORWARD MECHANICAL CORPGas, Storm, Water/Sanitary
9 projects · most recent 06/03/2026
General Wiring
FiledStatusContractorScope
06/03/2026Permit IssuedFSG ELECTRIC INCGeneral Wiring
03/28/2026CompleteTF ELECTRICAL CORPGeneral Wiring
03/28/2026CompleteTF ELECTRICAL CORPGeneral Wiring
03/28/2026CompleteTF ELECTRICAL CORPGeneral Wiring
02/02/2026CompleteSHELBY ELECTRICAL CORP—
05/15/2025Permit IssuedACCORD POWER ELECTRIC LLC—
07/22/2024CompleteFSG ELECTRIC INC1 meters, 1 new_meters
06/18/2024CompleteILLUMINOUS ELECTRIC CORP.—
08/11/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
1 project · most recent 05/15/2026
Steel Concrete Masonry
FiledStatusContractorScope
05/15/2026Permit IssuedLEEDING BUILDERS GROUP LLSteel, Concrete, Masonry
1 project · most recent 05/13/2025
FiledStatusContractorScope
05/13/2025Signed-offACCORD POWER INC251 panels, 136.79 kw, 52,792.94 roof_area_sqft
1 project · most recent 05/15/2026
Earthwork
FiledStatusContractorScope
05/15/2026Permit IssuedLEEDING BUILDERS GROUP LLEarthwork
▾Field Inspections (DOB CAP) — 27
DateTypeResultReport
07/02/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/23/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
05/11/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
03/11/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
01/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/27/2025Pass-Final Boiler Equipment InspectionPassView ↗
09/23/2025Pass-Final Boiler Equipment InspectionPassView ↗
08/20/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
08/20/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/17/2025Fail-Final Boiler Equipment InspectionFailView ↗
05/20/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
05/20/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/15/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/05/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
08/05/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
12/28/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
Latest 25 of 27.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
05/22/2026Sprinkler SystemsMARISA HARTEspecial
05/22/2026Post-installed AnchorsMARISA HARTEspecial
05/22/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
05/22/2026Standpipe SystemsMARISA HARTEspecial
12/24/2025FinalChristopher Carranoprogress
12/01/2025Public Assembly Emergency LightingMARISA HARTEprogress
12/01/2025Public Assembly Emergency LightingMARISA HARTEprogress
11/20/2025Public Assembly Emergency LightingMARISA HARTEprogress
10/17/2025HVAC-R and service water piping design and insulationMARISA HARTEenergy_progress
10/17/2025HVAC-R and service water heating equipmentMARISA HARTEenergy_progress
10/17/2025HVAC-R and service water heating system controlsMARISA HARTEenergy_progress
10/09/2025HVAC-R and service water heating equipmentMARISA HARTEenergy_progress
10/09/2025HVAC-R and service water heating system controlsMARISA HARTEenergy_progress
10/09/2025HVAC-R and service water piping design and insulationMARISA HARTEenergy_progress
10/06/2025HVAC-R and service water heating system controlsStephen Marcheseenergy_progress
10/06/2025HVAC-R and service water heating equipmentStephen Marcheseenergy_progress
10/06/2025HVAC-R and service water piping design and insulationStephen Marcheseenergy_progress
09/18/2025HVAC-R and service water heating equipmentStephen Marcheseenergy_progress
09/18/2025HVAC-R and service water piping design and insulationStephen Marcheseenergy_progress
09/18/2025HVAC-R and service water piping design and insulationMARISA HARTEenergy_progress
09/18/2025HVAC-R and service water heating system controlsMARISA HARTEenergy_progress
09/18/2025HVAC-R and service water heating equipmentMARISA HARTEenergy_progress
09/18/2025HVAC-R and service water heating system controlsStephen Marcheseenergy_progress
09/05/2025HVAC-R and service water heating equipmentMARISA HARTEenergy_progress
09/05/2025HVAC-R and service water heating system controlsMARISA HARTEenergy_progress
Latest 25 of 150.
▾Documents — 348 on file (BIS + DOB NOW)
▸Plans & Drawings80
▸DOB NOWPlans/Sketch74
08/25/2026Q08051845-I1Request digital key ↗
08/25/2026Q08052051-I1Request digital key ↗
08/25/2026Q08051943-I1Request digital key ↗
Showing 3 of 74 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
08/20/2026Q01221363-I1Request digital key ↗
08/20/2026Q01221363-P1Request digital key ↗
Showing 2 of 4 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Applications & Permits5
▸BISBPP-5 - Authorization to the Department of Transportation2
12/04/2023440747088Open ↗
10/06/2022440747088Open ↗
▸DOB NOWDEP Stormwater Construction Permit2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
10/06/2022440747088Open ↗
▸Zoning, Tax Lot & Property Records18
▸DOB NOWZD1: DOB Zoning Diagram8
08/18/2026Q00704893-C5Open ↗
08/18/2026Q00704893-A6Open ↗
08/18/2026Q00704893-A1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWZoning Exhibit form (1-5)8
08/18/2026Q00704893-C5Open ↗
08/18/2026Q00704893-A6Open ↗
08/18/2026Q00704893-A1Open ↗
Showing 3 of 8 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/01/2023440747088Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications169
▸DOB NOWDPL-1: Design Professional Seal & Signature81
08/25/2026Q08051845-P1Open ↗
08/25/2026Q08051962-I1Open ↗
08/25/2026Q08051915-I1Open ↗
Showing 3 of 81 on file for this type
▸DOB NOWProgress Inspector Seal & Signature58
09/23/2026Q00704893-Z3Open ↗
09/23/2026Q00704893-Z9Open ↗
09/23/2026Q00704893-Z7Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
09/23/2026Q00704893-Z3Open ↗
09/01/2026Q00704893-S7Open ↗
09/01/2026Q00704893-S4Open ↗
Showing 3 of 28 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/06/2022440747088Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/06/2022440747088Open ↗
▸Trade Schedules & Equipment9
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)8
08/18/2026Q00704893-C5Open ↗
08/18/2026Q00704893-A6Open ↗
08/18/2026Q00704893-A1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist8
08/18/2026Q00704893-A6Open ↗
Showing 1 of 8 on file for this type
▸BISSTREET TREE CHECKLIST1
12/01/2023440747088Open ↗
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification3
08/18/2026Q00704893-Z7Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWSOIL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs2
▸BISBPP-UTILITY APPROVAL TO RELOCATE POLE1
12/01/2023440747088Open ↗
▸BISDOB APPROVALS FOR NEW CC'S1
12/01/2023440747088Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/06/2022440747088Open ↗
▸Other Documents44
▸DOB NOWProperty Ownership Certification8
08/18/2026Q00704893-C5Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWSite Survey: Initial8
08/18/2026Q00704893-C5Open ↗
08/18/2026Q00704893-A6Open ↗
08/18/2026Q00704893-A1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone8
08/18/2026Q00704893-C5Open ↗
08/18/2026Q00704893-A6Open ↗
Showing 2 of 8 on file for this type
▸DOB NOWAlternate Plan 14
08/20/2026Q01221363-P1Open ↗
08/20/2026Q01221363-I1Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWAlternate Plan 24
08/20/2026Q01221363-I1Open ↗
08/20/2026Q01221363-P1Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
12/01/2023440747088Open ↗
12/01/2023440747088Open ↗
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP: CATCH BASIN/MANHOLE REQUIRED1
12/01/2023440747088Open ↗
▸BISBPP-PARKS: REMOVE MATURE TREE1
12/01/2023440747088Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type