← Back
BuildNYC
Television studio
East End Studios Sunnyside Campus
48-37 48TH STREET · Sunnyside · BIN 4437366
💬 Discuss this project
2024Year Built
5Stories
J6Building Class
M1-2Zoning
234,839 sfGross Floor Area
1Units
LL97 Covered0 Active ViolationsFDNY Report ↗
Television studio · Owner of record: Sunnyside Studios Owner · 110,445 sf lot · 2.13 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Cellar11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
East End Capital1307/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Bauer StructuresGeneral Contractor507/08/2026
Forward MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Future Tech Consultants O589408/23/2023
RA Engineering6986108/23/2023
Simpson Gumpertz & Heger23152—
Building Lifecycle
All (41)Filed (1)Permit Issued (4)Signed Off (1)Violation (10)Inspection (5)Objection (2)Special Inspection (18)
01/13/2026
Violation issued (FDNY_NOV, closed)
01/12/2026
Violation issued (FDNY_ORDER, closed)
01/12/2026
Violation issued (FDNY_ORDER, closed)
07/10/2025
Special inspection requirement — Fenestration areas
SEAN OBRIEN
07/10/2025
Special inspection requirement — Vestibules
Stephen Marchese
07/10/2025
Special inspection requirement — Insulation placement and R values
SEAN OBRIEN
07/10/2025
Special inspection requirement — Fenestration air leakage
SEAN OBRIEN
07/10/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SEAN OBRIEN
07/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Marchese
07/10/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Stephen Marchese
07/10/2025
Special inspection requirement — Sprayed fire-resistant materials
Stephen Marchese
07/10/2025
Special inspection requirement — Energy Code Compliance Inspections
SEAN OBRIEN
07/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
Stephen Marchese
07/10/2025
Special inspection requirement — Maintenance information
Stephen Marchese
07/10/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SEAN OBRIEN
07/10/2025
Special inspection requirement — Air barrier continuity plan testing
SEAN OBRIEN
07/10/2025
Special inspection requirement — Air barrier - visual inspection
SEAN OBRIEN
07/10/2025
Special inspection requirement — Protection of exposed foundation insulation
SEAN OBRIEN
12/06/2024
Signed off — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-Z1
08/05/2024
Permit issued — Support of Excavation
Q00704893-Z1-SE
07/18/2024
Violation issued (ECB, closed)
Construction
05/25/2024
Violation issued (ECB, closed)
Unknown
03/01/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/20/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/18/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/03/2024
Permit issued — Support of Excavation
Q00704893-Z1-SE
10/16/2023
Permit issued — Plumbing
Q00704893-S8-PL
10/11/2023
Permit issued — Support of Excavation
Q00704893-Z1-SE
09/28/2023
Special inspection requirement — Structural Steel - Welding
Stephen Marchese
09/28/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NIDAL ABISAAB
09/28/2023
Special inspection requirement — Subgrade Inspections
Stephen Marchese
09/01/2023
Objection resolved — Addressed
08/25/2023
Objection raised — Other
08/23/2023
Filed — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-Z1
05/02/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/02/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/01/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationSigned-offBauer Structures08/05/2024
DOB NOWSupport of ExcavationSigned-offBauer Structures01/03/2024
DOB NOWPlumbingSigned-offForward Heating10/16/2023
DOB NOWSupport of ExcavationSigned-offBauer Structures10/11/2023
BISEQISSUEDTitan Industrial Service04/25/2023
BIS—ISSUEDTitan Industrial Service04/25/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/01/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/20/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/20/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/18/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
07/10/2025Fenestration areasSEAN OBRIENenergy_progress
07/10/2025VestibulesStephen Marcheseenergy_progress
07/10/2025Insulation placement and R valuesSEAN OBRIENenergy_progress
07/10/2025Fenestration air leakageSEAN OBRIENenergy_progress
07/10/2025Wall Panels, Curtain Walls, and VeneersSEAN OBRIENspecial
07/10/2025Fire-Resistant Penetrations and JointsStephen Marchesespecial
07/10/2025Mastic and Intumescent Fire-resistant CoatingsStephen Marchesespecial
07/10/2025Sprayed fire-resistant materialsStephen Marchesespecial
07/10/2025Energy Code Compliance InspectionsSEAN OBRIENprogress
07/10/2025Fire-Resistance Rated ConstructionStephen Marcheseprogress
07/10/2025Maintenance informationStephen Marcheseenergy_progress
07/10/2025Fenestration and door U-factor and product ratingsSEAN OBRIENenergy_progress
07/10/2025Air barrier continuity plan testingSEAN OBRIENenergy_progress
07/10/2025Air barrier - visual inspectionSEAN OBRIENenergy_progress
07/10/2025Protection of exposed foundation insulationSEAN OBRIENenergy_progress
09/28/2023Structural Steel - WeldingStephen Marchesespecial
09/28/2023Excavations - Sheeting, Shoring, and BracingNIDAL ABISAABspecial
09/28/2023Subgrade InspectionsStephen Marchesespecial
▾Documents — 18 on file (BIS + DOB NOW)
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
07/21/2022421810295Open ↗
▸Seals & Professional Certifications3
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/22/2023421810295Open ↗
07/19/2023421810295Open ↗
07/21/2022421810295Open ↗
▸Trade Schedules & Equipment2
▸BISELECTRIC CUT-OFF1
08/22/2023421810295Open ↗
▸BISGAS CUT-OFF1
08/22/2023421810295Open ↗
▸Safety & Tenant Protection3
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
08/22/2023421810295Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
08/22/2023421810295Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/22/2023421810295Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION3
08/22/2023421810295Open ↗
08/22/2023421810295Open ↗
08/22/2023421810295Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
08/22/2023421810295Open ↗
▸Cost, Insurance & Ownership2
▸BISDEPT OF FINANCE VERIFICATION1
08/22/2023421810295Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
08/22/2023421810295Open ↗
▸Filing & Intake Forms3
▸BISBOROUGH INTAKE FORM2
08/22/2023421810295Open ↗
07/21/2022421810295Open ↗
▸BISEFILING COVER SHEET1
07/21/2022421810295Open ↗