BuildNYC
Television studio
East End Studios Sunnyside Campus
48-37 48TH STREET · Sunnyside · BIN 4621041
💬 Discuss this project
2024Year Built
5Stories
J6Building Class
M1-2Zoning
234,839 sfGross Floor Area
1Units
LL97 Covered0 Active Violations
Television studio · Owner of record: Sunnyside Studios Owner · 110,445 sf lot · 2.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionFire AlarmEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSunnyside Studio102p · 3 filings · 20 docs
BulkheadSunnyside 2pt project6p · 2 filings · 20 docs
Floor 5Mini crane construction equipment use225p · 4 filings · 20 docs
Floor 4Mini crane construction equipment use206p · 3 filings · 20 docs
Floor 3Mini crane construction equipment use214p · 3 filings · 20 docs
Floor 2Mini crane construction equipment use235p · 4 filings · 20 docs
Floor 1East End Studios, PS/I.S. 218X368p · 9 filings · 20 docs
Mezzanine371p · 1 filing · 20 docs
CellarPS/I.S. 218X492p · 4 filings · 20 docs
Basement1p · 1 filing · 20 docs
Site & exteriorEast End Studios13p · 13 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
East End Capital18709/13/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning4603/21/2026
Milrose Consultants603/21/2026
Patuxent Engineering1003/21/2026
Howard I Shapiro Associates403/21/2026
Platinum Services NY803/21/2026
Royal Expediting803/21/2026
AE Design Solution203/21/2026
Louis Striar1403/21/2026
KD Designs103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Bauer StructuresGeneral Contractor2007/08/2026
Leeding Builders GroupGeneral Contractor1606/28/2026
Platinum Services NYScaffold1207/08/2026
Red Hook Sign and ElectricSign hanger707/08/2026
BunlinScaffold607/08/2026
Forward MechanicalPlumbing407/08/2026
Metro Fire ProtectionFire Protection307/08/2026
NYFF EventsGeneral Contractor303/21/2026
W & W GlassScaffold307/08/2026
FSG ElectricElectrical203/22/2026
Accord PowerGeneral Contractor203/21/2026
Forward Mechanicalspecialty_contractor204/09/2026
Titan Industrial ServiceScaffold104/09/2026
Advanced Scaffold ServiceScaffold107/08/2026
New Leaf DevelopmentGeneral Contractor107/08/2026
TF ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Socotec Engineering4983805/15/2026
Future Tech Consultants O5891512/17/2025
Simpson Gumpertz & Heger2315512/17/2025
RA Engineering6986207/04/2025
Synergic Design8561105/13/2025
Building Lifecycle
All (300)Filed (78)Permit Issued (62)Signed Off (30)Violation (4)Inspection (22)Objection (74)Special Inspection (30)
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Other
08/17/2026
Signed off — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-S6
07/23/2026
Filed — Alteration
Install 127 ft curb cut as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# Q00704893-I1
Q08051845-P1
07/08/2026
Signed off — Alteration
Install 25 ft curb cut as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# Q00704893-I1
Q08052051-I1
07/08/2026
Signed off — Alteration
Install 19 ft curb cut as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# Q00704893-I1
Q08051915-I1
06/23/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/22/2026
Special inspection requirement — Sprinkler Systems
MARISA HARTE
05/22/2026
Special inspection requirement — Standpipe Systems
MARISA HARTE
05/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
05/22/2026
Special inspection requirement — Post-installed Anchors
MARISA HARTE
05/15/2026
Filed — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-C7
05/13/2026
Signed off — Alteration
Q01018998-I1
05/13/2026
Signed off — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-S5
05/13/2026
Signed off — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-S9
05/13/2026
Signed off — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-Z7
05/13/2026
Signed off — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-S4
05/11/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/11/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
03/05/2026
Signed off — Alteration
Q01338700-I1
02/02/2026
Signed off — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-Y1
02/02/2026
Signed off — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-Z8
02/02/2026
Signed off — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-Z9
01/20/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, ROOF PROTECTION AND CONSTRUCTION FENCE AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00912156-I1
01/08/2026
Filed — No Work
Q01338693-P1
01/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/05/2026
Permit issued — General Construction
Q01338700-I1-GC
12/31/2025
Objection resolved — Addressed
12/27/2025
Objection raised — Admin
12/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/24/2025
Filed — Alteration
Q01338700-I1
12/24/2025
Filed — No Work
Q01338693-I1
12/24/2025
Special inspection requirement — Final
Christopher Carrano
12/17/2025
Filed — New Building
Application filed to erect a new (5) story building. Application to be reviewed by HUB. Hub consultation took place on 12/09/21. Please assign to Hub for review.
Q00704893-C6
12/17/2025
Permit issued — General Construction
Q00704893-I1-GC
12/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
Stephen Marchese
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Marchese
12/16/2025
Special inspection requirement — Sprayed fire-resistant materials
Stephen Marchese
12/16/2025
Special inspection requirement — Fenestration areas
SEAN OBRIEN
12/16/2025
Special inspection requirement — Air barrier - visual inspection
SEAN OBRIEN
12/16/2025
Special inspection requirement — Insulation placement and R values
SEAN OBRIEN
12/16/2025
Special inspection requirement — Protection of exposed foundation insulation
SEAN OBRIEN
12/16/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SEAN OBRIEN
12/16/2025
Special inspection requirement — Energy Code Compliance Inspections
SEAN OBRIEN
12/16/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Stephen Marchese
12/16/2025
Special inspection requirement — Fenestration air leakage
SEAN OBRIEN
12/16/2025
Special inspection requirement — Maintenance information
Stephen Marchese
12/16/2025
Special inspection requirement — Air barrier continuity plan testing
SEAN OBRIEN
12/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SEAN OBRIEN
12/16/2025
Special inspection requirement — Vestibules
Stephen Marchese
12/04/2025
Signed off — Alteration
Q00841006-I1
12/01/2025
Special inspection requirement — Public Assembly Emergency Lighting
MARISA HARTE
12/01/2025
Special inspection requirement — Public Assembly Emergency Lighting
MARISA HARTE
11/24/2025
Filed — No Work
Q01219971-P1
11/24/2025
Filed — No Work
Q01221363-P1
11/20/2025
Special inspection requirement — Public Assembly Emergency Lighting
MARISA HARTE
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNYFF Events01/05/2026
DOB NOWGeneral ConstructionPermit IssuedLeeding Builders Group12/17/2025
DOB NOWBoiler EquipmentSigned-offRanshaw Plumbing & Heating09/12/2025
DOB NOWBoiler EquipmentSigned-offForward Heating09/05/2025
DOB NOWConstruction FenceSigned-offPlatinum Services NY08/04/2025
DOB NOWSidewalk ShedSigned-offPlatinum Services NY08/04/2025
DOB NOWBoiler EquipmentSigned-offRanshaw Plumbing & Heating07/16/2025
DOB NOWMechanical SystemsSigned-offForward Mechanical07/16/2025
DOB NOWCurb CutSigned-offLeeding Builders Group07/15/2025
DOB NOWCurb CutPermit IssuedLeeding Builders Group07/15/2025
DOB NOWCurb CutSigned-offLeeding Builders Group07/15/2025
DOB NOWCurb CutPermit IssuedLeeding Builders Group07/15/2025
DOB NOWCurb CutPermit IssuedLeeding Builders Group07/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offPlatinum Services NY07/02/2025
DOB NOWSolarSigned-offAccord Power05/15/2025
DOB NOWGeneral ConstructionPermit IssuedLeeding Builders Group05/05/2025
DOB NOWGeneral ConstructionPermit IssuedLeeding Builders Group03/31/2025
DOB NOWBoiler EquipmentSigned-offForward Heating03/05/2025
DOB NOWGeneral ConstructionPermit IssuedLeeding Builders Group01/08/2025
DOB NOWSupported ScaffoldSigned-offBunlin12/30/2024
DOB NOWSuspended ScaffoldSigned-offBunlin12/30/2024
DOB NOWPlumbingSigned-offForward Heating11/20/2024
DOB NOWSignSigned-offRed Hook Sign and Electric09/23/2024
DOB NOWSignSigned-offRed Hook Sign and Electric09/23/2024
DOB NOWSignSigned-offRed Hook Sign and Electric09/23/2024
DOB NOWSignSigned-offRed Hook Sign and Electric09/23/2024
DOB NOWSignSigned-offRed Hook Sign and Electric09/20/2024
DOB NOWSignSigned-offRed Hook Sign and Electric09/20/2024
DOB NOWSignSigned-offRed Hook Sign and Electric09/20/2024
DOB NOWConstruction FenceSigned-offPlatinum Services NY08/12/2024
DOB NOWConstruction FenceSigned-offPlatinum Services NY08/09/2024
DOB NOWSuspended ScaffoldSigned-offBunlin08/07/2024
DOB NOWSupported ScaffoldSigned-offBunlin08/07/2024
DOB NOWFoundationSigned-offBauer Structures08/05/2024
DOB NOWProtection and Mechanical MethodsSigned-offW W Glass07/22/2024
DOB NOWProtection and Mechanical MethodsSigned-offW W Glass07/18/2024
DOB NOWProtection and Mechanical MethodsSigned-offPlatinum Services NY07/15/2024
DOB NOWFoundationSigned-offBauer Structures05/09/2024
DOB NOWFoundationSigned-offBauer Structures05/09/2024
DOB NOWEarth WorkSigned-offBauer Structures04/17/2024
+ 10 more permits on file
1 project · most recent 05/15/2026
Air Conditioning Systems Heating Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/15/2026Permit IssuedLeeding Builders GroupAir Conditioning Systems, Heating Systems, Refrigeration Systems, Ventilation Systems
Cooling
Trane RNA-060-D-A-3-EABOB-CB2LO 27,670 CFM · Fan Coil Indoor ×10
RNA-031-D-A-3-EJAOB-CB2LO 15,160 CFM · Fan Coil Indoor ×4
RNA-050-D-A-3-EAAOB-CB2LO 23,440 CFM · Fan Coil Indoor ×4
RNA-050-D-A-3-EABOB-CB2LO 23,440 CFM · Fan Coil Indoor ×2
RNA-060-D-A-3-EABOB-CB3LO 27,640 CFM · Fan Coil Indoor ×2
Aaon RNA-060-D-A-3-EABOB-CB2LO 27,670 CFM · Fan Coil Indoor ×4
Friedrich FRIEDRICH/PDH15K 14,500 BTU · Ptac ×1
Heating
Cleaver-Brooks BMK-1500 1,025 kW · Boiler ×1
Ventilation
Greenheck HPA-24-85-A-150 57,000 CFM · Makeup Air ×1
Refrigeration
Lg LUU360HV 3 tons · Condensing Unit ×8
LUU480HHV 4 tons · Vrf Outdoor ×5
LUU420HHV 4 tons · Condensing Unit ×4
ARUN060G554 5 tons · Vrf Outdoor ×3
LSU363HLV3 3 tons · Condensing Unit ×3
LSU243HLV3 2 tons · Condensing Unit ×2
LSN243HLV3 2 tons · Vrf Indoor ×1
LUU120HV 1 tons · Condensing Unit ×1
LUU360HHV 3 tons · Condensing Unit ×1
Mitsubishi Electric LUU360HV 3 tons · Vrf Outdoor ×2
LUU420HHV 4 tons · Vrf Indoor ×2
LUU480HHV 4 tons · Vrf Indoor ×2
1 project · most recent 05/15/2026
Sprinkler System
FiledStatusContractorScope
05/15/2026Signed-offMetro Fire ProtectionSprinkler System
1 project · most recent 05/15/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/15/2026Signed-offForward MechanicalGas, Storm, Water/Sanitary
9 projects · most recent 06/03/2026
General Wiring
FiledStatusContractorScope
06/03/2026Permit IssuedFSG ElectricGeneral Wiring
03/28/2026CompleteTF ElectricalGeneral Wiring
03/28/2026CompleteTF ElectricalGeneral Wiring
03/28/2026CompleteTF ElectricalGeneral Wiring
02/02/2026CompleteShelby Electrical—
05/15/2025Permit IssuedAccord Power Electric—
07/22/2024CompleteFSG Electric1 meters, 1 new_meters
06/18/2024CompleteIlluminous Electric—
08/11/2023CompleteIlluminous ElectricGeneral Wiring
1 project · most recent 05/15/2026
Steel Concrete Masonry
FiledStatusContractorScope
05/15/2026Permit IssuedLeeding Builders GroupSteel, Concrete, Masonry
1 project · most recent 05/13/2025
FiledStatusContractorScope
05/13/2025Signed-offAccord Power251 panels, 136.79 kw, 52,792.94 roof_area_sqft
1 project · most recent 05/15/2026
Earthwork
FiledStatusContractorScope
05/15/2026Permit IssuedLeeding Builders GroupEarthwork
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
06/23/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
05/11/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
03/11/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
01/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/27/2025Pass-Final Boiler Equipment InspectionPassView ↗
09/23/2025Pass-Final Boiler Equipment InspectionPassView ↗
08/20/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
08/20/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/17/2025Fail-Final Boiler Equipment InspectionFailView ↗
05/20/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
05/20/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/15/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/05/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
08/05/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
12/28/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/28/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
05/22/2026Post-installed AnchorsMARISA HARTEspecial
05/22/2026Standpipe SystemsMARISA HARTEspecial
05/22/2026Sprinkler SystemsMARISA HARTEspecial
05/22/2026Fire-Resistant Penetrations and JointsMARISA HARTEspecial
12/24/2025FinalChristopher Carranoprogress
12/16/2025Fenestration air leakageSEAN OBRIENenergy_progress
12/16/2025Fire-Resistant Penetrations and JointsStephen Marchesespecial
12/16/2025Mastic and Intumescent Fire-resistant CoatingsStephen Marchesespecial
12/16/2025Sprayed fire-resistant materialsStephen Marchesespecial
12/16/2025Wall Panels, Curtain Walls, and VeneersSEAN OBRIENspecial
12/16/2025Energy Code Compliance InspectionsSEAN OBRIENprogress
12/16/2025Fire-Resistance Rated ConstructionStephen Marcheseprogress
12/16/2025Fenestration and door U-factor and product ratingsSEAN OBRIENenergy_progress
12/16/2025Maintenance informationStephen Marcheseenergy_progress
12/16/2025Insulation placement and R valuesSEAN OBRIENenergy_progress
12/16/2025Fenestration areasSEAN OBRIENenergy_progress
12/16/2025VestibulesStephen Marcheseenergy_progress
12/16/2025Air barrier - visual inspectionSEAN OBRIENenergy_progress
12/16/2025Protection of exposed foundation insulationSEAN OBRIENenergy_progress
12/16/2025Air barrier continuity plan testingSEAN OBRIENenergy_progress
12/01/2025Public Assembly Emergency LightingMARISA HARTEprogress
12/01/2025Public Assembly Emergency LightingMARISA HARTEprogress
11/20/2025Public Assembly Emergency LightingMARISA HARTEprogress
10/17/2025HVAC-R and service water heating system controlsMARISA HARTEenergy_progress
10/17/2025HVAC-R and service water heating equipmentMARISA HARTEenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
East End StudiosArts / Culture / EntertainmentFloor 1
Project Q01338700 Alteration · LOC Issued · 12/24/2025
Project Q01061737 Alteration · LOC Issued · 06/17/2024
Project Q01061738 Alteration · LOC Issued · 06/17/2024
Project Q01061739 Alteration · LOC Issued · 06/17/2024
Project Q01061740 Alteration · LOC Issued · 06/17/2024
Project Q01061742 Alteration · LOC Issued · 06/17/2024
Project Q01061743 Alteration · LOC Issued · 06/17/2024
Project Q01061744 Alteration · LOC Issued · 06/17/2024
PS/I.S. 218XEducationFloor 1
Project Q08051845 Alteration · Permit Entire · 01/20/2023
Project Q08051915 Alteration · LOC Issued · 01/20/2023
Project Q08051943 Alteration · Filing Withdrawn · 01/20/2023
Project Q08051962 Alteration · Permit Entire · 01/20/2023
Project Q08052051 Alteration · LOC Issued · 01/20/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 361 on file (BIS + DOB NOW)
▸Plans & Drawings80
▸DOB NOWPlans/Sketch74
08/25/2026Q08051845-I1Request digital key ↗
08/25/2026Q08052051-I1Request digital key ↗
08/25/2026Q08051943-I1Request digital key ↗
Showing 3 of 74 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly4
08/20/2026Q01221363-P1Request digital key ↗
08/20/2026Q01221363-I1Request digital key ↗
Showing 2 of 4 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Applications & Permits5
▸BISBPP-5 - Authorization to the Department of Transportation2
12/04/2023440747088Open ↗
10/06/2022440747088Open ↗
▸DOB NOWDEP Stormwater Construction Permit2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
10/06/2022440747088Open ↗
▸Zoning, Tax Lot & Property Records18
▸DOB NOWZD1: DOB Zoning Diagram8
08/18/2026Q00704893-I1Open ↗
08/18/2026Q00704893-C5Open ↗
08/18/2026Q00704893-A6Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWZoning Exhibit form (1-5)8
08/18/2026Q00704893-A6Open ↗
08/18/2026Q00704893-I1Open ↗
08/18/2026Q00704893-C5Open ↗
Showing 3 of 8 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/01/2023440747088Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications182
▸DOB NOWDPL-1: Design Professional Seal & Signature81
08/25/2026Q08051845-P1Open ↗
08/25/2026Q08051962-I1Open ↗
08/25/2026Q08051915-I1Open ↗
Showing 3 of 81 on file for this type
▸DOB NOWProgress Inspector Seal & Signature69
10/04/2026Q00704893-C6Open ↗
10/04/2026Q00704893-C6Open ↗
10/04/2026Q00704893-C6Open ↗
Showing 3 of 69 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
10/04/2026Q00704893-C6Open ↗
10/04/2026Q00704893-C6Open ↗
09/23/2026Q00704893-Z3Open ↗
Showing 3 of 30 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/06/2022440747088Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/06/2022440747088Open ↗
▸Trade Schedules & Equipment9
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)8
08/18/2026Q00704893-C5Open ↗
08/18/2026Q00704893-A6Open ↗
Showing 2 of 8 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist8
08/18/2026Q00704893-A6Open ↗
Showing 1 of 8 on file for this type
▸BISSTREET TREE CHECKLIST1
12/01/2023440747088Open ↗
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWSOIL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs2
▸BISBPP-UTILITY APPROVAL TO RELOCATE POLE1
12/01/2023440747088Open ↗
▸BISDOB APPROVALS FOR NEW CC'S1
12/01/2023440747088Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/06/2022440747088Open ↗
▸Other Documents44
▸DOB NOWProperty Ownership Certification8
08/18/2026Q00704893-C5Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWSite Survey: Initial8
08/18/2026Q00704893-C5Open ↗
08/18/2026Q00704893-A6Open ↗
08/18/2026Q00704893-A1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone8
08/18/2026Q00704893-C5Open ↗
08/18/2026Q00704893-A6Open ↗
Showing 2 of 8 on file for this type
▸DOB NOWAlternate Plan 14
08/20/2026Q01221363-I1Open ↗
08/20/2026Q01221363-P1Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWAlternate Plan 24
08/20/2026Q01221363-I1Open ↗
08/20/2026Q01221363-P1Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
12/01/2023440747088Open ↗
12/01/2023440747088Open ↗
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP: CATCH BASIN/MANHOLE REQUIRED1
12/01/2023440747088Open ↗
▸BISBPP-PARKS: REMOVE MATURE TREE1
12/01/2023440747088Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type