48 WEST 25TH STREET
MANHATTAN · BIN 1015610
💬 Discuss this project
1920Year Built
12Stories
O6Building Class
C6-4XZoning
96,267 sfGross Floor Area
13Units
LL97 Covered0 Active ViolationsFISP: SAFE
Office with commercial, 7-19 stories · Owner of record: 48 West 25th Street Property Investors I V · 9,529 sf lot · 10.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projects48 West 25 Street Property Investors Iv LLC1 filing
RoofSavanna6p · 4 filings · 20 docs
Floor 11Derris1 filing · 7 docs
Floor 10
Floor 9Skurnik Wines & Spirits4p · 7 filings · 20 docs
Floor 8
Floor 71825 Park Avenue Property Investors2p · 1 filing · 8 docs
Floor 6SavannaUnder Construction3p · 6 filings · 20 docs
Floor 5Cushman & Wakefield, INC.9p · 5 filings · 19 docs
Floor 4
Floor 3Savanna11p · 7 filings · 20 docs
Floor 2Savanna10p · 11 filings · 20 docs
Floor 1Jaybird, SavannaUnder Construction22p · 13 filings · 20 docs
MezzanineCushman & Wakefield, INC.3p · 2 filings · 15 docs
CellarJaybird, SavannaUnder Construction10p · 10 filings · 20 docs
Site & exteriorJaybirdUnder Construction13 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
48 W 25th St9303/21/2026
48 W 25 LLC C/O Colliers Tri-Sta9003/21/2026
24 West 25th Street Property Investment3007/08/2026
434 Broadway Property Investors III1107/08/2026
1825 Park Avenue Property Investors907/08/2026
Superior903/21/2026
Bernstein Real Estate603/21/2026
Savanna407/08/2026
LLC403/21/2026
49 East 74th Street303/21/2026
NCC Group103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/18/2026$54.0M—48 WEST 25TH STREET PROPERTY INVESTORS IV, LLC → 48 WEST 25TH STREET OWNER LLC$561/sf building
12/11/2018$90.0M—— → —$935/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Beam Living603/21/2026
Metropolis Group9203/21/2026
Millennium Designs of New York203/21/2026
Spring Scaffolding203/21/2026
AE Design Solution203/21/2026
Casa Group203/21/2026
Patuxent Engineering403/21/2026
Millennium Designs203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SavconGeneral Contractor3707/08/2026
Everest ScaffoldingScaffold607/08/2026
Advanced Plumbing, Mechanical & SprinklerFire Protection607/08/2026
Savcon ConstructionGeneral Contractor603/21/2026
Paul SignsSign hanger510/04/2026
Vanquish GroupGeneral Contractor507/08/2026
Five Boro AssociatesFire Protection407/08/2026
Solution Mechanical ContngPlumbing307/08/2026
Adler Windowsspecialty_contractor303/21/2026
Manhattan D EnterprisesScaffold303/21/2026
Unity Construction GroupGeneral Contractor207/08/2026
Advanced Plumbing MechanicalPlumbing207/08/2026
Rally Restorationspecialty_contractor203/21/2026
Moonk EnterpriseGeneral Contractor203/21/2026
Concept Construction ServiceGeneral Contractor207/08/2026
Penta Restorationspecialty_contractor107/08/2026
Nash Electric ServicesElectrical103/22/2026
Metropolis ElectricElectrical103/22/2026
Dynamic Electric ServiceElectrical103/21/2026
Ohm's ElectricalElectrical103/21/2026
Borowide Elect'l ContractorsElectrical103/22/2026
MC SuperstructureScaffold107/08/2026
SavconScaffold107/08/2026
Spring ScaffoldingScaffold107/08/2026
Cavan ElectricElectrical103/21/2026
New York Empire Electrical ConElectrical103/21/2026
Bedrock MechanicalFire Protection106/27/2026
Bedrock Plumbing & HeatingPlumbing106/27/2026
Enobrac PlumbingPlumbing107/08/2026
Enobrac PlumbingFire Protection107/08/2026
C.M. Richey Electrical ContractingElectrical103/22/2026
LCS Plumbing & ConsultingPlumbing107/08/2026
E.S.B. ElectricElectrical103/21/2026
Team ElectricElectrical103/22/2026
Electrical Solutions ofElectrical103/21/2026
HY-Lee Electric CoElectrical103/21/2026
PSI PartnersFire Protection107/08/2026
Dycon EnterprisesGeneral Contractor104/12/2026
Interior Building ServiceGeneral Contractor108/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Fenagh6942509/22/2026
DNA Controlled Inspection5542812/19/2024
PSI Agency254404/18/2024
Socotec Engineering4983709/15/2022
Chandler Pierce Architect2113106/30/2022
Howard L Zimmerman Architects1712205/24/2021
Building Lifecycle
All (300)Filed (75)Permit Issued (67)Signed Off (45)Facade (FISP) (21)Violation (26)Inspection (36)Special Inspection (30)
10/02/2026
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS D/F PROJECTING BANNER READING "JAYBIRD"
M01462398-I1
10/02/2026
Filed — Alteration
ERECT HALO LIT ILLUMINATED ACCESSORY BUSINESS SIGN READING "JAYBIRD"
M01462388-I1
10/02/2026
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS D/F PROJECTING BANNER READING "JAYBIRD"
M01462405-I1
10/02/2026
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS D/F PROJECTING BANNER READING "JAYBIRD"
M01462401-I1
10/02/2026
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS D/F PROJECTING BANNER READING "JAYBIRD"
M01462408-I1
10/02/2026
Permit issued — Sign
M01462401-I1-SG
10/02/2026
Permit issued — Sign
M01462405-I1-SG
10/02/2026
Permit issued — Sign
M01462408-I1-SG
10/02/2026
Permit issued — Sign
M01462388-I1-SG
10/02/2026
Permit issued — Sign
M01462398-I1-SG
09/29/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/22/2026
Filed — Alteration
Herewith filing for interior renovations on the 1st floor as indicated on plans. No change in use, occupancy, or egress.
M01377442-P1
09/18/2026
Special inspection requirement — Final
ARIEL GOLSHAN
09/18/2026
Special inspection requirement — Final
ARIEL GOLSHAN
09/18/2026
Special inspection requirement — Final
ARIEL GOLSHAN
09/18/2026
Special inspection requirement — Final
ARIEL GOLSHAN
09/18/2026
Special inspection requirement — Final
ARIEL GOLSHAN
08/26/2026
Permit issued — General Construction
M01444798-I1-GC
08/21/2026
Filed — Alteration
Interior demolition of existing non-bearing gyp. bd. Partitions. Installation of new non-bearing gyp. bd. partitions, ceilings, doors & finishes. No change in use, occupancy, or egress.
M01444798-I1
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
08/19/2026
Special inspection requirement — Post-installed Anchors
AILANTO DANIEL MINAWI
08/12/2026
Special inspection requirement — Final
Nicholas Tjartjalis
06/25/2026
Permit issued — Sprinklers
M01377442-S3-EW-SP
06/25/2026
Permit issued — Plumbing
M01377442-S2-PL
05/28/2026
Permit issued — Mechanical Systems
M01377442-S1-MS
05/27/2026
Permit issued — General Construction
M01377442-I1-GC
05/08/2026
Signed off — Alteration
Herewith filing for removal of existing demising wall on the 1st floor as indicated on plans. No change in use, occupancy, or egress.
M01379049-I1
04/10/2026
Permit issued — General Construction
M01379049-I1-GC
04/08/2026
Filed — Alteration
Herewith filing for interior renovations on the 1st floor as indicated on plans. No change in use, occupancy, or egress.
M01377442-S2
04/08/2026
Filed — Alteration
Herewith filing for interior renovations on the 1st floor as indicated on plans. No change in use, occupancy, or egress.
M01377442-S3
04/03/2026
Filed — Alteration
Herewith filing for removal of existing demising wall on the 1st floor as indicated on plans. No change in use, occupancy, or egress.
M01379049-I1
03/30/2026
Filed — Alteration
Herewith filing for interior renovations on the 1st floor as indicated on plans. No change in use, occupancy, or egress.
M01377442-I1
03/30/2026
Filed — Alteration
Herewith filing for interior renovations on the 1st floor as indicated on plans. No change in use, occupancy, or egress.
M01377442-S1
03/30/2026
Special inspection requirement — Post-installed Anchors
AILANTO DANIEL MINAWI
03/30/2026
Special inspection requirement — Interior lighting power
AILANTO DANIEL MINAWI
03/30/2026
Special inspection requirement — Duct leakage testing, insulation and design
AILANTO DANIEL MINAWI
03/30/2026
Special inspection requirement — Post-installed Anchors
AILANTO DANIEL MINAWI
03/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
AILANTO DANIEL MINAWI
03/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
03/30/2026
Special inspection requirement — Lighting controls
AILANTO DANIEL MINAWI
03/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
AILANTO DANIEL MINAWI
03/30/2026
Special inspection requirement — Electrical motors and elevators
AILANTO DANIEL MINAWI
03/30/2026
Special inspection requirement — Energy Code Compliance Inspections
AILANTO DANIEL MINAWI
03/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
AILANTO DANIEL MINAWI
03/30/2026
Special inspection requirement — Shutoff dampers
AILANTO DANIEL MINAWI
03/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
AILANTO DANIEL MINAWI
03/26/2026
Special inspection requirement — Post-installed Anchors
AILANTO DANIEL MINAWI
03/26/2026
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
03/26/2026
Special inspection requirement — Mechanical Systems
AILANTO DANIEL MINAWI
03/26/2026
Special inspection requirement — Final
AILANTO DANIEL MINAWI
03/26/2026
Special inspection requirement — Sprinkler Systems
AILANTO DANIEL MINAWI
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
02/13/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED, OVERHEAD PROTECTION, AND ROOF PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00904970-I1
04/21/2025
Cycle 10 facade report submitted
04/21/2025
Cycle 10 facade report signed — SAFE
04/09/2025
Cycle 10 facade inspection completed
04/02/2025
Cycle 9 facade report signed — SAFE
02/20/2025
Cycle 9 facade report submitted
01/06/2025
Cycle 9 facade inspection completed
12/31/2024
Signed off — Alteration
Herewith filing for modifications to existing sprinkler system and associated piping on the 9th floor MER as indicated on plans.
M01027899-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedWinway Development10/02/2026
DOB NOWSignPermit IssuedPaul Signs10/02/2026
DOB NOWSignPermit IssuedPaul Signs10/02/2026
DOB NOWSignPermit IssuedPaul Signs10/02/2026
DOB NOWSignPermit IssuedPaul Signs10/02/2026
DOB NOWGeneral ConstructionPermit IssuedInterior Building Service08/26/2026
DOB NOWSprinklersPermit IssuedBedrock Mechanical06/25/2026
DOB NOWPlumbingPermit IssuedBedrock Plumbing & Heating06/25/2026
DOB NOWMechanical SystemsPermit IssuedConcept Construction Service05/28/2026
DOB NOWGeneral ConstructionPermit IssuedConcept Construction Service05/27/2026
DOB NOWGeneral ConstructionSigned-offDycon Enterprises04/10/2026
DOB NOWSprinklersSigned-offAdvanced Plumbing, Mechanical & Sprinkler06/10/2024
DOB NOWGeneral ConstructionSigned-offSavcon05/24/2024
DOB NOWMechanical SystemsSigned-offSavcon05/24/2024
DOB NOWMechanical SystemsSigned-offSavcon Construction05/23/2024
DOB NOWGeneral ConstructionSigned-offSavcon Construction05/23/2024
DOB NOWPlumbingSigned-offAttention to Detail P&H.I05/22/2024
DOB NOWGeneral ConstructionSigned-offUnity Construction Group05/21/2024
DOB NOWSprinklersSigned-offMora Fire Protection05/21/2024
DOB NOWMechanical SystemsSigned-offUnity Construction Group05/21/2024
DOB NOWSuspended ScaffoldPermit IssuedPenta Restoration03/15/2024
DOB NOWSprinklersSigned-offAdvanced Plumbing, Mechanical & Sprinkler11/20/2023
DOB NOWGeneral ConstructionSigned-offPenta Restoration09/11/2023
DOB NOWSidewalk ShedSigned-offMC Superstructure08/28/2023
DOB NOWSidewalk ShedSigned-offSpring Scaffolding08/14/2023
DOB NOWSprinklersSigned-offAdvanced Plumbing, Mechanical & Sprinkler06/30/2023
DOB NOWGeneral ConstructionSigned-offAdler Windows06/08/2023
DOB NOWSprinklersSigned-offAdvanced Plumbing, Mechanical & Sprinkler04/19/2023
DOB NOWPlumbingSigned-offAdvanced Plumbing Mechanical02/10/2023
DOB NOWSprinklersSigned-offAdvanced Plumbing, Mechanical & Sprinkler02/09/2023
DOB NOWMechanical SystemsSigned-offSavcon02/07/2023
DOB NOWGeneral ConstructionSigned-offSavcon01/10/2023
DOB NOWGeneral ConstructionSigned-offSavcon01/07/2023
DOB NOWStructuralSigned-offSavcon12/02/2022
DOB NOWGeneral ConstructionPermit IssuedSavcon11/16/2022
DOB NOWGeneral ConstructionSigned-offSavcon07/21/2022
DOB NOWGeneral ConstructionSigned-offVanquish Group07/15/2022
DOB NOWMechanical SystemsSigned-offSavcon07/14/2022
DOB NOWMechanical SystemsSigned-offSavcon07/14/2022
DOB NOWGeneral ConstructionSigned-offSavcon07/14/2022
+ 60 more permits on file
2 projects · most recent 09/22/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/22/2026Permit IssuedConcept Construction ServiceAir Conditioning Systems
Cooling
Sigma SIG-SDSH096D.1 96,000 BTU · Vrf Outdoor ×8
09/14/2022——Air Conditioning Systems
Cooling
Task TGS153CAV-HE 185,000 BTU ×2
1 project · most recent 09/22/2026
Water/Sanitary
FiledStatusContractorScope
09/22/2026Permit IssuedBedrock Plumbing & HeatingWater/Sanitary
15 projects · most recent 04/17/2025
General Wiring
FiledStatusContractorScope
04/17/2025CompleteCrosswire ElectricalGeneral Wiring
07/16/2024CompleteTeam Electric2 meters
06/12/2024CompleteC.M. Richey Electrical ContractingGeneral Wiring
01/26/2024Permit IssuedNash Electric Services—
11/17/2023Permit IssuedTeam ElectricGeneral Wiring
08/15/2023CompleteTop Shelf Electric—
04/14/2022CompleteLeader Electric Co—
02/28/2022CompleteRight Away Electric—
02/03/2022CompleteLeader Electric CoGeneral Wiring
07/21/2021Complete5 J'S Electl Conts—
05/10/2021CompleteMetropolis ElectricGeneral Wiring
07/31/2020CompleteC.M. Richey Electrical ContractingGeneral Wiring
09/23/2019CompleteBorowide Elect'l Contractors—
08/06/2019Permit IssuedRight Away ElectricGeneral Wiring
02/19/2018CompleteM.t.electricGeneral Wiring
1 project · most recent 08/21/2026
FiledStatusContractorScope
08/21/2026Permit IssuedInterior Building Service1 scope_items
1 project · most recent 03/15/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
03/15/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 36
DateTypeResultReport
09/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/18/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
10/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/26/2024Pass-Final General Construction Non-Directive 14PassView ↗
07/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/09/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
02/01/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/01/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/18/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/19/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
07/17/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/09/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
05/05/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/19/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/18/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/14/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 36.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/18/2026FinalARIEL GOLSHANprogress
09/18/2026FinalARIEL GOLSHANprogress
09/18/2026FinalARIEL GOLSHANprogress
09/18/2026FinalARIEL GOLSHANprogress
09/18/2026FinalARIEL GOLSHANprogress
08/19/2026Post-installed AnchorsAILANTO DANIEL MINAWIspecial
08/19/2026Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
08/12/2026FinalNicholas Tjartjalisprogress
03/30/2026Post-installed AnchorsAILANTO DANIEL MINAWIspecial
03/30/2026Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
03/30/2026Duct leakage testing, insulation and designAILANTO DANIEL MINAWIenergy_progress
03/30/2026Interior lighting powerAILANTO DANIEL MINAWIenergy_progress
03/30/2026Shutoff dampersAILANTO DANIEL MINAWIenergy_progress
03/30/2026Electrical motors and elevatorsAILANTO DANIEL MINAWIenergy_progress
03/30/2026HVAC-R and service water piping design and insulationAILANTO DANIEL MINAWIenergy_progress
03/30/2026HVAC-R and service water heating system controlsAILANTO DANIEL MINAWIenergy_progress
03/30/2026Energy Code Compliance InspectionsAILANTO DANIEL MINAWIprogress
03/30/2026Post-installed AnchorsAILANTO DANIEL MINAWIspecial
03/30/2026Fire-Resistance Rated ConstructionAILANTO DANIEL MINAWIprogress
03/30/2026HVAC-R and service water heating equipmentAILANTO DANIEL MINAWIenergy_progress
03/30/2026Lighting controlsAILANTO DANIEL MINAWIenergy_progress
03/26/2026FinalALEXIS SCHLESSINGERMANprogress
03/26/2026Post-installed AnchorsAILANTO DANIEL MINAWIspecial
03/26/2026Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
03/26/2026Sprinkler SystemsAILANTO DANIEL MINAWIspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
JaybirdOfficeCellar, Floor 1
Project M01377442 Alteration · Permit Entire · 03/30/2026
Skurnik Wines & SpiritsOfficeFloor 9
Project M01013560 Alteration · LOC Issued · 04/18/2024
Project M01013579 Alteration · LOC Issued · 04/17/2024
Project M01013641 Alteration · LOC Issued · 04/17/2024
Project M01013656 Alteration · LOC Issued · 04/17/2024
SavannaOfficeFloors 1–3, 6, Roof
Project M08041000 Alteration · LOC Issued · 11/28/2022
Project M08042343 Alteration · LOC Issued · 11/28/2022
Project M08042369 Alteration · LOC Issued · 11/28/2022
Project M08042396 Alteration · LOC Issued · 11/28/2022
Project M08042475 Alteration · LOC Issued · 11/28/2022
Project M08020257 Alteration · LOC Issued · 11/14/2022
Project M07994408 Alteration · Approved · 09/15/2022
Project M07994468 Alteration · Approved · 09/14/2022
Project M07994491 Alteration · Approved · 09/14/2022
Project M07995334 Alteration · Approved · 09/14/2022
DerrisOfficeFloor 11
Project M00759611 Alteration · LOC Issued · 06/30/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,541 on file (BIS + DOB NOW)
▸Plans & Drawings75
▸DOB NOWPlans/Sketch63
10/04/2026M01462408-I1Request digital key ↗
10/04/2026M01462388-I1Request digital key ↗
10/04/2026M01462401-I1Request digital key ↗
Showing 3 of 63 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/05/2026M00232173-I1Request digital key ↗
09/04/2026M00420945-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/04/2026M00359353-I1Request digital key ↗
09/04/2026M00396575-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00396530-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00310160-I1Request digital key ↗
09/04/2026M00435882-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00396563-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00476227-I1Request digital key ↗
▸Applications & Permits226
▸BISPLAN / WORK APPROVAL APPLICATION118
05/05/2021141002091Open ↗
10/16/2020140963287Open ↗
07/09/2020140922009Open ↗
Showing 3 of 118 on file for this type
▸BISWORK PERMIT APPLICATION107
10/22/2020140963287Open ↗
09/03/2020140922081Open ↗
09/03/2020140922009Open ↗
Showing 3 of 107 on file for this type
▸BISSUSPENDED SCAFFOLD APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications408
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION165
05/08/2020123872639Open ↗
05/04/2020123872639Open ↗
05/04/2020123872639Open ↗
Showing 3 of 165 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature75
10/05/2026M01377442-P1Open ↗
10/04/2026M01462401-I1Open ↗
10/03/2026M01462408-I1Open ↗
Showing 3 of 75 on file for this type
▸DOB NOWProgress Inspector Seal & Signature65
10/05/2026M01462401-I1Open ↗
10/03/2026M01462405-I1Open ↗
10/03/2026M01462408-I1Open ↗
Showing 3 of 65 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature44
10/05/2026M01377442-P1Open ↗
10/05/2026M01377442-P1Open ↗
09/12/2026M00584283-P1Open ↗
Showing 3 of 44 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT21
05/05/2021141002091Open ↗
10/16/2020140963287Open ↗
07/09/2020140922009Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST17
06/07/2019123687714Open ↗
Showing 1 of 17 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
05/05/2021141002091Open ↗
10/16/2020140963287Open ↗
07/09/2020140922009Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
05/05/2021141002091Open ↗
10/16/2020140963287Open ↗
07/09/2020140922009Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Trade Schedules & Equipment136
▸BISSELF-CERT PLUMBING NOTICE42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE27
03/02/2020123872639Open ↗
02/19/2020123872639Open ↗
06/07/2019123687714Open ↗
Showing 3 of 27 on file for this type
▸BISSCHEDULE B - PLUMBING21
05/11/2020122965050Open ↗
Showing 1 of 21 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA16
07/15/2020123719146Open ↗
12/23/2019121083898Open ↗
07/24/2019123445753Open ↗
Showing 3 of 16 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT16
05/21/2020123687705Open ↗
05/07/2020123687705Open ↗
Showing 2 of 16 on file for this type
▸BISEQUIPMENT USE PERMITS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸BISTenant Protection Plan and Notes3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWStreet Tree Checklist2
09/01/2026M08028148-P1Open ↗
Showing 1 of 2 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos124
▸DOB NOWDEP ACP-5: Asbestos Assessment Report56
10/05/2026M01377442-P1Open ↗
10/04/2026M01462401-I1Open ↗
10/03/2026M01462388-I1Open ↗
Showing 3 of 56 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)52
10/16/2020140963287Open ↗
07/09/2020140922009Open ↗
07/08/2020140922081Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
09/03/2026M00583751-I1Open ↗
09/03/2026M00584204-I1Open ↗
09/03/2026M00580461-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance135
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS60
10/04/2019123803642Open ↗
06/07/2019123687705Open ↗
06/07/2019123687705Open ↗
Showing 3 of 60 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS38
07/02/2021140963287Open ↗
02/26/2021140914250Open ↗
02/26/2021140914250Open ↗
Showing 3 of 38 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY16
07/02/2021140963287Open ↗
02/23/2021123803642Open ↗
12/22/2020140922081Open ↗
Showing 3 of 16 on file for this type
▸BISTR8: Energy Code Progress Inspections10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
10/16/2020140963287Open ↗
07/09/2020140922009Open ↗
07/08/2020140922081Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/03/2026M00583751-I1Open ↗
09/03/2026M00580461-I1Open ↗
09/03/2026M00619908-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/29/2020140922009Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports43
▸BISTECHNICAL REPORT: RESPONSIBILITY38
07/02/2021140963287Open ↗
05/05/2021141002091Open ↗
02/26/2021140914250Open ↗
Showing 3 of 38 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Approvals, Objections & Sign-offs100
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST58
07/02/2021140963287Open ↗
02/26/2021140914250Open ↗
02/23/2021123803642Open ↗
Showing 3 of 58 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION22
09/03/2020140922081Open ↗
09/03/2020140922009Open ↗
09/06/2019122969010Open ↗
Showing 3 of 22 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership130
▸BISCOST AFFIDAVIT127
07/02/2021140963287Open ↗
02/26/2021140914250Open ↗
02/23/2021123803642Open ↗
Showing 3 of 127 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
10/29/2020140922009Open ↗
07/22/2020123687714Open ↗
07/22/2020123872639Open ↗
▸Filing & Intake Forms134
▸BISEFILING COVER SHEET70
10/04/2019123803642Open ↗
06/07/2019123687714Open ↗
Showing 2 of 70 on file for this type
▸BISADDITIONAL INFORMATION35
03/11/2020123687705Open ↗
03/02/2020123872639Open ↗
11/14/2019123687714Open ↗
Showing 3 of 35 on file for this type
▸BISBOROUGH INTAKE FORM19
05/18/2020121083898Open ↗
05/01/2020121083898Open ↗
02/19/2020123872639Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
05/05/2021141002091Open ↗
10/16/2020140963287Open ↗
07/09/2020140922009Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWAI1 Form (from plan PDF)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents21
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
05/21/2020123687705Open ↗
05/21/2020123687705Open ↗
▸DOB NOWProperty Ownership Certification2
09/01/2026M08028148-P1Open ↗
Showing 1 of 2 on file for this type
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type