← Back
Office, 20+ stories, with or without commercial
Grand Central Square
485 LEXINGTON AVENUE · BIN 1036206
💬 Discuss this project
1957Year Built
30Stories
O4Building Class
C5-3Zoning
743,789 sfGross Floor Area
30Units
LL97 Covered0 Open ViolationsFISP: SWARMP
Office, 20+ stories, with or without commercial · Owner of record: GREEN 485 TIC LLC · 46,141 sf lot · 16.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscapeCivilGeneral
Permit Issued — active, not yet Signed-off
Roof11p · 3 filings · 19 docs
Bulkhead1p · 1 filing · 6 docs
Floor 324p · 3 filings · 17 docs
Floor 317p · 4 filings · 20 docs
Floor 308p · 8 filings · 20 docs
Floor 292p · 2 filings · 9 docs
Floor 283p · 3 filings · 20 docs
Floor 274p · 3 filings · 12 docs
Floor 263p · 3 filings · 20 docs
Floor 255p · 3 filings · 12 docs
Floor 246p · 2 filings · 8 docs
Floor 23
Floor 226p · 4 filings · 20 docs
Floor 21
Floor 20
Floor 19Under Construction31p · 10 filings · 20 docs
Floor 18
Floor 171p · 1 filing · 14 docs
Floor 16Under Construction18p · 6 filings · 20 docs
Floor 15
Floor 14
Floor 13
Floor 122p · 1 filing · 6 docs
Floor 115p · 2 filings · 9 docs
Floor 102p · 2 filings · 14 docs
Floor 9Under Construction130p · 13 filings · 20 docs
Floor 8Under Construction72p · 12 filings · 20 docs
Floor 762p · 18 filings · 20 docs
Floor 67p · 4 filings · 20 docs
Floor 55p · 3 filings · 17 docs
Floor 44p · 4 filings · 20 docs
Floor 39p · 11 filings · 20 docs
Floor 23p · 1 filing · 6 docs
Floor 115p · 4 filings · 20 docs
Cellar23p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SL GREENE REALTY1,35809/16/2026
SIGNEXPO504/09/2026
GREEN 485 TIC LLC303/22/2026
BLADE CONTRACTING203/22/2026
QUIL PARK 485 GARAGE LLC103/22/2026
QUIK PARK 485 GARAGE LLC303/22/2026
CONCEPT CONSTRUCTION SERV103/22/2026
BLADE CONTRACTING INC. 1103/22/2026
ANZELIKA LVKANSKA0VASILEV103/22/2026
CBRE203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIZZO GROUP20503/21/2026
LOUIS STRIAR603/21/2026
SPRING SCAFFOLDING LLC1203/21/2026
BUILDING BROTHERS203/21/2026
SKYLINE ACCESS103/21/2026
ALL IN PERMIT CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONCEPT CONSTRUCTION SERVGeneral Contractor4407/16/2026
FINALY GENL CONTR CORPGeneral Contractor3807/08/2026
GILBANE BUILDING COMPANYGeneral Contractor1206/28/2026
SPRING SCAFFOLDING LLCGeneral Contractor1107/08/2026
A&A PLUMBING CORPPlumbing1007/08/2026
SKH MECHANICAL CORPFire Protection1007/08/2026
PSI PARTNERS, LLCFire Protection907/08/2026
BEDROCK PLBG. & HTG., INCPlumbing707/08/2026
ADDISON PLBG AND HTG CORPPlumbing707/08/2026
A & F FIRE PROTECTION COFire Protection508/05/2026
BEDROCK MECHANICAL INCFire Protection507/08/2026
JT MAGEN & COMPANY INCGeneral Contractor403/21/2026
ENOBRAC PLUMBING, INCPlumbing407/08/2026
JAMES E FITZGERALD INCGeneral Contractor407/08/2026
JTONIC DESIGN & CONSTRUCTGeneral Contractor407/08/2026
ENOBRAC PLUMBING, INCFire Protection407/08/2026
PLAZA CONSTRUCTION LLCGeneral Contractor407/08/2026
ARMON MECHANICAL INCPlumbing307/11/2026
TRISTATE PLBG SVCS CORPPlumbing309/16/2026
SYNERGY CONSTRUCTION INCGeneral Contractor307/08/2026
TRISTATE AIR CONDITIONINGGeneral Contractor303/21/2026
FULL CAPACITY FIRE CORPFire Protection307/08/2026
IDDC LLCGeneral Contractor303/21/2026
ACC CONSTRUCTION CORPGeneral Contractor307/08/2026
JOSEPH PUGLISIElectrical203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CODEGREEN5102807/21/2026
ALAN MARGOLIN & ASSOC4239111/25/2025
SPECIAL TESTING & CONSULT1688305/08/2025
MG ENGINEERING D.P.C.8546510/02/2024
JOSEPH MARTINES PE, PLLC1428312/01/2021
B2 ENGINEERING D.P.C.5433108/28/2019
Building Lifecycle
All (300)Filed (78)Permit Issued (80)Signed Off (44)Facade (FISP) (3)Violation (1)Inspection (60)Objection (4)Special Inspection (30)
09/15/2026
Permit issued — Plumbing
M01230823-I1-PL
08/06/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/04/2026
Permit issued — Standpipe
M01230955-I1-EW-SD
08/04/2026
Permit issued — Sprinklers
M01230817-I1-EW-SP
08/03/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/03/2026
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
07/22/2026
Permit issued — Sprinklers
M01426734-I1-EW-SP
07/22/2026
Permit issued — Mechanical Systems
M01426699-I1-MS
07/22/2026
Permit issued — General Construction
M01426670-I1-GC
07/21/2026
Filed — Alteration
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 16th floor (IQVIA) as per plans. No change to use, egress or occupancy.
M01426670-I1
07/20/2026
Filed — Alteration
Modifications to the existing HVAC system on the 16th floor (IQVIA) as per plans. No change to use, egress or occupancy.
M01426699-I1
07/20/2026
Filed — Alteration
Modifications to the existing sprinkler system on the 16th floor (IQVIA) as per plans. No change to use, egress or occupancy.
M01426734-I1
07/17/2026
Signed off — Alteration
M01317492-I1
07/16/2026
Signed off — Alteration
M01016813-I1
07/15/2026
Permit issued — General Construction
M01201677-I1-GC
07/15/2026
Permit issued — Mechanical Systems
M01201716-I1-MS
07/14/2026
Signed off — Alteration
Slab infill, existing stair opening on 10th floor (9th Floor Ceiling) to be infilled as per plans. No change to use, egress, or occupancy.
M01201852-I1
07/14/2026
Signed off — Alteration
Modifications to the existing sprinkler systems on the 9th (Whitebox) floor as per plans. No change to use, egress, or occupancy.
M01201800-I1
07/10/2026
Permit issued — Plumbing
M01201767-I1-PL
07/08/2026
Special inspection requirement — Post-installed Anchors
James Sullivan Jr
07/06/2026
Special inspection requirement — Duct leakage testing, insulation and design
James Sullivan Jr
07/06/2026
Special inspection requirement — Sprayed fire-resistant materials
James Sullivan Jr
07/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
James Sullivan Jr
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Sullivan Jr
07/06/2026
Special inspection requirement — Mechanical Systems
James Sullivan Jr
07/06/2026
Special inspection requirement — Energy Code Compliance Inspections
James Sullivan Jr
07/06/2026
Special inspection requirement — Lighting controls
James Sullivan Jr
07/06/2026
Special inspection requirement — Final
John Giuseffi
07/06/2026
Special inspection requirement — Final
James Sullivan Jr
07/06/2026
Special inspection requirement — Interior lighting power
James Sullivan Jr
06/30/2026
Signed off — Alteration
Modifications to the existing sprinkler systems on the 7th and 30th floors (Restrooms) as per plans. No change to use, egress or occupancy.
M01184413-I1
06/29/2026
Signed off — Alteration
Modifications to the existing plumbing system on the 7th and 30th floors (Restrooms) as per plans. No change to use, egress or occupancy.
M01184395-I1
06/24/2026
Permit issued — Mechanical Systems
M01230815-I1-MS
06/24/2026
Permit issued — Structural
M01230813-I1-ST
06/23/2026
Permit issued — General Construction
M01230806-I1-GC
06/23/2026
Permit issued — Mechanical Systems
M01227374-I1-MS
06/23/2026
Permit issued — Structural
M01230246-I1-ST
06/16/2026
Signed off — Alteration
Modifications to the existing plumbing system on the 3rd floor (Berkowitz Pollack) as per plans. No change to use, egress or occupancy.
M01317449-I1
06/15/2026
Signed off — Alteration
M01317387-I1
05/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/26/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/20/2026
Signed off — Alteration
Modifications to the existing standpipe system on the 17th floor (Risk Strategies) as per plans. No change to use, egress or occupancy.
M01044339-I1
05/20/2026
Signed off — Alteration
M01317420-I1
05/19/2026
Special inspection requirement — Final
John workley
05/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HATIM ELSAID
05/19/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
HATIM ELSAID
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HATIM ELSAID
05/15/2026
Special inspection requirement — Sprinkler Systems
HATIM ELSAID
05/14/2026
Filed — Alteration
Modifications to the existing sprinkler system on the 9th floor as per plans. No change to use, egress or occupancy.
M01227395-P1
05/14/2026
Filed — Alteration
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 9th floor as per plans. No change to use, egress or occupancy.
M01227356-P1
05/14/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/14/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
05/11/2026
Signed off — Alteration
Modifications to the existing sprinkler system on the 25th floor (Monjasa) as per plans. No change to use, egress or occupancy.
M01105174-I1
05/11/2026
Signed off — Alteration
M01044335-I1
05/11/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/11/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
05/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/28/2026
Signed off — Alteration
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 25th floor (Monjasa) as per plans. No change to use, egress or occupancy.
M01104627-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTRISTATE PLBG SVCS CORP09/15/2026
DOB NOWStandpipePermit IssuedA & F FIRE PROTECTION CO08/04/2026
DOB NOWSprinklersPermit IssuedA & F FIRE PROTECTION CO08/04/2026
DOB NOWSprinklersPermit IssuedFIVE BOROUGH NYC LLC07/22/2026
DOB NOWMechanical SystemsPermit IssuedICON INTERIORS INC07/22/2026
DOB NOWGeneral ConstructionPermit IssuedICON INTERIORS INC07/22/2026
DOB NOWGeneral ConstructionPermit IssuedCONCEPT CONSTRUCTION SERV07/15/2026
DOB NOWMechanical SystemsPermit IssuedCONCEPT CONSTRUCTION SERV07/15/2026
DOB NOWPlumbingPermit IssuedARMON MECHANICAL INC07/10/2026
DOB NOWStructuralPermit IssuedGILBANE BUILDING COMPANY06/24/2026
DOB NOWMechanical SystemsPermit IssuedGILBANE BUILDING COMPANY06/24/2026
DOB NOWMechanical SystemsPermit IssuedGILBANE BUILDING COMPANY06/23/2026
DOB NOWStructuralPermit IssuedGILBANE BUILDING COMPANY06/23/2026
DOB NOWGeneral ConstructionPermit IssuedGILBANE BUILDING COMPANY06/23/2026
DOB NOWSprinklersPermit IssuedDEPENDABLE MECHANICAL COR04/21/2026
DOB NOWSprinklersSigned-offS. TIEGER PLBG. CO., INC12/16/2025
DOB NOWStandpipeSigned-offBEDROCK MECHANICAL INC12/04/2025
DOB NOWMechanical SystemsSigned-offFINALY GENL CONTR12/03/2025
DOB NOWGeneral ConstructionSigned-offFINALY GENL CONTR12/03/2025
DOB NOWPlumbingSigned-offA&A PLUMBING CORP12/03/2025
DOB NOWStructuralPermit IssuedINTEGRATED HVAC SYS SVC12/02/2025
DOB NOWMechanical SystemsPermit IssuedINTEGRATED HVAC SYS SVC11/26/2025
DOB NOWStandpipePermit IssuedBEDROCK MECHANICAL INC10/27/2025
DOB NOWSprinklersPermit IssuedBEDROCK MECHANICAL INC10/27/2025
DOB NOWPlumbingPermit IssuedA&A PLUMBING CORP10/24/2025
DOB NOWMechanical SystemsPermit IssuedSTRUCTURE TONE, LLC10/22/2025
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURE TONE, LLC10/22/2025
DOB NOWPlumbingSigned-offTRISTATE PLBG SVCS CORP09/11/2025
DOB NOWPlumbingPermit IssuedTRISTATE PLBG SVCS CORP09/11/2025
DOB NOWSprinklersPermit IssuedADVANCED AUTO SPR.CO.,INC08/07/2025
DOB NOWStandpipePermit IssuedADVANCED AUTO SPR.CO.,INC08/07/2025
DOB NOWSprinklersPermit IssuedADVANCED AUTO SPR.CO.,INC08/07/2025
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.07/10/2025
DOB NOWMechanical SystemsPermit IssuedGILBANE BUILDING COMPANY07/08/2025
DOB NOWPlumbingSigned-offRRP PLUMBING CORP07/08/2025
DOB NOWGeneral ConstructionPermit IssuedGILBANE BUILDING COMPANY07/08/2025
DOB NOWStructuralPermit IssuedGILBANE BUILDING COMPANY07/07/2025
DOB NOWMechanical SystemsPermit IssuedGILBANE BUILDING COMPANY07/07/2025
DOB NOWGeneral ConstructionPermit IssuedGILBANE BUILDING COMPANY07/07/2025
DOB NOWStructuralPermit IssuedGILBANE BUILDING COMPANY07/07/2025
+ 60 more permits on file
3 projects · most recent 11/10/2025
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/10/2025Permit IssuedINTEGRATED HVAC SYS & SVCHeating and Air Conditioning Systems—
06/26/2025Permit IssuedGILBANE BUILDING COMPANYAir Conditioning Systems
Cooling
Florida Heat Pump Florida Heat Pump CL024 800 CFM · Wshp ×4
Florida Heat Pump CL036 1,200 CFM · Wshp ×3
Vertiv VERTIV DME037E 1,200 CFM · Crac Unit ×2
VERTIV DME020E 1,200 CFM · Crac Unit ×1
06/20/2025Permit IssuedGILBANE BUILDING COMPANYAir Conditioning Systems
Cooling
Vertiv VERTIV DME037E 1,200 CFM · Crac Unit ×2
VERTIV DME037 1,200 CFM · Crac Unit ×1
Florida Heat Pump Florida Heat Pump CL024 800 CFM · Wshp ×1
7 projects · most recent 07/20/2026
FiledStatusContractorScope
07/20/2026Permit IssuedFIVE BOROUGH NYC LLC—
05/14/2026Permit IssuedA & F FIRE PROTECTION CO779 heads
10/17/2025Signed-offA&H EXPRESS PLBG&HTG CORP385 heads
10/14/2025Permit IssuedBEDROCK MECHANICAL INC214 heads
08/07/2025Signed-offBEDROCK MECHANICAL INC77 heads
06/23/2025Permit IssuedA & F FIRE PROTECTION CO1 outlets
06/20/2025Permit IssuedA & F FIRE PROTECTION CO814 heads
9 projects · most recent 05/14/2026
Water/Sanitary
FiledStatusContractorScope
05/14/2026———
12/15/2025Signed-offTRISTATE PLBG SVCS CORPWater/Sanitary
11/25/2025Signed-offA&A PLUMBING CORPWater/Sanitary
10/14/2025———
08/07/2025———
06/20/2025Permit IssuedTRISTATE PLBG SVCS CORPWater/Sanitary
04/28/2025Permit IssuedARMON MECHANICAL INCWater/Sanitary
03/07/2025Signed-offARMON MECHANICAL INCWater/Sanitary
11/12/2019Signed-offPAR PLUMBING CO., INCWater/Sanitary
25 projects · most recent 07/29/2026
General Wiring Lighting
FiledStatusContractorScope
07/29/2026Permit IssuedALLSTATE ELECTRIC CORPGeneral Wiring
11/19/2025Permit IssuedFOREST ELECTRIC CORP.General Wiring
11/19/2025CompleteFOREST ELECTRIC CORP.General Wiring
11/19/2025CompleteFOREST ELECTRIC CORP.General Wiring
07/10/2025CompleteFIVE BOROUGH ELECTRIC INCGeneral Wiring
06/23/2025CompletePOWER-TECH INSTALL. ELEC'General Wiring
04/25/2025Permit IssuedSOLEIRE ELECL SOLTNS CORPGeneral Wiring
04/25/2025CompleteSOLEIRE ELECL SOLTNS CORP—
03/21/2025CompleteSOLEIRE ELECL SOLTNS CORPGeneral Wiring
10/21/2024CompletePOWER-TECH INSTALL. ELEC'General Wiring
03/07/2024CompleteGOODALL ELECTRIC CORP—
12/30/2022CompleteGREEN WATER AND POWER NYCGeneral Wiring
07/28/2021Permit IssuedPOWER-TECH INSTALL. ELEC'General Wiring
06/04/2021CompleteA.S.K. ELECTRICAL CORPGeneral Wiring
01/23/2021CompletePOWER-TECH INSTALL. ELEC'General Wiring
2 projects · most recent 06/26/2025
Steel Concrete Masonry
FiledStatusContractorScope
06/26/2025Permit IssuedGILBANE BUILDING COMPANYSteel
04/28/2025Signed-offCONCEPT CONSTRUCTION SERVConcrete, Masonry
2 projects · most recent 12/18/2025
FiledStatusContractorScope
12/18/2025———
12/19/2023Permit Issued——
▾Field Inspections (DOB CAP) — 131
DateTypeResultReport
08/06/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/03/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/03/2026Certified Sprinkler - SP - RoughingCertifiedView ↗
05/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/26/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/14/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/14/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/11/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/11/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/04/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/11/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/05/2026Fail-Final General Construction Non-Directive 14FailView ↗
12/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/27/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 131.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/08/2026Post-installed AnchorsJames Sullivan Jrspecial
07/06/2026FinalJames Sullivan Jrprogress
07/06/2026FinalJohn Giuseffiprogress
07/06/2026Sprayed fire-resistant materialsJames Sullivan Jrspecial
07/06/2026Interior lighting powerJames Sullivan Jrenergy_progress
07/06/2026Lighting controlsJames Sullivan Jrenergy_progress
07/06/2026Duct leakage testing, insulation and designJames Sullivan Jrenergy_progress
07/06/2026Mechanical SystemsJames Sullivan Jrspecial
07/06/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
07/06/2026Energy Code Compliance InspectionsJames Sullivan Jrprogress
07/06/2026HVAC-R and service water heating system controlsJames Sullivan Jrenergy_progress
05/19/2026Mastic and Intumescent Fire-resistant CoatingsHATIM ELSAIDspecial
05/19/2026Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
05/19/2026FinalJohn workleyprogress
05/15/2026Sprinkler SystemsHATIM ELSAIDspecial
05/15/2026Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
04/21/2026Sprinkler SystemsHATIM ELSAIDspecial
04/21/2026Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
11/11/2025Post-installed AnchorsYoung Suhspecial
11/11/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
10/31/2025HVAC-R and service water piping design and insulationHATIM ELSAIDenergy_progress
10/31/2025HVAC-R and service water heating system controlsHATIM ELSAIDenergy_progress
10/31/2025HVAC-R and service water heating equipmentHATIM ELSAIDenergy_progress
10/31/2025Maintenance informationHATIM ELSAIDenergy_progress
10/21/2025FinalHATIM ELSAIDprogress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
IQVIAOfficeFloors 16, 21
Project M01426670 Alteration · Permit Entire · 07/21/2026
Project M01426699 Alteration · Permit Entire · 07/20/2026
Project M01426734 Alteration · Permit Entire · 07/20/2026
Travelers InsuranceOfficeFloors 6–9
Project M01227356 Alteration · Permit Entire · 06/26/2025
Project M01227374 Alteration · Permit Entire · 06/26/2025
Project M01227389 Alteration · Permit Entire · 06/26/2025
Project M01227395 Alteration · Permit Entire · 06/26/2025
Project M01230955 Alteration · Permit Entire · 06/23/2025
Project M01230815 Alteration · Permit Entire · 06/20/2025
Project M01230817 Alteration · Permit Entire · 06/20/2025
Project M01230823 Alteration · Permit Entire · 06/20/2025
Project M00887665 Alteration · LOC Issued · 08/01/2023
Project M00831841 Alteration · Approved · 03/22/2023
Project M00569435 Alteration · LOC Issued · 09/28/2021
jost salad WRAPS, BOWLS+MORERestaurant / Food ServiceFloor 1
Project M01214845 Alteration · LOC Issued · 05/08/2025
Just SaladRestaurant / Food ServiceFloor 1
Project M01214930 Alteration · LOC Issued · 05/08/2025
Project M01215018 Alteration · LOC Issued · 05/08/2025
AnkuraOfficeFloors 9, 10
Project M01016813 Alteration · LOC Issued · 03/21/2024
Offit CapitalOfficeFloor 24
Project M08005292 Alteration · Permit Entire · 10/13/2022
The Leading Hotels of the WorldOfficeFloor 4
Project M00212850 Alteration · LOC Issued · 11/12/2019
Project M00212900 Alteration · LOC Issued · 11/12/2019
Hudson AllergyMedical / HealthcareFloors 1–5
Project M00184237 Alteration · LOC Issued · 09/26/2019
Bright HorizonsOtherFloor 1
Project M00002172 Alteration · LOC Issued · 01/25/2018
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 4,443 on file (BIS + DOB NOW)
▸Plans & Drawings186
▸DOB NOWPlans/Sketch156
09/06/2026M00002172-P1Request digital key ↗
09/06/2026M00002172-I1Request digital key ↗
09/03/2026M00498134-I1Request digital key ↗
Showing 3 of 156 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler8
09/05/2026M00302489-I1Request digital key ↗
09/05/2026M00343310-I1Request digital key ↗
09/04/2026M00347386-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems7
09/05/2026M00212696-I1Request digital key ↗
09/05/2026M00212850-I1Request digital key ↗
09/05/2026M00302439-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00212887-I1Request digital key ↗
09/05/2026M00302463-I1Request digital key ↗
09/05/2026M00343295-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed5
09/03/2026M00397726-P2Request digital key ↗
09/03/2026M00397726-P1Request digital key ↗
09/03/2026M00397726-P4Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00441241-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00453075-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
09/04/2026M00347390-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00184237-I1Request digital key ↗
▸Applications & Permits645
▸BISPLAN / WORK APPROVAL APPLICATION387
06/09/2021140977806Open ↗
06/04/2021140977806Open ↗
05/12/2021123908156Open ↗
Showing 3 of 387 on file for this type
▸BISWORK PERMIT APPLICATION255
06/15/2022123908156Open ↗
11/08/2021140977806Open ↗
12/24/2020140978798Open ↗
Showing 3 of 255 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION3
07/11/2022123908156Open ↗
Showing 1 of 3 on file for this type
▸Seals & Professional Certifications1,190
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION501
05/06/2020123913300Open ↗
05/06/2020123913300Open ↗
03/17/2020123466141Open ↗
Showing 3 of 501 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature184
09/06/2026M00002172-I1Open ↗
09/05/2026M00212850-I1Open ↗
09/05/2026M00302463-I1Open ↗
Showing 3 of 184 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST120
06/23/2021123908156Open ↗
05/06/2020123913300Open ↗
Showing 2 of 120 on file for this type
▸DOB NOWProgress Inspector Seal & Signature112
09/23/2026M01227374-I1Open ↗
09/23/2026M01227374-I1Open ↗
09/23/2026M01306402-I1Open ↗
Showing 3 of 112 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT108
12/18/2020140978798Open ↗
11/13/2020140948394Open ↗
11/11/2020140977806Open ↗
Showing 3 of 108 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature100
09/23/2026M01306402-I1Open ↗
09/23/2026M01230815-I1Open ↗
09/23/2026M01227374-I1Open ↗
Showing 3 of 100 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM50
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 50 on file for this type
▸BISPC FULL REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
12/18/2020140978798Open ↗
11/13/2020140948394Open ↗
09/02/2020140941104Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
12/18/2020140978798Open ↗
11/13/2020140948394Open ↗
11/11/2020140977806Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment349
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE90
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 90 on file for this type
▸BISSELF-CERT PLUMBING NOTICE62
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 62 on file for this type
▸BISSCHEDULE B - PLUMBING61
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 61 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA56
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 56 on file for this type
▸BISEQUIPMENT USE PERMITS37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8514
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSIGN HANGER CERTIFICATE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST5
06/25/2021123908156Open ↗
Showing 1 of 5 on file for this type
▸Environmental & Asbestos601
▸DOB NOWDEP ACP-5: Asbestos Assessment Report175
09/06/2026M00002172-I1Open ↗
09/05/2026M00212850-I1Open ↗
09/05/2026M00302463-I1Open ↗
Showing 3 of 175 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)127
12/18/2020140978798Open ↗
11/13/2020140948394Open ↗
09/02/2020140941104Open ↗
Showing 3 of 127 on file for this type
▸DOB NOWOER: Notice to Proceed116
09/06/2026M00002172-I1Open ↗
09/05/2026M00212850-I1Open ↗
09/05/2026M00343310-I1Open ↗
Showing 3 of 116 on file for this type
▸DOB NOWOER: Notice of Satisfaction82
09/05/2026M00212850-I1Open ↗
09/05/2026M00343310-I1Open ↗
09/04/2026M00381439-I1Open ↗
Showing 3 of 82 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'73
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 73 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED13
06/29/2021123908156Open ↗
12/18/2020140978798Open ↗
11/13/2020140948394Open ↗
Showing 3 of 13 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION7
05/10/2023140931277Open ↗
04/07/2022123693501Open ↗
06/08/2021140978798Open ↗
Showing 3 of 7 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance208
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS122
05/06/2020123913300Open ↗
05/06/2020123913300Open ↗
03/13/2020123512939Open ↗
Showing 3 of 122 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS48
06/03/2021140948394Open ↗
04/22/2021123856586Open ↗
02/18/2021140941104Open ↗
Showing 3 of 48 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
06/23/2021123908156Open ↗
06/03/2021140948394Open ↗
04/22/2021123856586Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
09/05/2026M00212850-I1Open ↗
09/02/2026M00641571-I1Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
11/13/2020140948394Open ↗
09/02/2020140941104Open ↗
08/14/2020140931277Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
05/10/2023140931277Open ↗
05/12/2022123693501Open ↗
▸Inspections & Test Reports30
▸BISTECHNICAL REPORT: RESPONSIBILITY25
06/23/2021123908156Open ↗
06/08/2021140978798Open ↗
06/03/2021140948394Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs301
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST198
08/09/2023140931277Open ↗
08/09/2023140931277Open ↗
05/12/2022123693501Open ↗
Showing 3 of 198 on file for this type
▸BISADMINISTRATIVE OBJECTIONS72
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 72 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
06/23/2021123908156Open ↗
Showing 1 of 7 on file for this type
▸BISFINAL3
05/10/2023140931277Open ↗
04/07/2022123693501Open ↗
11/16/2020140977806Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership466
▸BISCOST AFFIDAVIT464
06/27/2023140931277Open ↗
06/06/2023140931277Open ↗
05/15/2023140931277Open ↗
Showing 3 of 464 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
05/10/2023140931277Open ↗
04/07/2022123693501Open ↗
▸Filing & Intake Forms427
▸BISEFILING COVER SHEET207
05/12/2021123908156Open ↗
05/06/2020123913300Open ↗
Showing 2 of 207 on file for this type
▸BISBOROUGH INTAKE FORM141
05/01/2020121289505Open ↗
04/06/2020123512948Open ↗
03/17/2020123466141Open ↗
Showing 3 of 141 on file for this type
▸BISADDITIONAL INFORMATION70
06/25/2021123908156Open ↗
06/09/2021140977806Open ↗
04/13/2021140977806Open ↗
Showing 3 of 70 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
12/18/2020140978798Open ↗
11/13/2020140948394Open ↗
11/11/2020140977806Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISENVIRONMENTAL "E" DEP NOTICE OF SATISFACTION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENVIRONMENTAL "E" DEP NOTICE TO PROCEED2
03/13/2020123512939Open ↗
Showing 1 of 2 on file for this type
▸BISPLOT DIAGRAM2
06/23/2021123908156Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWIRA Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type