← Back
BuildNYC
Factory, light manufacturing
497 CARROLL STREET
BROOKLYN · BIN 3425001
💬 Discuss this project
0Year Built
8Stories
F5Building Class
M1-4Zoning
36,493 sfGross Floor Area
2Units
LL97 Covered0 Active ViolationsFDNY Report ↗
Factory, light manufacturing · Owner of record: PDS Second Carroll · 10,475 sf lot · 3.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHeavy Duty Pipe Scaffold1p · 1 filing · 9 docs
Floor 8Suite 81 interior alteration and mechanical air handler repl4p · 1 filing · 2 docs
Floor 7Trail of Bits Office28p · 1 filing · 18 docs
Floor 6Music Studios35p · 1 filing · 20 docs
Floor 5Medical Office A1p · 1 filing · 2 docs
Floor 4Non-loadbearing partitions for offices and conference rooms8p · 1 filing · 3 docs
Floor 3Sagamore Blue Offices3p · 2 filings · 10 docs
Floor 2Dynamic Solutions, Danu9p · 3 filings · 17 docs
Floor 1Music Studios, MUSIC STUDIO S1C StUDIO19p · 7 filings · 20 docs
CellarMUSIC STUDIO S1C StUDIO2p · 1 filing · 3 docs
Site & exteriorHeavy duty sidewalk shed14p · 3 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PDS Carroll Street3703/21/2026
Avery Hall Investments1207/08/2026
PDS Second Carroll203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Code3203/21/2026
Eurocelt Expediting1403/21/2026
Big Orange Expediting603/21/2026
Dana Shaar Expediting103/21/2026
Rite One Expediting203/21/2026
Walter T Gorman PE203/21/2026
Mbe Code & Zoning203/21/2026
KX Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Republic Scaffold & HoistScaffold1807/08/2026
N.Y.C. RockGeneral Contractor607/08/2026
Knockout ConstructionGeneral Contractor304/09/2026
Design Smart NYCGeneral Contractor204/09/2026
IxcanGeneral Contractor203/21/2026
Village P & H NYFire Protection207/08/2026
Hudson BlackGeneral Contractor204/09/2026
Village Electl ContractorsElectrical103/22/2026
JKT ConstructionGeneral Contractor104/09/2026
R&R Contracting ManagementGeneral Contractor107/08/2026
All Pro Plumbing & HeatingPlumbing107/08/2026
Ariana ContractingFire Protection107/08/2026
Copper PlumbingPlumbing107/08/2026
Infiniti Esc PlumbingPlumbing107/08/2026
Centrum ElectricElectrical103/22/2026
Zone Plumbing & HeatingPlumbing107/08/2026
Indy ElectricElectrical103/22/2026
John GuthElectrical103/21/2026
Bluwolf Electric CoElectrical103/21/2026
Peter SweenyElectrical103/21/2026
SD Electl Division NYC CoElectrical103/22/2026
Twintech ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Adal Engineering4205309/05/2024
Katz Engineering238408/08/2023
Carroll Street Studio Architects7933306/30/2023
Fenagh6942405/25/2023
Walter T. Gorman, P.E., P268101/09/2023
Building Lifecycle
All (198)Filed (33)Permit Issued (32)Signed Off (25)Violation (34)Inspection (20)Objection (24)Special Inspection (30)
02/07/2025
Signed off — Alteration
B01048061-I1
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/17/2024
Permit issued — Mechanical Systems
B01048061-I1-MS
09/05/2024
Filed — Alteration
B01048061-I1
09/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Dariusz Makara
09/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
Dariusz Makara
09/05/2024
Special inspection requirement — Shutoff dampers
Dariusz Makara
09/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
Dariusz Makara
05/20/2024
Signed off — Alteration
Construction of non-loadbearing partitions to create offices and conference rooms. No change to use, egress, or occupancy.
B00929111-I1
05/08/2024
Special inspection requirement — Mechanical Systems
Dariusz Makara
05/08/2024
Special inspection requirement — Final
Dariusz Makara
05/02/2024
Signed off — Alteration
Modification of the exist sprinkler system on 1st floor as per plans attached herewith. No change in use, egress and occupancy.
B08024139-I1
03/19/2024
Signed off — Alteration
GENERAL CONSTRUCTION, INTERIOR BUILDOUT OF EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
B00840640-S1
03/19/2024
Signed off — Alteration
GENERAL CONSTRUCTION, INTERIOR BUILDOUT OF EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.
B00840640-I1
12/18/2023
Signed off — Alteration
B00801531-I1
11/30/2023
Signed off — Alteration
B00939999-I1
11/27/2023
Signed off — Alteration
Installation and modification of plumbing piping and electric water heater in existing commercial space on floor 007. Plumbing work. There is to be no change of use, occupancy, or egress.
B00833747-S2
11/21/2023
Signed off — Alteration
Installation and modification of plumbing piping and electric water heater in existing commercial space on floor 007. Plumbing work. There is to be no change of use, occupancy, or egress.
B00833747-I1
11/13/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/09/2023
Signed off — Alteration
B08033674-I1
11/06/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/02/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/24/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/18/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/13/2023
Signed off — Alteration
Installation and modification of plumbing piping and electric water heater in existing commercial space on floor 007. Plumbing work. There is to be no change of use, occupancy, or egress.
B00833747-S1
10/13/2023
Signed off — Alteration
Installation and modification of plumbing piping and electric water heater in existing commercial space on floor 007. Plumbing work. There is to be no change of use, occupancy, or egress.
B00833747-S3
10/11/2023
Signed off — Alteration
Installation of a and pantry sink and water cooler
B08007741-S1
10/10/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/03/2023
Permit issued — General Construction
B00939999-I1-GC
09/29/2023
Permit issued — General Construction
B00929111-I1-GC
09/28/2023
Filed — Alteration
B00939999-I1
09/08/2023
Filed — Alteration
Construction of non-loadbearing partitions to create offices and conference rooms. No change to use, egress, or occupancy.
B00929111-I1
09/05/2023
Special inspection requirement — Final
LISE ANNE COUTURE
08/25/2023
Signed off — Alteration
Installation of a and pantry sink and water cooler
B08007741-S3
08/24/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/23/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/18/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/08/2023
Filed — Alteration
Installation and modification of plumbing piping and electric water heater in existing commercial space on floor 007. Plumbing work. There is to be no change of use, occupancy, or egress.
B00833747-P1
08/03/2023
Signed off — Alteration
PLUMBING WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B08050595-I1
08/01/2023
Signed off — Alteration
Interior renovation of space including installation of partitions and lighting. No change of use, occupancy, egress, or zoning this application.
B00889053-I1
07/28/2023
Signed off — Alteration
Installation of a and pantry sink and water cooler
B08007741-S4
07/23/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/11/2023
Permit issued — General Construction
B00889053-I1-GC
07/05/2023
Permit issued — Mechanical Systems
B08007741-S4-MS
06/30/2023
Filed — Alteration
Interior renovation of space including installation of partitions and lighting. No change of use, occupancy, egress, or zoning this application.
B00889053-I1
06/29/2023
Special inspection requirement — Energy Code Compliance Inspections
Joel Shifflet
06/29/2023
Special inspection requirement — Interior lighting power
Joel Shifflet
06/29/2023
Special inspection requirement — Lighting controls
Joel Shifflet
06/29/2023
Special inspection requirement — Fire-Resistance Rated Construction
Joel Shifflet
06/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joel Shifflet
06/28/2023
Signed off — Alteration
Installation of a and pantry sink and water cooler
B08007741-S5
06/23/2023
Permit issued — Plumbing
B00840640-S1-PL
06/21/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/21/2023
Special inspection requirement — Mechanical Systems
AILANTO DANIEL MINAWI
06/21/2023
Special inspection requirement — Maintenance information
AILANTO DANIEL MINAWI
06/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
AILANTO DANIEL MINAWI
06/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
AILANTO DANIEL MINAWI
Latest 60 of 198 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offKnockout Construction09/17/2024
DOB NOWGeneral ConstructionSigned-offN.Y.C. Rock10/03/2023
DOB NOWGeneral ConstructionSigned-offDesign Smart NYC09/29/2023
DOB NOWGeneral ConstructionSigned-offN.Y.C. Rock07/11/2023
DOB NOWMechanical SystemsSigned-offN.Y.C. Rock07/05/2023
DOB NOWPlumbingSigned-offAll Pro Plumbing & Heating06/23/2023
DOB NOWGeneral ConstructionSigned-offR&R Contracting Management05/17/2023
DOB NOWSprinklersSigned-offVillage P & H NY04/12/2023
DOB NOWSprinklersSigned-offAriana Contracting04/04/2023
DOB NOWMechanical SystemsSigned-offHudson Black03/31/2023
DOB NOWPlumbingSigned-offCopper Mechanical03/31/2023
DOB NOWGeneral ConstructionSigned-offHudson Black03/30/2023
DOB NOWGeneral ConstructionSigned-offN.Y.C. Rock03/29/2023
DOB NOWPlumbingSigned-offZone Plumbing & Heating03/29/2023
DOB NOWMechanical SystemsSigned-offIxcan02/28/2023
DOB NOWGeneral ConstructionSigned-offN.Y.C. Rock02/24/2023
DOB NOWGeneral ConstructionSigned-offKnockout Construction02/15/2023
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing12/29/2022
DOB NOWSprinklersSigned-offVillage P & H NY11/10/2022
DOB NOWGeneral ConstructionSigned-offDesign Smart NYC10/24/2022
DOB NOWGeneral ConstructionSigned-offKnockout Construction10/07/2022
DOB NOWSidewalk ShedSigned-offRepublic Scaffold & Hoist03/31/2022
DOB NOWCurb CutSigned-offJKT Construction04/06/2021
DOB NOWSupported ScaffoldSigned-offRepublic Scaffold & Hoist04/01/2021
DOB NOWSidewalk ShedSigned-offRepublic Scaffold & Hoist03/31/2021
DOB NOWSupported ScaffoldSigned-offRepublic Scaffold & Hoist03/30/2021
DOB NOWSupported ScaffoldSigned-offRepublic Scaffold & Hoist12/03/2020
DOB NOWSupported ScaffoldSigned-offRepublic Scaffold & Hoist12/03/2020
DOB NOWSidewalk ShedSigned-offRepublic Scaffold & Hoist06/09/2020
DOB NOWSupported ScaffoldSigned-offRepublic Scaffold & Hoist08/28/2019
DOB NOWSupported ScaffoldSigned-offRepublic Scaffold & Hoist08/20/2019
DOB NOWSidewalk ShedSigned-offRepublic Scaffold & Hoist05/30/2019
BISPLISSUEDPlumbing P & H09/28/2022
BISPLISSUEDMac Felder04/29/2022
BIS—ISSUEDJKT Construction03/29/2022
BIS—ISSUEDJKT Construction03/22/2022
BISEQISSUEDJKT Construction10/21/2021
BIS—ISSUEDJKT Construction03/30/2021
BISEQISSUEDRepublic Scaffold & Hoist02/05/2021
BISEQISSUEDRepublic Scaffold & Hoist01/22/2021
+ 23 more permits on file
20 projects · most recent 10/02/2024
General Wiring
FiledStatusContractorScope
10/02/2024CompleteBluwolf Electric CoGeneral Wiring
01/19/2024CompleteSD Electl Division NYC CoGeneral Wiring
12/14/2023CompleteIndy ElectricGeneral Wiring
08/04/2023CompleteAccurate ElectricalGeneral Wiring
06/05/2023CompleteIndy ElectricGeneral Wiring
05/23/2023CompleteVillage Electl ContractorsGeneral Wiring
04/27/2023CompleteApollo Electric USAGeneral Wiring
04/07/2023CompleteTwintech ElectricGeneral Wiring
04/05/2023CompleteIndy ElectricGeneral Wiring
03/05/2023CompleteCentrum ElectricGeneral Wiring
01/19/2023CompleteSD Electl Division NYC CoGeneral Wiring
12/13/2022CompleteCentrum ElectricGeneral Wiring
10/19/2022CompleteCentrum ElectricGeneral Wiring
03/03/2021CompleteQueensboro Electrical ContractingGeneral Wiring
05/29/2019CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
11/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/06/2023Pass-Final General Construction Non-Directive 14PassView ↗
11/02/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/24/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/24/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/23/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/18/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/23/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/20/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/07/2023Fail-Final General Construction Non-Directive 14FailView ↗
05/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/23/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/12/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
09/05/2024HVAC-R and service water piping design and insulationDariusz Makaraenergy_progress
09/05/2024HVAC-R and service water heating system controlsDariusz Makaraenergy_progress
09/05/2024Shutoff dampersDariusz Makaraenergy_progress
09/05/2024HVAC-R and service water heating equipmentDariusz Makaraenergy_progress
05/08/2024Mechanical SystemsDariusz Makaraspecial
05/08/2024FinalDariusz Makaraprogress
09/05/2023FinalLISE ANNE COUTUREprogress
06/29/2023Energy Code Compliance InspectionsJoel Shiffletprogress
06/29/2023Interior lighting powerJoel Shiffletenergy_progress
06/29/2023Lighting controlsJoel Shiffletenergy_progress
06/29/2023Fire-Resistance Rated ConstructionJoel Shiffletprogress
06/29/2023Fire-Resistant Penetrations and JointsJoel Shiffletspecial
06/21/2023Mechanical SystemsAILANTO DANIEL MINAWIspecial
06/21/2023Maintenance informationAILANTO DANIEL MINAWIenergy_progress
06/21/2023HVAC-R and service water heating system controlsAILANTO DANIEL MINAWIenergy_progress
06/21/2023HVAC-R and service water piping design and insulationAILANTO DANIEL MINAWIenergy_progress
06/21/2023Duct leakage testing, insulation and designAILANTO DANIEL MINAWIenergy_progress
06/21/2023FinalAILANTO DANIEL MINAWIprogress
06/12/2023FinalJoel Shiffletprogress
06/05/2023HVAC-R and service water heating system controls—energy_progress
06/05/2023Maintenance information—energy_progress
06/05/2023Duct leakage testing, insulation and design—energy_progress
06/05/2023HVAC-R and service water piping design and insulation—energy_progress
06/05/2023Mechanical Systems—special
06/05/2023Final—progress
Latest 25 of 60.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Dynamic SolutionsOfficeFloor 2
Project B00939999 Alteration · LOC Issued · 09/28/2023
Trail of Bits OfficeOfficeFloor 7
Project B00833747 Alteration · LOC Issued · 03/08/2023
MUSIC STUDIO S1C StUDIOArts / Culture / EntertainmentCellar, Floor 1
Project B08050595 Alteration · LOC Issued · 12/22/2022
Sagamore Blue OfficesOfficeFloor 3
Project B08033674 Alteration · LOC Issued · 12/14/2022
DanuMedical / HealthcareFloor 2
Project B08019581 Alteration · LOC Issued · 10/20/2022
Music StudiosArts / Culture / EntertainmentFloors 1, 6
Project B08007741 Alteration · LOC Issued · 09/30/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 470 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch25
08/28/2026B08019581-I1Request digital key ↗
08/28/2026B08024139-I1Request digital key ↗
08/28/2026B08033674-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold5
09/02/2026B00213078-I1Request digital key ↗
09/01/2026B00217024-I1Request digital key ↗
08/15/2026B00217024-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026B00173437-I1Request digital key ↗
08/15/2026B00173437-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00307408-I1Request digital key ↗
▸Applications & Permits90
▸BISPLAN / WORK APPROVAL APPLICATION59
05/21/2024321195425Open ↗
05/17/2024321195425Open ↗
05/16/2024321195425Open ↗
Showing 3 of 59 on file for this type
▸BISWORK PERMIT APPLICATION24
09/28/2022321195425Open ↗
03/24/2022321195425Open ↗
06/10/2021321195425Open ↗
Showing 3 of 24 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM2
06/05/2023321195425Open ↗
Showing 1 of 2 on file for this type
▸BISRESTRICTION: EASEMENT AGREEMENT1
09/06/2022321195425Open ↗
▸BISVERIFY TAX LOT1
09/09/2022321195425Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
09/12/2023321195425Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/28/2022321195425Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications96
▸DOB NOWDPL-1: Design Professional Seal & Signature33
08/28/2026B08019581-I1Open ↗
08/28/2026B08024139-I1Open ↗
08/28/2026B08033674-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature33
10/03/2026B00173437-I1Open ↗
09/27/2026B08007741-I1Open ↗
09/27/2026B08007741-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/27/2026B08007741-I1Open ↗
08/31/2026B01048061-I1Open ↗
08/29/2026B00833747-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
01/21/2021340803018Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
01/21/2021340803018Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/21/2021340803018Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment60
▸BISEQUIPMENT USE PERMITS28
09/29/2022321195425Open ↗
09/29/2022321195425Open ↗
09/29/2022321195425Open ↗
Showing 3 of 28 on file for this type
▸BISSCHEDULE B - PLUMBING15
12/08/2023321195425Open ↗
12/08/2023321195425Open ↗
10/03/2023321195425Open ↗
Showing 3 of 15 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT10
09/29/2022321195425Open ↗
09/29/2022321195425Open ↗
09/29/2022321195425Open ↗
Showing 3 of 10 on file for this type
▸BISSTANDPIPE SYSTEMS2
06/15/2022321629519Open ↗
06/14/2022321195425Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
02/26/2026321556838Open ↗
09/20/2022321461075Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
06/14/2022321195425Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER SYSTEMS1
06/14/2022321195425Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
06/14/2022321195425Open ↗
▸BISFENESTRATION AREAS1
06/14/2022321195425Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
06/14/2022321195425Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/14/2022321195425Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/14/2022321195425Open ↗
▸BISLIGHTING CONTROLS1
06/14/2022321195425Open ↗
▸BIS* HVAC INSULATION AND SEALING1
06/14/2022321195425Open ↗
▸Inspections & Test Reports45
▸BISTECHNICAL REPORT: RESPONSIBILITY27
12/07/2022321195425Open ↗
11/03/2022321630213Open ↗
11/03/2022321630213Open ↗
Showing 3 of 27 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
09/09/2022321195425Open ↗
Showing 1 of 2 on file for this type
▸BISFOOTING AND FOUNDATION INSPECTION1
06/14/2022321195425Open ↗
▸BISPOST-INSTALLED ANCHORS1
06/14/2022321195425Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
06/20/2022321195425Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STEEL - WELDING1
06/20/2022321195425Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs27
▸BISSCHEDULE A - OCCUPANCY / USE12
05/17/2024321195425Open ↗
05/16/2024321195425Open ↗
03/23/2023321195425Open ↗
Showing 3 of 12 on file for this type
▸BISSUPERSEDING LETTER8
09/28/2022321195425Open ↗
11/10/2020321195425Open ↗
11/10/2020321195425Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
11/04/2022321630213Open ↗
09/22/2022321461075Open ↗
06/21/2022321629519Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL1
06/15/2022321629519Open ↗
▸Cost, Insurance & Ownership13
▸BISPROJECT-SPECIFIC GL INSURANCE5
06/10/2021321195425Open ↗
11/09/2020321195425Open ↗
12/19/2019321195425Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
03/03/2026321556838Open ↗
09/20/2022321461075Open ↗
06/20/2022321629519Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
06/10/2021321195425Open ↗
▸Filing & Intake Forms46
▸BISADDITIONAL INFORMATION28
05/31/2023321195425Open ↗
05/23/2023321195425Open ↗
06/17/2022321195425Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING COVER SHEET14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISBOROUGH INTAKE FORM2
01/12/2021321195425Open ↗
Showing 1 of 2 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
01/21/2021340803018Open ↗
Showing 1 of 2 on file for this type
▸Other Documents3
▸BISMAINTENANCE INFORMATION1
06/14/2022321195425Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
12/07/2022321195425Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type