← Back
BuildNYC
Office, 20+ stories, with or without commercial
498 7TH AVENUE
MANHATTAN · BIN 1014445
💬 Discuss this project
1920Year Built
24Stories
O4Building Class
M1-9A/R12Zoning
803,800 sfGross Floor Area
1Units
LL97 Covered0 Active ViolationsFISP: SWARMP
Office, 20+ stories, with or without commercial · Owner of record: 498 Seventh · 38,800 sf lot · 20.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsGeorge Comfort & Sons, INC.1 filing
RoofGeorge Comfort & Sons, INC.Under Construction2p · 5 filings · 19 docs
Floor 21George Comfort & Sons, INC.2 filings · 9 docs
Floor 20George Comfort & Sons3p · 5 filings · 20 docs
Floor 19George Comfort & Sons, INC.3 filings · 20 docs
Floor 181 filing · 2 docs
Floor 17George Comfort & Sons, INC.6p · 3 filings · 9 docs
Floor 16George Comfort & Sons, INC.4 filings · 20 docs
Floor 15George Comfort & Sons2p · 2 filings · 20 docs
Floor 14George Comfort & Sons, INC.2p · 4 filings · 20 docs
Floor 13Ambient Enterprises12p · 8 filings · 20 docs
Floor 12
Floor 11Hazen & SawyerUnder Construction8p · 3 filings · 14 docs
Floor 101199 SEIU Funds1p · 1 filing · 9 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 21199SEIU, 1199 SEIU Funds3p · 3 filings · 9 docs
Floor 1Ground Central3p · 5 filings · 18 docs
CellarGeorge Comfort & Sons4p · 1 filing · 4 docs
Site & exteriorGeorge Comfort & Sons, INC.Under Construction6 filings · 20 docs
Filed — no permit issued1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
George Comfort & Sons84310/13/2026
498 Seventh19203/22/2026
498 7th Avenue4203/21/2026
Dashrock1003/21/2026
498 7th LLC by George Comfort703/21/2026
Vii West End Avenue Owner403/21/2026
498 7th403/21/2026
200 Madison Owners303/21/2026
200 Madison Associates, LP by George203/21/2026
200 Madison Confort Sons203/21/2026
498 Seventh Ave LLC GGF Sons203/21/2026
Murano203/21/2026
Garment Capitol Associates203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants7403/21/2026
Seay-Yarbrough403/21/2026
Synergy Building Consultants303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Excel Interior ConstructionGeneral Contractor2807/08/2026
Core Four ConstructionGeneral Contractor707/08/2026
Arsenal ScaffoldScaffold607/08/2026
Mega PlumbingPlumbing507/08/2026
Millenium Mechanical Servicespecialty_contractor407/08/2026
K.E.S. Construction CoGeneral Contractor407/08/2026
Denko MechanicalFire Protection407/08/2026
Bedrock Plumbing & HeatingPlumbing307/08/2026
A&A PlumbingPlumbing307/08/2026
S. Tieger Plumbing CoPlumbing207/08/2026
J.A. Lee Electric ServicesElectrical203/22/2026
Samson ElectricElectrical203/21/2026
Level Solar Inc Dba LevelElectrical203/21/2026
Quest Builders GroupGeneral Contractor207/08/2026
Ashlar MechanicalFire Protection207/08/2026
Eurotech ConstructionGeneral Contractor107/08/2026
Slade ElectricElectrical103/21/2026
Todaro JosephElectrical103/21/2026
Rockmor Electric EnterprisesElectrical103/21/2026
Pace PlumbingFire Protection107/08/2026
Andamio ScaffoldingScaffold107/08/2026
McQueen EusebioElectrical103/21/2026
Everest ScaffoldingScaffold107/08/2026
Powers Bridging & ScaffoldingScaffold109/22/2026
RM Electric CoElectrical103/21/2026
Abco-Peerless SprinklerFire Protection107/08/2026
Absolute Electrical Contracting ofElectrical103/22/2026
Bedrock MechanicalFire Protection107/08/2026
Denmar ElectricElectrical103/22/2026
Cedar Electrical ContractorsElectrical103/21/2026
L & M Mechanical NYPlumbing107/08/2026
Mega PlumbingFire Protection107/08/2026
Allran Electric of NYElectrical103/22/2026
Cobra Kitchen Ventilationspecialty_contractor107/08/2026
A.B.C.D. ConstructionGeneral Contractor109/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ryan Special Engineering2018503/20/2026
Milrose Consultants2003710/07/2025
Alan Margolin & Associates4231905/02/2024
Mih Systems Group2561109/19/2023
Gilsanz Murray Steficek240103/30/2023
Kendra E. Logan, Register6794204/01/2022
S.A.M. Architecture5901112/30/2021
Brian Ill Development1402102/02/2021
Special Inspection Services1200207/20/2020
Marc Daniel Technical Services4582111/12/2019
Building Lifecycle
All (300)Filed (59)Permit Issued (66)Signed Off (32)Facade (FISP) (6)Violation (28)Inspection (21)Objection (58)Special Inspection (30)
10/09/2026
Filed — Alteration
M01470605-I1
09/21/2026
Permit issued — Sidewalk Shed
M01458944-I1-SH
09/16/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01458944-I1
09/09/2026
Permit issued — General Construction
M01386932-I1-GC
08/14/2026
Permit issued — Boiler Equipment
M01106250-I1-BE
06/15/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
04/27/2026
Filed — Alteration
Safe With A Repair and Maintenance Program Facade Repairs
M01386932-I1
04/14/2026
Special inspection requirement — Fenestration air leakage
KENDRA LOGAN
04/14/2026
Special inspection requirement — Final
KENDRA LOGAN
04/14/2026
Special inspection requirement — Fenestration areas
KENDRA LOGAN
04/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
KENDRA LOGAN
04/14/2026
Special inspection requirement — Air barrier - visual inspection
KENDRA LOGAN
03/20/2026
Filed — Alteration
Replace existing Standby Emergency Generator with new .
M01105968-P1
03/20/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN DUCEY
03/20/2026
Special inspection requirement — Final
JOHN DUCEY
03/20/2026
Special inspection requirement — Mechanical Systems
William Ryan
03/20/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
William Ryan
03/19/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/12/2026
Permit issued — Sprinklers
M01274706-I1-EW-SP
01/12/2026
Permit issued — Plumbing
M01274706-I1-PL
01/06/2026
Special inspection requirement — Final
JOHN DUCEY
01/06/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
William Ryan
01/06/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN DUCEY
01/06/2026
Special inspection requirement — Mechanical Systems
William Ryan
10/16/2025
Permit issued — General Construction
M01274702-I1-GC
10/15/2025
Permit issued — Mechanical Systems
M01274705-I1-MS
10/14/2025
Permit issued — Sprinklers
M01274706-I1-PL
10/14/2025
Permit issued — Sprinklers
M01274706-I1-EW-SP
10/07/2025
Filed — Alteration
Modifying existing HVAC layout for new tenant
M01274705-I1
10/07/2025
Filed — Alteration
PLUMBING - Installation of New Domestic Cold water line, connected to existing, for new coffee maker and water dispenser SPRINKLER - Removal of 64 old Sprinkler heads and the installation of 67 New Sprinkler heads
M01274706-I1
10/07/2025
Filed — Alteration
M01274702-I1
09/11/2025
Permit issued — Boiler Equipment
M01106250-I1-BE
08/20/2025
Special inspection requirement — Mechanical Systems
Christopher Drutjons
08/20/2025
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
08/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
08/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
08/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
08/20/2025
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
08/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
08/20/2025
Special inspection requirement — Ventilation and air distribution system
Christopher Drutjons
08/20/2025
Special inspection requirement — Maintenance information
Christopher Drutjons
08/20/2025
Special inspection requirement — Final
Christopher Drutjons
08/20/2025
Special inspection requirement — Sprinkler Systems
Christopher Drutjons
04/09/2025
Signed off — Alteration
REMOVAL OF PLUMBING FIXTURES WITH ASSOCIATED PIPING, REMOVAL AND RELOCATION OF SPRINKLER HEADS WITH ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00738060-I1
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/25/2024
Signed off — Alteration
REMOVAL OF PLUMBING FIXTURES WITH ASSOCIATED PIPING, REMOVAL OF SPRINKLER HEADS WITH ASSOCIATED PIPING AND INSTALLATION OF TEMP LOOP ASSOCIATED WITH SOFT DEMOLITION ON 20TH CONSTRUCTION/21ST MARKETING AND 21ST CONSTRUCTION/22ND MARKETING FLOORS.
M00361948-I1
10/18/2024
Permit issued — Mechanical Systems
M01105968-I1-MS
10/14/2024
Filed — Alteration
M01106250-I1
10/14/2024
Filed — Alteration
Replace existing Standby Emergency Generator with new .
M01105968-I1
08/29/2024
Signed off — Alteration
MODIFICATIONS TO HVAC SYSTEM ON 13TH CONSTRUCTION/14TH MARKETING AND 14TH CONSTRUCTION/15TH MARKETING FLOORS AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00243138-I1
05/22/2024
Filed — Alteration
MODIFICATIONS TO HVAC SYSTEM ON 13TH CONSTRUCTION/14TH MARKETING AND 14TH CONSTRUCTION/15TH MARKETING FLOORS AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00243138-P1
05/22/2024
Signed off — Alteration
MODIFICATIONS TO EXISTING PLUMBING AND SPRINKLER SYSTEMS ON 19TH FLOOR (20TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00558021-I1
05/22/2024
Signed off — Alteration
INTERIOR TENANT FIT OUT OF 19TH FLOOR (20TH MARKETING) OF APPROX. 21,003 SF OFFICE SPACE IN EXISTING BUILDING WITH NO WORK TO THE EXTERIOR BUILDING ENVELOPE (WALLS, ROOFS, WINDOWS OR DOORS). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00558060-I1
05/22/2024
Special inspection requirement — HVAC insulation and sealing
Christopher Drutjons
05/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
05/22/2024
Special inspection requirement — Final
Christopher Drutjons
05/22/2024
Special inspection requirement — Mechanical Systems
Christopher Drutjons
05/22/2024
Special inspection requirement — HVAC and service water heating system controls
Christopher Drutjons
05/22/2024
Special inspection requirement — HVAC and service water heating equipment
Christopher Drutjons
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPowers Bridging & Scaffolding09/21/2026
DOB NOWGeneral ConstructionPermit IssuedA.B.C.D. Construction09/09/2026
DOB NOWBoiler EquipmentPermit IssuedAce-Atlas Plumbing & Heating08/14/2026
DOB NOWSprinklersPermit IssuedS. Tieger Plumbing Co01/12/2026
DOB NOWPlumbingSigned-offS. Tieger Plumbing Co01/12/2026
DOB NOWGeneral ConstructionPermit IssuedExcel Interior Construction10/16/2025
DOB NOWMechanical SystemsPermit IssuedExcel Interior Construction10/15/2025
DOB NOWPlumbingSigned-offS. Tieger Plumbing Co10/14/2025
DOB NOWSprinklersPermit IssuedS. Tieger Plumbing Co10/14/2025
DOB NOWBoiler EquipmentPermit IssuedAce-Atlas Plumbing & Heating09/11/2025
DOB NOWMechanical SystemsPermit IssuedMillenium Mechanical Service10/18/2024
DOB NOWSprinklersSigned-offAbco-Peerless Sprinkler10/05/2023
DOB NOWMechanical SystemsSigned-offQuest Builders Group10/03/2023
DOB NOWGeneral ConstructionSigned-offQuest Builders Group09/22/2023
DOB NOWMechanical SystemsPermit IssuedExcel Interior Construction08/24/2023
DOB NOWGeneral ConstructionPermit IssuedExcel Interior Construction08/21/2023
DOB NOWMechanical SystemsPermit IssuedExcel Interior Construction06/14/2023
DOB NOWPlumbingPermit IssuedBedrock Plumbing & Heating06/13/2023
DOB NOWSprinklersPermit IssuedBedrock Mechanical06/13/2023
DOB NOWGeneral ConstructionPermit IssuedExcel Interior Construction05/20/2023
DOB NOWStructuralSigned-offExcel Interior Construction03/31/2023
DOB NOWSprinklersSigned-offS. Tieger Plumbing Co02/09/2023
DOB NOWMechanical SystemsSigned-offExcel Interior Construction02/09/2023
DOB NOWGeneral ConstructionSigned-offExcel Interior Construction02/09/2023
DOB NOWGeneral ConstructionSigned-offCore Four Construction02/03/2023
DOB NOWPlumbingSigned-offA&A Plumbing12/15/2022
DOB NOWMechanical SystemsSigned-offExcel Interior Construction11/09/2022
DOB NOWSprinklersSigned-offS. Tieger Plumbing Co11/03/2022
DOB NOWPlumbingSigned-offA&A Plumbing10/26/2022
DOB NOWStructuralSigned-offExcel Interior Construction10/12/2022
DOB NOWGeneral ConstructionSigned-offExcel Interior Construction10/12/2022
DOB NOWPlumbingSigned-offMega Plumbing08/09/2022
DOB NOWPlumbingSigned-offMega Plumbing08/09/2022
DOB NOWMechanical SystemsSigned-offExcel Interior Construction06/27/2022
DOB NOWGeneral ConstructionSigned-offExcel Interior Construction06/08/2022
DOB NOWMechanical SystemsSigned-offExcel Interior Construction03/23/2022
DOB NOWGeneral ConstructionSigned-offCobra Kitchen Ventilation01/19/2022
DOB NOWSprinklersSigned-offManengeering Bureau10/20/2021
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating10/19/2021
DOB NOWGeneral ConstructionSigned-offExcel Interior Construction09/28/2021
+ 60 more permits on file
3 projects · most recent 03/20/2026
Generators Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/20/2026Permit IssuedMillenium Mechanical ServiceGenerators
Generators
Kohler MODEL 600ROZD 600 kW · Generator ×5
10/07/2025Permit IssuedExcel Interior ConstructionAir Conditioning Systems
Cooling
Climatemaster SR-036 1,200 CFM · Wshp ×1
SR-060 2,000 CFM · Wshp ×1
06/09/2023Permit IssuedExcel Interior ConstructionHeating and Air Conditioning Systems
Heat / Cool
Heat Controller HBH009A1C30C65 383 CFM · Heat Pump Outdoor ×1
HBH012A1C30C65 191 CFM · Heat Pump Outdoor ×1
1 project · most recent 10/07/2025
FiledStatusContractorScope
10/07/2025Permit IssuedDenko Mechanical131 heads
1 project · most recent 10/07/2025
Water/Sanitary
FiledStatusContractorScope
10/07/2025Signed-offDenko MechanicalWater/Sanitary
25 projects · most recent 09/17/2026
General Wiring Lighting
FiledStatusContractorScope
09/17/2026Permit IssuedOptimal Electric—
04/01/2024CompleteDenmar ElectricGeneral Wiring
10/19/2023CompleteJas Electrical ServicesGeneral Wiring
04/18/2023CompleteMidland Electrical CoGeneral Wiring
07/04/2022CompleteDaven ElectricGeneral Wiring
06/13/2022Permit IssuedDenmar ElectricGeneral Wiring
05/20/2021CompleteForest Electric—
04/07/2021CompleteMidland Electrical CoGeneral Wiring
04/07/2021CompleteMidland Electrical CoGeneral Wiring
03/24/2021Permit IssuedStar Electrical Contractors—
03/01/2021CompleteBorowide Elect'l Contractors—
09/18/2020CompletePolo Electric Corp D/B/AGeneral Wiring
08/18/2020Permit IssuedCaputek Electrical Services—
07/16/2020CompleteNead ElectricGeneral Wiring
07/08/2020CompleteMidland Electrical Co—
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
06/15/2026Fail-Final Boiler Equipment InspectionFailView ↗
03/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/01/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/27/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/27/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/08/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/05/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/01/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/30/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/01/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/24/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/24/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/03/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/24/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/22/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/02/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 133
DateRequirementInspectorRole
04/14/2026Fenestration and door U-factor and product ratingsKENDRA LOGANenergy_progress
04/14/2026FinalKENDRA LOGANprogress
04/14/2026Air barrier - visual inspectionKENDRA LOGANenergy_progress
04/14/2026Fenestration areasKENDRA LOGANenergy_progress
04/14/2026Fenestration air leakageKENDRA LOGANenergy_progress
03/20/2026Mechanical SystemsWilliam Ryanspecial
03/20/2026FinalJOHN DUCEYprogress
03/20/2026Energy Code Compliance InspectionsJOHN DUCEYprogress
03/20/2026Emergency and Standby Power Systems (Generator)William Ryanspecial
01/06/2026FinalJOHN DUCEYprogress
01/06/2026Energy Code Compliance InspectionsJOHN DUCEYprogress
01/06/2026Mechanical SystemsWilliam Ryanspecial
01/06/2026Emergency and Standby Power Systems (Generator)William Ryanspecial
08/20/2025Sprinkler SystemsChristopher Drutjonsspecial
08/20/2025Ventilation and air distribution systemChristopher Drutjonsenergy_progress
08/20/2025HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
08/20/2025Maintenance informationChristopher Drutjonsenergy_progress
08/20/2025HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
08/20/2025HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
08/20/2025Energy Code Compliance InspectionsChristopher Drutjonsprogress
08/20/2025FinalChristopher Drutjonsprogress
08/20/2025Post-installed AnchorsChristopher Drutjonsspecial
08/20/2025Mechanical SystemsChristopher Drutjonsspecial
08/20/2025Post-installed AnchorsChristopher Drutjonsspecial
05/22/2024HVAC and service water heating equipment Christopher Drutjonsenergy_progress
Latest 25 of 133.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Hazen & SawyerOfficeFloor 11
Project M01274702 Alteration · Permit Entire · 10/07/2025
Project M01274705 Alteration · Permit Entire · 10/07/2025
Project M01274706 Alteration · Permit Entire · 10/07/2025
Ambient EnterprisesOfficeFloor 13
Project M00919678 Alteration · LOC Issued · 09/19/2023
Project M00923061 Alteration · LOC Issued · 09/19/2023
Project M00923096 Alteration · LOC Issued · 09/19/2023
Ground CentralRestaurant / Food ServiceFloor 1
Project M00478852 Alteration · LOC Issued · 03/03/2021
Project M00451742 Alteration · LOC Issued · 02/02/2021
1199SEIUOfficeFloor 2
Project M00275198 No Work · PA Certificate of Operation Issued · 01/21/2020
1199 SEIU FundsOfficeFloors 2, 10
Project M00225451 No Work · PA Certificate of Operation Issued · 10/28/2019
Project M00225479 No Work · PA Certificate of Operation Issued · 10/28/2019
Project M00225606 No Work · PA Certificate of Operation Issued · 10/28/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 3,603 on file (BIS + DOB NOW)
▸Plans & Drawings62
▸DOB NOWPlans/Sketch34
10/04/2026M01458944-I1Request digital key ↗
09/06/2026M00040279-I1Request digital key ↗
09/04/2026M00477044-P1Request digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
09/05/2026M00202947-I1Request digital key ↗
09/04/2026M00355316-I1Request digital key ↗
09/04/2026M00361932-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00243189-I1Request digital key ↗
09/04/2026M00361948-I1Request digital key ↗
09/04/2026M00397217-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly5
09/05/2026M00225451-I1Request digital key ↗
09/05/2026M00225606-P1Request digital key ↗
09/05/2026M00225606-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed4
09/05/2026M00264637-I1Request digital key ↗
09/04/2026M00477044-I1Request digital key ↗
Showing 2 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/05/2026M00243363-I1Request digital key ↗
09/04/2026M00361948-I1Request digital key ↗
09/03/2026M00377142-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction3
09/04/2026M00451742-I1Request digital key ↗
09/04/2026M00454353-P1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Curb Cut1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
09/05/2026M00175201-I1Request digital key ↗
▸Applications & Permits751
▸BISPLAN / WORK APPROVAL APPLICATION495
03/26/2025122510005Open ↗
12/23/2024123342748Open ↗
06/07/2024123465115Open ↗
Showing 3 of 495 on file for this type
▸BISWORK PERMIT APPLICATION243
10/16/2020122510005Open ↗
Showing 1 of 243 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPLACE OF ASSEMBLY6
06/12/2023120062207Open ↗
03/25/2022120062207Open ↗
03/15/2022120062207Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications806
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION400
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 400 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST103
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 103 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT74
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 74 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM62
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 62 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature58
09/23/2026M01458944-I1Open ↗
09/05/2026M00242561-I1Open ↗
09/05/2026M00225451-I1Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWProgress Inspector Seal & Signature58
10/02/2026M00243138-P1Open ↗
10/02/2026M00243138-P1Open ↗
10/02/2026M00243138-P1Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature39
10/06/2026M00558021-P2Open ↗
10/02/2026M00243138-P1Open ↗
09/27/2026M00856771-I1Open ↗
Showing 3 of 39 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPC FULL REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment290
▸BISSELF-CERT PLUMBING NOTICE64
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 64 on file for this type
▸BISEQUIPMENT USE PERMITS57
10/14/2020123525248Open ↗
10/14/2020123525248Open ↗
10/14/2020123525248Open ↗
Showing 3 of 57 on file for this type
▸BISSCHEDULE B - PLUMBING55
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 55 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE52
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 52 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT27
10/14/2020123525248Open ↗
Showing 1 of 27 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA24
02/06/2024123682979Open ↗
06/22/2023123682915Open ↗
06/22/2023123677725Open ↗
Showing 3 of 24 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8511
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸Safety & Tenant Protection42
▸DOB NOWHPD-1: Anti-Harassment Area Checklist36
09/04/2026M00451742-I1Open ↗
09/04/2026M00477044-I1Open ↗
09/04/2026M00454353-P1Open ↗
Showing 3 of 36 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCertificate of No Harassment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos220
▸BISASBESTOS: CERTIFICATION (DEP ACP5)97
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 97 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'67
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 67 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report39
09/05/2026M00243363-I1Open ↗
09/04/2026M00454353-P1Open ↗
09/03/2026M00377142-I1Open ↗
Showing 3 of 39 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/04/2026M00451742-I1Open ↗
Showing 1 of 2 on file for this type
▸Energy Compliance159
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS74
10/09/2020121188534Open ↗
Showing 1 of 74 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS25
11/24/2021140926586Open ↗
11/24/2021140926586Open ↗
12/03/2020123525257Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY25
11/18/2021123885037Open ↗
11/18/2021123885037Open ↗
11/15/2021123885037Open ↗
Showing 3 of 25 on file for this type
▸BISTR8: Energy Code Progress Inspections12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)5
10/24/2024123342748Open ↗
01/23/2023122715295Open ↗
09/20/2022123810466Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL4
03/31/2025123342739Open ↗
10/24/2024123342748Open ↗
10/24/2024123342748Open ↗
Showing 3 of 4 on file for this type
▸BISINSULATION PLACEMENT & R VALUES4
10/24/2024123342748Open ↗
10/24/2024123342748Open ↗
10/24/2024123342748Open ↗
Showing 3 of 4 on file for this type
▸BIS* HVAC INSULATION AND SEALING3
03/31/2025123342739Open ↗
01/23/2023122715295Open ↗
09/20/2022123810466Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/04/2026M00451742-I1Open ↗
Showing 1 of 2 on file for this type
▸Inspections & Test Reports84
▸BISTECHNICAL REPORT: RESPONSIBILITY52
03/24/2025122510005Open ↗
12/18/2024123342739Open ↗
12/03/2021123885037Open ↗
Showing 3 of 52 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISSPRAYED FIRE-RESISTANT MATERIALS3
12/18/2024123501077Open ↗
09/20/2022123810466Open ↗
07/07/2022123342748Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
09/20/2022123810466Open ↗
07/07/2022123342748Open ↗
▸Approvals, Objections & Sign-offs271
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST119
12/19/2024123342748Open ↗
02/12/2024123682979Open ↗
08/24/2023123682915Open ↗
Showing 3 of 119 on file for this type
▸BISADMINISTRATIVE OBJECTIONS88
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 88 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE20
08/11/2023121188534Open ↗
08/09/2023121188534Open ↗
08/03/2023121188534Open ↗
Showing 3 of 20 on file for this type
▸BISFINAL7
03/31/2025123342739Open ↗
12/18/2024123501077Open ↗
10/24/2024123342748Open ↗
Showing 3 of 7 on file for this type
▸BISSHED LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFA LETTER OF DEFECT : FD-FALD3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership315
▸BISCOST AFFIDAVIT294
03/24/2025122510005Open ↗
08/23/2023123682915Open ↗
11/24/2021140926586Open ↗
Showing 3 of 294 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW317
03/12/2024123342739Open ↗
03/12/2024123501077Open ↗
03/12/2024123342748Open ↗
Showing 3 of 17 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Filing & Intake Forms453
▸BISBOROUGH INTAKE FORM179
10/16/2020122510005Open ↗
Showing 1 of 179 on file for this type
▸BISEFILING COVER SHEET164
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 164 on file for this type
▸BISADDITIONAL INFORMATION96
08/09/2021121188534Open ↗
04/28/2021123810466Open ↗
04/28/2021123810466Open ↗
Showing 3 of 96 on file for this type
▸BISeFiling Job Application Cover Sheet14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸Other Documents74
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION24
07/06/2022121188534Open ↗
07/06/2022121188534Open ↗
03/30/2022120062207Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWAlternate Plan 35
09/05/2026M00225451-I1Open ↗
09/05/2026M00225606-P1Open ↗
09/05/2026M00225606-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAlternate Plan 15
09/05/2026M00225451-I1Open ↗
09/05/2026M00225606-P1Open ↗
09/05/2026M00225606-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAlternate Plan 25
09/05/2026M00225451-I1Open ↗
09/05/2026M00225606-P1Open ↗
09/05/2026M00225606-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAlternate Plan 55
09/05/2026M00225451-I1Open ↗
09/05/2026M00225606-P1Open ↗
09/05/2026M00225606-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAlternate Plan 45
09/05/2026M00225451-I1Open ↗
09/05/2026M00225606-I1Open ↗
09/05/2026M00225606-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAlternate Plan 63
09/05/2026M00225606-P1Open ↗
09/05/2026M00225606-I1Open ↗
09/05/2026M00275198-I1Open ↗
▸DOB NOWAlternate Plan 73
09/05/2026M00225606-P1Open ↗
09/05/2026M00225606-I1Open ↗
09/05/2026M00275198-I1Open ↗
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 161
09/05/2026M00275198-I1Open ↗
▸DOB NOWAlternate Plan 211
09/05/2026M00275198-I1Open ↗
▸DOB NOWAlternate Plan 121
09/05/2026M00275198-I1Open ↗
▸DOB NOWAlternate Plan 221
09/05/2026M00275198-I1Open ↗
▸DOB NOWAlternate Plan 181
09/05/2026M00275198-I1Open ↗
▸DOB NOWAlternate Plan 151
09/05/2026M00275198-I1Open ↗
▸DOB NOWAlternate Plan 201
09/05/2026M00275198-I1Open ↗
▸DOB NOWAlternate Plan 231
09/05/2026M00275198-I1Open ↗
▸DOB NOWAlternate Plan 131
09/05/2026M00275198-I1Open ↗
▸DOB NOWAlternate Plan 111
09/05/2026M00275198-I1Open ↗
▸DOB NOWAlternate Plan 141
09/05/2026M00275198-I1Open ↗
▸DOB NOWAlternate Plan 171
09/05/2026M00275198-I1Open ↗
▸DOB NOWAlternate Plan 91
09/05/2026M00275198-I1Open ↗
▸DOB NOWAlternate Plan 191
09/05/2026M00275198-I1Open ↗
▸DOB NOWAlternate Plan 81
09/05/2026M00275198-I1Open ↗
▸DOB NOWAlternate Plan 101
09/05/2026M00275198-I1Open ↗
▸DOB NOWAlternate Plan 241
09/05/2026M00275198-I1Open ↗