Elevator cooperative
329 WEST 77 STREET
MANHATTAN · BIN 1031092
💬 Discuss this project
1930Year Built
15.5Stories
D4Building Class
R10AZoning
209,780 sfGross Floor Area
94Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SAFE
Elevator cooperative · Owner of record: 50 RIVERSIDE TENANTS CORP · 15,925 sf lot · 13.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 2 filings · 20 docs
BulkheadUnder Construction3p · 2 filings · 12 docs
Penthouse1p · 1 filing · 4 docs
Floor 152p · 2 filings · 9 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10Under Construction7p · 1 filing · 9 docs
Floor 91p · 1 filing · 18 docs
Floor 83p · 1 filing · 20 docs
Floor 74p · 2 filings · 18 docs
Floor 6
Floor 5
Floor 41p · 1 filing · 16 docs
Floor 3
Floor 21p · 1 filing · 16 docs
Floor 1
2 jobs · most recent 05/18/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/18/2026Permit IssuedLEGACY PLUMBING & HTG LLCGas, Water/Sanitary
01/19/2026Signed-offT.N.T. PLBG & HTG, INCGas, Water/Sanitary
25 jobs · most recent 08/14/2026
General Wiring
FiledStatusContractorScope
08/14/2026CompletePRUDENT ELECTRIC INC—
06/23/2026Permit IssuedCHAMPION ELECTRIC INCGeneral Wiring
04/28/2026Permit IssuedANI ELECTRIC CORPGeneral Wiring
12/22/2025Permit IssuedTHE METRO GROUP ELECTRICGeneral Wiring
09/18/2025CompleteJTE ELECTRICAL SERVICES—
09/15/2025CompleteIKAROS ELECTRICAL ENT INCGeneral Wiring
08/12/2025CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
01/08/2025CompleteKOBRYN ELEC'L SERVICES INGeneral Wiring
08/18/2024CompleteIMR ELECTRICAL CONTRACTINGeneral Wiring
08/07/2024CompleteLUME ELECTRIC INC—
07/25/2024CompleteEVS ELECTRIC CORPGeneral Wiring
06/06/2024CompleteCAVAN ELECTRIC CORP.General Wiring
02/15/2024CompleteEINSTEIN ELEC'L CORPGeneral Wiring
01/11/2024CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
01/02/2024CompleteERRIGAL ELECTRICAL CORPGeneral Wiring
1 job · most recent 07/17/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/17/2025Permit IssuedSKYLINE RESTORATION INCTenant Protection Plan 72 Hour
1 job · most recent 09/23/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/23/2025Permit IssuedSKYLINE RESTORATION INCSuspended Scaffold (SC)
Building Lifecycle
All (300)Filed (52)Permit Issued (59)Signed Off (29)Facade (FISP) (15)Violation (40)Inspection (21)Objection (54)Special Inspection (30)
08/19/2026
Permit issued — General Construction
M01251297-I1-GC
08/05/2026
Signed off — Alteration
PLUMBING FIXTURES IN APT 5A FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01241140-S1
08/05/2026
Signed off — Alteration
PLUMBING FIXTURES IN APT 5A FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01241140-I1
06/17/2026
Permit issued — Plumbing
M01397678-S1-PL
06/01/2026
Permit issued — General Construction
M01397678-I1-GC
05/18/2026
Filed — Alteration
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 10B ON THE 10TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01397678-I1
05/18/2026
Filed — Alteration
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 10B ON THE 10TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01397678-S1
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
03/20/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/26/2026
Permit issued — Suspended Scaffold
M01266678-I1-SC
02/05/2026
Signed off — Alteration
Mechanical work filed in conjunction with apartment#8B renovation.
M00628922-S1
01/19/2026
Filed — Alteration
PLUMBING FIXTURES IN APT 5A FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01241140-P1
12/16/2025
Permit issued — General Construction
M01241140-I1-GC
12/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/12/2025
Signed off — Alteration
Mechanical work filed in conjunction with apartment#8B renovation.
M00628922-S2
11/12/2025
Signed off — Alteration
Mechanical work filed in conjunction with apartment#8B renovation.
M00628922-I1
11/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/26/2025
Special inspection requirement — Post-installed Anchors
MOHAMMAD AHEAD
09/26/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MOHAMMAD AHEAD
09/23/2025
Filed — Alteration
Installation of material hoist. Amend #1, change in tieback and anchor for masonry, added Ctwt and tie back to beam detail, and added concrete wall anchor detail
M01266678-P1
09/22/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MOHAMMAD AHEAD
09/22/2025
Special inspection requirement — Post-installed Anchors
MOHAMMAD AHEAD
09/18/2025
Permit issued — General Construction
M01251297-I1-GC
09/15/2025
Permit issued — General Construction
M01241140-I1-GC
09/12/2025
Permit issued — Plumbing
M01241140-S1-PL
09/02/2025
Permit issued — Suspended Scaffold
M01266678-I1-SC
08/27/2025
Objection resolved — Addressed
08/25/2025
Objection resolved — Addressed
08/25/2025
Objection resolved — Addressed
08/20/2025
Filed — Alteration
Installation of material hoist. Amend #1, change in tieback and anchor for masonry, added Ctwt and tie back to beam detail, and added concrete wall anchor detail
M01266678-I1
08/19/2025
Signed off — Alteration
NEW MECHANICAL SYSTEM INSTALLATION INCLUDING NEW INDOOR & OUTDOOR UNITS TO REPLACE EXISTING WINDOW UNITS AS PER PLANS FILED HEREWITH. NO CHANGES IN EGRESS, USE OR OCCUPANCY.
M01184754-I1
08/15/2025
Objection raised — Admin
08/15/2025
Objection raised — Energy
08/15/2025
Objection resolved — Addressed
08/15/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/12/2025
Objection raised — Other
08/12/2025
Objection raised — Other
08/12/2025
Objection raised — Other
08/12/2025
Objection raised — Other
07/28/2025
Filed — Alteration
PLUMBING FIXTURES IN APT 5A FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01241140-S1
07/28/2025
Filed — Alteration
PLUMBING FIXTURES IN APT 5A FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01241140-I1
07/17/2025
Filed — Alteration
Roof replacement as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M01251297-I1
07/03/2025
Special inspection requirement — Insulation placement and R values
Anthony Stasio
07/03/2025
Special inspection requirement — Final
Anthony Stasio
07/03/2025
Special inspection requirement — Masonry
Anthony Stasio
07/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
Michael Lombardo
06/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Kaushansky
06/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Andrew Fethes
06/13/2025
Special inspection requirement — Interior lighting power
Andrew Fethes
06/13/2025
Special inspection requirement — Lighting in dwelling units
Andrew Fethes
06/13/2025
Special inspection requirement — Final
Andrew Fethes
05/19/2025
Permit issued — Mechanical Systems
M01184754-I1-MS
04/24/2025
Cycle 10 facade report submitted
04/24/2025
Cycle 10 facade report signed — SAFE
04/24/2025
Objection resolved — Addressed
04/24/2025
Objection resolved — Addressed
04/22/2025
Signed off — Alteration
Interior Renovation of an existing apartment (Apt 13E) for the removal of Non-load-bearing interior partitions and cabinet work. As per plans filed herewith, no change to use, occupancy or egress.
M01068417-I1
04/10/2025
Cycle 10 facade inspection completed
Latest 60 of 300 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ORSID REALTY3409/13/2026
ORSID NY1508/20/2026
KINGS GROUP NY1407/08/2026
50 RIVERSIDE TENANT'S CORP.6603/22/2026
AWR GROUP103/22/2026
50 RIVERSIDE TENANTS CONP103/22/2026
B H MANAGEMENT103/22/2026
F I LANDSCAPING CORP D B A F I C203/21/2026
50 RIVERSIDE DRIVE TENANTS2403/21/2026
DOUGLAS ELLIMAN PROPERTY MANG203/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AGOUTI CONSTRUCTION CONSULTING1303/21/2026
METROPOLIS GROUP INC403/21/2026
CLARKE CONSTRUCTION CONSULTANTS303/21/2026
RPO203/21/2026
LMS-ACE SERVICES103/21/2026
SKYLINE ACCESS103/21/2026
MESZAROS ENGINEERING PLLC203/21/2026
GREEN STUDIO803/21/2026
SOL BUILDING CONSULTING SERVICES603/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYLINE RESTORATION INCGeneral Contractor808/20/2026
SPRING SCAFFOLDING LLCGeneral Contractor807/08/2026
KINGS GROUP NY CORPGeneral Contractor707/08/2026
A.M.N. CORPORATIONPlumbing607/08/2026
RDM RENOVATION CORPGeneral Contractor603/21/2026
SAULUX INTERIORS CORPGeneral Contractor507/08/2026
CEKO CONTRACTING INCGeneral Contractor407/08/2026
RG DECORATING & PAINTINGGeneral Contractor407/08/2026
ROYAL HVAC SYSTEMS INCGeneral Contractor407/08/2026
BAYSIDE CONTRACTING INCGeneral Contractor307/08/2026
SENAN CLANCY CONTRACTINGGeneral Contractor207/08/2026
VILIMAS MECHANICAL CORPPlumbing207/08/2026
PACIFIC PLBG&HTG CORPPlumbing207/08/2026
SM CONSTRUCTION & CONTRAGeneral Contractor207/08/2026
KRSLOVIC, ANTEElectrical103/21/2026
MCGANN, RAYMONDElectrical103/21/2026
PRUDENT ELECTRIC INCElectrical103/22/2026
REAZ MOHAMMEDElectrical103/21/2026
TOMASZ PUZAElectrical103/21/2026
ABILENE INCGeneral Contractor107/08/2026
COLEMAN CONTRACTING CORPGeneral Contractor103/21/2026
GOLDEN INTERIORS INCGeneral Contractor107/08/2026
GOLDEN SAW CONSTRUCTION CGeneral Contractor107/08/2026
K & B HVAC LLCGeneral Contractor107/08/2026
KLAIRGAR INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A2 ARCHITECT, PC2504205/18/2026
MOHAMMAD AHEAD - PROFESSI9286209/23/2025
WINTON GROUP ARCHITECTURE4343107/28/2025
EDG2578307/17/2025
LOMBARDO PROF ENGINEERING8566107/17/2025
BROMLEY CALDARI ARCHITECT1534103/27/2025
CNS INSPECTION SERVICES7566103/07/2025
LANDMARK FACILITIES GROUP2913401/07/2025
RYAN SPECIAL ENGINEERING2018106/21/2024
LINEA LLP3155508/22/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSKYLINE RESTORATION INC08/19/2026
DOB NOWPlumbingPermit IssuedLEGACY PLUMBING & HTG LLC06/17/2026
DOB NOWGeneral ConstructionPermit IssuedLJPY CORP06/01/2026
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC02/26/2026
DOB NOWGeneral ConstructionSigned-offSENAN CLANCY CONTRACTING12/16/2025
DOB NOWGeneral ConstructionPermit IssuedSKYLINE RESTORATION INC09/18/2025
DOB NOWGeneral ConstructionSigned-offSENAN CLANCY CONTRACTING09/15/2025
DOB NOWPlumbingSigned-offT.N.T. PLBG & HTG, INC09/12/2025
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC09/02/2025
DOB NOWMechanical SystemsSigned-offNEW YORK COOLING TOWERS I05/19/2025
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC01/24/2025
DOB NOWGeneral ConstructionSigned-offRG DECORATING & PAINTING07/22/2024
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC11/13/2023
DOB NOWGeneral ConstructionSigned-offBAYSIDE CONTRACTING INC10/13/2023
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC10/06/2023
DOB NOWMechanical SystemsSigned-offBAYSIDE CONTRACTING INC10/02/2023
DOB NOWPlumbingSigned-offA.M.N. CORPORATION07/31/2023
DOB NOWGeneral ConstructionSigned-offSM CONSTRUCTION & CONTRA04/18/2023
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC02/17/2023
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC02/02/2023
DOB NOWGeneral ConstructionSigned-offGOLDEN SAW CONSTRUCTION C01/27/2023
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC12/16/2022
DOB NOWGeneral ConstructionSigned-offRAFI RAZA11/21/2022
DOB NOWPlumbingSigned-offNEW YORK PARK PLBG&HTG CO11/15/2022
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC11/14/2022
DOB NOWMechanical SystemsSigned-offRDM RENOVATION CORP11/11/2022
DOB NOWGeneral ConstructionSigned-offRDM RENOVATION CORP11/11/2022
DOB NOWPlumbingSigned-offMACREDDIN PLBG & HTG INC07/25/2022
DOB NOWGeneral ConstructionSigned-offCOLEMAN CONTRACTING07/12/2022
DOB NOWGeneral ConstructionSigned-offSM CONSTRUCTION & CONTRA07/08/2022
DOB NOWPlumbingSigned-offA.M.N. CORPORATION07/07/2022
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC06/29/2022
DOB NOWMechanical SystemsSigned-offKLAIRGAR INC05/26/2022
DOB NOWPlumbingSigned-offA.M.N. CORPORATION05/26/2022
DOB NOWGeneral ConstructionPermit IssuedRG DECORATING & PAINTING01/20/2022
DOB NOWMechanical SystemsSigned-offSAULUX INTERIORS CORP01/07/2022
DOB NOWGeneral ConstructionSigned-offCEKO CONTRACTING INC01/07/2022
DOB NOWPlumbingSigned-offVILIMAS MECHANICAL CORP01/04/2022
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC11/12/2021
DOB NOWGeneral ConstructionPermit IssuedSPARTAN DEMOLITION CO LLC11/01/2021
+ 60 more permits on file
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
03/20/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/20/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/29/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2023Pass-Final PL - UndergroundPassView ↗
03/02/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/28/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/01/2022Pass-Final NB - 18 Month TCO UpdatePassView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
05/05/2026Fire-Resistant Penetrations and JointsAnn Macklinspecial
09/26/2025Alternative Materials - OTCR Buildings Bulletin NumberMOHAMMAD AHEADspecial
09/26/2025Post-installed AnchorsMOHAMMAD AHEADspecial
09/22/2025Post-installed AnchorsMOHAMMAD AHEADspecial
09/22/2025Alternative Materials - OTCR Buildings Bulletin NumberMOHAMMAD AHEADspecial
07/03/2025Tenant Protection Plan ComplianceMichael Lombardospecial
07/03/2025Insulation placement and R valuesAnthony Stasioenergy_progress
07/03/2025FinalAnthony Stasioprogress
07/03/2025MasonryAnthony Stasiospecial
06/13/2025FinalAndrew Fethesprogress
06/13/2025Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
06/13/2025Energy Code Compliance InspectionsAndrew Fethesprogress
06/13/2025Interior lighting powerAndrew Fethesenergy_progress
06/13/2025Lighting in dwelling unitsAndrew Fethesenergy_progress
03/27/2025Tenant Protection Plan ComplianceAshley Rauenzahnspecial
03/26/2025Fire-Resistant Penetrations and JointsAshley Rauenzahnspecial
03/26/2025FinalAshley Rauenzahnprogress
01/09/2025Fire-Resistant Penetrations and JointsThomas Newboldspecial
01/08/2025Fire-Resistant Penetrations and JointsThomas Newboldspecial
06/19/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
06/18/2024FinalAshley Rauenzahnprogress
09/05/2023Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
09/05/2023Lighting in dwelling unitsLisa Vangelasenergy_progress
09/05/2023Fire-Resistance Rated ConstructionLisa Vangelasprogress
09/05/2023FinalLisa Vangelasprogress
Latest 25 of 81.
▾Documents — 1,072 on file (BIS + DOB NOW)
▸Plans & Drawings55
▸DOB NOWPlans/Sketch41
09/06/2026M00039074-I1Request digital key ↗
09/03/2026M00589716-I1Request digital key ↗
09/03/2026M00598711-P1Request digital key ↗
Showing 3 of 41 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00237685-I1Request digital key ↗
09/04/2026M00367348-I1Request digital key ↗
09/04/2026M00390242-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00258920-I1Request digital key ↗
09/04/2026M00351060-I1Request digital key ↗
09/04/2026M00393532-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/06/2026M00039074-I1Request digital key ↗
08/15/2026M00039074-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00148593-I1Request digital key ↗
▸Applications & Permits214
▸BISWORK PERMIT APPLICATION95
03/29/2021123602093Open ↗
11/02/2020140956473Open ↗
08/21/2020140927282Open ↗
Showing 3 of 95 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION71
06/01/2021140927282Open ↗
03/24/2021123880274Open ↗
09/24/2020140956473Open ↗
Showing 3 of 71 on file for this type
▸DOB NOWLPC Approval/Permit46
09/04/2026M00367348-I1Open ↗
09/04/2026M00390242-P1Open ↗
09/04/2026M00393532-I1Open ↗
Showing 3 of 46 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/21/2020123685066Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications241
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION94
01/08/2020123880274Open ↗
10/24/2019123319523Open ↗
10/24/2019123319523Open ↗
Showing 3 of 94 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature49
09/06/2026M00039074-I1Open ↗
09/05/2026M00148593-I1Open ↗
09/05/2026M00258920-I1Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature39
09/28/2026M01397678-S1Open ↗
09/21/2026M00598711-I1Open ↗
09/02/2026M00390242-P2Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWProgress Inspector Seal & Signature37
09/21/2026M00598711-I1Open ↗
09/21/2026M00598711-I1Open ↗
09/02/2026M00685741-P1Open ↗
Showing 3 of 37 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
09/24/2020140956473Open ↗
07/23/2020140927282Open ↗
07/09/2019140857703Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/23/2020140927282Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment91
▸BISSELF-CERT PLUMBING NOTICE38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸BISSCHEDULE B - PLUMBING26
09/15/2020123685066Open ↗
11/02/2019140857703Open ↗
07/09/2019140857703Open ↗
Showing 3 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE19
11/14/2019123685066Open ↗
06/17/2019123685066Open ↗
05/28/2019123319523Open ↗
Showing 3 of 19 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
09/21/2020123685066Open ↗
▸Safety & Tenant Protection31
▸BISTenant Protection Plan and Notes14
09/24/2020140956473Open ↗
08/11/2020140927282Open ↗
07/09/2019140857703Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWTenant Protection Plan11
09/04/2026M00367348-I1Open ↗
09/04/2026M00390242-P1Open ↗
09/04/2026M00393532-I1Open ↗
Showing 3 of 11 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM4
11/20/2019123880274Open ↗
07/15/2019123685066Open ↗
12/03/2018123562670Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos85
▸DOB NOWDEP ACP-5: Asbestos Assessment Report39
09/05/2026M00258920-I1Open ↗
09/04/2026M00351060-I1Open ↗
09/04/2026M00367348-I1Open ↗
Showing 3 of 39 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)28
09/24/2020140956473Open ↗
08/21/2020140927282Open ↗
10/17/2019123880274Open ↗
Showing 3 of 28 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance66
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
10/24/2019123319523Open ↗
10/24/2019123319523Open ↗
05/28/2019123124421Open ↗
Showing 3 of 26 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS13
10/24/2019123319523Open ↗
05/28/2019123124421Open ↗
Showing 2 of 13 on file for this type
▸BISTR8: Energy Code Progress Inspections9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
04/12/2022140956473Open ↗
09/03/2021140927282Open ↗
09/03/2021140927282Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/12/2022140956473Open ↗
10/21/2020140857703Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC EXEMPTION1
08/11/2020140927282Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY12
04/12/2022140956473Open ↗
09/01/2021140927282Open ↗
04/15/2021123562670Open ↗
Showing 3 of 12 on file for this type
▸Approvals, Objections & Sign-offs100
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST32
04/12/2022140956473Open ↗
09/22/2021123880274Open ↗
09/03/2021140927282Open ↗
Showing 3 of 32 on file for this type
▸BISLANDMARKS APPROVAL29
09/24/2020140956473Open ↗
08/11/2020140927282Open ↗
11/06/2019123880274Open ↗
Showing 3 of 29 on file for this type
▸BISADMINISTRATIVE OBJECTIONS20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
06/02/2021140927282Open ↗
10/24/2019123319523Open ↗
Showing 2 of 12 on file for this type
▸BISLANDMARKS SIGNOFF4
04/12/2022140956473Open ↗
09/01/2021140927282Open ↗
12/08/2020140857703Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
04/15/2021123562670Open ↗
▸Cost, Insurance & Ownership75
▸BISCOST AFFIDAVIT68
09/01/2021140927282Open ↗
10/19/2020123685066Open ↗
09/24/2020140956473Open ↗
Showing 3 of 68 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
04/12/2022140956473Open ↗
04/15/2021123562670Open ↗
12/08/2020140857703Open ↗
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
12/11/2019140857703Open ↗
▸Filing & Intake Forms87
▸BISEFILING COVER SHEET33
10/15/2019123880274Open ↗
06/17/2019123685066Open ↗
06/17/2019123685066Open ↗
Showing 3 of 33 on file for this type
▸BISADDITIONAL INFORMATION33
06/02/2021140927282Open ↗
06/01/2021140927282Open ↗
04/19/2021123880274Open ↗
Showing 3 of 33 on file for this type
▸BISBOROUGH INTAKE FORM13
03/29/2021123602093Open ↗
11/14/2019123685066Open ↗
10/24/2019123319523Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
09/24/2020140956473Open ↗
07/23/2020140927282Open ↗
07/09/2019140857703Open ↗
Showing 3 of 8 on file for this type
▸Other Documents15
▸DOB NOWProof of Historic Building4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
06/26/2019123685066Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution2
09/06/2026M00039074-I1Open ↗
Showing 1 of 2 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
10/12/2018123124421Open ↗
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type