RoofUnder Construction14p · 7 filings · 20 docs
ArchitectureEquipmentGeneralStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Latest 3 of 7 filings on this floor.
Penthouse1p · 1 filing · 3 docs
Fire Protection
No filed description on record for this project.
On file for this project
3 documents · 1 drawing sheet
Floor 59Under Construction2p · 3 filings · 19 docs
Plumbing
Issued Permit Scope
Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
APPLICATION FILED HEREWITH FOR PLUMBING WORKTYPE ASSOCIATED W/INTERIOR ALTERATION ON THE 57th & 58th FLOORS. SCOPE TO INCLUDE NEW PLUMBING FIXTURES, POINT OF USE HOT WATER HEATERS, INCLUDING PIPING AND VALVES. NO CHANGEOF USE, OCCUPANCY OR EGRESS
On file for this project
11 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
4 documents · 1 drawing sheet
Floor 58Under Construction26p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
ALTERATION APPLICATION FILED HEREWITH FOR INTERIOR ALTERATION AT 58TH AND 59THFLOOR . SCOPE TO INCLUDE NEW INTERIOR PARTITIONS, LIGHTING, NEW FINISHES. NO CHANGE OF USE, OCCUPANCY OR EGRESS.
On file for this project
14 documents · 7 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 57Under Construction26p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INTERIOR REMOVALS WORK AT 58M/57C PARTIAL FLOOR INCLUDING PARTITION, CEILING AND DOOR REMOVALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Latest 3 of 7 filings on this floor.
Floor 56Under Construction7p · 3 filings · 17 docs
ArchitectureStructural
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
a)New steel beams, b) Exist. Beam Reinforcement, c) New handrail connections; General Construction as per plans filed herewith. No change to use, occupancy and egress.
On file for this project
9 documents · 1 drawing sheet
Floor 55Under Construction14p · 4 filings · 20 docs
ArchitectureFire ProtectionLandscapeMechanicalPlumbing
Issued Permit Scope
General Construction · Supported Scaffold
Plumbing and Sprinkler scope associated with the renovation of the one-tenant office space on 55M/54C floor. No change of use, egress, or occupancy.
On file for this project
11 documents · 7 drawing sheets
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INTERIOR REMOVALS WORK ON THE 55M/54C - 56M/55C FLOORS TO INCLUDE PARTITION, CEILING, AND DOOR REMOVALS AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 54Under Construction30p · 5 filings · 20 docs
ArchitectureGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Plumbing and Sprinkler scope associated with the renovation of the one-tenant office space on 55M/54C floor. No change of use, egress, or occupancy.
On file for this project
11 documents
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
Architectural scope associated with the renovation of the one-tenant office space on 55M/54C floor. No change of use, egress, or occupancy.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 53Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 52Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 51Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 50Under Construction7p · 3 filings · 18 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INTERIOR REMOVALS WORK AT 51M/50C PARTIAL FLOOR INCLUDING PARTITION, CEILING AND DOOR REMOVALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 49Under Construction41p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
Plumbing/ Sprinkler scope associated with the renovation of the one-tenant office space on 50M/49C floor. No change of use, egress, or occupancy.
On file for this project
34 documents
INTERIOR REMOVALS WORK AT 50M/49C FLOOR INCLUDING PARTITION, CEILING AND DOOR REMOVALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 48Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 47Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 46Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 45Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 44Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 43Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 42Under Construction7p · 3 filings · 13 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
INTERIOR REMOVALS WORK ON THE 42C/43M FLOORS TO INCLUDE PARTITION, CEILING, AND DOOR REMOVALS AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
Floor 41Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 40Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 39Under Construction7p · 3 filings · 12 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
INTERIOR REMOVALS WORK ON THE 40M/39C FLOOR TO INCLUDE PARTITION, CEILING, AND DOOR REMOVALS AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 38Under Construction11p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Application being filed herewith for Mechanical work including adding HVAC Units at the subject premises, per plans submitted herewith. No change in use, egress or occupancy in this application.
On file for this project
11 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 37Under Construction6p · 3 filings · 20 docs
ArchitectureOther
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Interior renovation of the 37th Floor existing office space (37M/36C floor designation). No change of use, egress or occupancy.
On file for this project
13 documents
Floor 36Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 35Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 34Under Construction14p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Plumbing and Sprinkler scope associated with the renovation of the office space on the 34C/35M floor. No change of use, egress, or occupancy.
On file for this project
21 documents
Floor 33Under Construction83p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
Plumbing and Sprinkler scope associated with the renovation of the one-tenant office space on 34M/33C floor. No change of use, egress, or occupancy.
On file for this project
23 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Latest 3 of 5 filings on this floor.
Floor 32Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 31Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 30Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 29Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 28Under Construction10p · 5 filings · 20 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
INTERIOR REMOVALS WORK AT 28C/29M FLOOR TO INCLUDE PARTITION, CEILING AND DOOR REMOVALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
Latest 3 of 5 filings on this floor.
Floor 27Under Construction8p · 3 filings · 12 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Plumbing work as shown on plans.
On file for this project
4 documents · 2 drawing sheets
Floor 26Under Construction13p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Mechanical work as shown on plans.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 25Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 24Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 23Under Construction6p · 3 filings · 12 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INTERIOR REMOVALS WORK ON THE 24M/23C FLOOR TO INCLUDE PARTITION, CEILING, AND DOOR REMOVALS AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 22Under Construction6p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 21Under Construction9p · 3 filings · 20 docs
Architecture
Issued Permit Scope
General Construction · Supported Scaffold
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
Structural scope associated with the renovation of the terrace on the 21C/22M floor in compliance with the BB 2018-002. No change of use, egress or occupancy.
On file for this project
14 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 20Under Construction20p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INTERIOR REMOVALS WORK AT 21M/20C PARTIAL FLOOR INCLUDING PARTITION, CEILING AND DOOR REMOVALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Plumbing and Sprinkler scope associated with the renovation of the one tenant office space on 21M/20C floor. No change of use, egress, or occupancy.
On file for this project
25 documents
Floor 19Under Construction6p · 1 filing · 4 docs
Architecture
Issued Permit Scope
General Construction
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
Floor 18Under Construction6p · 1 filing · 4 docs
Architecture
Issued Permit Scope
General Construction
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
Floor 17Under Construction7p · 2 filings · 19 docs
ArchitectureStructural
Issued Permit Scope
General Construction
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
Structural scope associated with the renovation of the terrace on the 17th floor. No change of use, egress or occupancy.
On file for this project
15 documents · 1 drawing sheet
Floor 16Under Construction9p · 2 filings · 9 docs
Architecture
Issued Permit Scope
General Construction
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INTERIOR REMOVALS WORK ON THE 16TH FLOOR TO INCLUDE PARTITION, CEILING AND DOOR REMOVALS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
Floor 15Under Construction9p · 3 filings · 20 docs
ArchitectureFire ProtectionOther
Issued Permit Scope
General Construction
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
Structural modifications to existing setback roofs located on 26th and 28th Floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
18 documents · 1 drawing sheet
Sprinkler modifications to take place on the 15th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 2 drawing sheets
Floor 14Under Construction7p · 2 filings · 8 docs
Architecture
Issued Permit Scope
General Construction
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
No filed description on record for this project.
On file for this project
4 documents · 1 drawing sheet
Floor 13Under Construction6p · 2 filings · 5 docs
Architecture
Issued Permit Scope
General Construction
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
Project M01415816Permit Issued · 08/25/2026
INTERIOR REMOVALS WORK AT 14M/13C PARTIAL FLOOR INCLUDING PARTITION, CEILING AND DOOR REMOVALS AS PER PLANS (SUITES 1420/1440). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
1 document
Floor 12Under Construction6p · 1 filing · 4 docs
Architecture
Issued Permit Scope
General Construction
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
Floor 11Under Construction12p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
filing herewith sprinkler head removals and remaining heads to form as temporary protection for duration of construction only. no change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Application being filed herewith for Mechanical work including adding HVAC Units at the subject premises, per plans submitted herewith. No change in use, egress or occupancy in this application.
On file for this project
11 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 10Under Construction12p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
filing herewith sprinkler head removals and remaining heads to form as temporary protection for duration of construction only. no change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Application being filed herewith for Mechanical work including adding HVAC Units at the subject premises, per plans submitted herewith. No change in use, egress or occupancy in this application.
On file for this project
11 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 9Under Construction14p · 3 filings · 18 docs
ArchitectureGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INTERIOR GENERAL CONSTRUCTION AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
On file for this project
4 documents · 1 drawing sheet
INTERIOR MECHANICAL WORK CONSISTING OF MODIFICATIONS TO DUCT, DAMPERS, AND DOOR LOUVERS AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE.
On file for this project
10 documents · 1 drawing sheet
Floor 8Under Construction7p · 2 filings · 9 docs
Architecture
Issued Permit Scope
General Construction
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
INTERIOR REMOVALS WORK AT 8M/8C FLOOR INCLUDING PARTITION, CEILING AND DOOR REMOVALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
Floor 7Under Construction8p · 2 filings · 20 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
General Construction
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
PLUMBING AND SPRINKLER MODIFICATIONS (WW NORTON) AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Floor 6Under Construction7p · 2 filings · 18 docs
ArchitectureMechanical
Issued Permit Scope
General Construction
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
Mechanical work to consist of condenser water infrastructure as indicated on plans . No change in use egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
Floor 5Under Construction7p · 2 filings · 10 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
Sprinkler modifications to take place on the 15th floor as per drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Floor 4Under Construction7p · 2 filings · 10 docs
ArchitectureMechanical
Issued Permit Scope
General Construction
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
No filed description on record for this project.
On file for this project
6 documents · 1 drawing sheet
Floor 3Under Construction13p · 5 filings · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 3RD FLOOR (ZARA) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
Application being filed herewith for Mechanical work including adding HVAC Units at the subject premises, per plans submitted herewith. No change in use, egress or occupancy in this application.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 2Under Construction8p · 3 filings · 20 docs
ArchitectureMechanical
Issued Permit Scope
General Construction
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE CELLAR, 1ST AND 2ND FLOOR RETAIL SPACE (ZARA) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Mechanical work to consist of condenser water infrastructure as indicated on plans . No change in use egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
Floor 1Under Construction12p · 5 filings · 20 docs
ArchitectureDMFire ProtectionPlumbing
Issued Permit Scope
General Construction
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
4 documents
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE CELLAR, 1ST AND 2ND FLOOR RETAIL SPACE (ZARA) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 3 drawing sheets
PROPOSED REPLACEMENT OF EXISTING STOREFRONT FOR STORE RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Cellar40p · 4 filings · 20 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction · Structural
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE CELLAR, 1ST AND 2ND FLOOR RETAIL SPACE (ZARA) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 3 drawing sheets
Structural repairs as indicated on plans.
On file for this project
10 documents · 2 drawing sheets
General construction repairs as per plans.
On file for this project
10 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.