← Back
Over six families without stores
500 CLINTON AVENUE
BROOKLYN · BIN 3057539
💬 Discuss this project
1930Year Built
4Stories
C1Building Class
R6AZoning
6,000 sfGross Floor Area
8Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: GAB PROPERTIES LLC · 2,400 sf lot · 2.5 FAR built · Flood zone X
Locations of Work
Mechanical
Permit Issued — active, not yet Signed-off
Floor 1Under Construction2p · 1 filing · 10 docs
CellarUnder Construction1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3RD 85TH1208/28/2026
GAB PROPERTIES LLC303/22/2026
500 CLINTON AVENUE RESIDENCES LL1203/22/2026
500 CLINTON RESIDENCES703/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/12/2018$4.2M—500 CLINTON AVENUE RESIDENCES, LLC → GAB PROPERTIES LLC$704/sf building
12/23/2014$2.4M—Private party → 500 CLINTON AVENUE RESIDENCES, LLC$392/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BLACK OAK ARCHITECTURE, PC106/03/2026
MDG DESIGN GROUP303/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M-DIS DESIGN GROUP303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PAUL TRAKTMAN LIC PLBR INPlumbing707/08/2026
APOSTOL, JOHNElectrical103/21/2026
BRANDL, BENJAMINElectrical103/21/2026
MR. AIR NYC CORPGeneral Contractor108/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BLACK OAK ARCHITECTURE, P9912106/03/2026
SEAD ENGINEERING PC2665303/18/2022
Building Lifecycle
All (88)Filed (4)Permit Issued (3)Violation (56)Objection (10)Special Inspection (15)
08/26/2026
Permit issued — Mechanical Systems
B01400100-I1-MS
06/03/2026
Filed — Alteration
INSTALLATION OF SPLIT-TYPE AIR CONDITIONING SYSTEM AT EXISTING APARTMENT #1A, INCLUDING INDOOR FAN COIL UNIT, OUTDOOR CONDENSER, REFRIGERANT PIPING, CONDENSATE DRAINAGE, AND ALL ASSOCIATED ELECTRICAL CONNECTIONS. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B01400100-I1
05/11/2026
Special inspection requirement — Final
Jin Lee
05/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
Jin Lee
05/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jin Lee
05/11/2026
Special inspection requirement — Mechanical Systems
Jin Lee
05/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jin Lee
05/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
Jin Lee
05/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
Jin Lee
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
03/22/2022
Special inspection requirement — Fire-Resistance Rated Construction
INHWAN CHANG
03/22/2022
Special inspection requirement — Energy Code Compliance Inspections
INHWAN CHANG
03/22/2022
Special inspection requirement — Maintenance information
INHWAN CHANG
03/18/2022
Filed — Alteration
HEREWITH FILE TO INSTALL WASHER AND DRYER FOR RESIDENTIAL BUILDING WITH PLUMBING WORK. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B00404713-P2
11/19/2021
Special inspection requirement — Maintenance information
INHWAN CHANG
11/19/2021
Special inspection requirement — Fire-Resistance Rated Construction
INHWAN CHANG
11/19/2021
Special inspection requirement — Energy Code Compliance Inspections
INHWAN CHANG
11/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
11/09/2021
Violation issued (ECB, closed)
Construction
11/05/2021
Permit issued — Plumbing
B00404713-I1-PL
08/20/2021
Objection resolved — Addressed
08/20/2021
Objection resolved — Addressed
08/19/2021
Objection raised — Inspections
08/19/2021
Objection raised — Scope
08/17/2021
Filed — Alteration
HEREWITH FILE TO INSTALL WASHER AND DRYER FOR RESIDENTIAL BUILDING WITH PLUMBING WORK. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B00404713-P1
11/04/2020
Permit issued — Plumbing
B00404713-I1-PL
10/09/2020
Objection raised — Inspections
10/09/2020
Objection resolved — Addressed
10/09/2020
Objection raised — Scope
10/09/2020
Objection resolved — Addressed
10/09/2020
Objection raised — Inspections
10/09/2020
Objection resolved — Addressed
10/07/2020
Filed — Alteration
HEREWITH FILE TO INSTALL WASHER AND DRYER FOR RESIDENTIAL BUILDING WITH PLUMBING WORK. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B00404713-I1
03/11/2020
Violation issued (ECB, closed)
Boilers
10/21/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/21/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/27/2015
Violation issued (ECB, closed)
Construction
07/27/2015
Violation issued (ECB, closed)
Construction
07/27/2015
Violation issued (ECB, closed)
Construction
07/01/2015
Violation issued (ECB, closed)
Unknown
07/01/2015
Violation issued (ECB, closed)
Unknown
06/27/2015
Violation issued (ECB, closed)
Construction
06/25/2015
Violation issued (HPD, closed)
C
06/25/2015
Violation issued (ECB, closed)
Construction
06/25/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/25/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/25/2015
Violation issued (HPD, closed)
C
06/25/2015
Violation issued (ECB, closed)
Construction
06/25/2015
Violation issued (HPD, closed)
B
06/25/2015
Violation issued (HPD, closed)
B
06/25/2015
Violation issued (HPD, closed)
B
06/25/2015
Violation issued (ECB, closed)
Unknown
06/25/2015
Violation issued (HPD, open)
B
06/25/2015
Violation issued (FDNY_NOV, closed)
11/05/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/05/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/02/2014
Violation issued (ECB, closed)
Unknown
10/02/2014
Violation issued (ECB, closed)
Unknown
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMR. AIR NYC CORP08/26/2026
DOB NOWPlumbingSigned-offPAUL TRAKTMAN LIC PLBR IN11/05/2021
DOB NOWPlumbingSigned-offPAUL TRAKTMAN LIC PLBR IN11/04/2020
BISOTISSUEDMIKE & SAJO CONTRACTING05/03/2016
BISOTISSUEDMIKE & SAJO CONTRACTING01/02/2016
BISPLISSUEDPRECISION PLBG SVCS., INC09/25/2015
BISPLISSUEDPRECISION PLBG SVCS., INC09/25/2015
BISOTISSUEDMIKE & SAJO CONTRACTING09/25/2015
BISMHISSUEDMIKE & SAJO CONTRACTING09/25/2015
BISOTISSUEDMIKE & SAJO CONTRACTING02/23/2015
BISOTISSUEDMIKE & SAJO CONTRACTING01/30/2015
1 project · most recent 06/03/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/03/2026Permit IssuedMR. AIR NYC CORPHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-2D20NL 18,000 BTU · Condensing Unit ×1
MXZ-5D42NL 40,500 BTU · Condensing Unit ×1
1 project · most recent 03/18/2022
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
03/18/2022Signed-offPAUL TRAKTMAN LIC PLBR INGas, Plumbing-Sprinkler, Water/Sanitary
1 project · most recent 08/21/2026
HVAC Wiring
FiledStatusContractorScope
08/21/2026Permit IssuedINTELOGIC ELECTRIC, INC.HVAC Wiring
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
05/11/2026FinalJin Leeprogress
05/11/2026Tenant Protection Plan ComplianceJin Leespecial
05/11/2026Fire-Resistant Penetrations and JointsJin Leespecial
05/11/2026Mechanical SystemsJin Leespecial
05/11/2026HVAC-R and service water piping design and insulationJin Leeenergy_progress
05/11/2026HVAC-R and service water heating system controlsJin Leeenergy_progress
05/11/2026HVAC-R and service water heating equipmentJin Leeenergy_progress
03/22/2022Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
03/22/2022Fire-Resistance Rated ConstructionINHWAN CHANGprogress
03/22/2022Energy Code Compliance InspectionsINHWAN CHANGprogress
03/22/2022Maintenance informationINHWAN CHANGenergy_progress
11/19/2021Maintenance informationINHWAN CHANGenergy_progress
11/19/2021Fire-Resistance Rated ConstructionINHWAN CHANGprogress
11/19/2021Energy Code Compliance InspectionsINHWAN CHANGprogress
11/19/2021Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
▾Documents — 130 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00404713-P2Request digital key ↗
08/14/2026B00404713-P1Request digital key ↗
08/14/2026B00404713-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/16/2026B01400100-I1Request digital key ↗
▸Applications & Permits31
▸BISPLAN / WORK APPROVAL APPLICATION19
02/20/2016321236177Open ↗
02/09/2016321236177Open ↗
12/28/2015321236177Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION11
05/17/2016321236177Open ↗
05/17/2016321236177Open ↗
01/07/2016321236177Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
03/18/2016321165653Open ↗
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature10
09/28/2026B01400100-I1Open ↗
09/28/2026B01400100-I1Open ↗
09/28/2026B01400100-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
04/26/2016321165653Open ↗
01/22/2016321165626Open ↗
01/22/2016321165653Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/28/2026B01400100-I1Open ↗
09/28/2026B01400100-I1Open ↗
09/28/2026B01400100-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
12/28/2015321236177Open ↗
07/22/2015321165626Open ↗
07/14/2015321165653Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
12/28/2015321236177Open ↗
07/22/2015321165626Open ↗
07/14/2015321165653Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/02/2026B00404713-I1Open ↗
09/02/2026B00404713-P2Open ↗
09/02/2026B00404713-P1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
12/28/2015321236177Open ↗
12/02/2015321165653Open ↗
11/04/2015321165626Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan3
09/02/2026B00404713-P2Open ↗
08/14/2026B00404713-P1Open ↗
08/14/2026B00404713-I1Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
12/28/2015321236177Open ↗
07/22/2015321165626Open ↗
07/14/2015321165653Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/02/2026B00404713-P2Open ↗
08/16/2026B01400100-I1Open ↗
08/14/2026B00404713-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
01/22/2016321165626Open ↗
01/22/2016321165653Open ↗
12/28/2015321236177Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
01/22/2016321165626Open ↗
01/22/2016321165653Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
04/26/2016321165653Open ↗
03/11/2016321165626Open ↗
01/22/2016321165626Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
07/22/2015321165626Open ↗
07/14/2015321165653Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/22/2016321165626Open ↗
01/22/2016321165653Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT9
01/22/2016321165626Open ↗
01/22/2016321165653Open ↗
12/28/2015321236177Open ↗
Showing 3 of 9 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT5
01/07/2016321236177Open ↗
10/02/2015321165626Open ↗
07/14/2015321165653Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION4
02/20/2016321236177Open ↗
12/02/2015321165653Open ↗
11/04/2015321165626Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET4
12/28/2015321236177Open ↗
07/22/2015321165626Open ↗
07/14/2015321165653Open ↗
Showing 3 of 4 on file for this type
▸Other Documents4
▸DOB NOWDHCR Document2
09/02/2026B00404713-P2Open ↗
08/14/2026B00404713-P1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/07/2016321236177Open ↗
▸BISPLOT DIAGRAM1
02/02/2015321082289Open ↗