← Back
Three families
504 HOWARD AVENUE
BROOKLYN · BIN 3393514
💬 Discuss this project
1992Year Built
3Stories
C0Building Class
R6Zoning
1,800 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Three families · Owner of record: NYC HOUSING AUTHORITY · 1,500 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingOther
Roof3p · 2 filings · 20 docs
Floor 41p · 1 filing · 4 docs
Floor 36p · 2 filings · 20 docs
Floor 26p · 2 filings · 20 docs
Floor 17p · 2 filings · 20 docs
Cellar7p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC PACT PRESERVATION PARTNERS409/07/2026
NEW YORK CITY HOUSING AUTHORITY607/08/2026
PARSONS CONSTRUCTION503/22/2026
N.Y.C. HOUSING AUTHORITY203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AKRF, INC.204/21/2026
DAGHER ENGINEERING PLLC906/30/2025
SLM ARCHITECTURE, P.C.212/03/2024
SOCOTEC, INC.205/13/2024
AP PROFESSIONAL ENGINEERING PLLC102/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.103/21/2026
METROPOLIS GROUP INC2203/21/2026
RYBAK DEVELOPMENT203/21/2026
SANDEEP KAUR103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FSC D&C LLCGeneral Contractor607/08/2026
DUAL FUEL COMPANY LLCGeneral Contractor407/08/2026
DUAL FUEL PLUBING & HTINGPlumbing307/08/2026
PARSONS CONSTRUCTION INCGeneral Contractor303/21/2026
LET IT GROW, INCORPORATEDGeneral Contractor209/07/2026
LIBERTY NY RESTORATION INGeneral Contractor207/08/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor107/08/2026
A & E PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS18031404/21/2026
Building Lifecycle
All (50)Filed (17)Permit Issued (16)Signed Off (6)Violation (4)Inspection (7)
07/29/2026
Permit issued — Earth Work
B01386707-S2-EA
07/24/2026
Permit issued — General Construction
B01386707-I1-GC
07/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/07/2026
Signed off — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B00949014-I1
07/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/11/2026
Signed off — Alteration
MECHANICAL WORK INCLUDES INSTALLATION OF NEW GAS VENT DUCT IN BOILER ROOM EXISTING CHIMNEY
B00926287-I1
04/21/2026
Filed — Alteration
LANDSCAPING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01386707-S1
04/21/2026
Filed — Alteration
LANDSCAPING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01386707-S2
04/16/2026
Filed — Alteration
LANDSCAPING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01386707-I1
04/10/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00925886-I1
03/20/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00923851-I1
03/19/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00948268-I1
03/17/2026
Permit issued — General Construction
B00918807-I1-GC
01/16/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00931219-I1
09/02/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/12/2025
Permit issued — Mechanical Systems
B00926287-I1-MS
07/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/15/2025
Permit issued — Boiler Equipment
B00949014-I1-BE
06/30/2025
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B00925886-P2
04/28/2025
Permit issued — General Construction
B00918807-I1-GC
04/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/13/2025
Filed — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B00949014-P1
03/13/2025
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B00925886-P1
03/13/2025
Filed — Alteration
MECHANICAL WORK INCLUDES INSTALLATION OF NEW GAS VENT DUCT IN BOILER ROOM EXISTING CHIMNEY
B00926287-P1
03/06/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/02/2025
Permit issued — Mechanical Systems
B00923851-I1-MS
01/02/2025
Permit issued — Plumbing
B00948268-I1-PL
12/23/2024
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B00948268-I1
12/19/2024
Filed — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00923851-I1
12/03/2024
Filed — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW sashes
B00918807-P1
08/12/2024
Permit issued — General Construction
B00931219-I1-GC
08/01/2024
Permit issued — Plumbing
B00925886-I1-PL
07/30/2024
Permit issued — Mechanical Systems
B00926287-I1-MS
07/24/2024
Filed — Alteration
MECHANICAL WORK INCLUDES INSTALLATION OF NEW GAS VENT DUCT IN BOILER ROOM EXISTING CHIMNEY
B00926287-I1
07/24/2024
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B00925886-I1
07/10/2024
Permit issued — Boiler Equipment
B00949014-I1-BE
05/13/2024
Filed — Alteration
Facade repairs. No change in egress, use or occupancy.
B00931219-P1
05/10/2024
Permit issued — General Construction
B00931219-I1-GC
04/29/2024
Permit issued — General Construction
B00918807-I1-GC
04/10/2024
Violation issued (HPD, closed)
A
03/25/2024
Filed — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B00949014-I1
03/15/2024
Filed — Alteration
Facade repairs. No change in egress, use or occupancy.
B00931219-I1
11/17/2023
Permit issued — General Construction
B00918807-I1-GC
10/31/2023
Filed — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW sashes
B00918807-I1
02/24/2023
Permit issued — Sidewalk Shed
B00832413-I1-SH
02/22/2023
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
B00832413-I1
10/20/2022
Violation issued (ECB, open)
Boilers
06/16/2020
Violation issued (ECB, closed)
Boilers
07/25/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkPermit IssuedLET IT GROW, INCORPORATED07/29/2026
DOB NOWGeneral ConstructionPermit IssuedLET IT GROW, INCORPORATED07/24/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/17/2026
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC08/12/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING07/15/2025
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC04/28/2025
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL01/02/2025
DOB NOWPlumbingSigned-offA & E PLUMBING CORP01/02/2025
DOB NOWGeneral ConstructionSigned-offLIBERTY NY RESTORATION IN08/12/2024
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING08/01/2024
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC07/30/2024
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING07/10/2024
DOB NOWGeneral ConstructionSigned-offLIBERTY NY RESTORATION IN05/10/2024
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC04/29/2024
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC11/17/2023
DOB NOWSidewalk ShedPermit IssuedPARSONS CONSTRUCTION INC02/24/2023
BISPLISSUEDDANICA PLBG & HTG CORP06/16/1992
BIS—ISSUEDHALMAR BUILDERS06/08/1992
1 project · most recent 03/13/2025
Heating Systems Others
FiledStatusContractorScopeMake / Model / Capacity
03/13/2025Signed-offDUAL FUEL COMPANY LLCHeating Systems, Others
Heating
A.O. Smith A.O. SMITH BTH-120 120,000 BTU · Water Heater ×2
Lochinvar KBX0400N 400,000 BTU · Boiler ×2
Other
N/A n/a 1 CFM ×8
1 project · most recent 04/21/2026
Storm
FiledStatusContractorScope
04/21/2026——Storm
1 project · most recent 03/31/2023
FiledStatusContractorScope
03/31/2023Permit IssuedBDS ELECTRIC CORP.—
1 project · most recent 02/22/2023
Sidewalk Shed
FiledStatusContractorScope
02/22/2023Permit IssuedPARSONS CONSTRUCTION INCSidewalk Shed
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/02/2025Pass-Final Boiler Equipment InspectionPassView ↗
07/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
04/20/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
04/20/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSAMI HAJJAR P.Especial
04/20/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
04/15/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSAMI HAJJAR P.Especial
04/13/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
04/13/2026FinalSAMI HAJJAR P.Eprogress
07/01/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
07/01/2025Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
07/01/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
07/01/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
07/01/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
07/01/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
03/13/2025FinalSAMI HAJJAR P.Eprogress
03/13/2025Mechanical SystemsSAMI HAJJAR P.Especial
03/13/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
03/13/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
01/09/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
01/09/2025Tenant Protection Plan Compliance—special
01/09/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
01/09/2025Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
01/09/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
01/09/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
12/05/2024Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
12/05/2024Lighting controlsSAMI HAJJAR P.Eenergy_progress
12/05/2024Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
Latest 25 of 43.
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/27/2026B00832413-I1Request digital key ↗
08/25/2026B00949014-I1Request digital key ↗
08/25/2026B00949014-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸Seals & Professional Certifications40
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/27/2026B00832413-I1Open ↗
08/25/2026B00949014-P1Open ↗
08/25/2026B00949014-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/30/2026B01386707-S1Open ↗
08/28/2026B00925886-I1Open ↗
08/27/2026B01386707-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026B00925886-P1Open ↗
08/28/2026B00925886-I1Open ↗
08/25/2026B00948268-I1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/25/2026B00949014-P1Open ↗
08/25/2026B00949014-I1Open ↗
08/25/2026B00931219-P1Open ↗
Showing 3 of 11 on file for this type
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
08/25/2026B00949014-I1Open ↗
08/25/2026B00949014-P1Open ↗
08/24/2026B00925886-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B00931219-I1Open ↗
▸Other Documents1
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026B01386707-S1Open ↗