| Owner | Filings | Most Recent |
|---|---|---|
| ACHS MANAGMENT | 39 | 09/01/2026 |
| SKYLINE SCAFFOLDING GROUP | 36 | 07/08/2026 |
| IDB BANK | 33 | 07/08/2026 |
| MJM CONTRACTING ASSOCIATES | 15 | 07/08/2026 |
| IDB BANK OF NY | 6 | 03/22/2026 |
| PLATINUM SERVICES NY | 5 | 03/22/2026 |
| CLASSIC CONSULTING GROUP | 4 | 03/22/2026 |
| OWNERS REP | 3 | 03/22/2026 |
| 511 FIFTH AVENUE LLC | 9 | 03/22/2026 |
| MJM ASSOCIATES CONSTR | 9 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| SPENCER ENGINEERING, PC | 5 | 07/21/2026 |
| R.J. MCGEE ENGINEERING, PLLC | 6 | 05/26/2026 |
| DESIGN REPUBLIC | 2 | 05/22/2026 |
| GEA CONSULTING ENGINEERS | 14 | 03/12/2026 |
| KLH PROFESSIONAL ENGINEERS, PSC P.C | 4 | 08/01/2025 |
| ALSIEUX ARCHITECTURE, LLC. | 2 | 06/02/2025 |
| AFM INSPECTIONS & ENGINEERING, PLLC | 1 | 05/01/2025 |
| SSUPERETTE DESIGN LLC | 1 | 04/15/2025 |
| SEVERUD ASSOCIATES CONSULTING ENGIN | 1 | 04/15/2025 |
| ASHRAF CORP | 5 | 03/01/2025 |
| THE EIPEL ENGINEERING GROUP, D.P.C. | 2 | 12/05/2024 |
| RIGID STRUCTURAL DESIGN, LLC | 2 | 11/01/2024 |
| PAUL PERDEK, PROF. ENG. PLLC | 12 | 07/20/2023 |
| PLAN B ENGINEERING | 6 | 07/19/2023 |
| KPFF CONSULTING ENGINEERS | 1 | 11/30/2022 |
| BKSK ARCHITECTS, LLP | 1 | 07/16/2021 |
| ROBERT SILMAN ASSOCIATES | 1 | 06/22/2021 |
| MJ ENGINEERING & DESIGN | 1 | 06/18/2021 |
| JOEL PHAGOO P.E. PLLC | 2 | 11/01/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| WILLIAM VITACCO ASSOCIATES | 26 | 03/21/2026 |
| KD DESIGNS | 4 | 03/21/2026 |
| Rigid Structural Design, LLC | 4 | 03/21/2026 |
| DVA Advisors | 11 | 03/21/2026 |
| RIZZO GROUP | 6 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 38 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SKYLINE SCAFFOLDING GROUP | General Contractor | 64 | 07/08/2026 |
| MJM ASSOCIATES CONSTR LLC | General Contractor | 43 | 07/08/2026 |
| M&D FIRE SPRINKLER INC | Fire Protection | 12 | 07/08/2026 |
| MICHILLI INC | General Contractor | 9 | 07/08/2026 |
| MMI PLUMBING & HEATING INC. | Plumbing | 7 | 07/08/2026 |
| TURNER CONSTRUCTION COMPANY | General Contractor | 6 | 09/15/2026 |
| CORE SCAFFOLD SYSTEMS INC. | General Contractor | 3 | 03/21/2026 |
| FIREQUEST CORP | Fire Protection | 3 | 09/24/2026 |
| PLATINUM SERVICES NY LLC | General Contractor | 3 | 03/21/2026 |
| A&A PLUMBING CORP | Plumbing | 3 | 09/15/2026 |
| MJM CONSTR ASSOCIATES LLC | General Contractor | 2 | 04/09/2026 |
| CLASSIC CONSULTING GROUP | General Contractor | 2 | 03/21/2026 |
| QUEUE ELEC'L CONTRS, INC | Electrical | 1 | 03/22/2026 |
| L.D. FLECKEN INC | Electrical | 1 | 03/21/2026 |
| BEDROCK PLBG. & HTG., INC | Plumbing | 1 | 06/28/2026 |
| HALPERN, S | Electrical | 1 | 03/21/2026 |
| CITRIN, JAY | Electrical | 1 | 03/21/2026 |
| ULTRA GENERAL CONTRACTING INC. | General Contractor | 1 | 07/08/2026 |
| ALLSTATE SPRINKLER LLC | Fire Protection | 1 | 06/28/2026 |
| CHRISTOPHER HAND | Electrical | 1 | 03/21/2026 |
| TF ELECTRICAL CORP | Electrical | 1 | 03/22/2026 |
| ALVARADO, JUAN | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AA BUILDING & INSPECTION | 1519 | 9 | 07/21/2026 |
| DOMANI INSPECTION SERVICE | 843 | 8 | 05/26/2026 |
| AK ENGINEERING PC | 678 | 3 | 04/25/2025 |
| ALAN MARGOLIN & ASSOC | 423 | 8 | 04/16/2025 |
| TROLYDIA TESTING & INSPEC | 4422 | 6 | 07/20/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | FIREQUEST CORP | 09/23/2026 |
| DOB NOW | General Construction | Permit Issued | TURNER CONSTRUCTION COMPANY | 09/14/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TURNER CONSTRUCTION COMPANY | 09/14/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 09/14/2026 |
| DOB NOW | Sprinklers | Permit Issued | FIREQUEST CORP | 08/25/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 08/12/2026 |
| DOB NOW | General Construction | Permit Issued | TURNER CONSTRUCTION COMPANY | 07/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TURNER CONSTRUCTION COMPANY | 07/01/2026 |
| DOB NOW | Sprinklers | Permit Issued | FIREQUEST CORP | 06/18/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 06/03/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TURNER CONSTRUCTION COMPANY | 05/19/2026 |
| DOB NOW | General Construction | Permit Issued | TURNER CONSTRUCTION COMPANY | 05/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | M&D FIRE SPRINKLER INC | 11/20/2025 |
| DOB NOW | Sprinklers | Permit Issued | M&D FIRE SPRINKLER INC | 11/20/2025 |
| DOB NOW | Mechanical Systems | Signed-off | MJM CONSTR ASSOCIATES LLC | 11/18/2025 |
| DOB NOW | General Construction | Permit Issued | MJM CONSTR ASSOCIATES LLC | 11/18/2025 |
| DOB NOW | Plumbing | Signed-off | MICHAEL ITSKOVICH | 09/11/2025 |
| DOB NOW | General Construction | Signed-off | MICHILLI INC | 07/22/2025 |
| DOB NOW | Construction Fence | Permit Issued | CLASSIC CONSULTING GROUP | 07/03/2025 |
| DOB NOW | General Construction | Signed-off | MICHILLI INC | 07/01/2025 |
| DOB NOW | Structural | Signed-off | MICHILLI INC | 07/01/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | MICHILLI INC | 07/01/2025 |
| DOB NOW | Sprinklers | Signed-off | ALLSTATE SPRINKLER LLC | 06/24/2025 |
| DOB NOW | General Construction | Signed-off | MJM ASSOCIATES CONSTR LLC | 06/16/2025 |
| DOB NOW | Plumbing | Permit Issued | BEDROCK PLBG. & HTG., INC | 05/30/2025 |
| DOB NOW | Structural | Signed-off | MICHILLI INC | 05/14/2025 |
| DOB NOW | General Construction | Signed-off | MICHILLI INC | 05/13/2025 |
| DOB NOW | Mechanical Systems | Signed-off | MICHILLI INC | 05/12/2025 |
| DOB NOW | Supported Scaffold | Signed-off | ULTRA GENERAL CONTRACTING INC. | 05/02/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PLATINUM SERVICES NY LLC | 03/03/2025 |
| DOB NOW | Construction Fence | Signed-off | MJM ASSOCIATES CONSTR LLC | 02/27/2025 |
| DOB NOW | Construction Fence | Signed-off | MJM ASSOCIATES CONSTR LLC | 02/03/2025 |
| DOB NOW | Mechanical Systems | Signed-off | MJM ASSOCIATES CONSTR LLC | 02/03/2025 |
| DOB NOW | General Construction | Permit Issued | MJM ASSOCIATES CONSTR LLC | 01/07/2025 |
| DOB NOW | Structural | Signed-off | MJM ASSOCIATES CONSTR LLC | 12/23/2024 |
| DOB NOW | General Construction | Signed-off | MJM ASSOCIATES CONSTR LLC | 12/10/2024 |
| DOB NOW | Foundation | Signed-off | MJM ASSOCIATES CONSTR LLC | 12/09/2024 |
| DOB NOW | Supported Scaffold | Signed-off | SKYLINE SCAFFOLDING GROUP | 11/04/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | SKYLINE SCAFFOLDING GROUP | 10/22/2024 |
| DOB NOW | General Construction | Signed-off | MJM ASSOCIATES CONSTR LLC | 10/04/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/26/2026 | Permit Issued | TURNER CONSTRUCTION COMPA | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Lg ARNU183MAA4 19,100 CFM · Vrf Indoor ×11 ARNU123MAA4 12,300 BTU · Vrf Indoor ×7 ARNU363M2A4 36,200 BTU · Vrf Indoor ×5 ARNU243MIA4 24,200 BTU · Vrf Indoor ×2 ZRNU183SKSA 19,100 BTU · Vrf Indoor ×2 ZRUN024GSS0 24,000 BTU · Vrf Outdoor ×2 Ventilation |
| 04/07/2026 | Permit Issued | TURNER CONSTRUCTION COMPA | Air Conditioning Systems | Cooling Lg ZRNU183M3AAA 19,100 BTU · Vrf Indoor ×3 ZRNU483M3AA 48,100 BTU · Vrf Indoor ×2 ZRNU183SKSA 19,100 BTU · Vrf Indoor ×1 ZRNU243M3AAA 24,200 BTU · Vrf Indoor ×1 ZRNU363M2AA 36,200 BTU · Vrf Outdoor ×1 ZRUN024GSS0 2,119 CFM · Vrf Outdoor ×1 |
| 03/12/2026 | Signed-off | MJM CONSTR ASSOCIATES LLC | Heating and Air Conditioning Systems | Heat / Cool Lg ARNU243M2A4 7,100 BTU · Vrf Indoor ×20 ARNU483B8A4 14,100 BTU · Vrf Indoor ×20 ARNU123MAA4 3,600 BTU · Vrf Indoor ×4 ARNU363B8A4 10,600 BTU · Vrf Indoor ×4 FCU-1M-8 24,200 BTU · Fan Coil Indoor ×2 |
| 07/25/2022 | Permit Issued | MJM ASSOCIATES CONSTR LLC | Air Conditioning Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/26/2026 | Permit Issued | FIREQUEST CORP | Sprinkler System |
| 04/07/2026 | Permit Issued | FIREQUEST CORP | Sprinkler System |
| 03/12/2026 | — | — | — |
| 04/25/2025 | Signed-off | ALLSTATE SPRINKLER LLC | 146 heads |
| 04/16/2025 | Permit Issued | M&D FIRE SPRINKLER INC | 776 heads |
| 04/16/2025 | Permit Issued | M&D FIRE SPRINKLER INC | 944 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/26/2026 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 04/07/2026 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 03/12/2026 | Signed-off | MMI PLUMBING & HEATING IN | Water/Sanitary |
| 08/01/2025 | Permit Issued | BEDROCK PLBG. & HTG., INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/23/2026 | Permit Issued | TEAM ELECTRIC, INC | General Wiring |
| 08/24/2026 | Permit Issued | TEAM ELECTRIC, INC | General Wiring |
| 06/01/2026 | Permit Issued | TEAM ELECTRIC, INC | General Wiring |
| 05/19/2026 | Permit Issued | DENALI ELECTRIC CORP | — |
| 05/23/2025 | Complete | JSP ELECTL CNTNG CORP | General Wiring |
| 02/04/2025 | Complete | TF ELECTRICAL CORP | General Wiring |
| 10/21/2024 | Complete | TOP SHELF ELECTRIC CORP | — |
| 02/18/2022 | Permit Issued | STAR ELEC'L CONTRACTORS C | — |
| 01/21/2022 | Permit Issued | STAR ELEC'L CONTRACTORS C | — |
| 01/03/2022 | Permit Issued | STAR ELEC'L CONTRACTORS C | — |
| 11/19/2021 | Permit Issued | JOSEPH SKARULIS | General Wiring |
| 05/26/2019 | Complete | ALLSTATE ELEC'L CONT INC | General Wiring |
| 10/11/2018 | Permit Issued | QUEUE ELEC'L CONTRS, INC | General Wiring |
| 02/21/2018 | Complete | TOP SHELF ELECTRIC CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/15/2025 | Signed-off | MICHILLI INC | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/02/2025 | Permit Issued | CLASSIC CONSULTING GROUP | Fence |
| 05/23/2025 | — | — | Fence |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/24/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/29/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/22/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 05/26/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/15/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/05/2026 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 04/24/2026 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 04/23/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 04/23/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 02/06/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 01/15/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 01/15/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 01/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 12/12/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 12/12/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/21/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/17/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 09/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 09/16/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/20/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/03/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 08/23/2024 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 08/23/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/04/2026 | Fire-Resistant Penetrations and Joints | Younes Abouyaala | special |
| 05/18/2026 | Post-installed Anchors | JOHN MCMONAGLE | special |
| 04/20/2026 | HVAC-R and service water heating equipment | JOHN MCMONAGLE | energy_progress |
| 04/20/2026 | Maintenance information | JOHN MCMONAGLE | energy_progress |
| 04/20/2026 | HVAC-R and service water piping design and insulation | JOHN MCMONAGLE | energy_progress |
| 04/20/2026 | HVAC-R and service water heating system controls | JOHN MCMONAGLE | energy_progress |
| 04/20/2026 | Lighting controls | JOHN MCMONAGLE | energy_progress |
| 04/20/2026 | Interior lighting power | JOHN MCMONAGLE | energy_progress |
| 04/20/2026 | Energy Code Compliance Inspections | JOHN MCMONAGLE | progress |
| 04/20/2026 | Final | JOHN MCMONAGLE | progress |
| 04/20/2026 | Sprinkler Systems | JOHN MCMONAGLE | special |
| 04/20/2026 | Post-installed Anchors | JOHN MCMONAGLE | special |
| 04/20/2026 | Sprayed fire-resistant materials | JOHN MCMONAGLE | special |
| 04/20/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 04/20/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 04/20/2026 | Post-installed Anchors | JOHN MCMONAGLE | special |
| 04/20/2026 | Mechanical Systems | JOHN MCMONAGLE | special |
| 04/20/2026 | Preliminary | JOHN MCMONAGLE | progress |
| 04/20/2026 | Fire-Resistance Rated Construction | JOHN MCMONAGLE | progress |
| 04/20/2026 | Final | JOHN MCMONAGLE | progress |
| 04/20/2026 | Fire-Resistant Penetrations and Joints | JOHN MCMONAGLE | special |
| 03/24/2026 | Maintenance information | JOHN MCMONAGLE | energy_progress |
| 03/24/2026 | HVAC-R and service water piping design and insulation | JOHN MCMONAGLE | energy_progress |
| 03/24/2026 | HVAC-R and service water heating equipment | JOHN MCMONAGLE | energy_progress |
| 03/24/2026 | HVAC-R and service water heating system controls | JOHN MCMONAGLE | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| The North Face | Retail | Cellar, Floors 1–3, Mezzanine | Project M01206803 Project M01206819 Project M01206601 Project M01206716 |