Office with commercial, 7-19 stories
511 5TH AVENUE
MANHATTAN · BIN 1035353
💬 Discuss this project
1917Year Built
17Stories
O6Building Class
C5-3Zoning
125,632 sfGross Floor Area
2Units
LL97 Covered9 Active Violations 3 unresolved · 6 paperwork only 10 old, status unconfirmed ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: 511 Fifth Avenue · 7,735 sf lot · 16.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsAurora Capital AssociatesUnder Construction8 filings
RoofAurora Capital AssociatesUnder Construction9p · 4 filings · 20 docs
Floor 18Aurora Capital AssociatesUnder Construction4p · 2 filings · 11 docs
Floor 17Aurora Capital AssociatesUnder Construction2p · 2 filings · 11 docs
Floor 16Aurora Capital AssociatesUnder Construction2p · 1 filing · 11 docs
Floor 15WeWorkUnder Construction28p · 2 filings · 20 docs
Floor 14
Floor 13Sprinkler workUnder Construction1 filing · 7 docs
Floor 12WeWorkUnder Construction4 filings · 20 docs
Floor 11WeWorkUnder Construction21p · 1 filing · 20 docs
Floor 10WeWorkUnder Construction21p · 1 filing · 20 docs
Floor 9WeWorkUnder Construction23p · 2 filings · 20 docs
Floor 8
Floor 7
Floor 6Alteration IUnder Construction2p · 1 filing · 7 docs
Floor 5Alteration IUnder Construction1p · 1 filing · 7 docs
Floor 4Alteration IUnder Construction2p · 1 filing · 7 docs
Floor 3The North FaceUnder Construction5p · 4 filings · 20 docs
Floor 2Northface, The North FaceUnder Construction12p · 9 filings · 7 docs
Floor 1Northface, The North FaceUnder Construction14p · 9 filings · 20 docs
MezzanineNorthface, The North FaceUnder Construction26p · 10 filings · 20 docs
CellarNorthface, The North FaceUnder Construction23p · 9 filings · 20 docs
Sub-CellarAlteration IUnder Construction2p · 1 filing · 7 docs
Site & exteriorIdb Bank of NY9 filings · 12 docs
Filed — no permit issuedFacade Inspection Safety Program (FISP) inspection2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Idb Bank3807/08/2026
DB Properties1703/21/2026
Aurora Capital Associates1103/21/2026
511 Fifth Partners903/22/2026
Idb Bank of New York803/21/2026
Tandy & Allen Realty703/21/2026
Cany Architecture Engineering110/04/2026
Donald R. Borg Construction Co103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates2603/21/2026
KD Designs403/21/2026
Rigid Structural Design403/21/2026
DVA Advisors1103/21/2026
Codegreen603/21/2026
A1 Expediting Service3803/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Skyline Scaffolding GroupScaffold6407/08/2026
MJM Associates ConstructionGeneral Contractor3007/08/2026
MJM Associates ConstructionScaffold1307/08/2026
M&D Fire SprinklerFire Protection1207/08/2026
MichilliGeneral Contractor907/08/2026
Mmi Plumbing & HeatingPlumbing707/08/2026
Turner Construction CompanyGeneral Contractor609/15/2026
Core Scaffold SystemsScaffold303/21/2026
Platinum Services NYScaffold303/21/2026
A&A PlumbingPlumbing309/15/2026
FirequestFire Protection309/24/2026
Classic Consulting GroupScaffold203/21/2026
MJM Construction AssociatesGeneral Contractor204/09/2026
Queue Electrical ContractorsElectrical103/22/2026
Ultra General ContractingScaffold107/08/2026
Millar Elevator IndustriesElectrical103/21/2026
Allstate SprinklerFire Protection106/28/2026
Bedrock Plumbing & HeatingPlumbing106/28/2026
TF ElectricalElectrical103/22/2026
Allstate Electrical ContElectrical103/21/2026
Accu-Glo Electric of N.y.incElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Milrose Consultants2003410/20/2026
Domani Inspection Service8431410/19/2026
Alan Margolin & Associates423910/09/2026
AA Building & Inspection1519907/21/2026
AK Engineering678304/25/2025
Trolydia Testing & Inspec4422607/20/2023
Building Lifecycle
All (300)Filed (80)Permit Issued (80)Signed Off (25)Facade (FISP) (6)Violation (58)Inspection (7)Objection (14)Special Inspection (30)
10/20/2026
Filed — Alteration
Plumbing as shown on plans filed herewith.
M01457907-S2
10/20/2026
Filed — Alteration
Plumbing as shown on plans filed herewith.
M01457907-S1
10/20/2026
Filed — Alteration
Plumbing as shown on plans filed herewith.
M01457907-S3
10/20/2026
Permit issued — Mechanical Systems
M01457907-S1-MS
10/19/2026
Filed — Alteration
Plumbing as shown on plans filed herewith.
M01457907-I1
10/19/2026
Filed — Alteration
Modifications of existing sprinkler system to include relocation, additions and removals of existing sprinkler heads. No change in use, egress or occupancy.
M01389891-P1
10/19/2026
Filed — Alteration
Modifications of existing sprinkler system to include relocation, additions and removals of existing sprinkler heads. No change in use, egress or occupancy.
M01389891-P2
10/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
10/13/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
10/13/2026
Special inspection requirement — Preliminary
JOHN MCMONAGLE
10/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
10/13/2026
Special inspection requirement — Final
JOHN MCMONAGLE
10/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
10/13/2026
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
10/09/2026
Filed — Alteration
Modification to an existing sprinkler system.
M00438657-P3
10/09/2026
Filed — Alteration
Modification to an existing sprinkler system in conjunction with OT # 140951496.
M00395386-P3
10/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
Benjamin Plotnick
10/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Benjamin Plotnick
10/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
Benjamin Plotnick
09/29/2026
Special inspection requirement — Sprinkler Systems
Young Suh
09/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
09/29/2026
Special inspection requirement — Sprinkler Systems
Young Suh
09/23/2026
Permit issued — Sprinklers
M01425228-S3-EW-SP
09/21/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01461616-I1
09/21/2026
Special inspection requirement — Post-installed Anchors
Benjamin Plotnick
09/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Plotnick
09/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Plotnick
09/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Benjamin Plotnick
09/21/2026
Special inspection requirement — Post-installed Anchors
Benjamin Plotnick
09/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Benjamin Plotnick
09/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Plotnick
09/21/2026
Special inspection requirement — Post-installed Anchors
Benjamin Plotnick
09/15/2026
Special inspection requirement — Final
Benjamin Plotnick
09/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Plotnick
09/14/2026
Permit issued — Mechanical Systems
M01425228-S1-MS
09/14/2026
Permit issued — Plumbing
M01425228-S2-PL
09/14/2026
Permit issued — General Construction
M01425228-I1-GC
09/09/2026
Special inspection requirement — Sprinkler Systems
Benjamin Plotnick
09/09/2026
Special inspection requirement — Final
Benjamin Plotnick
09/09/2026
Special inspection requirement — Mechanical Systems
Benjamin Plotnick
09/08/2026
Signed off — Alteration
Install new fixtures: (1) FD on the 1st; (1) Lavatory, (1) WC, (1) sink on the Mez and (1) sink, (2) lavatories, (2) WCs, (1) DF, (1) HWH and (1) circulation pump on the 2nd Floor and associated CW/sanitary piping as per plans (North Face Retail Flagship.
M01206803-I1
08/31/2026
Signed off — Alteration
Modifications to the existing Sprinkler System: Install (26) new sprinkler heads on 1st Floor, (61) heads on the Mezzanine Level, (59) heads on the 2nd Floor and associated sprinkler piping as per plans (North Face Retail Flagship.)
M01206819-I1
08/31/2026
Filed — Alteration
Interior renovation of existing office space located on the 15th floor. Work to include minor demo, new partitions, doors and ceiling modifications as shown on plans. No change in use, egress or occupancy.
M01425228-S3
08/31/2026
Filed — Alteration
Interior renovation of existing office space located on the 15th floor. Work to include minor demo, new partitions, doors and ceiling modifications as shown on plans. No change in use, egress or occupancy.
M01425228-S2
08/31/2026
Filed — Alteration
Interior renovation of existing office space located on the 15th floor. Work to include minor demo, new partitions, doors and ceiling modifications as shown on plans. No change in use, egress or occupancy.
M01425228-S1
08/31/2026
Filed — Alteration
Interior renovation of existing office space located on the 15th floor. Work to include minor demo, new partitions, doors and ceiling modifications as shown on plans. No change in use, egress or occupancy.
M01425228-I1
08/25/2026
Permit issued — Sprinklers
M01389891-S3-EW-SP
08/12/2026
Permit issued — Plumbing
M01389891-S2-PL
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/21/2026
Filed — Alteration CO
Applicaiton filed for interior non-structural demolition on the 2nd floor and, to obtain a certificate of occupancy for existing 18-story office building.
M01116386-P2
07/01/2026
Permit issued — General Construction
M01389891-I1-GC
07/01/2026
Permit issued — Mechanical Systems
M01389891-S1-MS
07/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
07/01/2026
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
07/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
06/18/2026
Signed off — Alteration
Modifications to the existing HVAC System: Install new ductwork distribution, condensate piping, pumps, exhaust fans and associated wiring on the Cellar, Mezzanine, 1-2nd Floors as per plans (The North Face Retail Flagship.)
M01206773-I1
06/18/2026
Permit issued — Sprinklers
M01368729-S3-EW-SP
06/12/2026
Signed off — Alteration
Minor interior demolition. Interior Fit-out and Installation of new staircase, carpentry and finishes on the Cellar, 1-2nd Floors as per plans (North Face Retail Flagship.) No change to use, egress or occupancy.
M01206601-I1
06/05/2026
Signed off — Alteration
Structural Modifications: Installation of structural steel for vestibule & internal staircase on the Ground Floor, Mezzanine, 2-3rd Floors as per plans (The North Face Flagship Retail.) No change to use, egress or occupancy.
M01206716-I1
06/03/2026
Permit issued — Plumbing
M01368729-S2-PL
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedArchstone Builders10/20/2026
DOB NOWSprinklersPermit IssuedFirequest09/23/2026
DOB NOWGeneral ConstructionPermit IssuedTurner Construction Company09/14/2026
DOB NOWMechanical SystemsPermit IssuedTurner Construction Company09/14/2026
DOB NOWPlumbingPermit IssuedA&A Plumbing09/14/2026
DOB NOWSprinklersPermit IssuedFirequest08/25/2026
DOB NOWPlumbingPermit IssuedA&A Plumbing08/12/2026
DOB NOWGeneral ConstructionPermit IssuedTurner Construction Company07/01/2026
DOB NOWMechanical SystemsPermit IssuedTurner Construction Company07/01/2026
DOB NOWSprinklersPermit IssuedFirequest06/18/2026
DOB NOWPlumbingPermit IssuedA&A Plumbing06/03/2026
DOB NOWMechanical SystemsPermit IssuedTurner Construction Company05/19/2026
DOB NOWGeneral ConstructionPermit IssuedTurner Construction Company05/13/2026
DOB NOWSprinklersPermit IssuedM&D Fire Sprinkler11/20/2025
DOB NOWSprinklersPermit IssuedM&D Fire Sprinkler11/20/2025
DOB NOWMechanical SystemsSigned-offMJM Construction Associates11/18/2025
DOB NOWGeneral ConstructionPermit IssuedMJM Construction Associates11/18/2025
DOB NOWPlumbingSigned-offMichael Itskovich09/11/2025
DOB NOWGeneral ConstructionSigned-offMichilli07/22/2025
DOB NOWConstruction FencePermit IssuedClassic Consulting Group07/03/2025
DOB NOWGeneral ConstructionSigned-offMichilli07/01/2025
DOB NOWStructuralSigned-offMichilli07/01/2025
DOB NOWMechanical SystemsSigned-offMichilli07/01/2025
DOB NOWSprinklersSigned-offAllstate Sprinkler06/24/2025
DOB NOWGeneral ConstructionSigned-offMJM Associates Construction06/16/2025
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating05/30/2025
DOB NOWStructuralSigned-offMichilli05/14/2025
DOB NOWGeneral ConstructionSigned-offMichilli05/13/2025
DOB NOWMechanical SystemsSigned-offMichilli05/12/2025
DOB NOWSupported ScaffoldSigned-offUltra General Contracting05/02/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPlatinum Services NY03/03/2025
DOB NOWConstruction FenceSigned-offMJM Associates Construction02/27/2025
DOB NOWMechanical SystemsSigned-offMJM Associates Construction02/03/2025
DOB NOWConstruction FenceSigned-offMJM Associates Construction02/03/2025
DOB NOWGeneral ConstructionPermit IssuedMJM Associates Construction01/07/2025
DOB NOWStructuralSigned-offMJM Associates Construction12/23/2024
DOB NOWGeneral ConstructionSigned-offMJM Associates Construction12/10/2024
DOB NOWFoundationSigned-offMJM Associates Construction12/09/2024
DOB NOWSupported ScaffoldSigned-offSkyline Scaffolding Group11/04/2024
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group10/22/2024
+ 60 more permits on file
5 projects · most recent 10/19/2026
Heating and Air Conditioning Systems Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/19/2026Permit IssuedTurner Construction CompanyHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ARNU183MAA4 19,100 CFM · Vrf Indoor ×11
ARNU123MAA4 12,300 BTU · Vrf Indoor ×7
ARNU363M2A4 36,200 BTU · Vrf Indoor ×5
ARNU243MIA4 24,200 BTU · Vrf Indoor ×2
ZRNU183SKSA 19,100 BTU · Vrf Indoor ×2
ZRUN024GSS0 24,000 BTU · Vrf Outdoor ×2
Ventilation
Greenheck SQ-130-VG 1,175 CFM · Exhaust Fan ×1
SQ-160-VG 1,465 CFM · Exhaust Fan ×1
08/31/2026Permit IssuedTurner Construction CompanyHeating and Air Conditioning Systems
Heat / Cool
Lg ARNU123TRD4 13,600 BTU · Vrf Indoor ×8
ARNU243L3G4 27,300 BTU · Vrf Indoor ×6
ZRNU183SKSA 21,500 BTU · Vrf Indoor ×1
ZRUN024GSS0 2,119 CFM · Heat Pump Outdoor ×1
04/07/2026Permit IssuedTurner Construction CompanyAir Conditioning Systems
Cooling
Lg ZRNU183M3AAA 19,100 BTU · Vrf Indoor ×3
ZRNU483M3AA 48,100 BTU · Vrf Indoor ×2
ZRNU183SKSA 19,100 BTU · Vrf Indoor ×1
ZRNU243M3AAA 24,200 BTU · Vrf Indoor ×1
ZRNU363M2AA 36,200 BTU · Vrf Outdoor ×1
ZRUN024GSS0 2,119 CFM · Vrf Outdoor ×1
03/12/2026Signed-offMJM Construction AssociatesHeating and Air Conditioning Systems
Heat / Cool
Lg ARNU243M2A4 7,100 BTU · Vrf Indoor ×20
ARNU483B8A4 14,100 BTU · Vrf Indoor ×20
ARNU123MAA4 3,600 BTU · Vrf Indoor ×4
ARNU363B8A4 10,600 BTU · Vrf Indoor ×4
FCU-1M-8 24,200 BTU · Fan Coil Indoor ×2
07/25/2022Permit IssuedMJM Associates ConstructionAir Conditioning Systems
Cooling
Lg ARUM241BTE5 233,100 BTU · Vrf Outdoor ×115
ARUM036GSS5 35,000 BTU · Vrf Outdoor ×3
__Junk__ ARUM036GSS5 35,000 BTU · Vrf Outdoor ×27
8 projects · most recent 10/20/2026
Sprinkler System
FiledStatusContractorScope
10/20/2026——Sprinkler System
10/19/2026Permit IssuedFirequestSprinkler System
10/09/2026Permit IssuedM&D Fire Sprinkler776 heads
10/09/2026Permit IssuedM&D Fire Sprinkler944 heads
08/31/2026Permit IssuedFirequestSprinkler System
04/07/2026Permit IssuedFirequestSprinkler System
03/12/2026———
04/25/2025Signed-offAllstate Sprinkler146 heads
6 projects · most recent 10/20/2026
Water/Sanitary
FiledStatusContractorScope
10/20/2026——Water/Sanitary
10/19/2026Permit IssuedA&A PlumbingWater/Sanitary
08/31/2026Permit IssuedA&A PlumbingWater/Sanitary
04/07/2026Permit IssuedA&A PlumbingWater/Sanitary
03/12/2026Signed-offMmi Plumbing & HeatingWater/Sanitary
08/01/2025Signed-offBedrock Plumbing & HeatingWater/Sanitary
14 projects · most recent 09/23/2026
General Wiring
FiledStatusContractorScope
09/23/2026Permit IssuedTeam ElectricGeneral Wiring
08/24/2026Permit IssuedTeam ElectricGeneral Wiring
06/01/2026Permit IssuedTeam ElectricGeneral Wiring
05/19/2026Permit IssuedDenali Electric—
05/23/2025CompleteJSP Electl CNTNGGeneral Wiring
02/04/2025CompleteTF ElectricalGeneral Wiring
10/21/2024CompleteTop Shelf Electric—
02/18/2022Permit IssuedStar Electrical Contractors—
01/21/2022Permit IssuedStar Electrical Contractors—
01/03/2022Permit IssuedStar Electrical Contractors—
11/19/2021Permit IssuedJoseph SkarulisGeneral Wiring
05/26/2019CompleteAllstate Electrical ContGeneral Wiring
10/11/2018Permit IssuedQueue Electrical ContractorsGeneral Wiring
02/21/2018CompleteTop Shelf Electric—
1 project · most recent 04/15/2025
Steel
FiledStatusContractorScope
04/15/2025Signed-offMichilliSteel
2 projects · most recent 06/02/2025
Fence
FiledStatusContractorScope
06/02/2025Permit IssuedClassic Consulting GroupFence
05/23/2025——Fence
1 project · most recent 09/21/2026
FiledStatusContractorScope
09/21/2026———
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/18/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/09/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/13/2026FinalJOHN MCMONAGLEprogress
10/13/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
10/13/2026Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
10/13/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
10/13/2026PreliminaryJOHN MCMONAGLEprogress
10/13/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
10/13/2026Post-installed AnchorsJOHN MCMONAGLEspecial
10/09/2026HVAC-R and service water heating system controlsBenjamin Plotnickenergy_progress
10/09/2026HVAC-R and service water piping design and insulationBenjamin Plotnickenergy_progress
10/09/2026HVAC-R and service water heating equipmentBenjamin Plotnickenergy_progress
09/29/2026Sprinkler SystemsYoung Suhspecial
09/29/2026Sprinkler SystemsYoung Suhspecial
09/29/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
09/21/2026Fire-Resistant Penetrations and JointsBenjamin Plotnickspecial
09/21/2026Post-installed AnchorsBenjamin Plotnickspecial
09/21/2026Energy Code Compliance InspectionsBenjamin Plotnickprogress
09/21/2026Post-installed AnchorsBenjamin Plotnickspecial
09/21/2026Fire-Resistant Penetrations and JointsBenjamin Plotnickspecial
09/21/2026Post-installed AnchorsBenjamin Plotnickspecial
09/21/2026Fire-Resistant Penetrations and JointsBenjamin Plotnickspecial
09/21/2026Energy Code Compliance InspectionsBenjamin Plotnickprogress
09/15/2026FinalBenjamin Plotnickprogress
09/15/2026Fire-Resistant Penetrations and JointsBenjamin Plotnickspecial
09/09/2026FinalBenjamin Plotnickprogress
09/09/2026Mechanical SystemsBenjamin Plotnickspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
WeWorkOfficeFloors 9–12, 15
Project M01425228 Alteration · Permit Entire · 08/31/2026
Project M01389891 Alteration · Permit Entire · 05/22/2026
Project M01368729 Alteration · Permit Entire · 04/02/2026
The North FaceRetailCellar, Floors 1–3, Mezzanine
Project M01206773 Alteration · LOC Issued · 04/25/2025
Project M01206803 Alteration · LOC Issued · 04/25/2025
Project M01206819 Alteration · LOC Issued · 04/25/2025
Project M01206601 Alteration · LOC Issued · 04/15/2025
Project M01206716 Alteration · LOC Issued · 04/15/2025
NorthfaceRetailCellar, Floors 1, 2, Mezzanine
Project M01162661 Alteration · LOC Issued · 01/16/2025
Idb Bank of NYBank / Financial branchFloors 2–18
Project M00088104 Alteration · LOC Issued · 11/01/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 724 on file (BIS + DOB NOW)
▸Plans & Drawings78
▸DOB NOWPlans/Sketch56
10/20/2026M01457907-I1Request digital key ↗
10/20/2026M01457907-S1Request digital key ↗
10/20/2026M01457907-S2Request digital key ↗
Showing 3 of 56 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold6
09/03/2026M00335509-P1Request digital key ↗
09/03/2026M00335509-P2Request digital key ↗
09/03/2026M00335509-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler6
08/24/2026M00438657-P1Request digital key ↗
08/24/2026M00438657-I1Request digital key ↗
08/24/2026M00395386-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed5
09/01/2026M00335507-P2Request digital key ↗
09/01/2026M00335507-P3Request digital key ↗
09/01/2026M00335507-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026M00395383-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00395348-P1Request digital key ↗
09/04/2026M00395348-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Protection of Mechanical Methods1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits107
▸BISPLAN / WORK APPROVAL APPLICATION63
09/24/2024140951520Open ↗
08/18/2023120555005Open ↗
07/12/2023101549996Open ↗
Showing 3 of 63 on file for this type
▸BISWORK PERMIT APPLICATION40
10/24/2022140951496Open ↗
10/24/2022140951496Open ↗
12/27/2021140951496Open ↗
Showing 3 of 40 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
10/14/2020122614625Open ↗
Showing 1 of 2 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
03/31/2022140951496Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
03/31/2022140951496Open ↗
▸Seals & Professional Certifications234
▸DOB NOWDPL-1: Design Professional Seal & Signature81
10/20/2026M01457907-I1Open ↗
10/20/2026M01457907-S1Open ↗
10/20/2026M01457907-S2Open ↗
Showing 3 of 81 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION44
10/01/2019123771365Open ↗
09/19/2019123710216Open ↗
09/18/2019123710216Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature36
10/20/2026M01457907-I1Open ↗
10/20/2026M01457907-S3Open ↗
10/20/2026M01457907-S2Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature36
10/20/2026M01457907-I1Open ↗
10/20/2026M01457907-S2Open ↗
10/20/2026M01457907-S2Open ↗
Showing 3 of 36 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
10/01/2019123771365Open ↗
08/13/2018123124163Open ↗
04/26/2018123500942Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
12/18/2020140992656Open ↗
10/01/2019123771365Open ↗
08/13/2018123124163Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
12/18/2020140992656Open ↗
09/15/2020140951520Open ↗
09/14/2020140951496Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
09/15/2020140951520Open ↗
09/14/2020140951496Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/18/2020140992656Open ↗
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment29
▸BISEQUIPMENT USE PERMITS10
10/13/2017122766382Open ↗
Showing 1 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
10/14/2020122614625Open ↗
Showing 1 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
10/13/2017122766382Open ↗
Showing 1 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING3
10/27/2020122614625Open ↗
07/19/2020122614625Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/25/2026M01116386-P2Open ↗
Showing 1 of 3 on file for this type
▸BISTenant Protection Plan and Notes1
08/13/2018123124163Open ↗
▸Environmental & Asbestos62
▸DOB NOWDEP ACP-5: Asbestos Assessment Report36
10/20/2026M01457907-I1Open ↗
10/20/2026M01457907-S1Open ↗
10/20/2026M01457907-S2Open ↗
Showing 3 of 36 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
09/16/2019123710216Open ↗
04/26/2018123500942Open ↗
Showing 2 of 13 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
09/03/2026M00557621-I1Open ↗
09/02/2026M00395383-I1Open ↗
09/01/2026M08046432-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: VARIANCE (DEP FORM V5)2
05/13/2022123710216Open ↗
12/27/2021140951496Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/07/2021140951520Open ↗
▸BISAPPLICANT SHALL PROIVDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0259MN211
12/14/2022123710216Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance48
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS22
07/31/2019123710216Open ↗
09/25/2018123500942Open ↗
05/07/2018123500942Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
02/28/2024123710216Open ↗
12/23/2021140951496Open ↗
12/23/2021140951496Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
09/25/2018123500942Open ↗
10/13/2017122766382Open ↗
Showing 2 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
12/18/2020140992656Open ↗
09/15/2020140951520Open ↗
09/14/2020140951496Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/28/2024123710216Open ↗
▸Inspections & Test Reports29
▸BISTECHNICAL REPORT: RESPONSIBILITY22
02/28/2024123710216Open ↗
02/28/2024123710216Open ↗
12/23/2021140951496Open ↗
Showing 3 of 22 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISHYDRO FLOW TEST LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/12/2023122614625Open ↗
▸Approvals, Objections & Sign-offs35
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
02/29/2024123710216Open ↗
04/13/2023122614625Open ↗
08/10/2021123124163Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDEP Variance (V5) letter7
09/02/2026M00395383-I1Open ↗
Showing 1 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSUPERSEDING LETTER3
10/24/2022140951496Open ↗
06/17/2021123710216Open ↗
06/09/2021123710216Open ↗
▸BISTAP LETTER - FIRE SVC : DEP-FIRE1
11/18/2021122614625Open ↗
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/12/2018123124163Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
11/18/2021122614625Open ↗
▸Cost, Insurance & Ownership46
▸BISCOST AFFIDAVIT40
11/30/2022140951496Open ↗
11/16/2022123710216Open ↗
09/26/2022140951496Open ↗
Showing 3 of 40 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
11/17/2025140951496Open ↗
11/17/2025140951520Open ↗
02/28/2024123710216Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
12/27/2021140951496Open ↗
▸Filing & Intake Forms44
▸BISEFILING COVER SHEET22
09/16/2020140951496Open ↗
10/01/2019123771365Open ↗
07/31/2019123710216Open ↗
Showing 3 of 22 on file for this type
▸BISADDITIONAL INFORMATION13
10/03/2024140951520Open ↗
12/14/2022123710216Open ↗
12/14/2022123710216Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM6
06/17/2021123710216Open ↗
06/09/2021123710216Open ↗
09/16/2020140951496Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
12/18/2020140992656Open ↗
09/15/2020140951520Open ↗
09/14/2020140951496Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification3
08/25/2026M01116386-P1Open ↗
08/25/2026M01116386-P2Open ↗
08/25/2026M01116386-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
11/17/2020140951496Open ↗
09/16/2019123710216Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
10/26/2018123330305Open ↗
▸DOB NOWIRA Certification1
10/04/2026M01461616-I1Open ↗
▸DOB NOWPro Cert Restriction Exception (LL158/17)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type