← Back
Office with commercial, 1-6 stories
515 GREENWICH STREET
MANHATTAN · BIN 1010358
💬 Discuss this project
1910Year Built
5Stories
O5Building Class
M1-6Zoning
59,615 sfGross Floor Area
11Units
LL97 Covered7 Open Violations ▸
Office with commercial, 1-6 stories · Owner of record: DARA PARTNERS, L.P. · 13,687 sf lot · 4.36 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralGeneral
Roof2p · 1 filing · 5 docs
Floor 21p · 1 filing · 5 docs
Floor 14p · 4 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GORILLAS TECHNOLOGIES US, INC.1007/08/2026
OSSA PROPERTIES1107/08/2026
DARA PARTNERS5003/22/2026
OWNER OF 515 GREENWICH ST103/22/2026
OWNER 315 SPRING STREE103/22/2026
DARA PROPERTIES203/22/2026
TRIDENT MAILING CORP103/22/2026
360 TEN EYCK203/21/2026
OSSA PROPERTY1403/21/2026
MARK EPSTEIN DBA DARA PARTNERS403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS603/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
PAUL FUSCO CONSULTING603/21/2026
MBE CODE & ZONING LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DK CONSTRUCTION ONE, CORPGeneral Contractor407/08/2026
JSL DESIGN INCGeneral Contractor203/21/2026
MARTIN LOETTERLEElectrical103/21/2026
ROBERT COVELLOElectrical103/21/2026
WIESLAW MAKSIMElectrical103/21/2026
AMP COMMUNICATIONS LLCGeneral Contractor107/08/2026
DENMAR ELECTRIC CORPElectrical103/22/2026
PEBBLE CRAFT INCGeneral Contractor107/08/2026
FORTINI JOHNElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INM ARCHITECT, P.C.3351109/05/2024
KMB DESIGN GROUP, LLC513110/07/2022
TROLYDIA TESTING & INSPEC4422105/19/2022
LAURENCE G. JONES ARCHITE5560208/05/2021
EP ENGINEERING LLC658106/14/2021
Building Lifecycle
All (108)Filed (12)Permit Issued (5)Signed Off (3)Violation (60)Objection (12)Special Inspection (16)
09/06/2024
Permit issued — General Construction
M01097258-I1-GC
09/05/2024
Filed — Alteration
M01097258-I1
08/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nikola Martinovic
08/16/2024
Special inspection requirement — Final
Nikola Martinovic
10/31/2023
Signed off — Alteration
T-Mobile: Installation of new antennas sectors on the roof. Removal of antennas from the facade. Replacement of cabinet and removal of RRUs in the equipment room on 2nd floor. All work is in compliance with TPPN 5/98.No change in use, egress, or occupancy
M00777917-I1
03/22/2023
Permit issued — Antenna
M00777917-I1-AN
10/12/2022
Objection raised — Scope
10/12/2022
Objection resolved — Addressed
10/12/2022
Objection raised — Scope
10/12/2022
Objection resolved — Addressed
10/12/2022
Objection raised — Zoning
10/12/2022
Objection resolved — Addressed
10/12/2022
Objection raised — Admin
10/12/2022
Objection resolved — Addressed
10/12/2022
Objection raised — Fire_Protection
10/12/2022
Objection resolved — Addressed
10/12/2022
Objection raised — Zoning
10/12/2022
Objection resolved — Addressed
10/07/2022
Filed — Alteration
T-Mobile: Installation of new antennas sectors on the roof. Removal of antennas from the facade. Replacement of cabinet and removal of RRUs in the equipment room on 2nd floor. All work is in compliance with TPPN 5/98.No change in use, egress, or occupancy
M00777917-I1
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/20/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/19/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/06/2022
Signed off — Alteration
Install new mechanical rooftop unit
M00737095-I1
05/26/2022
Permit issued — Mechanical Systems
M00737095-I1-MS
05/19/2022
Filed — Alteration
Install new mechanical rooftop unit
M00737095-I1
01/31/2022
Signed off — Alteration
M00534948-I1
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Laurence Jones
08/06/2021
Special inspection requirement — Final
Laurence Jones
08/05/2021
Filed — Alteration
M00534948-P1
08/05/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Laurence Jones
08/05/2021
Special inspection requirement — Final
Laurence Jones
06/16/2021
Permit issued — General Construction
M00534948-I1-GC
06/14/2021
Filed — Alteration
M00534948-I1
06/14/2021
Filed — Alteration
MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS IN GROUND FLOOR COMMERCIAL SPACE TO INCLUDE HVAC WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M00537629-I1
06/14/2021
Permit issued — Mechanical Systems
M00537629-I1-MS
06/10/2021
Special inspection requirement — Mechanical Systems
EVAN PARGANOS
06/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
EVAN PARGANOS
06/10/2021
Special inspection requirement — Post-installed Anchors
EVAN PARGANOS
06/10/2021
Special inspection requirement — Final
EVAN PARGANOS
06/10/2021
Special inspection requirement — HVAC-R and service water heating system controls
EVAN PARGANOS
06/10/2021
Special inspection requirement — HVAC-R and service water heating equipment
EVAN PARGANOS
06/10/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
EVAN PARGANOS
06/10/2021
Special inspection requirement — Duct leakage testing, insulation and design
EVAN PARGANOS
06/10/2021
Special inspection requirement — Maintenance information
EVAN PARGANOS
06/10/2021
Special inspection requirement — Shutoff dampers
EVAN PARGANOS
05/18/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/18/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/18/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/18/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/10/2020
Filed — No Work
M00311342-I1
02/05/2020
Filed — No Work
M00307629-I1
02/03/2020
Filed — No Work
M00307151-I1
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/05/2019
Filed — No Work
M00222677-I1
06/18/2019
Violation issued (ECB, closed)
Construction
05/29/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/29/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/28/2019
Filed — No Work
M00173054-I1
03/18/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPEBBLE CRAFT INC09/06/2024
DOB NOWAntennaSigned-offAMP COMMUNICATIONS LLC03/22/2023
DOB NOWMechanical SystemsSigned-offJSL DESIGN INC05/26/2022
DOB NOWGeneral ConstructionSigned-offDK CONSTRUCTION ONE, CORP06/16/2021
DOB NOWMechanical SystemsSigned-offDK CONSTRUCTION ONE, CORP06/14/2021
BISOTISSUEDWINICK PRODUCTIONS, LLC02/06/2020
BISOTISSUEDWINICK PRODUCTIONS, LLC01/30/2020
BISOTISSUEDWINICK PRODUCTIONS, LLC02/07/2019
BISOTISSUEDWINICK PRODUCTIONS, LLC09/11/2018
BISPLISSUEDDUAL FUEL PLUBING & HTING10/19/2015
BISOTISSUEDLA ROCCA RESTORATION INC05/20/2015
BISFBISSUEDMICHAEL S. KAPLAN04/01/2014
BISOTISSUEDDUAL FUEL COMPANY LLC03/31/2014
BISPLISSUEDTHE BIG IC LLC03/31/2014
BISOTISSUEDRICHFIELD CONSTRUCTION IN01/31/2014
BISPLISSUEDACCESS PLBG & HTG CORP01/22/2013
BISOTISSUEDBECKMAN STUDIO DESIGN BUI01/03/2013
BIS—ISSUEDDARA PROPERTIES10/09/2012
BISOTISSUEDRICHFIELD DESIGN & CONSTR10/05/2012
BISPLISSUEDORBIT PLBG & HTG INC06/22/2012
BISPLISSUEDORBIT PLBG & HTG INC06/06/2012
BISMHISSUEDWHITE LEAF MECHANICAL COR12/16/2011
BISEQISSUEDWHITE LEAF MECHANICAL COR12/16/2011
BISOTISSUEDWHITE LEAF MECHANICAL COR12/14/2011
BISFBISSUEDMETROPOLITAN HT&POWER CO08/17/2011
BISMHISSUEDWHITE LEAF MECHANICAL COR07/15/2011
BISSPISSUEDTMS PLUMBING & HTG CORP07/05/2011
BISMHISSUEDWHITE LEAF MECHANICAL COR06/20/2011
BISMHISSUEDWHITE LEAF MECHANICAL COR06/01/2011
BISOTISSUEDL.E.C.INC04/22/2011
BISOTISSUEDLEONE CONSTRUCTION, INC03/18/2011
BISSPISSUEDLYNE'S PLUMBING AND HEAT CORP11/28/2001
BIS—ISSUED315 SPRING STREET LLC02/26/2001
BISOTISSUEDAPPLIED ELECTRIC CORP.08/17/2000
BISOTISSUEDSTANS RENOVATION03/01/2000
BISEQISSUEDSTANS RENOVATION03/01/2000
BISOTISSUEDSTANS RENOVATION CORP04/02/1999
BISMHISSUEDSTAN RENOVATION CORP03/18/1999
BISOTISSUEDSTANS RENOVATION03/16/1999
BISSPISSUEDAUTOMATIC FIRE SPRINKLER NSTALL09/14/1998
+ 5 more permits on file
1 project · most recent 06/14/2021
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/14/2021Signed-offDK CONSTRUCTION ONE, CORPAir Conditioning Systems
Cooling
Daikin Model: FXTQ54TAVJUAAB 1,800 CFM · Vrf Indoor ×5
Model: RXTQ60TAVJUA 57,000 BTU · Vrf Outdoor ×5
2 projects · most recent 11/28/2023
General Wiring
FiledStatusContractorScope
11/28/2023CompleteDENMAR ELECTRIC CORPGeneral Wiring
06/16/2021CompleteBRANDL ELECTRIC INC.General Wiring
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
08/16/2024Fire-Resistant Penetrations and JointsNikola Martinovicspecial
08/16/2024FinalNikola Martinovicprogress
08/06/2021Fire-Resistant Penetrations and JointsLaurence Jonesspecial
08/06/2021FinalLaurence Jonesprogress
08/05/2021Fire-Resistant Penetrations and JointsLaurence Jonesspecial
08/05/2021FinalLaurence Jonesprogress
06/10/2021Mechanical SystemsEVAN PARGANOSspecial
06/10/2021Fire-Resistant Penetrations and JointsEVAN PARGANOSspecial
06/10/2021Post-installed AnchorsEVAN PARGANOSspecial
06/10/2021FinalEVAN PARGANOSprogress
06/10/2021HVAC-R and service water heating system controlsEVAN PARGANOSenergy_progress
06/10/2021HVAC-R and service water heating equipmentEVAN PARGANOSenergy_progress
06/10/2021HVAC-R and service water piping design and insulationEVAN PARGANOSenergy_progress
06/10/2021Duct leakage testing, insulation and designEVAN PARGANOSenergy_progress
06/10/2021Maintenance informationEVAN PARGANOSenergy_progress
06/10/2021Shutoff dampersEVAN PARGANOSenergy_progress
▾Documents — 309 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch - Temporary Place of Assembly6
09/05/2026M00128693-I1Request digital key ↗
09/05/2026M00173054-I1Request digital key ↗
09/05/2026M00222677-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch6
09/03/2026M00537629-I1Request digital key ↗
09/03/2026M00534948-I1Request digital key ↗
09/03/2026M00534948-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits45
▸BISPLAN / WORK APPROVAL APPLICATION23
02/07/2020123857870Open ↗
01/31/2020123854338Open ↗
02/05/2019123672668Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION21
02/07/2020123857870Open ↗
01/31/2020123854338Open ↗
09/06/2019123672668Open ↗
Showing 3 of 21 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/12/2011120674010Open ↗
▸Seals & Professional Certifications86
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION32
03/20/2020123449223Open ↗
03/20/2020123449223Open ↗
03/20/2020123857870Open ↗
Showing 3 of 32 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
02/07/2020123857870Open ↗
01/31/2020123854338Open ↗
02/05/2019123672668Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
07/31/2013121711843Open ↗
07/31/2013121711843Open ↗
07/31/2013121711843Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/05/2026M00128693-I1Open ↗
09/05/2026M00173054-I1Open ↗
09/05/2026M00307151-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/27/2026M00534948-I1Open ↗
08/27/2026M01097258-I1Open ↗
08/26/2026M00537629-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
01/31/2020123854338Open ↗
02/05/2019123672668Open ↗
09/06/2018123449223Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026M01097258-I1Open ↗
08/27/2026M00534948-I1Open ↗
08/26/2026M00537629-I1Open ↗
Showing 3 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)1
02/07/2020123857870Open ↗
▸Trade Schedules & Equipment22
▸BISEQUIPMENT USE APPLICATION-PERMIT8
09/16/2011120674010Open ↗
08/10/2011120706913Open ↗
08/10/2011120706913Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS6
08/09/2011120706913Open ↗
08/09/2011120706913Open ↗
08/09/2011120706913Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
05/19/2015122396978Open ↗
09/03/2014121917783Open ↗
02/10/2014121917783Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
03/06/2015121917783Open ↗
02/10/2014121917783Open ↗
▸BISSCHEDULE B - PLUMBING2
01/17/2013121395212Open ↗
10/04/2012121395212Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
05/14/2013121395212Open ↗
▸Safety & Tenant Protection3
▸BISST-1 Street Tree Checklist2
07/31/2013121711843Open ↗
08/27/2012121177779Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos34
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)7
10/04/2012121395212Open ↗
10/04/2012121395212Open ↗
08/13/2012121177779Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice to Proceed6
09/03/2026M00534948-I1Open ↗
08/13/2026M01097258-I1Open ↗
08/13/2026M00537629-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/03/2026M00534948-P1Open ↗
09/03/2026M00534948-I1Open ↗
08/26/2026M01097258-I1Open ↗
Showing 3 of 6 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
07/31/2013121711843Open ↗
07/31/2013121711843Open ↗
07/31/2013121711843Open ↗
▸DOB NOWOER: Notice of Satisfaction3
09/03/2026M00534948-I1Open ↗
08/13/2026M00737095-I1Open ↗
08/13/2026M00777917-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
06/03/2011120706913Open ↗
Showing 1 of 2 on file for this type
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
05/19/2015122396978Open ↗
02/10/2014121917783Open ↗
02/10/2014121917783Open ↗
Showing 3 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections4
10/03/2013121395212Open ↗
10/04/2012121395212Open ↗
09/16/2011120674010Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
10/12/2011120674010Open ↗
Showing 1 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
10/12/2011120674010Open ↗
10/03/2013121395212Open ↗
▸Approvals, Objections & Sign-offs29
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
03/20/2020123449223Open ↗
03/20/2020123857870Open ↗
03/12/2020123854338Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
07/31/2013121711843Open ↗
10/04/2012121395212Open ↗
08/07/2012121177779Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
05/19/2015122396978Open ↗
09/16/2013121711843Open ↗
01/16/2013121177779Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER1
11/04/2015121917783Open ↗
▸Cost, Insurance & Ownership25
▸BISCOST AFFIDAVIT25
05/22/2015122396978Open ↗
05/19/2015122396978Open ↗
04/16/2014121711843Open ↗
Showing 3 of 25 on file for this type
▸Filing & Intake Forms30
▸BISEFILING COVER SHEET15
02/07/2020123857870Open ↗
01/31/2020123854338Open ↗
02/05/2019123672668Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION10
02/07/2020123857870Open ↗
02/07/2020123857870Open ↗
02/05/2019123672668Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM5
03/20/2020123449223Open ↗
03/20/2020123857870Open ↗
03/12/2020123854338Open ↗
Showing 3 of 5 on file for this type
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
09/16/2011120674010Open ↗
09/14/2011120674010Open ↗
08/19/2011120706913Open ↗
Showing 3 of 5 on file for this type
▸BISSupporting Document: Fee Exempt1
04/16/2014121711843Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
01/04/2013121395212Open ↗
▸BISENVIRONMENTAL 'E' DEP NOTICE TO PROCEED1
03/20/2014121917783Open ↗