Condo, residential tower (mixed-use, multi-family elevator) [derived]
521 PARK AVENUE
MANHATTAN · BIN 1041910
💬 Discuss this project
1912Year Built
12Stories
RMBuilding Class
R10Zoning
49,749 sfGross Floor Area
29Units
LL97 CoveredRent Stabilized3 Open Violations 2 unresolved · 1 paperwork only ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 521 PARK AVE CONDO · 6,025 sf lot · 8.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 6 filings · 20 docs
Floor 1121p · 1 filing · 3 docs
Floor 1111p · 1 filing · 3 docs
Floor 110
Floor 109
Floor 108
Floor 107
Floor 106
Floor 105
Floor 104
Floor 103
Floor 102
Floor 101
Floor 100
Floor 99
Floor 98
Floor 97
Floor 96
Floor 95
Floor 94
Floor 93
Floor 92
Floor 91
Floor 90
Floor 89
Floor 88
Floor 87
Floor 86
Floor 85
Floor 84
Floor 83
Floor 82
Floor 81
Floor 80
Floor 79
Floor 78
Floor 77
Floor 76
Floor 75
Floor 74
Floor 73
Floor 72
Floor 71
Floor 70
Floor 69
Floor 68
Floor 67
Floor 66
Floor 65
Floor 64
Floor 63
Floor 62
Floor 61
Floor 60
Floor 59
Floor 58
Floor 57
Floor 56
Floor 55
Floor 54
Floor 53
Floor 52
Floor 51
Floor 50
Floor 49
Floor 48
Floor 47
Floor 46
Floor 45
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 1210p · 4 filings · 17 docs
Floor 11Under Construction19p · 5 filings · 20 docs
Floor 10
Floor 9
Floor 8
Floor 73p · 1 filing · 14 docs
Floor 6
Floor 5
Floor 42p · 1 filing · 8 docs
Floor 3
Floor 2Under Construction10p · 2 filings · 15 docs
Floor 1
Cellar1p · 1 filing · 3 docs
Basement12p · 3 filings · 20 docs
Sub-Basement45p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES2908/16/2026
OWNERS REP807/08/2026
METROPOLIS GROUP507/08/2026
STAR-CEL WATERPROOFING304/09/2026
521 PARK AVENUE CONDOMINIUMS4603/22/2026
OCULUC CONS'T INC203/22/2026
GUMLEY & HAFT.RLTY CO.103/22/2026
GUMLEY HAFT203/22/2026
DK103/22/2026
DISH WIRELESS103/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION403/21/2026
Y A CONSULTING EXPEDITING603/21/2026
Rigid Structural Design, LLC203/21/2026
ADG403/21/2026
METROPOLIS GROUP INC1203/21/2026
JAM CONSULTANTS, INC.303/21/2026
CCM CONSULTING GROUP, INC.203/21/2026
MK ARCHITECTURE PC603/21/2026
RIGGING CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIME RENOVATIONS &General Contractor1007/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor807/08/2026
I & H CONSTRUCTION LLCGeneral Contractor607/08/2026
STAR-CEL WATERPROOFINGGeneral Contractor407/08/2026
EMPHASIS CONSTRUCTION LLCGeneral Contractor407/08/2026
RUGOVA GROUP LLCPlumbing207/08/2026
MELE CONTRACTING, INCGeneral Contractor203/21/2026
ACCURATE MECHANICAL INCPlumbing207/08/2026
ORBIT PLBG & HTG INCPlumbing208/16/2026
JOSEPH LA POINTEElectrical203/21/2026
WEST NEW YORK RESTORATION OF CTGeneral Contractor107/08/2026
AURA PLUMBING INCPlumbing107/08/2026
HI-TECH PLUMBING & HEATINGPlumbing106/28/2026
ORION CONSTRUCTION & PAINTINGGeneral Contractor107/08/2026
DAVEN ELECTRIC CORPElectrical103/22/2026
FOS ELEC'L CONTR'S INC.Electrical103/22/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
FERNAN DEVINEGeneral Contractor107/08/2026
IVENKO INCGeneral Contractor108/12/2026
APOLLO ELECTRIC USA, INCElectrical103/22/2026
ROCKHILL CONSTRUCTION COGeneral Contractor107/08/2026
RZ PROJECT MANAGEMENT CORGeneral Contractor107/08/2026
TRISTRUX LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MARCH CHADWICK, ARCHITECT2253105/11/2026
MOTTOLA RINI ENGINEERS, P3251112/02/2025
C3D ARCHITECTURE PLLC1689110/15/2025
PAUL CHRISTAKOS ARCHITECT5894210/05/2025
GRANT ENGINEERING CONSULT3512305/23/2025
VERSAI LLC8133305/13/2025
CROSSCHECK INSPECTION SER544109/17/2024
PCS ENGINEERING3745203/18/2024
AK ENGINEERING PC678312/26/2023
GEORGE J. XERAKIAS, PE1658107/19/2023
Building Lifecycle
All (211)Filed (37)Permit Issued (37)Signed Off (12)Facade (FISP) (15)Violation (41)Inspection (19)Objection (20)Special Inspection (30)
08/14/2026
Permit issued — Plumbing
M01370239-S1-PL
08/11/2026
Permit issued — General Construction
M01370239-I1-GC
05/12/2026
Filed — Alteration
Alteration is being filed for the plumbing work at the subject premises as per plans submitted herewith. No change in use, egress or occupancy.
M01252561-P1
05/11/2026
Filed — Alteration
RENOVATION OF APT 11B FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01370239-S1
05/11/2026
Filed — Alteration
RENOVATION OF APT 11B FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01370239-I1
05/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/25/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARCH CHADWICK
03/19/2026
Special inspection requirement — Lighting in dwelling units
Tomasz Gil
03/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Tomasz Gil
03/11/2026
Special inspection requirement — Final
Tomasz Gil
01/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/04/2025
Permit issued — Plumbing
M01252561-I1-PL
12/02/2025
Filed — Alteration
Alteration is being filed for the mechanical work at the subject premises as per plans submitted herewith. No change in use, egress or occupancy.
M01252549-I1
12/02/2025
Filed — Alteration
Alteration is being filed for the plumbing work at the subject premises as per plans submitted herewith. No change in use, egress or occupancy.
M01252561-I1
12/02/2025
Special inspection requirement — Maintenance information
Anthony Rini, III
12/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
Anthony Rini, III
12/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Rini, III
12/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
Anthony Rini, III
11/25/2025
Permit issued — General Construction
M01252526-I1-GC
10/15/2025
Filed — Alteration
ALTERATION OF APARTMENT INTERIORS, INSTALLATION OF NEW FINISHES AND FIXTURES. NO CHANGE IN USE, BULK, EGRESS OROCCUPANCY.
M01252526-I1
10/06/2025
Signed off — Alteration
RENOVATION OF EXISTING BATHROOMS AND REPLACEMENT OF HARDWOOD FLOORING IN TWO BEDROOMS. NO CHANGE TO ZONING, USE, OR EGRESS.
M00926053-I1
10/06/2025
Special inspection requirement — Final
Paul Christakos
10/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Christakos
10/06/2025
Special inspection requirement — Lighting controls
Paul Christakos
10/06/2025
Special inspection requirement — Lighting in dwelling units
Paul Christakos
10/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Paul Christakos
10/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
Paul Christakos
10/05/2025
Filed — Alteration
RENOVATION OF EXISTING BATHROOMS AND REPLACEMENT OF HARDWOOD FLOORING IN TWO BEDROOMS. NO CHANGE TO ZONING, USE, OR EGRESS.
M00926053-P1
08/08/2025
Cycle 10 facade report signed — SAFE
07/31/2025
Cycle 10 facade inspection completed
07/11/2025
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENTS 11C & 12C. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M07993532-I1
07/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Damir Sehic
07/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
Damir Sehic
07/08/2025
Special inspection requirement — Final
Damir Sehic
07/08/2025
Special inspection requirement — Mechanical Systems
Anthony Rini, III
07/08/2025
Special inspection requirement — Final
Anthony Rini, III
07/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Damir Sehic
07/08/2025
Special inspection requirement — Interior lighting power
Damir Sehic
07/08/2025
Special inspection requirement — Lighting controls
Damir Sehic
07/02/2025
Permit issued — Structural
M01146020-S2-ST
06/26/2025
Filed — Alteration
Roof Replacement with insulation entirely above roof deck
M01231877-I1
06/19/2025
Special inspection requirement — Lighting controls
Paul Christakos
06/19/2025
Special inspection requirement — Lighting in dwelling units
Paul Christakos
06/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
Paul Christakos
06/19/2025
Special inspection requirement — Final
Paul Christakos
06/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Paul Christakos
06/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Christakos
06/18/2025
Signed off — Alteration
Dish: Installation of new telecommunication antenna sectors, GPS antenna & equipment cabinet on the roof. Installation of conduits and service room connection as per plans. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy.
M00989614-I1
06/04/2025
Violation issued (HPD, closed)
A
05/23/2025
Filed — Alteration
Dish: Installation of new telecommunication antenna sectors, GPS antenna & equipment cabinet on the roof. Installation of conduits and service room connection as per plans. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy.
M00989614-P1
05/23/2025
Cycle 10 facade report submitted
05/19/2025
Signed off — Alteration
M01172821-I1
05/13/2025
Filed — Alteration
PLUMBING MODIFICATIONS: REPLACE AND RELOCATE PLUMBING FIXTURES, INSTALL NEW FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01146020-S2
05/12/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00677107-I1
05/08/2025
Filed — Alteration
Sidewalk SHED installation and hoist at roof as per plans filed herewith.
M01222501-I1
Latest 60 of 211 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC08/14/2026
DOB NOWGeneral ConstructionPermit IssuedIVENKO INC08/11/2026
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC12/04/2025
DOB NOWGeneral ConstructionPermit IssuedROCKHILL CONSTRUCTION CO11/25/2025
DOB NOWStructuralPermit IssuedSTAR-CEL WATERPROOFING07/02/2025
DOB NOWSidewalk ShedPermit IssuedSTAR-CEL WATERPROOFING05/08/2025
DOB NOWPlumbingPermit IssuedHI-TECH PLUMBING & HEATIN04/28/2025
DOB NOWSidewalk ShedSigned-offA. PETER LUGER CONST INC01/30/2025
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC01/24/2025
DOB NOWSuspended ScaffoldPermit IssuedSTAR-CEL WATERPR&RESTR CO01/03/2025
DOB NOWGeneral ConstructionSigned-offEMPHASIS CONSTRUCTION LLC12/30/2024
DOB NOWGeneral ConstructionPermit IssuedRZ PROJECT MANAGEMENT COR12/13/2024
DOB NOWGeneral ConstructionSigned-offSTAR-CEL WATERPROOFING11/14/2024
DOB NOWGeneral ConstructionSigned-offEMPHASIS CONSTRUCTION LLC10/29/2024
DOB NOWStructuralPermit IssuedFERNAN DEVINE10/23/2024
DOB NOWAntennaSigned-offTRISTRUX LLC06/25/2024
DOB NOWSuspended ScaffoldPermit IssuedSTAR-CEL WATERPR&RESTR CO04/01/2024
DOB NOWMechanical SystemsSigned-offI H CONSTRUCTION03/29/2024
DOB NOWPlumbingPermit IssuedAURA PLUMBING INC02/14/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC01/30/2024
DOB NOWMechanical SystemsPermit IssuedPRIME RENOVATIONS &01/30/2024
DOB NOWPlumbingSigned-offRUGOVA GROUP LLC01/16/2024
DOB NOWGeneral ConstructionSigned-offI H CONSTRUCTION01/11/2024
DOB NOWSuspended ScaffoldPermit IssuedSTAR-CEL WATERPR&RESTR CO12/27/2023
DOB NOWGeneral ConstructionPermit IssuedPRIME RENOVATIONS &12/20/2023
DOB NOWGeneral ConstructionSigned-offSTAR-CEL WATERPROOFING11/17/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC02/10/2023
DOB NOWPlumbingSigned-offRUGOVA GROUP LLC12/01/2022
DOB NOWMechanical SystemsSigned-offI H CONSTRUCTION11/29/2022
DOB NOWGeneral ConstructionSigned-offI H CONSTRUCTION11/29/2022
DOB NOWStructuralSigned-offPRIME RENOVATIONS &09/20/2022
DOB NOWGeneral ConstructionSigned-offPRIME RENOVATIONS &09/20/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC02/10/2022
DOB NOWMechanical SystemsSigned-offMELE CONTRACTING, INC05/25/2021
DOB NOWPlumbingSigned-offANTHONY DISABATO03/19/2021
DOB NOWMechanical SystemsSigned-offORION CONSTRUCTION & PAIN06/01/2020
DOB NOWPlumbingSigned-offANTHONY DISABATO01/31/2020
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR08/07/2025
BISPLISSUEDGREGG NY PLUMBING, INC04/07/2023
BISMHISSUEDQUADRANT DEVELOPMENT12/22/2021
+ 47 more permits on file
2 projects · most recent 12/02/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/02/2025——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NLHZ 36,000 BTU · Heat Pump Outdoor ×1
MXZ-SM42NLHZ 42,000 BTU · Heat Pump Outdoor ×1
04/16/2024Permit IssuedPRIME RENOVATIONS &Heating and Air Conditioning Systems
Heat / Cool
Lg MULTI V HEAT PUMP / ARUNO48G554 3,885 CFM · Vrf Outdoor ×1
4 projects · most recent 05/12/2026
Water/Sanitary Gas Medical Gas
FiledStatusContractorScope
05/12/2026Permit IssuedORBIT PLBG & HTG INCGas, Water/Sanitary
05/11/2026Permit IssuedORBIT PLBG & HTG INCWater/Sanitary
04/16/2024Permit IssuedAURA PLUMBING INCMedical Gas, Water/Sanitary
09/07/2022Signed-offRUGOVA GROUP LLCWater/Sanitary
13 projects · most recent 08/16/2026
General Wiring
FiledStatusContractorScope
08/16/2026Permit IssuedLENS ELECTRIC, INCGeneral Wiring
06/11/2026CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
11/24/2025Permit IssuedAPOLLO ELECTRIC USA, INC—
11/24/2025Permit IssuedAPOLLO ELECTRIC USA, INCGeneral Wiring
12/01/2024CompleteE & M ELECTRICAL NY CORPGeneral Wiring
11/22/2024CompleteETECH ELECTRICAL LLCGeneral Wiring
08/12/2024CompleteDAVEN ELECTRIC CORPGeneral Wiring
10/02/2023Permit IssuedTRISTRUX LLC16 meters, 1 new_meters
02/09/2022CompleteV. VASS ELECTRIC CORP—
07/09/2021CompleteFOS ELEC'L CONTR'S INC.General Wiring
11/10/2020CompleteBELMONT ELECTRICAL, INCGeneral Wiring
03/26/2019Permit IssuedVERDE ELECTRIC CORP.General Wiring
05/14/2018CompleteL&B ELEC'L INTERNATIONALGeneral Wiring
2 projects · most recent 05/13/2025
Steel
FiledStatusContractorScope
05/13/2025Permit IssuedSTAR-CEL WATERPROOFINGSteel
09/17/2024Permit IssuedFERNAN DEVINESteel
1 project · most recent 05/08/2025
Sidewalk Shed
FiledStatusContractorScope
05/08/2025Permit IssuedSTAR-CEL WATERPROOFINGSidewalk Shed
1 project · most recent 10/15/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
10/15/2025Permit IssuedROCKHILL CONSTRUCTION COTenant Protection Plan 72 Hour
1 project · most recent 03/18/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
03/18/2024Permit IssuedSTAR-CEL WATERPR&RESTR COSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
05/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/25/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/14/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/14/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/08/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 77
DateRequirementInspectorRole
03/19/2026Lighting in dwelling unitsTomasz Gilenergy_progress
03/19/2026Fire-Resistant Penetrations and JointsMARCH CHADWICKspecial
03/11/2026Energy Code Compliance InspectionsTomasz Gilprogress
03/11/2026FinalTomasz Gilprogress
12/02/2025HVAC-R and service water heating system controlsAnthony Rini, IIIenergy_progress
12/02/2025HVAC-R and service water piping design and insulationAnthony Rini, IIIenergy_progress
12/02/2025Maintenance informationAnthony Rini, IIIenergy_progress
12/02/2025HVAC-R and service water heating equipmentAnthony Rini, IIIenergy_progress
10/06/2025Energy Code Compliance InspectionsPaul Christakosprogress
10/06/2025Fire-Resistant Penetrations and JointsPaul Christakosspecial
10/06/2025Fire-Resistance Rated ConstructionPaul Christakosprogress
10/06/2025Lighting in dwelling unitsPaul Christakosenergy_progress
10/06/2025Lighting controlsPaul Christakosenergy_progress
10/06/2025FinalPaul Christakosprogress
07/08/2025Mechanical SystemsAnthony Rini, IIIspecial
07/08/2025Interior lighting powerDamir Sehicenergy_progress
07/08/2025Fire-Resistance Rated ConstructionDamir Sehicprogress
07/08/2025Energy Code Compliance InspectionsDamir Sehicprogress
07/08/2025FinalDamir Sehicprogress
07/08/2025Fire-Resistant Penetrations and JointsDamir Sehicspecial
07/08/2025FinalAnthony Rini, IIIprogress
07/08/2025Lighting controlsDamir Sehicenergy_progress
06/19/2025Fire-Resistance Rated ConstructionPaul Christakosprogress
06/19/2025Fire-Resistant Penetrations and JointsPaul Christakosspecial
06/19/2025Energy Code Compliance InspectionsPaul Christakosprogress
Latest 25 of 77.
▾Documents — 494 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch34
09/03/2026M00496170-I1Request digital key ↗
09/02/2026M00677107-I1Request digital key ↗
09/02/2026M00677107-P1Request digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/03/2026M00198572-I1Request digital key ↗
08/15/2026M00198572-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
08/15/2026M00166189-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00228012-I1Request digital key ↗
▸Applications & Permits89
▸BISPLAN / WORK APPROVAL APPLICATION46
06/23/2025100159962Open ↗
06/03/2025100159962Open ↗
02/21/2024102645737Open ↗
Showing 3 of 46 on file for this type
▸BISWORK PERMIT APPLICATION41
08/08/2025100159962Open ↗
04/07/2023121243546Open ↗
12/23/2021122896394Open ↗
Showing 3 of 41 on file for this type
▸BISIntent to Revoke Approval/Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications124
▸DOB NOWDPL-1: Design Professional Seal & Signature36
09/05/2026M00166189-I1Open ↗
09/03/2026M00198572-I1Open ↗
09/03/2026M00198572-P1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature32
09/19/2026M01146020-I1Open ↗
09/19/2026M01146020-I1Open ↗
09/19/2026M01146020-I1Open ↗
Showing 3 of 32 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
10/21/2020123855346Open ↗
12/11/2019123835886Open ↗
07/24/2018123485576Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/19/2026M01146020-I1Open ↗
09/19/2026M01146020-I1Open ↗
09/02/2026M00969662-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/21/2020123855346Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/21/2020123855346Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment25
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
06/28/2019122896394Open ↗
06/14/2017121243546Open ↗
04/24/2017122896394Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
06/22/2022122896394Open ↗
06/03/2022122896394Open ↗
04/24/2022122896394Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS5
06/22/2022122896394Open ↗
06/22/2022122896394Open ↗
06/03/2022122896394Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
10/13/2015121924980Open ↗
10/05/2015121924980Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING3
10/26/2023121243546Open ↗
Showing 1 of 3 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection13
▸BISTenant Protection Plan and Notes7
10/21/2020123855346Open ↗
12/11/2019123835886Open ↗
08/24/2018123485576Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan4
08/15/2026M00166189-I1Open ↗
08/13/2026M00228012-I1Open ↗
08/13/2026M00198572-P1Open ↗
Showing 3 of 4 on file for this type
▸BISDS1-Demolition Submittal Certification Form2
07/07/2017121243546Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos45
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
09/03/2026M00496170-I1Open ↗
09/01/2026M00765267-I1Open ↗
08/28/2026M00965813-S1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
09/03/2026M00198572-I1Open ↗
09/01/2026M00799148-I1Open ↗
08/17/2026M01370239-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
07/24/2018123485576Open ↗
06/14/2017121243546Open ↗
10/07/2016122896394Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
12/11/2019123835886Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance49
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS19
10/21/2020123855346Open ↗
12/11/2019123835886Open ↗
07/24/2018123485576Open ↗
Showing 3 of 19 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
06/01/2021123835886Open ↗
03/25/2021122896394Open ↗
03/15/2017122386710Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
06/01/2021123835886Open ↗
03/25/2021122896394Open ↗
03/24/2021122896394Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
06/28/2024121243546Open ↗
04/24/2022122896394Open ↗
▸BISFENESTRATION AIR LEAKAGE2
04/24/2022122896394Open ↗
04/24/2022122896394Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL2
04/24/2022122896394Open ↗
04/24/2022122896394Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING2
04/24/2022122896394Open ↗
04/24/2022122896394Open ↗
▸BISFENESTRATION AREAS2
04/24/2022122896394Open ↗
04/24/2022122896394Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00496170-I1Open ↗
08/13/2026M00799148-I1Open ↗
▸BISLIGHTING IN DWELLING UNITS1
06/28/2024121243546Open ↗
▸BISINTERIOR LIGHTING POWER1
06/28/2024121243546Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/28/2024121243546Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY9
06/13/2025100159962Open ↗
02/25/2024102645737Open ↗
06/03/2022122896394Open ↗
Showing 3 of 9 on file for this type
▸BISMECHANICAL SYSTEMS1
06/28/2024121243546Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
08/28/2025100159962Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/12/2016122896394Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
02/26/2024102645737Open ↗
▸Approvals, Objections & Sign-offs29
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
09/02/2025100159962Open ↗
06/28/2024121243546Open ↗
02/26/2024102645737Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSUPERSEDING LETTER3
08/08/2025100159962Open ↗
04/07/2023121243546Open ↗
05/07/2018122896394Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026M00677107-I1Open ↗
08/13/2026M01172821-I1Open ↗
08/13/2026M00677107-P1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/28/2018123485576Open ↗
07/21/2017121243546Open ↗
▸BISFINAL1
06/28/2024121243546Open ↗
▸Cost, Insurance & Ownership29
▸BISCOST AFFIDAVIT27
06/01/2021123835886Open ↗
03/25/2021122896394Open ↗
03/01/2021123855346Open ↗
Showing 3 of 27 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
06/28/2024121243546Open ↗
04/24/2022122896394Open ↗
▸Filing & Intake Forms32
▸BISEFILING COVER SHEET14
10/21/2020123855346Open ↗
12/11/2019123835886Open ↗
07/24/2018123485576Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION11
07/05/2023121243546Open ↗
08/30/2018122896394Open ↗
05/18/2017122896394Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM6
03/07/2023121243546Open ↗
12/23/2021122896394Open ↗
12/23/2021122896394Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents7
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026M00969662-I1Open ↗
08/13/2026M00969662-P1Open ↗
▸DOB NOWCalculations2
08/13/2026M00969662-P1Open ↗
08/13/2026M00969662-I1Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
02/26/2024102645737Open ↗