| Owner | Filings | Most Recent |
|---|---|---|
| 523 FULTON | 23 | 09/25/2026 |
| ALLIED PROPERTY GROUP | 167 | 07/08/2026 |
| TRI BOROUGH SCAFFOLDING | 16 | 07/08/2026 |
| BUILDERS /DEVELOPER LEGAC | 1 | 03/22/2026 |
| LEGACY BUILDERS DEVELOPER | 12 | 03/22/2026 |
| MJM ASSOCIATES CONSTR | 2 | 03/22/2026 |
| CHEA RTY & DVLPT CO/B | 5 | 03/22/2026 |
| CHEA RLTY & DEVELOPMEN | 7 | 03/22/2026 |
| CHE RTY & DULPT CO/3 | 1 | 03/22/2026 |
| CHERA REALTY & DEV CO/ | 4 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| HNY CONSULTING ENGINEERS LLC | 3 | 08/25/2026 |
| ERICKSEN ROED AND ASSOCIATES, INC. | 1 | 08/19/2026 |
| INTERIOR ARCHITECTS | 1 | 08/13/2026 |
| AM ARCHITECT P.C. | 7 | 06/30/2026 |
| ZYSCOVICH ARCHITECTS | 11 | 06/18/2026 |
| ACTIVE DESIGN GROUP ENGINEERING | 7 | 05/27/2026 |
| ETTINGER ENGINEERING ASSOCIATES | 7 | 12/08/2025 |
| MADSEN CONSULTING ENGINEERING, PLLC | 1 | 11/18/2025 |
| MARIN ARCHITECTS, P.C. | 4 | 11/10/2025 |
| LEON SKVIRSKY PE | 1 | 09/23/2025 |
| LEVIN ENGINEERING PLLC | 18 | 01/10/2025 |
| SDG ENGINEERING PC | 4 | 02/29/2024 |
| FL&M ENGINEERING DESIGN &INSPECTION | 1 | 08/31/2023 |
| KZ ENGINEERING, P.C | 8 | 05/05/2023 |
| HIGH LINE ENGINEERING PC | 1 | 11/17/2022 |
| JZN ENGINEERING, PC. | 3 | 03/30/2022 |
| RICHARD H BALSER, P.E. | 2 | 03/02/2022 |
| ABS ENGINEERING, PLLC | 14 | 05/06/2021 |
| PATUXENT ENGINEERING LLC | 1 | 02/08/2021 |
| VINCENT J. LIOTTA P.E. | 1 | 11/09/2020 |
| B2 ENGINEERING PC | 1 | 09/14/2020 |
| HC ARCHITECT, PC | 4 | 08/11/2020 |
| ASIF JAMIL, RA | 1 | 07/17/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| SYNERGY BUILDING CONSULTANTS | 8 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 66 | 03/21/2026 |
| PATUXENT ENGINEERING | 2 | 03/21/2026 |
| LEVIN ENGINEERING PLLC | 12 | 03/21/2026 |
| JP EXPEDITE | 8 | 03/21/2026 |
| MARIN ARCHITECTS, P.C. | 5 | 03/21/2026 |
| CANAS SOLUTIONS | 12 | 03/21/2026 |
| THE GREEN STUDIO | 1 | 03/21/2026 |
| VINCENT J. LIOTTA P.E. | 1 | 03/21/2026 |
| BUILDING BROTHERS | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| MJM ASSOCIATES CONSTR LLC | General Contractor | 34 | 07/08/2026 |
| ALL CITY REMODELING, INC | General Contractor | 28 | 07/10/2026 |
| E & S AND SONS CORP | General Contractor | 16 | 07/08/2026 |
| TRI BOROUGH SCAFFOLDING | General Contractor | 14 | 07/08/2026 |
| MC SUPERSTRUCTURE INC | General Contractor | 7 | 04/09/2026 |
| F.S. SITE CORP | Fire Protection | 6 | 07/08/2026 |
| REPUBLIC EXTERIOR SERVICE | General Contractor | 6 | 07/08/2026 |
| G.N.T. MECHANICAL LLC | Fire Protection | 5 | 07/08/2026 |
| F.S. SITE CORP | Plumbing | 4 | 07/08/2026 |
| SIGNSTAR NYC | Scaffold | 4 | 07/08/2026 |
| G.N.T. MECHANICAL, LLC | Fire Protection | 4 | 07/08/2026 |
| SIGNS CAD | Scaffold | 4 | 07/08/2026 |
| G.N.T. MECHANICAL LLC | Plumbing | 3 | 07/08/2026 |
| LEGACY BUILDERS/DEVELOPERS CORP | General Contractor | 3 | 07/08/2026 |
| GO PRO FIRE PROTECTION C | Fire Protection | 3 | 07/08/2026 |
| GEMSTAR CONSTRUCTION CORP. | General Contractor | 3 | 09/25/2026 |
| REPUBLIC SCAFFOLD&HOIST C | General Contractor | 3 | 03/21/2026 |
| EFFICIENT CLIMATE SOLUTIO | General Contractor | 3 | 03/21/2026 |
| IGNITE PLUMBING HEATING | General Contractor | 2 | 03/22/2026 |
| ABR PLBG & HTG CONTR. INC | Fire Protection | 2 | 07/28/2026 |
| A&P REMODELING CO INC | Fire Protection | 2 | 07/08/2026 |
| DGC CAPITAL CONTRACTING CORP | General Contractor | 2 | 07/08/2026 |
| GINOS GC CORP | General Contractor | 2 | 03/21/2026 |
| G.N.T. MECHANICAL, LLC | Plumbing | 2 | 07/08/2026 |
| GO PRO PLUMBING AND HEATING | Plumbing | 2 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| METRIC CONSULTING AND INS | 1803 | 10 | 06/18/2026 |
| RICHARD H. BALSER ENGINEE | 3028 | 17 | 03/05/2026 |
| WHITESTONE ASSOCIATES ENG | 8144 | 4 | 11/18/2025 |
| REGIONAL TESTING CORP. | 394 | 15 | 09/13/2024 |
| LILKER ASSOCIATES CONSULT | 816 | 1 | 02/13/2024 |
| LEVIN ENGINEERING PLLC | 1267 | 3 | 11/17/2022 |
| HIGH LINE ENGINEERING PC | 2920 | 2 | 11/17/2022 |
| VINCENT J. LIOTTA P. E. | 1974 | 1 | 11/09/2020 |
| B2 ENGINEERING D.P.C. | 5433 | 1 | 09/14/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | GEMSTAR CONSTRUCTION CORP. | 09/24/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | GEMSTAR CONSTRUCTION CORP. | 09/24/2026 |
| DOB NOW | Structural | Permit Issued | GEMSTAR CONSTRUCTION CORP. | 09/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | ABR PLBG & HTG CONTR. INC | 07/27/2026 |
| DOB NOW | General Construction | Permit Issued | ALL CITY REMODELING, INC | 07/08/2026 |
| DOB NOW | Construction Fence | Permit Issued | ALL CITY REMODELING, INC | 07/07/2026 |
| DOB NOW | Standpipe | Permit Issued | ABR PLBG & HTG CONTR. INC | 06/26/2026 |
| DOB NOW | Structural | Permit Issued | DGC CAPITAL CONTRACTING CORP | 06/18/2026 |
| DOB NOW | Plumbing | Permit Issued | ABR PLBG&HTG CONTR INC | 06/12/2026 |
| DOB NOW | Structural | Permit Issued | ALL CITY REMODELING, INC | 06/09/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | ALL CITY REMODELING, INC | 06/09/2026 |
| DOB NOW | Construction Fence | Permit Issued | ALL CITY REMODELING, INC | 05/28/2026 |
| DOB NOW | General Construction | Permit Issued | ALL CITY REMODELING, INC | 05/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | PALCO MECHANICAL LLC | 11/10/2025 |
| DOB NOW | Sign | Signed-off | PAUL SIGNS, INC | 09/24/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | REPUBLIC EXTERIOR SERVICE | 08/15/2025 |
| DOB NOW | Sprinklers | Permit Issued | BLUEWATER P&H, INC | 05/05/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | DENAIR HVAC INC | 04/14/2025 |
| DOB NOW | General Construction | Permit Issued | DGC CAPITAL CONTRACTING CORP | 04/04/2025 |
| DOB NOW | Plumbing | Signed-off | IGNITE PLUMBING & HEATING | 03/28/2025 |
| DOB NOW | General Construction | Permit Issued | MJM ASSOCIATES CONSTR LLC | 02/27/2025 |
| DOB NOW | Sprinklers | Permit Issued | ROM PIPING & HEATING INC | 02/26/2025 |
| DOB NOW | Plumbing | Signed-off | ROM PIPING & HTG INC | 02/10/2025 |
| DOB NOW | General Construction | Permit Issued | MJM ASSOCIATES CONSTR LLC | 02/03/2025 |
| DOB NOW | Sprinklers | Signed-off | GO PRO FIRE PROTECTION C | 11/22/2024 |
| DOB NOW | Plumbing | Permit Issued | ALAN J BRUTOSKY PLBR CONT | 10/25/2024 |
| DOB NOW | Mechanical Systems | Signed-off | MJM ASSOCIATES CONSTR LLC | 09/10/2024 |
| DOB NOW | Sprinklers | Signed-off | ALAN J. BRUTOSKY PLBG CON | 07/24/2024 |
| DOB NOW | Supported Scaffold | Permit Issued | REPUBLIC EXTERIOR SERVICE | 07/18/2024 |
| DOB NOW | Structural | Signed-off | MJM ASSOCIATES CONSTR LLC | 05/15/2024 |
| DOB NOW | Construction Fence | Signed-off | MJM ASSOCIATES CONSTR LLC | 04/10/2024 |
| DOB NOW | Foundation | Permit Issued | MJM ASSOCIATES CONSTR LLC | 04/10/2024 |
| DOB NOW | Structural | Signed-off | MJM ASSOCIATES CONSTR LLC | 04/10/2024 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | MJM ASSOCIATES CONSTR LLC | 04/09/2024 |
| DOB NOW | Structural | Signed-off | MJM ASSOCIATES CONSTR LLC | 04/09/2024 |
| DOB NOW | Mechanical Systems | Signed-off | MJM ASSOCIATES CONSTR LLC | 04/09/2024 |
| DOB NOW | Sprinklers | Signed-off | G.N.T. MECHANICAL LLC | 03/29/2024 |
| DOB NOW | Foundation | Permit Issued | MJM ASSOCIATES CONSTR LLC | 03/27/2024 |
| DOB NOW | Plumbing | Signed-off | ALAN J BRUTOSKY PLBR CONT | 03/18/2024 |
| DOB NOW | Plumbing | Signed-off | ALAN J BRUTOSKY PLBR CONT | 03/18/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/25/2026 | Permit Issued | GEMSTAR CONSTRUCTION CORP | Heating and Air Conditioning Systems | Heat / Cool Lg ARNU483M3A4 1,600 CFM · Vrf Indoor ×4 ARUM241BET5 233 BTU · Vrf Outdoor ×1 FAN COIL UNIT 1,600 CFM · Fan Coil Indoor ×1 |
| 07/18/2025 | Permit Issued | DENAIR HVAC INC | Heating and Air Conditioning Systems, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/03/2024 | Permit Issued | BLUEWATER P&H, INC | — |
| 11/17/2022 | Permit Issued | ROM PIPING & HEATING INC | 27 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/08/2025 | Signed-off | IGNITE PLUMBING & HEATING | Gas, Water/Sanitary |
| 05/20/2025 | Permit Issued | F.S. SITE CORP | Water/Sanitary |
| 01/10/2025 | Signed-off | ROM PIPING & HTG INC | Water/Sanitary |
| 06/21/2024 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/29/2026 | Permit Issued | WCK ELECTRIC CORP. | General Wiring |
| 09/25/2025 | Permit Issued | LIMITLESS ELECT RESOURCES | — |
| 04/08/2025 | Permit Issued | NOVA ELECTRIC LLC | General Wiring |
| 03/25/2025 | Complete | PROSPECT ELECT. SERV INC | General Wiring |
| 01/03/2025 | Permit Issued | AMPACITY ELECTRICAL INC | 7 meters, 2 new_meters |
| 09/16/2024 | Complete | AMPACITY ELECTRICAL INC | General Wiring |
| 05/24/2024 | Permit Issued | STAR ELEC'L CONTRACTORS C | — |
| 05/24/2024 | Permit Issued | STAR ELEC'L CONTRACTORS C | — |
| 11/15/2023 | Permit Issued | POWER DIRECT ELECTRIC INC | — |
| 08/21/2023 | Complete | NASH ELECTRIC SERVICES IN | — |
| 12/15/2022 | Permit Issued | BRANDL ELECTRIC INC. | General Wiring |
| 10/04/2022 | Cancelled | COGEN ELEC'L SERVICES,INC | General Wiring |
| 04/26/2022 | Permit Issued | RAINBOW ELECTRIC CO., INC | — |
| 05/03/2021 | Permit Issued | STAR ELEC'L CONTRACTORS C | — |
| 02/23/2021 | Permit Issued | K.N.C ELECTRIC INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | GEMSTAR CONSTRUCTION CORP | Steel, Concrete, Masonry |
| 06/18/2026 | Permit Issued | ABR PLBG & HTG CONTR. INC | Steel |
| 11/18/2025 | Permit Issued | DGC CAPITAL CONTRACTING C | Steel, Wood |
| 02/29/2024 | Permit Issued | MJM ASSOCIATES CONSTR LLC | Steel, Concrete, Masonry |
| 11/30/2023 | Permit Issued | MJM ASSOCIATES CONSTR LLC | 1 scope_items |
| 11/30/2023 | — | — | 1 scope_items |
| 04/13/2022 | — | — | 1 scope_items |
| 03/30/2022 | Permit Issued | MJM ASSOCIATES CONSTR LLC | 2 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/30/2026 | Permit Issued | ALL CITY REMODELING, INC | Fence |
| 05/27/2026 | Permit Issued | ALL CITY REMODELING, INC | Fence |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/11/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/11/2026 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 04/16/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/30/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/10/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/09/2025 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 12/04/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/17/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/31/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 10/01/2025 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 08/01/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/21/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/24/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/27/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/21/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/31/2024 | Pass-Final PL - Underground | Pass | View ↗ |
| 10/28/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/30/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/27/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/25/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/13/2024 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 09/09/2024 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 09/04/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/03/2024 | Certified Sprinkler (SP) - Booster Pump Test | Certified | View ↗ |
| 09/03/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/29/2026 | Post-installed Anchors | — | special |
| 06/29/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 06/29/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 06/29/2026 | Maintenance information | — | energy_progress |
| 06/29/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/26/2026 | Final | — | progress |
| 06/26/2026 | Structural Cold-Formed Steel | — | special |
| 06/26/2026 | Structural Steel - Details | — | special |
| 06/26/2026 | Final | — | progress |
| 06/26/2026 | Footing and Foundation | — | progress |
| 06/26/2026 | Mechanical Systems | — | special |
| 06/26/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 06/26/2026 | Masonry | — | special |
| 06/25/2026 | Final | Stephen Furnstahl | progress |
| 06/25/2026 | Fire-Resistance Rated Construction | — | progress |
| 06/25/2026 | Energy Code Compliance Inspections | — | progress |
| 06/25/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 06/25/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/11/2026 | Air barrier - visual inspection | Altagracia Martinez | energy_progress |
| 06/11/2026 | Final | Altagracia Martinez | progress |
| 06/11/2026 | Energy Code Compliance Inspections | Altagracia Martinez | progress |
| 06/11/2026 | Insulation placement and R values | Altagracia Martinez | energy_progress |
| 06/11/2026 | Fenestration and door U-factor and product ratings | Altagracia Martinez | energy_progress |
| 06/11/2026 | Fenestration air leakage | Altagracia Martinez | energy_progress |
| 06/11/2026 | Fenestration areas | Altagracia Martinez | energy_progress |