| Owner | Filings | Most Recent |
|---|---|---|
| NOUVEAU PROPERTY MANAGEMENT | 25 | 09/16/2026 |
| CHARLES H GREENTHAL MANAGEMENT COR | 96 | 07/08/2026 |
| 535 EAST 86TH ST CORP CO-OP | 87 | 03/22/2026 |
| DNA CONTRACTING LLC | 1 | 03/22/2026 |
| 535 E 86 ST CORP.INSIGNIA | 1 | 03/22/2026 |
| 535 EAST 86 ST | 3 | 03/22/2026 |
| INSIGNIA RESIDENTIAL GROUP | 7 | 03/22/2026 |
| 535 E 86 ST CORP ISIGNIA | 1 | 03/22/2026 |
| KRESIEL MGMT CO | 1 | 03/22/2026 |
| KRISEL CO. | 4 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| RESTRUCTURE ENGINEERING, PLLC | 2 | 07/16/2026 |
| ALWAYS FAST SERVICES CORP | 1 | 06/24/2026 |
| LAWLESS AND MANGIONE | 3 | 06/11/2026 |
| JACK GREEN ASSOCIATES | 1 | 05/08/2026 |
| DXA STUDIO | 1 | 03/13/2026 |
| ASR ENGINEERING PC | 2 | 02/23/2026 |
| STUDIO HUJI | 1 | 06/26/2025 |
| RISE PROJECTS | 5 | 06/10/2025 |
| YORKOS ENGINEERING DESIGN CONSULT | 4 | 12/20/2024 |
| PAUL PERDEK, PROF. ENG. PLLC | 7 | 08/20/2024 |
| AMR ENGINEERING CONSULTANT, P.C. | 2 | 08/07/2024 |
| BOSCHEN DESIGN ARCHITECTURE | 4 | 05/09/2024 |
| KIYOMI K. TROEMNER | 1 | 04/11/2024 |
| REUBEN S JACKSON | 4 | 01/12/2024 |
| KRIS KOZLOWSKI ARCHITECT | 2 | 09/12/2023 |
| STUDIO Y&A ARCHITECTURE DESIGN DPC | 1 | 06/30/2023 |
| A2 ARCHITECT, PC | 2 | 10/20/2022 |
| JACK L. GORDON ARCHITECTS, PC | 2 | 08/30/2022 |
| RICHARD L. KADIN, ARCHITECT | 3 | 08/03/2022 |
| GOLDMAN COPELAND ASSOCIATES | 1 | 07/22/2022 |
| ENGINEERING PROFESSIONAL SERVICE P. | 4 | 07/06/2022 |
| COLOMBO ARCHITECTURAL STUDIO PC | 2 | 03/16/2022 |
| HAMANN ENGINEERING, PLLC | 2 | 04/14/2021 |
| ROGER BROOME, ARCHITECT P.C. | 1 | 01/19/2021 |
| RAWLINS DESIGN INC. | 1 | 10/22/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| J A EXPEDITING | 6 | 03/21/2026 |
| IDEAL | 4 | 03/21/2026 |
| AE DESIGN SOLUTION | 20 | 03/21/2026 |
| STECC | 10 | 03/21/2026 |
| JENNY FLORES EXPEDITING | 5 | 03/21/2026 |
| BOSCHEN DESIGN, ARCHITECTURE | 7 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 3 | 03/21/2026 |
| PROFESSIONAL SOLUTIONS | 1 | 03/21/2026 |
| BMB BUILDING CONSULTING | 8 | 03/21/2026 |
| CONVERSANO ASSOCIATES, INC. | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| EMPIRE NY INSTALLATIONS INC | General Contractor | 8 | 07/08/2026 |
| SWE DEVELOPMENT CORP | General Contractor | 4 | 07/08/2026 |
| HAMILTON AIR COMPANY, INC. | General Contractor | 4 | 07/31/2026 |
| TMS PLBG & HEATING CORP | Plumbing | 3 | 07/08/2026 |
| D&E REFRIGERATION & AIR C | General Contractor | 3 | 03/21/2026 |
| DEMARI SERVICES INC | General Contractor | 3 | 07/08/2026 |
| LYNX BUILDERS, INC | General Contractor | 3 | 03/21/2026 |
| LEVY INTERIOR CORP | General Contractor | 3 | 03/21/2026 |
| NEW HOME CITY INC | General Contractor | 3 | 07/08/2026 |
| ZATOS PLBG AND HTG INC | Plumbing | 2 | 07/08/2026 |
| PRODIGY CONSTRUCTION INC | General Contractor | 2 | 03/21/2026 |
| TMS PLMBG & HTG CORP | Plumbing | 2 | 07/08/2026 |
| RELIABLE DESIGN INC | General Contractor | 2 | 03/21/2026 |
| HUDSON PLMBING & MCH, LLC | Plumbing | 2 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 2 | 09/16/2026 |
| AMER. ELEVATOR & MACH. CO | Electrical | 2 | 03/22/2026 |
| POFI CONSTRUCTION CORP | General Contractor | 2 | 08/12/2026 |
| LEGACY PLUMBING & HTG LLC | Plumbing | 2 | 07/08/2026 |
| NORMAN TCHERNOFF | Electrical | 1 | 03/21/2026 |
| NEIL CABERA | Electrical | 1 | 03/21/2026 |
| EMELEC ELECTRIC CORP | Electrical | 1 | 03/22/2026 |
| MEGA ELEC'L CONTR'G, INC | Electrical | 1 | 03/22/2026 |
| FIVE STARS AWNINGS & SIGN | General Contractor | 1 | 07/08/2026 |
| EVEREST SCAFFOLDING INC | General Contractor | 1 | 07/08/2026 |
| LIBERTY FABRICATION INC | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| COLE TECHNOLOGIES/CONTROL | 1290 | 2 | 07/16/2026 |
| SPECIAL TESTING & CONSULT | 1688 | 3 | 06/11/2026 |
| JACK GREEN ASSOCIATES | 422 | 1 | 05/08/2026 |
| ASR ENGINEERING PC | 8404 | 2 | 02/23/2026 |
| MOHAMMAD AHEAD - PROFESSI | 9286 | 1 | 06/26/2025 |
| YORKOS ENGINEERING, DESIG | 6991 | 6 | 12/20/2024 |
| OUTSOURCE SPECIAL INSPECT | 2827 | 3 | 09/04/2024 |
| BUILDING CONSULTING ENGIN | 1034 | 1 | 08/07/2024 |
| BOSCHEN DESIGN, ARCHITECT | 2477 | 4 | 05/09/2024 |
| HRF SERVICES CORP | 5616 | 3 | 04/12/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 09/15/2026 |
| DOB NOW | General Construction | Permit Issued | POFI CONSTRUCTION CORP | 08/11/2026 |
| DOB NOW | General Construction | Permit Issued | HAMILTON AIR COMPANY, INC. | 07/30/2026 |
| DOB NOW | Structural | Permit Issued | POFI CONSTRUCTION CORP | 07/16/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | POFI CONSTRUCTION CORP | 07/15/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | ANDAMIO SCAFFOLDING LLC | 06/24/2026 |
| DOB NOW | Plumbing | Signed-off | TMS PLBG & HEATING CORP | 06/01/2026 |
| DOB NOW | General Construction | Permit Issued | NEW HOME CITY INC | 05/15/2026 |
| DOB NOW | General Construction | Permit Issued | NEW HOME CITY INC | 05/15/2026 |
| DOB NOW | General Construction | Permit Issued | NEW HOME CITY INC | 05/15/2026 |
| DOB NOW | General Construction | Permit Issued | HELLO CHAPTER LLC | 04/15/2026 |
| DOB NOW | Plumbing | Permit Issued | TMS PLBG & HEATING CORP | 04/07/2026 |
| DOB NOW | Structural | Permit Issued | TOWER SERVICES INC | 01/30/2026 |
| DOB NOW | General Construction | Signed-off | FIVE STARS AWNINGS & SIGN | 07/10/2025 |
| DOB NOW | Mechanical Systems | Signed-off | HAMILTON AIR COMPANY, INC. | 02/13/2025 |
| DOB NOW | Plumbing | Signed-off | SUPER PLUMBERS CORP | 10/03/2024 |
| DOB NOW | General Construction | Signed-off | DEMARI SERVICES INC | 10/01/2024 |
| DOB NOW | Mechanical Systems | Signed-off | HAMILTON AIR COMPANY, INC. | 09/25/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | DEMARI SERVICES INC | 08/22/2024 |
| DOB NOW | Supported Scaffold | Signed-off | EMPIRE NY INSTALLATIONS I | 08/20/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | DEMARI SERVICES INC | 08/14/2024 |
| DOB NOW | Plumbing | Signed-off | T & T PLUMBING INC | 07/31/2024 |
| DOB NOW | General Construction | Signed-off | LEVY INTERIOR CORP | 07/29/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | EMPIRE NY INSTALLATIONS I | 07/15/2024 |
| DOB NOW | Mechanical Systems | Signed-off | D&E REFRIGERATION & AIR C | 07/12/2024 |
| DOB NOW | General Construction | Signed-off | SHERLOCK HOMES INTERIOR | 05/02/2024 |
| DOB NOW | Plumbing | Signed-off | BYPASS MECHANICAL CORP | 05/01/2024 |
| DOB NOW | Plumbing | Signed-off | TMS PLBG & HEATING CORP | 02/22/2024 |
| DOB NOW | Plumbing | Permit Issued | A.M.N. CORPORATION | 01/30/2024 |
| DOB NOW | General Construction | Signed-off | SWE DEVELOPMENT CORP | 01/25/2024 |
| DOB NOW | Plumbing | Signed-off | WATSON'S PLBG, HTG, & BDG | 12/20/2023 |
| DOB NOW | General Construction | Signed-off | 360 PRESTIGE CONTRACTING | 12/20/2023 |
| DOB NOW | General Construction | Permit Issued | CUSTOM INTERIORS RENOVATI | 09/18/2023 |
| DOB NOW | Plumbing | Signed-off | HUDSON PLMBING & MCH, LLC | 08/01/2023 |
| DOB NOW | General Construction | Signed-off | RELIABLE DESIGN INC | 07/25/2023 |
| DOB NOW | General Construction | Signed-off | DEMARI SERVICES INC | 04/28/2023 |
| DOB NOW | Supported Scaffold | Signed-off | EMPIRE NY INSTALLATIONS I | 03/14/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | EMPIRE NY INSTALLATIONS I | 03/13/2023 |
| DOB NOW | Plumbing | Signed-off | ORBIT PLBG & HTG INC | 11/11/2022 |
| DOB NOW | General Construction | Signed-off | SIENIA CONSTRUCTION INC | 11/07/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/08/2026 | Permit Issued | HAMILTON AIR COMPANY, INC | Air Conditioning Systems | Cooling |
| 04/24/2020 | Permit Issued | SUPERIOR HVAC INC | Air Conditioning Systems, Heating Systems | Cooling Applied Comfort NYCWC09K00E7 350 CFM · Wshp ×3 NYCWC12K00E7 370 CFM · Wshp ×2 NYCWC17K00E7 410 CFM · Wshp ×1 Heating Trane ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/12/2023 | Permit Issued | A.M.N. CORPORATION | Water/Sanitary |
| 03/16/2022 | Signed-off | HAUSMAN PLUMBING INC | Water/Sanitary |
| 01/19/2021 | Signed-off | POWER PLUMBING & HEATING | Gas, Water/Sanitary |
| 04/24/2020 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/20/2026 | Permit Issued | MEGA ELEC'L CONTR'G, INC | — |
| 08/18/2026 | Permit Issued | Y.S ELECTRIC | General Wiring, Lighting |
| 05/06/2026 | Complete | ASCUATECH ELECTRICAL CORP | — |
| 04/29/2026 | Permit Issued | BOROWIDE ELECT'L CONTR'S | — |
| 04/08/2026 | Permit Issued | NGM ELECTRIC INC | General Wiring |
| 02/23/2026 | Complete | LINA ELECTRIC, CORP | — |
| 02/13/2025 | Complete | ENNELL GRP ELECTRIC CORP | General Wiring |
| 02/03/2025 | Complete | EMPIRE LIC ELECL CONTRS | General Wiring |
| 07/30/2024 | Complete | ACCURATE ELEC'L CORP. | General Wiring |
| 06/26/2024 | Complete | MEGA ELEC'L CONTR'G, INC | — |
| 01/03/2024 | Permit Issued | USIS ELECTRIC INC | General Wiring |
| 12/23/2023 | Complete | ATMOS ELECTRIC SVCE CORP | General Wiring |
| 09/25/2023 | Permit Issued | DANUBE ELECTRIC CO., INC. | General Wiring |
| 05/18/2023 | Permit Issued | CJC ELECTRIC INC | General Wiring |
| 02/14/2023 | Complete | MEGA ELEC'L CONTR'G, INC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/13/2026 | Permit Issued | POFI CONSTRUCTION CORP | Concrete, Masonry |
| 07/16/2026 | — | — | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/13/2026 | Permit Issued | POFI CONSTRUCTION CORP | Suspended Scaffold (SC) |
| 08/15/2024 | Permit Issued | — | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/25/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/14/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/30/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/27/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/10/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/28/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/06/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/08/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/04/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/25/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/16/2024 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 09/09/2024 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 06/21/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/22/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/09/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/05/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/02/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/31/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/31/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/07/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/07/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/04/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/07/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/03/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/25/2026 | Alternative Materials - OTCR Buildings Bulletin Number | George Xerakias | special |
| 08/25/2026 | Post-installed anchors in masonry | George Xerakias | special |
| 08/13/2026 | Alternative Materials - OTCR Buildings Bulletin Number | George Xerakias | special |
| 08/13/2026 | Post-installed anchors in masonry | George Xerakias | special |
| 07/15/2026 | Insulation placement and R values | Renee Beck | energy_progress |
| 06/09/2026 | Fire-Resistant Penetrations and Joints | LAWRENCE GREEN | special |
| 06/04/2026 | Masonry | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 06/03/2026 | Concrete - Cast-In-Place | GEORGE ANDERSEN | special |
| 06/03/2026 | Masonry | GEORGE ANDERSEN | special |
| 06/03/2026 | Post-installed Anchors | GEORGE ANDERSEN | special |
| 06/03/2026 | Final | Renee Beck | progress |
| 06/03/2026 | Tenant Protection Plan Compliance | GEORGE ANDERSEN | special |
| 06/01/2026 | Final | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 05/13/2026 | Post-installed Anchors | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/13/2026 | Structural Stability – Alterations of existing buildings | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/13/2026 | Masonry | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/13/2026 | Concrete - Cast-In-Place | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/13/2026 | Tenant Protection Plan Compliance | SEBASTIAN SETTEDUCATE JR., P.E | special |
| 05/12/2026 | Final | SEBASTIAN SETTEDUCATE JR., P.E | progress |
| 05/08/2026 | HVAC-R and service water heating equipment | LAWRENCE GREEN | energy_progress |
| 05/08/2026 | HVAC-R and service water heating system controls | LAWRENCE GREEN | energy_progress |
| 05/08/2026 | Maintenance information | LAWRENCE GREEN | energy_progress |
| 03/20/2026 | Masonry | AKM RAHMAN | special |
| 03/05/2026 | Final | Wayne Norbeck | progress |
| 02/23/2026 | Energy Code Compliance Inspections | AKM RAHMAN | progress |