| Owner | Filings | Most Recent |
|---|---|---|
| PARKE TOWER MANAGEMENT | 1,058 | 09/13/2026 |
| MADISON TOWER ASSOCIATES LP | 151 | 07/08/2026 |
| BAIN CAPITAL | 12 | 07/08/2026 |
| PARK AV PL CONDOMINIUM | 9 | 03/22/2026 |
| PARK TOWER REALTY | 87 | 03/22/2026 |
| 535 MADISON AVE ASSOC | 1 | 03/22/2026 |
| PARK TOWER | 46 | 03/22/2026 |
| PARK TOWERS ASSOC. | 2 | 03/22/2026 |
| PARK TOWERS GROUP | 1 | 03/22/2026 |
| PARK TOWER MNGMNT | 9 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| MURDOCH ENGINEERING | 2 | 08/27/2026 |
| COSENTINI ASSOCIATES | 69 | 08/19/2026 |
| TED MOUDIS ASSOCIATES | 9 | 08/18/2026 |
| ROBERT DERECTOR ASSOCIATES | 16 | 07/16/2026 |
| CSR ASSOCIATES, PA | 2 | 07/15/2026 |
| SSM DESIGN LLP D/B/A SPECTOR GROUP | 16 | 03/25/2026 |
| JAC ENGINEERING DPC | 2 | 02/25/2026 |
| ESD | 6 | 01/20/2026 |
| ROSINI ENGINEERING, PC | 11 | 11/24/2025 |
| STANTEC CONSULTING | 7 | 10/29/2025 |
| BENJAMIN PORTO ARCHITECTURE D.P.C. | 4 | 09/11/2025 |
| LILKER ASSOCIATES CONSULTING ENGINE | 4 | 06/04/2025 |
| MSM ENGINEERING SERVICES, PLLC | 3 | 03/25/2025 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 2 | 02/11/2025 |
| NELSON ARCHITECTURE &INTERIORS, INC | 1 | 01/10/2025 |
| WSP | 3 | 09/24/2024 |
| AMA CONSULTING ENGINEERS, PC | 2 | 08/26/2024 |
| SDGA, PLLC | 1 | 07/17/2024 |
| GNP DESIGN GROUP | 2 | 06/17/2024 |
| TPG ARCHITECTURE, LLP | 5 | 03/15/2024 |
| MMOSER ASSOCIATES | 1 | 01/20/2023 |
| LONGO ARCHITECTS & ASSOCIATES, LLC | 1 | 08/17/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| BURNHAM NATIONWIDE INC | 156 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 13 | 03/21/2026 |
| PROJECT EXPEDITERS CONSULTING CO. | 6 | 03/21/2026 |
| UNITED FIRE PROTECTION | 4 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 11 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| STRUCTURE TONE, LLC | General Contractor | 27 | 07/08/2026 |
| DEPENDABLE MECHANICAL COR | Fire Protection | 16 | 07/08/2026 |
| A&H EXPRESS PLBG&HTG CORP | Plumbing | 15 | 07/08/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 14 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 11 | 08/18/2026 |
| PAR PLUMBING CO., INC | Plumbing | 10 | 07/08/2026 |
| ICON INTERIORS INC | General Contractor | 8 | 07/08/2026 |
| REIDY CONTRACTING GROUP | General Contractor | 8 | 07/08/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 8 | 08/26/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 5 | 07/08/2026 |
| SOTIRIOS STATHOPOULOS | Electrical | 5 | 03/21/2026 |
| BENCHMARK BUILDERS LLC | General Contractor | 5 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 4 | 07/08/2026 |
| GLOBAL FACILITY MANAGEMENT | General Contractor | 4 | 08/26/2026 |
| UNITY CONSTRUCTION GROUP | General Contractor | 4 | 07/08/2026 |
| TAURINO MANAGEMENT, INC | General Contractor | 4 | 07/08/2026 |
| LEVINE, GEORGE | Fire Protection | 3 | 03/21/2026 |
| PETRETTI & ASSOCIATES LLC | General Contractor | 3 | 07/08/2026 |
| JAMES E FITZGERALD INC | General Contractor | 3 | 07/08/2026 |
| NATIONAL SIGN LIGHTING | Scaffold | 2 | 08/30/2026 |
| KLEINKNECHT ELEC. CO.,INC | Electrical | 2 | 03/22/2026 |
| POLO ELECTRIC CORP. D/B/A | Electrical | 2 | 03/22/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 2 | 07/08/2026 |
| SOH PAR SPRINKLER LLC | Fire Protection | 2 | 07/08/2026 |
| UNITED FIRE PROT CORP | Fire Protection | 2 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AK ENGINEERING PC | 678 | 95 | 08/19/2026 |
| ASSURE PROFESSIONAL ENGIN | 6962 | 3 | 07/16/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 10 | 02/26/2026 |
| SHU SHING LI | 7551 | 1 | 02/25/2026 |
| MEP INSPECTIONS, INC | 1102 | 7 | 10/29/2025 |
| TECTONIC ENGINEERING CONS | 106 | 4 | 09/11/2025 |
| ROSINI ENGINEERING, PC | 3282 | 6 | 07/10/2025 |
| DNA CONTROLLED INSPECTION | 554 | 11 | 03/15/2024 |
| RYAN SPECIAL ENGINEERING | 2018 | 4 | 01/12/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sign | Permit Issued | NATIONAL MAINTENANCE, INC | 08/28/2026 |
| DOB NOW | Sign | Permit Issued | NATIONAL MAINTENANCE, INC | 08/28/2026 |
| DOB NOW | General Construction | Permit Issued | CLUNE CONSTRUCTION CO LP | 08/25/2026 |
| DOB NOW | Sprinklers | Permit Issued | AGGRESSIVE FIRE PROT LLC | 08/20/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CLUNE CONSTRUCTION CO LP | 08/20/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR FIRE PROTECTION LLC | 08/17/2026 |
| DOB NOW | Sprinklers | Permit Issued | MACCARONE PLUMBING INC | 07/31/2026 |
| DOB NOW | General Construction | Permit Issued | GLOBAL FACILITY MANAGEMENT | 07/30/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | GLOBAL FACILITY MANAGEMENT | 07/30/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | PENGUIN AIR CONDITIONING | 04/16/2026 |
| DOB NOW | Standpipe | Permit Issued | DEPENDABLE MECHANICAL COR | 04/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | DEPENDABLE MECHANICAL COR | 04/02/2026 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 04/02/2026 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 04/02/2026 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 03/30/2026 |
| DOB NOW | Sprinklers | Permit Issued | UNITED FIRE PROT CORP | 03/20/2026 |
| DOB NOW | Sprinklers | Permit Issued | W & M SPRINKLER-NYC,LLC | 03/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | GLOBAL FACILITY MANAGEMEN | 03/06/2026 |
| DOB NOW | Sprinklers | Signed-off | PAR PLUMBING CO., INC | 03/04/2026 |
| DOB NOW | General Construction | Permit Issued | GLOBAL FACILITY MANAGEMEN | 03/03/2026 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 11/06/2025 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 11/05/2025 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 10/24/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | JT MAGEN & COMPANY INC | 10/24/2025 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 09/17/2025 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 09/17/2025 |
| DOB NOW | Mechanical Systems | Signed-off | PETRETTI & ASSOCIATES LLC | 09/04/2025 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 09/03/2025 |
| DOB NOW | General Construction | Signed-off | PETRETTI & ASSOCIATES LLC | 09/03/2025 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 09/03/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 08/29/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 08/27/2025 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 08/06/2025 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 08/04/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 07/23/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 07/23/2025 |
| DOB NOW | Sprinklers | Signed-off | DEPENDABLE MECHANICAL COR | 07/09/2025 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 07/08/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 07/07/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 07/07/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/16/2026 | Permit Issued | GLOBAL FACILITY MANAGEMEN | Heating and Air Conditioning Systems | Heat / Cool Florida Heat Pump CL009 300 CFM · Heat Pump Outdoor ×2 CL012 375 CFM · Heat Pump Outdoor ×1 CL018 600 CFM · Heat Pump Outdoor ×1 CL030 900 CFM · Heat Pump Outdoor ×1 EC3000 8,750 CFM · Heat Pump Outdoor ×1 |
| 04/01/2026 | Signed-off | STRUCTURE TONE, LLC | Air Conditioning Systems | Cooling Greenheck ×1 |
| 03/19/2026 | Signed-off | STRUCTURE TONE, LLC | Air Conditioning Systems | Cooling Samsung AM036ANHDCH/AA 33,169 BTU · Vrf Indoor ×2 AM012TNVDCH/AA 11,179 BTU · Vrf Indoor ×1 AM096HXWAJR 103,000 BTU · Vrf Outdoor ×2 |
| 01/14/2026 | Permit Issued | PENGUIN AIR CONDITIONING | Air Conditioning Systems | Cooling Liebert ×2 |
| 11/24/2025 | Signed-off | TAURINO MANAGEMENT, INC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Climatemaster SB-120 124,000 BTU · Wshp ×2 SR-042 40,800 BTU · Wshp ×2 SR-060 59,900 BTU · Wshp ×2 TC-036 34,700 BTU · Wshp ×2 TC-042 41,900 BTU · Wshp ×2 TC-024 24,100 BTU · Wshp ×1 TC-060 59,600 BTU · Wshp ×1 Ventilation Greenheck SP-A390-VG 100 CFM · Exhaust Fan ×2 SQ-95-VG 400 CFM · Exhaust Fan ×2 SQ-95VG 415 CFM · Exhaust Fan ×2 |
| 03/18/2025 | Signed-off | REIDY CONTRACTING GROUP | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Ventilation Loren Cook GN-622 400 CFM · Exhaust Fan ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/19/2026 | Permit Issued | AGGRESSIVE FIRE PROT LLC | 14 heads |
| 07/16/2026 | Permit Issued | PAR FIRE PROTECTION LLC | 61 heads |
| 04/01/2026 | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 113 heads, 1 outlets |
| 03/19/2026 | Signed-off | A&H EXPRESS PLBG&HTG CORP | 212 heads |
| 02/26/2026 | Permit Issued | W & M SPRINKLER-NYC,LLC | 41 heads |
| 02/25/2026 | Permit Issued | UNITED FIRE PROT CORP | 4 heads |
| 02/11/2026 | Signed-off | A&H EXPRESS PLBG&HTG CORP | 112 heads |
| 11/24/2025 | Signed-off | DEMAR PLUMBING CORP | 297 heads |
| 06/04/2025 | Permit Issued | A&H EXPRESS PLBG&HTG CORP | Sprinkler System |
| 04/18/2025 | Permit Issued | PAR FIRE PROTECTION LLC | 6 heads |
| 03/18/2025 | Signed-off | A&H EXPRESS PLBG&HTG CORP | — |
| 02/03/2025 | Signed-off | A&H EXPRESS PLBG&HTG CORP | 15 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/19/2026 | — | — | — |
| 07/16/2026 | Permit Issued | MACCARONE PLUMBING INC | Water/Sanitary |
| 04/01/2026 | Signed-off | DEPENDABLE MECH CORP | Water/Sanitary |
| 03/19/2026 | Signed-off | DEPENDABLE MECH CORP | Water/Sanitary |
| 02/26/2026 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 02/11/2026 | Signed-off | DEPENDABLE MECH CORP | Water/Sanitary |
| 11/24/2025 | Signed-off | DEMAR PLUMBING CORP | Storm, Water/Sanitary |
| 06/04/2025 | Signed-off | DEPENDABLE MECH CORP | Water/Sanitary |
| 03/18/2025 | Signed-off | DEPENDABLE MECH CORP | Water/Sanitary |
| 02/03/2025 | Signed-off | DEPENDABLE MECH CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/31/2026 | Permit Issued | KLEINKNECHT ELEC. CO.,INC | General Wiring |
| 08/11/2026 | Permit Issued | ACCURATE ELEC'L CONTR'S C | General Wiring |
| 04/06/2026 | Permit Issued | POLO ELECTRIC CORP. D/B/A | General Wiring |
| 02/05/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 02/05/2026 | Permit Issued | JAM ELECTRICAL CORP | — |
| 11/03/2025 | Permit Issued | POLO ELECTRIC CORP. D/B/A | General Wiring |
| 09/09/2025 | Complete | POLO ELECTRIC CORP. D/B/A | General Wiring |
| 09/09/2025 | Complete | POLO ELECTRIC CORP. D/B/A | General Wiring |
| 08/08/2025 | Complete | POLO ELECTRIC CORP. D/B/A | General Wiring |
| 07/03/2025 | Complete | POLO ELECTRIC CORP. D/B/A | General Wiring |
| 06/24/2025 | Permit Issued | JAM ELECTRICAL CORP | — |
| 06/04/2025 | Permit Issued | JAM ELECTRICAL CORP | — |
| 04/16/2025 | Permit Issued | POLO ELECTRIC CORP. D/B/A | General Wiring |
| 03/25/2025 | Complete | POLO ELECTRIC CORP. D/B/A | General Wiring |
| 03/13/2025 | Complete | POLO ELECTRIC CORP. D/B/A | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/24/2025 | Signed-off | DEMAR PLUMBING CORP | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/24/2025 | Signed-off | DEMAR PLUMBING CORP | Fence |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/03/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/03/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 08/06/2026 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 07/31/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/21/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/15/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/15/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/07/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/03/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/27/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/26/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/26/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/01/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/14/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/14/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 04/06/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 04/01/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/31/2026 | Fail-Final SP - Up to 3 Requested Floors | Fail | View ↗ |
| 03/19/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/10/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/10/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/03/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/03/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/25/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/25/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/12/2026 | Final | JERE MURDOCH | progress |
| 08/12/2026 | Final | JERE MURDOCH | progress |
| 07/27/2026 | Post-installed Anchors | Ari Kamo | special |
| 07/24/2026 | HVAC-R and service water piping design and insulation | Ari Kamo | energy_progress |
| 07/24/2026 | Lighting controls | Ari Kamo | energy_progress |
| 07/24/2026 | Interior lighting power | Ari Kamo | energy_progress |
| 07/22/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/22/2026 | Energy Code Compliance Inspections | Ari Kamo | progress |
| 07/21/2026 | Energy Code Compliance Inspections | Ari Kamo | progress |
| 07/21/2026 | Final | Ted Moudis | progress |
| 07/21/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/20/2026 | Final | Ari Kamo | progress |
| 07/20/2026 | Sprinkler Systems | Ari Kamo | special |
| 07/20/2026 | Mechanical Systems | Ari Kamo | special |
| 07/09/2026 | HVAC-R and service water piping design and insulation | GUNJAN KHANDWALA | energy_progress |
| 07/09/2026 | Fire-Resistant Penetrations and Joints | GUNJAN KHANDWALA | special |
| 07/09/2026 | Electrical motors and elevators | GUNJAN KHANDWALA | energy_progress |
| 07/09/2026 | HVAC-R and service water heating system controls | GUNJAN KHANDWALA | energy_progress |
| 07/09/2026 | Post-installed Anchors | GUNJAN KHANDWALA | special |
| 07/09/2026 | Post-installed Anchors | GUNJAN KHANDWALA | special |
| 07/09/2026 | HVAC-R and service water heating equipment | GUNJAN KHANDWALA | energy_progress |
| 07/09/2026 | Heating Systems | GUNJAN KHANDWALA | special |
| 07/09/2026 | Maintenance information | GUNJAN KHANDWALA | energy_progress |
| 07/09/2026 | Fire-Resistant Penetrations and Joints | GUNJAN KHANDWALA | special |
| 06/22/2026 | Fire-Resistant Penetrations and Joints | GUNJAN KHANDWALA | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Monarch Capital at Park Tower | Office | Floor 22 | Project M01418967 Project M08002014 |
| Alpha Wave Global | Office | Floor 9 | Project M01366752 |
| China Merchants Bank | Office | Floors 17, 18, 22, 23 | Project M01362313 Project M01243716 |
| Audax Group | Office | Floor 11 | Project M01207358 |
| Garda Capital Partners | Office | Floors 34, 35 | Project M01240472 Project M00536286 |
| FTV Capital | Office | Floors 27, 33 | Project M01225939 Project M01228635 Project M01228644 Project M00758627 Project M00758784 Project M00749044 Project M00754697 Project M00748990 |
| Bain Capital | Office | Floors 20, 30 | Project M01200227 Project M00800709 Project M08040764 |
| Canell & Spears | Office | Floor 14 | Project M01170995 |
| Edgewood Management | Office | Floor 15 | Project M01078179 |
| Nordic Capital | Office | Floor 20 | Project M01057551 |
| RIMOWA | Retail | — | Project M01006175 |
| Glenmede | Office | Floor 21 | Project M00908512 |
| Lanier | Office | Floor 12 | Project M08041011 |
| Monarch | Office | Floor 22 | Project M08002007 |
| Wells Fargo Advisors | Office | Floor 16 | Project M00773632 Project M00773665 |
| Garda | Office | Floor 34 | Project M00536268 |
| ViciPartners | Office | Floor 20 | Project M00189613 |